A001_Item_Unique_Identification_Marking_Plan.pdf

PDF 99 KB Posted

Attached to
Repair of Console, Power Distr
Solicitation number
FA8517-17-Q-0018
Issued by

About this file

A001-IUID Marking Plan

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY

TDP X TM OTHER

D. SYSTEM / ITEM

F-15 TISS

E. CONTRACT / PR NO.

FD20601700203

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Plan

3. SUBTITLE

N/A

4. AUTHORITY

DI-MGMT-81803

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para: 3.1.2

6. REQUIRING OFFICE

410 SCMS/GULA

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Pham, Phong DNAME: 06 DEC 2016DATE:

The Contractor shall label all items IAW MIL-STD-130N and associated technical data Engineering Orders (EO) & Technical Order Publication Change Request (252). Label for each item shall contains the following information:

nomenclature, part number, serial number, date of manufacture, manufacturer's name, Commercial and Government Entity (CAGE) code, date of warranty expiration, and National Stock Number (NSN). The Contractor's IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130, DoD Standard Practice Identification Marking of US Military Property.

Block 9: Submit to U.S. Government only. Distribution Statement B" which states 448 SCMG/PKH. Distribution authorized to U.S. Government Agencies only (Proprietary Information).

Blocks 10 - 13: The Contractor shall develop and submit a complete IUID marking plan within 30 days after contract award. The Government will review and determine acceptance or rejection and notify contractor within 10 business days of receipt. If rejected, the Contractor shall have 10 business days to correct any errors and return a corrected IUID Marking Plan to the Government for review. The Contractor shall provide updates to the IUID Marking Plan as necessary due to any repair procedure change that impacts the IUID marking of

NSN.

Block 14: Document submission shall be made electronically via MS Office (Power Point, Excel, or Word) 2010 format.

Final submittal both via Email addresses and in Wide Area Work Flow (WAWF). Submittal in WAWF will be accepted/approved by Government personnel. When information is submitted in WAWF the contractor shall provide email notification to email addresses below:

Program Manager adam.wiley.1@us.af.mil

Program Engineer phong.pham@us.af.mil

Program Equip Specialist elbert.scarborough@us.af.mil

COORDINATORS:

Program Engineer, Attn: Phong Pham

410 SCMS/GUEA

235 Byron St., Ste 19A Robins AFB, GA 31098

1 1 0

Program Equipment Specialist, Attn: Elbert Scarborough

410 SCMS/GULA

235 Byron St., Ste 19A Robins AFB, GA 31098

1 1 0

Program Manager, Attn: Adam Wiley

410 SCMS/GULA

235 Byron St., Ste 19A Robins AFB, GA 31098

1 1 0

3 3 015. TOTAL

G. PREPARED BY

Sanders, Audrey K

410 SCMS / GULA

478-222-2226

H. DATE

16 DEC 2016

I. APPROVED BY

//DIGITALLY SIGNED//

HEADLAND.PAUL.D.1246894490

410 SCMS / GUEA 478-327-3038 / 497-3038

J. DATE

15 DEC 2016

Page 1 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 17 Jan 2017

PREVIOUS EDITION MAY BE USED.

File details come from the government source that posted it. Updated .