About this file

RFIs

View the file

Other files for this federal contract opportunity

Other files attached to Design-Build Construct Addition to Kitting Facility, newest first.
File Type Posted
FA8501-15-R-0006_Amendment_04.pdf PDF
RFI__3_Revised.pdf PDF
RFI__3.pdf PDF
RFI__2.pdf PDF
UHHZ_130209_Design-Build_SOW_Package--Rev1--04-22-15.pdf PDF
FA8501-15-R-0006_Amendment_03.pdf PDF
BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
FA8501-15-R-0006_Amendment_02.pdf PDF
Site_Visit_Attendee_List.pdf PDF
Solicitation_Amendment_0001.pdf PDF
Wage_Determinations.pdf PDF
App_C_UHHZ_130209.pdf PDF
Final_RFP.pdf PDF
UHHZ_130209_Design-Build_SOW_Package.pdf PDF
Drawings.pdf PDF
130209_-_Special_Warranty_Requirements.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUESTS FOR INFORMATION #1

FA8501‐15‐R‐0006, PROJECT UHHZ130209 CONSTRUCT ADDITION TO KITTING FACILITY BLDG 20121

1) Section B, Bid Schedule, CLIN0001, Page 3 of 20 ‐‐ Are Offerors required to enter a total for this CLIN which totals both Design (CLIN0001AA) and Construction Cost (CLIN0001AB) under CLIN 0001?

ANSWER: Offerors should enter a price for 0001AA for the design portion IAW SOW and a price for

0001AB for the Build portion IAW SOW.

2) Section B, Bid Schedule, CLIN0001, Page 3 & 4 of 20 ‐‐ The Bid Schedule does not include any CLINs for submitting pricing for Alternate No. 1 and Alternate No. 2 identified in the Statement of Work – 01005, under Paragraph 1.01 STATEMENT OF WORK, Subparagraph F Architectural, Subparagraphs 2 & 3 on Page 3 of 9. Should Offerors add lines below CLIN0001AB indicating the pricing for these two Alternate Bid Items or will the Government issue a revised Bid Schedule?

ANSWER: The Bid Schedule will be revised to include line items for the alternate pricing options. A solicitation amendment is forthcoming.

3) Are there any drawings for the existing building?

ANSWER: Yes, drawings were attached to the solicitation and should be found in the attachments section/package.

4) Will there be another PG. 3 Section B‐Supplies or Services & Prices issued to accommodate the alternate 1 & 2 prices?

ANSWER: The Bid Schedule will be revised to include line items for the alternate pricing options.

Solicitation Amendment 0002 will be forthcoming.

5) Will the government use the entire 60 days before award of project after bid submission?

ANSWER: Yes.

6) I am working on pricing for Solicitation FA8501‐15‐R‐0006, Construct Addition to Kitting Facility, Bldg

20121. Section 01020, Construction Performance Requirements references the “Robins Air Force Base

Facility Standards” multiple times. Could you please provide the Facility Standards document?

ANSWER: Yes. Solicitation Amendment 0002 is forthcoming and this document will be attached/uploaded.

7) Is there any way to access the list of interested vendors?

ANSWER: I am unable to post the list of interested vendors and cannot change the viewing of interested vendors. I have posted the Site Visit list of attendees as an alternative.