QASP.pdf
PDF 170 KB Posted
- Attached to
- F-16 Radar Advanced Programmable Signal Processor (APSP) Repair Federal contract opportunity
- Solicitation number
- FA8251-19-R-0006
About this file
QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RDL.pdf | ||
| Wage_Equivalent.pdf | ||
| Packaging.pdf | ||
| Trasportation.pdf | ||
| FA825119R0006.pdf | ||
| CDRLs.pdf | ||
| SQS.pdf | ||
| SECTION_L_Proposal_Instructions.pdf | ||
| SECTION_M_Evaluation_Factors_for_Award.pdf | ||
| SOW.pdf | ||
| PWS.pdf | ||
| DD_254_(FA8251-19-R-0006)__APSP_repair.pdf | ||
| SPI.pdf | ||
| PWS_Update.pdf | ||
| 19R0006_PreSolicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan For the Repair of the APG-68 APSP LRU's
Purpose: The purpose of this Quality Assurance Surveillance Plan (QASP) is to identifr the methods and procedures the Government will use to ensure it receives the services to be put under contract as identified in the Performance-based Work Statement (PWS) for the F- 16 AN/APG-68 Advanced Programmable Signal Processor (APSP). This plan is established to evaluate contract requirements and contractor's actions during the life of the contract and is designed to provide an effective method of measuring the quality and improvement of the component repair effort.
All specific contractor requirements shall be identified / authorized by individual delivery orders and the PWS. The Defense Contract Management Agency (DCMA) is delegated quality assurance responsibilities under this QASP. The DCMA will act as the Contracting Officer Representative (COR) and participate inthe surveillance of the contractor In Accordance With (JAW) their approved surveillance plans.
Award of requirement will result in a 3 year, firm fixed price, contract for the repair of the AN/APG-68 APSP LRU's. Estimate of requirements is for a total of 60 assets per year.
Roles and Responsibilities of the Government Multi-function Team: The Multi-functional Team (MFT) has developed this QASP as an avenue to develop a solid communications tool in which the government and contractor will collectively ensure that quality products are returned to the Air Force inventory within cost and schedule. The multi-functional team will remain a collective group throughout the life of the contract. Team members are representative of functional areas. The MTF members have specific functional and/or technical responsibilities that may include but are not limited to:
Contracting Officer (CO) - Contract management Program Manager (PM) - Requirements, Asset delivery schedule, CDRLs, Quality Assurance Production Management Specialist (PMS) -Asset delivery schedule, CAV reporting Engineer - Technical data Equipment Specialist (ES) - TechlMaintenance Data, Defense Repair Information Logistics System (DRILS) Material Manager (MM) - Requirements, Asset delivery schedule, Inventory posture DCMA Quality Assurance Specialist (COR) - Quality assurance
Performance Assessment of the Contractor:
Surveillance of contractor actions will be inspected and monitored JAW the DCMA' s Surveillance Plan.
A summary of the inspection results will be recorded quarterly and provided to the CO at Ogden OO-ALC. Any unacceptable rating will be addressed in these summaries. These documents then become part of the official Air Force contract record.
The contractor is responsible to ensure all-inclusive management of the quality control requirements are accomplished as outlined in the contract. This includes the establishment of a viable quality control program, detailed inspection programs, monitoring actions and effective corrective actions.
The contractor will be evaluated by surveillance of members of the MFT through inspections and/or reviews of required documents.
Surveillance will be accomplished by DCMA's surveillance plans. DCMA will review and document all complaints along with resolution of such complaints with the documentation becoming a permanent part of the surveillance records.
If at any time during the surveillance period, the results of the surveillance show that the number of unacceptable observations during the period exceeds the performance threshold, and it is determined that it is not government caused, the DCMA ACO notifies the CO in writing. The CO and Contractor will evaluate the situation and negotiate consideration for unacceptable performance. The authority used is the Inspection of Services Clause.
All negative comments/actions/reviews will be dealt with JAW contractual arrangements.
Performance Management of Contract:
If at any time during surveillance period the results of surveillance show that the number of unacceptable observations during the period exceeds the performance threshold, and it is determined that it is not government caused, the DCMA ACO will notify the assigned CO. The CO evaluates the comments and contacts the contractor. The CO and the contactor will evaluate the situation discuss remedies to improve performance, negotiate consideration for unacceptable performance and otherwise assert the Government's contractual rights when necessary.
Signatures:
Name / Title / Office Signature Date
Alan Hozian
9 /8
Jeffrey Moody Procurement Contracting Officer /2-, '/(AFMC OL:H/PZABB 77 (1_ 3
Javad Refahiyat Engineer 4 /416 SCMS/GUMAD
Christopher Bradshaw ip o- oi
Max Aragon Material Management Specialist /ij'<'I )
416SCMS/GUMAD /L -X
if( \
Kristin O'Dell Production Management Specialist
File details come from the government source that posted it.