PWS.pdf
PDF 492 KB Posted
- Attached to
- F-16 Radar Advanced Programmable Signal Processor (APSP) Repair Federal contract opportunity
- Solicitation number
- FA8251-19-R-0006
About this file
Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DD_254_(FA8251-19-R-0006)__APSP_repair.pdf | ||
| SPI.pdf | ||
| FA825119R0006.pdf | ||
| CDRLs.pdf | ||
| SQS.pdf | ||
| SECTION_L_Proposal_Instructions.pdf | ||
| SECTION_M_Evaluation_Factors_for_Award.pdf | ||
| SOW.pdf | ||
| RDL.pdf | ||
| QASP.pdf | ||
| Wage_Equivalent.pdf | ||
| Packaging.pdf | ||
| Trasportation.pdf | ||
| PWS_Update.pdf | ||
| 19R0006_PreSolicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
Ogden Air Logistics Center (OO-ALC) AFMC
Hill AFB, UT 84056-5609
PERFORMANCE WORK STATEMENT (PWS)
PURCHASE REQUEST NO.
FD2020-1900009-00
ESSENTIAL REPAIR FOR:
Advanced Programmable Signal Processor
NSN: 1270-01-396-3088WF, PN 783R300G01
Dated: 5 September 2018
EQUIPMENT TYPE: F16 C/D
416th Supply Chain Management Squadron
PWS for the Essential Repair of Advanced Programmable Signal Processor
PR: FD2020-1900009-00 2 V1, 5 SEPTEMBER 2018
1.0 SCOPE
1.1 Work Compliance
1.2 Maintenance
1.3 Special Testing
1.4 Function
1.5 Rework Testing
1.6 Modification and Reliability
1.7 Survivability
1.8 Non-Essential Service
1.9 Clarification Statement
2.0 DEFINITIONS AND ACRONYMS
3.0 REPORTING AND DATA REQUIREMENTS
3.1 Commercial Asset Visibility Air Force (CAV AF) End Item Report
3.2 Contract Depot Maintenance (CDM) Production Report
3.3 Annual Government Property Physical Inventory Report
3.4 Maintenance Data Collection Reporting
3.5 Counterfeit Protection Plan (CPP)
3.6 IUID Plan and Marking Activity/Verification Report
3.7 Contractor Manpower Equivalent Reporting
3.8 Test Tool Security
3.9 Safety and Health
4.0 SECURITY AND FOREIGN DISCLOSURE
4.1 DD Form 254
4.2 Destructive Notice
4.3 Per Export Control Limitations
4.4 Uses and Safeguarding of Information
5.0 GOVERNMENT PROPERTY
5.1 Government Furnished Property
5.2 Government Furnished Equipment
5.3 Government Furnished Material
6.0 COUNTERFEIT PREVENTION PLAN (CPP) REQUIREMENT
6.1 Applicability
6.2 Definitions
6.3 Parts Availability and Use of Parts Brokers
6.4 Procurement Policies
6.5 Risk Assessment
6.6 Detection and Avoidance Responsibilities
6.7 Testing and Verification
6.8 Configuration Identification and Traceability
PR: FD2020-1900009-00 3 V1, 5 SEPTEMBER 2018
6.9 Counterfeit Notification and Reporting
6.10 Counterfeit Prevention Training
7.0 ITEM UNIQUE IDENTIFICATION (IUID) MARKING (IAW AFMCI 20-105 Para. 3.12)
8.0 GENERAL WORK REQUIREMENTS
8.1 Mission Capability (MICAPs)
8.2 Configuration
8.3 Technical Data
8.4 Cleaning, Corrosion Control and Treatment
8.5 Electrostatic Discharge (ESD)
8.6 Quality
8.7 Receiving Inspection
8.8 Handling
8.9 Shipping
8.10 Non-Destructive Inspection (NDI)
8.11 Warranty of Work
8.12 Condemnation and Disposition
8.13 Product Quality Discrepancy Report (PQDR)
8.14 Environmental Stress Screening (ESS) Requirements
8.15 Beyond Economical Repair (BER)
8.16 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Program/Electronic Parts
Screening
8.17 Option for Non-Support
9.0 SPECIFIC WORK REQUIREMENTS
9.1 Inspection
9.2 Disassembly
9.3 Repair
9.4 Spares and Repair Parts
9.5 Update
9.6 Correction of Deficiency (COD) and Engineering Change Proposals (ECP)
9.7 Finishing
9.8 Marking
9.9 Can Not Duplicate (CND)/ Retest Okay (RTOK) Conditions
9.10 Acceptance Testing
10.0 SERVICE SUMMARY
10.1 WAWF/Material Inspection and Receiving Reports
10.2 Defense Repair Information Logistics System (DRILS)
10.3 Product Quality Discrepancy Report (PQDR)
10.4 CAV AF
11.0 TECHNICAL ORDERS AND DIRECTIVES
PR: FD2020-1900009-00 4 V1, 5 SEPTEMBER 2018
11.1 Applicable Government Documents
11.2 Applicable Non-Government Documents
1.0 SCOPE.
This Performance Work Statement (PWS) establishes the minimum work requirements for essential repair of the following F-16 C/D recoverable end item; Advanced Programmable Signal Processor (APSP), National
Stock Numbers (NSN) and Part Numbers are listed in Section 5, to a serviceable “A” condition. The repair processes used by the Contractor shall bring service life back to the reconditioned end items that would resemble the originally manufactured item. The end items shall be restored to a nearly new condition, but not necessarily cosmetically new in a facility owned and/or operated by the Contractor.
1.1 Work Compliance.
All work performed by the Contractor shall comply, In-Accordance-With (IAW), with the Instructions and Technical Data requirements contained in this PWS and Section 11. Additional work discovered after award of contract that is not covered by the contract will be negotiated and approved by the
Contracting Officer (CO) through the Administrative Contracting Officer (ACO) prior to work being started.
1.2 Maintenance.
It is the intent of the Government under this contract that the Contractor will induct funded end item(s)
(for the purpose of this contract, end item is defined as the NSN listed under each Contract Line Item
Number (CLIN), and repair that end item and subcomponents. Items are to be repaired to a serviceable operating condition. Increases or decreases in work, which impact the maintenance facility or the
Government, will be sent through the ACO/CO for negotiation and approval, prior to beginning work.
1.3 Special Testing.
The Contractor shall not design, develop or manufacture tooling or test equipment of a specialized nature as a requirement under this work specification without the express direction of the CO through the ACO.
1.4 Function.
The functional capabilities for which the end item was designed shall not be changed, modified, or altered unless such changes are directed by this work specification and authorized by the OO-ALC
Program Manager.
1.5 Rework Testing.
If an item is returned for rework, as a result of a Product Quality Discrepancy Report (PQDR) more than one time in any 12 month period, then a limited Environmental Stress Screening (ESS) will be required before returning the item in serviceable condition. The Contractor will coordinate actions with the
Government engineering authority should this occur. Any tests that will be excluded as part of this effort will have prior written approval from the engineering authority through the appropriate Government
Contracting Official.
PR: FD2020-1900009-00 5 V1, 5 SEPTEMBER 2018
1.6 Modification and Reliability.
The Contractor shall expend no effort under this PWS for additional engineering design or development of the items or components; however, suggested reliability or maintainability improvements are welcomed.
1.7 Survivability.
The Contractor will return the recoverable end items to the original specifications of the item, except as noted in the applicable engineering change orders. The Contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the Government.
1.8 Non-Essential Service.
This effort is considered a Non-Mission Essential Service. According to Department of Defense
Instruction (DODI) 1100.22, it is determined that the Contractor will not be required to provide services during crisis unless otherwise directed by an authorized Government representative. The Contractor will contact the CO for instructions concerning services if a crisis situation occurs.
1.9 Clarification Statement.
NSN Stock classes change frequently. The item itself does not change. When the stock class changes but the NIIN does not change, treat the CLIN as the same item.
PR: FD2020-1900009-00 6 V1, 5 SEPTEMBER 2018
2.0 DEFINITIONS AND ACRONYMS.
ACRONYM OR
PHRASE
DEFINITION
AT Acceptance Test: The functional and operational tests performed on the end- item to ensure that all performance standards are satisfactorily met to restore the end-item to a serviceable condition.
ACO Administrative Contracting Officer
BER Beyond Economical Repair
CALIBRATION A comparison between two instruments, one of which is a standard of higher accuracy, to detect and correlate or adjust any variation in the accuracy of the instrument or equipment item being compared or tested.
CAV AF Commercial Asset Visibility Air Force. This is the end item production reporting system for Contractor repairs and GFM transactions.
CCA Circuit Card Assembly
CDRL Contract Data Requirements List
CND Can Not Duplicate
CO Contracting Officer
CONDEMN A normally repaired item which, due to the extent of required work process, has been deemed uneconomical to make serviceable.
COMPONENT A normally repaired item which, due to the extent of required work process, has been deemed uneconomical to make serviceable.
DD FORM
13481A
Department of Defense (DoD) form required to be created and attached on all
Government Property being shipped from the Contractor’s facility IAW DLM 4000.251
(ref most current amendment or replacement).
DISASSEMBLE To remove the components that make up the end-item in accordance with disassembly instructions IAW OEM Technical Data.
DoD Department of Defense
DRILS Defense Repair Information Logistics System
ESS Environmental Stress Screening
GFE Government Furnished Equipment
GFP Government Furnished Property
GFM Government Furnished Material
IAW In Accordance With
IUID Item Unique Identification – The program was an initiative incorporated by the
Government to improve the tracking of assets during transit, operation, storage, and repair. This program was implemented to provide an easier means for the Contractor and DoD to track unique assets through electronically scanning the asset tag which identifies the item.
MICAP Mission Capability
NSN National Stock Number
OEM Original Equipment Manufacturer- SCI
PQDR Product Quality Discrepancy Report
PR: FD2020-1900009-00 7 V1, 5 SEPTEMBER 2018
PMS Production Management Specialist: That individual who develops and prepares the
Contract Maintenance Purchase Request (PR) package, and is the program manager for the duration of the contract. PMS, as used in this document, refers to the production manager, office, and phone indicated on the title page of the Appendix A.
QAR Quality Assurance Representative
RECOVERABLE An unserviceable item that can have maintenance performed to restore it to a serviceable condition.
RTOK Retest Okay
SERVICEABLE Capable of meeting the requirements and performing the function for which it was designed or modified and meets all test requirements established by this work specification and the Technical Data cited in the PWS.
ACRONYM OR
PHRASE
DEFINITION
PWS Performance work statement
SRU Shop Replaceable Unit
UPDATE To bring an end-item up to the latest acceptable Government approved configuration without changing its original form, fit or functional capability.
USAF United States Air Force
PR: FD2020-1900009-00 8 V1, 5 SEPTEMBER 2018
3.0 REPORTING AND DATA REQUIREMENTS.
Reporting and data requirements shall be provided in the Contract Data Requirements List (CDRL), DD Form
1423-1. The Contractor shall prepare and submit the following records, forms, or reports in support of this work effort.
3.1 Commercial Asset Visibility Air Force (CAV AF) End Item Report.
Refer to the CAV AF Statement of Work for technical requirements/considerations, responsibilities, and reporting requirements of the CAV AF system. IAW CDRL A001 (DI-MGMT-81634C) and Data Item
Description (DID).
a. DD Form 1348-1A, Single Line Item Release/Receipt Document. The Contractor shall use DD Form
1348-1A as the shipping document for shipment transactions of all end items. The DD Form 1348-
1A will be initiated and printed in the CAV AF system. If CAV AF is down, then a manual DD
1348-1A may be utilized, updating CAV one business day. It is imperative that the contractor in completing the DD Form1348-1A perpetuate some information from the incoming shipping document DD Form 1348-1A for each item received and for all outgoing shipments. Additionally, the contractor shall annotate the DD Form 1348-1A to include the contract number. This is IAW
DLM 4000.25-1, directives listed in the contract, or can be as directed by the ACO, PCO, DCMA, PMS or CAV AF POC.
b. The purpose of CAV AF is to maintain asset visibility and accountability throughout the repair process, update asset condition and balance to Air Force Supply Systems, reports financial and inventory balances, and feeds production and unit repair costs to the maintenance and budgeting systems.
3.2 Contract Depot Maintenance (CDM) Production Report.
The Contractor shall report monthly by contract delivery order on all applicable categories, totals and onhand balances, providing all listed DID requirements for each repair location, including Sub-
Contractor facilities, if applicable, for the contracts maintenance occurrence actions during the reporting period IAW CDRL A002 (DI-PSSS-81995).
3.3 Annual Government Property Physical Inventory Report.
The Contractor shall provide an Annual Government Property Physical Inventory Report IAW CDRL
A003 (DI-MGMT-80441B).
a. The Contractor shall conduct an annual 100% physical inventory over the course of a year’s time of each NIIN as not to impede maintenance operations. Upon completion of all NIIN’s 100% physical inventory, the Contractor shall provide the AF Government inventory listing of the result of all AF
GFP in the Contractor’s possession.
3.4 Maintenance Data Collection Reporting.
Serial Number tracking by the Contractor is REQUIRED for all received end items. The Contractor shall document all maintenance actions involving maintenance with the disassembly, cleaning, inspection, maintenance and replacement of repaired end items. The Contractor shall load maintenance data to the
Defense Repair Information Logistics IAW CDRL A004 (DI-MISC-82003/T).
PR: FD2020-1900009-00 9 V1, 5 SEPTEMBER 2018
3.5 Counterfeit Protection Plan (CPP).
The Contractor shall adhere to a counterfeit mitigation program. The Contractor shall submit the
Counterfeit Protection Plan to the Government IAW CDRL A005 (DI-MISC-81832). Specific guidance for Counterfeit Mitigation Plan is detailed in Section 6.
3.6 IUID Plan and Marking Activity/Verification Report.
a. For components that have been repaired only, check that components requiring UID mark IAW
MIL-STD-130N have supplemental label/tags installed and that they can be verified IAW applicable drawings. The supplemental UID mark shall be placed adjacent to or near existing label not to cover any existing marking.
b. The Contractor shall provide a report detailing all IUID marking activity. The IUID marking activity reports will be provided as requested by DCMA and/or provided via an electronic copy through Wide
Area Workflow (WAWF) and F-16C/D end item Program Manager IAW CDRL A007 (DIMGMT-
81804A) and Section 7 of this PWS.
c. The contractor shall provide and conform to an Item Unique Identification (IUID) marking plan. A copy of the contractors IUID marking plan will be provided to DCMA, contracting, and the program representative within 60 days of award. IAW CDRL Exhibits A006.
3.7 Contractor Manpower Equivalent Reporting.
The Contractor shall report ALL Contractor labor hours (including Sub-Contractor labor hours) required for performance of services provided under this contract for the repair of all items previously listed via a secure data collection site. The Contractor is required to completely fill in all required data fields at http://www.ecmra.mil. User manuals are available at the Contractor Manpower Reporting Application
(CMRA) link IAW CDRL A009
3.8 Test Tool Security.
The contractor shall establish and maintain a program that will provide the status of test tool security referenced in para. 9.11 IAW CDRL A008
3.9 Safety and Health.
While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The Contractor shall notify the
Contracting Officer (CO), within eight (8) hours of any damage to Government Property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to Government Property less than
$500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) reporting.
b. Date, Time and exact location of accident/incident.
c. Brief Narrative of accident/incident (Events leading to accident/incident).
d. Cause of accident/incident, if known.
e. Estimated cost of accident/incident (material and labor to repair/replace).
f. Nomenclature of equipment and personnel involved in accident/incident.
g. Corrective actions (taken or proposed).
PR: FD2020-1900009-00 10 V1, 5 SEPTEMBER 2018
h. Other pertinent information.
If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety
Office
4.0 SECURITY AND FOREIGN DISCLOSURE.
The Contractor shall ensure requirements for safeguarding classified information, materials, for obtaining and verifying personnel security clearances, for protecting Government Property and data are fulfilled.
4.1 DD Form 254.
DoD Contract Security Classification Specification, is REQUIRED for Advanced Programmable Signal
Processor (APSP), (NSN and PN is listed in Section 5).
4.2 Destructive Notice.
For classified documents, follow the procedures in DOD 5220.22-M, National Industrial Security
Program (NISPOM), Section 11 and DoD5200.1-R, Information Security Program Regulation. For unclassified, limited documents, destroy by any method that shall prevent disclosure of contents or reconstruction of the document.
4.3 Per Export Control Limitations.
Foreign Disclosure Restrictions IAW AFMCI 21-113, 21- 149 and 23-102 Do Apply.
4.4 Uses and Safeguarding of Information.
Information from the secure website is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data.
5.0 GOVERNMENT PROPERTY.
All property owned or leased by the Government. Government Property includes Government Furnished
Property (GFP), Government Furnished Material (GFM), and Government Furnished Equipment (GFE). FAR
Part 45.
5.1 Government Furnished Property.
GFP is property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. The GFP furnished to the Contractor is listed below under section 5.2(e).
a. Contractor shall notify the CO, within one (1) workday of any damages when the dollar value exceeds $10,000.00 and within two (2) workdays for any damages less than $10,000.00 during the execution of the contract.
PR: FD2020-1900009-00 11 V1, 5 SEPTEMBER 2018
b. When the Government owned asset is in the possession of the Contractor, the asset shall be accounted for, tracked and stored in a secure area where they are protected and handled in such a manner against all damages, weather, and foreign matter. Further, the Contractor shall secure the asset to prevent any damages, pilferages, or loss while in the Contractor’s possession IAW DoD
5200.1-R.
5.2 Government Furnished Equipment.
An all-inclusive term to define all types of equipment. It includes facilities, plant equipment, agency peculiar property, special tooling, and special test equipment. For the purpose of annually reporting dollar values on Department of Defense (DOD) property in the custody of Contractors (DD Form 1662, DOD Property in the Custody of Contractors), items must be categorized according to the specific FAR property definitions. GFE, if authorized on this contract, will be stated and identified in an attachment to this appendix or as another uniquely identified section as part of this contract. The Contractor will comply with the GFE related clauses in the basic contract. a. GFE will not be furnished by the
Government.
b. Necessary ST/STE/SE will be furnished by the Contractor unless identified within the Appendix A or Appendix B if applicable. If substitute ST/STE/SE are proposed for use in this effort, authorization must be obtained by the ACO/CO from the Program Manager (PM).
c. For authorization of GFE on this contract, the PMS is to contact the ALC Loan Control Officer for
Government loan property authorization.
d. While the GFE is in the possession of the Contractor, it is the Contractor’s responsibility to provide routine maintenance and calibration of the GFE to ensure the GFE is returned to the Government in the same condition as when provided, less normal wear and tear. GFE will not be requisitioned until it is actually required and will be turned in when no longer required.
e. The contractor is granted rent free use of Government property accountable to contract F42620-01-D-0076. And may use said GFE on a non-interference basis.
Contract Number Asset ID Description Part Serial Condition
F42620-01-D-0076 0000587.01 SYSTEM
BENCH T/S
CONSOLE
2134D54G01 0007 A
F42620-01-D-0076 0000555.00 PSP LRU TEST
SET
3426B13G02 83001 A
F42620-01-D-0076 0000744.00 PSP LRU TEST
SET
3426B13G03 84002 A
f. In the event the APSP LRU Test Station becomes unserviceable and is unavailable to perform acceptance test of a repaired APSP, the Contractor is authorized to perform acceptance test using the System Test Bench.
PR: FD2020-1900009-00 12 V1, 5 SEPTEMBER 2018
5.3 Government Furnished Material.
Government Property supplied to the Contractor, for incorporation into an end item to be delivered under the contract or which may be consumed in the performance of the contract. It includes, but is not limited to, raw and processed material, parts, components, and assemblies. GFM is also referred to as materials and direct materials under the terms of the contract.
a. GFM will not be furnished by the Government.
b. Any type of GFP, GFE, and GFM will always be returned or shipped utilizing a DD 1348-1A unless otherwise directed by Program Management or Hill Contracting individuals. This is the authorized shipping document so that the item can be properly identified upon Contractor’s return.
6.0 COUNTERFEIT PREVENTION PLAN (CPP) REQUIREMENT.
Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 (C001) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes
Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DOD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. (C001). At a minimum, the CPP shall address:
6.1 Applicability.
The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
6.2 Definitions.
The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
6.3 Parts Availability and Use of Parts Brokers.
The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts
Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the
Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A).
6.4 Procurement Policies.
The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP.
PR: FD2020-1900009-00 13 V1, 5 SEPTEMBER 2018
The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D).
6.5 Risk Assessment.
The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP.
Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The Contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements.
As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The Contractor shall require completion of a trade study, documented within the
CPP, which shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D).
6.6 Detection and Avoidance Responsibilities.
The Contractor shall establish processes for the review and approval of Contractor and applicable
SubContractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for
Contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for
Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their Sub-Contractors per ODASD Memo titled “Overarching
DOD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E).
6.7 Testing and Verification.
The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the Sub-Contractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, paragraph 4.1.4, appendix E).
6.8 Configuration Identification and Traceability.
The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the
Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or
PR: FD2020-1900009-00 14 V1, 5 SEPTEMBER 2018
corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts.
The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts, unless:
a. The Contractor has established a counterfeit avoidance/detection system approved by the DOD.
b. The counterfeit parts were procured from a DoD-accredited trusted supplier or provided as
Government Property.
c. The Contractor has provide timely notification to the Government. (Ref. AS5553, paragraph 4.1.6, appendix F).
6.9 Counterfeit Notification and Reporting.
The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a Contractor or Sub-Contractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The Procuring Contracting
Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Materiel Reporting Program (DMRP) Office in
406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data
Exchange Program (GIDEP) system, which will serve as the DOD central reporting repository. (Ref.
AS5553, paragraph 4.1.7, appendix G).
6.10 Counterfeit Prevention Training.
The Contractor shall provide appropriate training and shall require all personnel working procurement with-in their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The
CPP shall describe and list the training provided by the Contractor to their personnel.
PR: FD2020-1900009-00 15 V1, 5 SEPTEMBER 2018
7.0 ITEM UNIQUE IDENTIFICATION (IUID) MARKING (IAW AFMCI 20-105 Para.
3.12).
The Contractor shall replace damaged markings, identification, and decals. IUID markings are required for all end items and subcomponents to the end item IAW CRDL A006 (DI-MGMT-81803), CDRL A007
(DIMGMT-81804A), and the Technical Data listed in Section 11.
7.1 Each completed end-item will be permanently and legibly marked with the Contractor’s facility identification. This identification will display the name of the Contractor facility, date of maintenance and contract number. This identification can be by decalcomania, rubber stamp, or stencil. When using rubber stamp or stencil, use permanent, waterproof ink or paint of contrasting color; also, end-item identification plates shall reflect the latest configuration/update, i.e., National Stock Number, Part
Number as applicable.
7.2 For items that do not have an IUID marking specifications the Contractor shall develop the marking specifications in accordance with the latest version of MIL-STD-130N.
7.3 IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the Contractor shall notify the CO for determination.
7.4 IUID markings which will be potentially destroyed during repair due to technical direction (i.e. paint removal, sand blasting, etc.) shall be recorded prior to maintenance action and replaced with the same
UII as part of the repair action.
7.5 The Contractor shall submit the required and applicable data for legacy items to the DoD IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.
8.0 GENERAL WORK REQUIREMENTS.
The Contractor shall inspect, test, repair, update, reassemble, calibrate, and retest GFP IAW this PWS and all applicable Technical Data/Directives listed in Section 11.
8.1 Mission Capability (MICAPs).
MICAPs will be identified to the Contractor and work priorities will be set by direction of the
Government to ensure “repair to demand” versus “batch repairing”. To meet this, the Contractor will be allowed to move components among reparable end items to expedite repairs. However, this practice shall be limited as to not produce BER assets as a direct result.
8.2 Configuration.
The Contractor is authorized to induct all configurations of the end items listed in Section 5 IAW the quantities in the Delivery Order.
http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html
PR: FD2020-1900009-00 16 V1, 5 SEPTEMBER 2018
8.3 Technical Data.
The Contractor shall comply with the latest dated TOs and other directives used or issued during the time the work is being accomplished.
Note: No technical related issue in this document shall be construed as taking precedence over TOs and/or manufacturer drawings, and their accompanying documents and specifications for these end items.
8.4 Cleaning, Corrosion Control and Treatment.
The Contractor shall clean the end item thoroughly prior-to and after disassembly and maintain cleanliness during this maintenance effort. Accomplish corrosion control and treatment as required, using methods and materials IAW TO 1-1-689, TO 1-1-689, MIL-STD-1250, MIL-HDBK-454A, and
MILHDBK-1568.
8.5 Electrostatic Discharge (ESD).
Proper ESD procedures shall be in place prior to contract award. The Contractor shall implement or maintain an ESD Control Program. IAW MIL-STD-1686C, MIL-HDBK-263B.
8.6 Quality.
The Contractor is responsible to ensure all-inclusive management of the quality control requirements are accomplished as outlined in the contract. This includes the establishment of viable quality control program, detail inspection programs, monitoring actions and effective corrective actions.
8.7 Receiving Inspection.
An inspection for proper identity, completeness, and obvious damage shall be performed on each end item upon its receipt at the Contractor’s facility. Any deficiencies found as a result of the inspection shall be brought to the attention of the end item Program Manager through the ACO/CO.
8.8 Handling.
The Contractor shall exercise care to prevent and damages, pilferage, or loss of GFP while it is in the
Contractor’s possession. The Contractor shall store all GFP in a secure area and provide protection against all adverse environment conditions. Reusable shipping containers, packaging, and crating material in which the GFP is received shall be handled with care.
8.9 Shipping.
Reusable shipping containers, packaging, and crating material in which the asset is received shall be handled with care. Reusable containers shall be stored for reuse, and configuration of the containers shall not be altered. All assets will always be returned or shipped utilizing a DD 1348-1A unless otherwise directed by the Government. DD 1348-1A is the authorized shipping document, not a DD250, so that the item can be properly identified.
8.10 Non-Destructive Inspection (NDI).
The Contractor shall accomplish Non-Destructive Inspection (NDI) by disassembly to the extent necessary to assure a definite acceptance or rejection of the suspected item or area. (Note: T.O. 33B- 1-1 provides examples of inspection methods and criteria).The Contractor shall accomplish inspections
PR: FD2020-1900009-00 17 V1, 5 SEPTEMBER 2018
during the maintenance process while the item is accessible for the following: a. Quality replacement parts.
b. Correct dimensions of replacement parts.
c. Correct type and quantity of parts and materials.
8.11 Warranty of Work.
The Contractor shall warranty their work IAW industry standards. The Contractor shall provide the terms of their warranty in their bid or proposal prior to contract award. Any rework that is done under warranty shall be at no addition cost to the Government.
8.12 Condemnation and Disposition.
Authorization shall be obtained from the ACO/CO through the end item Production Manager initially for the authorization request. Authorization will be obtained from the Equipment Specialist. The Contractor will be allowed to retain condemned units for cannibalization of spare parts.
8.13 Product Quality Discrepancy Report (PQDR).
If a GFP is received from the Contractor and at any time during the warranty period the asset becomes unserviceable the Government will initiate a PQDR and return the asset back to the Contractor. The
Contractor shall repair the GFP to serviceable condition at no additional cost to the Government. In addition, if an asset is returned for rework as a result of a PQDR more than 1 time in any 12 month period then the Contractor shall also conduct an ESS at no additional cost to the Government before returning the GFP to serviceable condition. The Contractor shall coordinate actions with the CO and
Production Manager. Any tests that will be excluded as part of this effort will have prior written approval from the Production Manager.
8.14 Environmental Stress Screening (ESS) Requirements.
The Contractor shall conduct an ESS test when the same serial number returns to repair less than 12 months from previous repair date IAW MIL-HDBK-263B and MIL-HDBK-344A. If this is within the
Contractor’s warranty this will be at no cost to the Government.
8.15 Beyond Economical Repair (BER).
BER is defined as end item(s) which when restored to serviceable “A” condition, in accordance with applicable requirements, the cost will exceed 75% of the Stock Listed price. If the Contractor estimates the total cost of the repair and/or overhaul of any end item received will exceed 75% of the Stock Listed price, the Contractor shall promptly notify the ACO in writing and shall not perform further services on any such items except at the direction of the ACO. Upon receipt of the written notification that a particular item is not reparable, the Contractor shall dispose of the unit in the manner directed by the
ACO. The Procuring CO may authorize the Contractor, through the ACO, in writing, to exceed 75% of the Stock Listed Price when an item is in critical supply status.
8.16 Diminishing Manufacturing Sources and Material Shortages (DMSMS) Program/Electronic Parts
Screening.
The Contractor shall utilize an Electronics Parts Screening process that shall identify Diminishing
Manufacturing Sources (DMS) for parts for the end item design. The Contractor shall be responsible for
PR: FD2020-1900009-00 18 V1, 5 SEPTEMBER 2018
its Sub-Contractors' parts obsolescence awareness. The Contractor shall regularly check the Government
Industry Data Exchange Program (GIDEP) database for DMSMS items during all repair phases, and shall determine if any of these items are used in, or planned to be used in the end items..
8.17 Option for Non-Support.
In the event that the Contractor no longer wants to support the Advanced Programmable Signal Processor
(ALL NSNs included in Section 5) at the end of this contract, the Contractor shall provide the option for the Government to purchase a Production Drawing Package, Depot-Level Technical Data, Depot-Level
Support Equipment Requirements Documents, and the Depot-Level Support Equipment.
9.0 SPECIFIC WORK REQUIREMENTS.
The Contractor shall repair, update, inspect, reassemble, and test the reworked end-item and components and calibrate, if applicable, IAW T.O. 00-25-234 or other Government Approved Technical Data, and the
Technical Data listed in Section 11 as applicable.
9.1 Inspection.
The Contractor shall accomplish a thorough inspection of each end-item, reusable or replacement component parts and materials (external and internal) for the following:
a. End item for loose or missing parts, materials and attaching hardware.
b. End item for dents, punctures, bent pins, cracked, wrinkled or misalign conditions that may cause chafing.
c. Component parts, material, and attaching hardware to determine serviceability, and conformance with the Technical Data.
d. Structural parts for dents, punctures, cracks, oversized holes, evidence of chafing, corrosion, and, deterioration.
9.2 Disassembly.
The Contractor shall disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation and maintenance IAW Technical Data listed in Section 11 as applicable and
Government Approved Contractor Technical Data.
Note: Serviceable precision matched or mated component parts shall be handled in a manner to ensure their reinstallation as a matched set.
9.3 Repair.
The repairs consist of repairing or replacing components and/or sub-assemblies. The reusable disassembled item components shall be used as replacement components for restoring the Program
Memory Module to serviceable condition. The sub-assemblies are not required to maintain the end item identification.
a. Maintenance and replacement of accessory and component parts shall be IAW this PWS, the
Technical Data cited in Section 11 and this PWS. In the event that a deviation from the Technical
Data is required, an approval request in letter form shall be submitted to the Production Manager via e-mail to obtain approval or disapproval.
PR: FD2020-1900009-00 19 V1, 5 SEPTEMBER 2018
9.4 Spares and Repair Parts.
The Contractor will be allowed to retain condemned units for cannibalization of spare parts upon approval of the OO-ALC Production Manager. Upon completion of the contract, per existing disposal code assigned to the item, the Contractor shall dispose of parts retained for cannibalization.
a. Replacement parts and materials shall also be IAW Section 11. In the event that a deviation from the
Technical Data is required and the Contractor desires the use of a substitute part, an approval request in letterform shall be submitted to the ACO/CO, who will obtain the appropriate engineering office determination and respond accordingly.
9.5 Update.
The Contractor shall update the GFP as outlined in TOs and other directives listed in Section 11. This shall be accomplished concurrently with the maintenance required by this PWS and shall be to the latest approved and supportable configuration however, functional capabilities for which the item was designed shall not be changed. Performance and reliability Class 2 Revision Notices will be incorporated as determined by the Contractor. These Revision Notices will be incorporated under contract however, the functional capabilities for which the end-item was designed shall not be changed.
9.6 Correction of Deficiency (COD) and Engineering Change Proposals (ECP).
COD updates and improvement ECPs which are negotiated and funded separately, will be accomplished in accordance with the mutually agreed to schedules. Items will not be updated to the latest approved and supportable configuration specified in the contract under the following conditions:
a. Updates are not funded/authorized separately, e.g. spares not covered by the production COD clause.
b. Updates will not be required if the received configuration is compatible with configurations in use at the time of receipt and those updates are not required to satisfy update schedules which are bilaterally agreed to between the Contractor and the Government.
9.7 Finishing.
The Contractor shall replace damaged internal protective finish to the extent necessary to ensure serviceability and provide adequate protection IAW Government Approved Contractor Technical Data, and the Technical Data listed in Section 11.
a. External finishing of the end-item shall be accomplished only to the extent necessary to provide adequate protection, using high quality commercially available finish materials. Minor scratches are to be touched up or spot painted to provide necessary protection.
9.8 Marking.
Each completed end-item will be permanently and legibly marked with the Contractor’s facility identification. This identification will display the name of the Contractor facility, date of maintenance and contract number. This identification can be by decalcomania, rubber stamp, or stencil. When using rubber stamp or stencil, use permanent, waterproof ink or paint of contrasting color; also, end-item identification plates shall reflect the latest configuration/update, i.e., National Stock Number, Part
Number as applicable.
PR: FD2020-1900009-00 20 V1, 5 SEPTEMBER 2018
a. Check that components requiring an IUID mark, IAW MIL-STD-130, have supplemental label/tags installed and that they can be verified, refer to T.O. 00-25-260. The supplemental IUID mark shall be placed adjacent to or near existing label not to cover any existing marking. IAW CDRL A007 (DI-
MGMT-81804A).
b. The Contractor shall replace damaged markings, identification, and decals as outlined per the applicable Technical Data, Government Approved Contractor Technical Data and MIL-STD-130.
9.9 Can Not Duplicate (CND)/ Retest Okay (RTOK) Conditions.
End Items deemed to be serviceable on initial inspection and subsequently pass Acceptance Test
Procedures (ATP) will not be repaired and will be considered to be end items that meet CND/RTOK conditions.
9.10 Acceptance Testing.
The Contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the Government. Test and checkout shall be accomplished IAW the specifications found in Section 11.
a. Upon satisfactory completion of final acceptance test, the Contractor shall cover and seal all port, vents and electrical connections/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment. (NAS 847)
b. All completed work shall be subject to acceptance inspection by Defense Contract Management
Agency (DCMA).
9.11 Defense Security Service (DSS) requirements.
The contractor shall ensure that test equipment utilized for repairs of end items are certified, maintained/updated, and continually monitored IAW DDS requirements.
10.0 SERVICE SUMMARY.
10.1 WAWF/Material Inspection and Receiving Reports
Performance Objective Performance Threshold
PR: FD2020-1900009-00 21 V1, 5 SEPTEMBER 2018
The Contractor will report material handling/reporting requirements accurately by using WAWF/Material Inspection and Receiving
Reports
Receiving Reports in WAWF must have an accuracy rate of 98%
The Contractor will report material handling/reporting requirements completely by using the WAWF/ Material Inspection &
Receiving Reports.
Receiving Reports in WAWF must have a completeness rate of 100%.
The Contractor will perform workmanship inspections on all repaired items as identified on the Material Inspection & Receiving Reports.
Random Sampling inspections must pass with a
100% workmanship rate.
The Contractor will perform workmanship inspections on all repaired items as identified on the WAWF /Material Inspection & Receiving
Reports.
Process Proof Evaluations inspections must pass with a 100% workmanship rate.
10.2 Defense Repair Information Logistics System (DRILS)
Performance Objective Performance Threshold
The Contractor will report Maintenance Data
Collection information for all items worked.
Must maintain 100% or above completeness on all required documentation. Reference CDRL exhibit
A004 (DI-MISC-82003/T).
10.3 Product Quality Discrepancy Report (PQDR)
Performance Objective Performance Threshold
The Contractor must perform a test evaluation of items returned due to failures reported from the field units.
Must maintain 100% accuracy in reporting all required discrepancy report documentation.
The Contractor must perform a test evaluation of items returned due to failures reported from the field units.
Must maintain 100% completeness on all required discrepancy report documentation.
10.4 CAV AF
Performance Objective Performance Threshold
The Contractor will report Supply and
Maintenance transactions through the repair process from receipt to shipment.
Must maintain 100% or above completeness on all required documentation. Reference CDRL exhibit
A001 (DI-MGMT-81634C)
PR: FD2020-1900009-00 22 V1, 5 SEPTEMBER 2018
The Contractor must maintain and provide accurate CAV AF reporting.
Contractor input into the CAV AF system must be
100% accurate. Errors must be corrected within 1 working days of discovery by Contractor or notification of the error. IAW CDRL A001
(DIMGMT-81634C).
The Contractor must provide timely CAV AF reporting.
Contractor input into the CAV AF system must be
98% on time. IAW CDRL A001 (DI-
MGMT81634C).
The Contractor shall report by delivery order all on-hand balances and production produced ruing the reporting period.
A002 DI-PSSS-81995
The Contractor shall conduct 100% physical inventory by in NIIN in EXCEL.
A003 DI-MGMT-80441B
11.0 TECHNICAL ORDERS AND DIRECTIVES.
11.1 Applicable Government Documents.
AFMCI 21-113 Contract Maintenance Program for Depot maintenance Activity Group
(DMAG)
AFMCI 21-149 Contract Depot Maintenance (CDM) Program (04 Mar 2009)
CAV AF Manual Commercial Asset Visibility Air Force (Version 8 or higher)
DOD 4100.39-M Federal Logistics information System (FLIS) Procedures
DOD 4160.28-M Defense Demilitarization: Program Administration
DODI 4140.01 Department of Defense Supply Chain Materiel Management Policy
DODI 4140.67 Department of Defense Counterfeit Prevention Policy
DLM 4000.25-1 Military Standard Requisitioning and Issue Procedures (MILSTRIP)
DLM 4000.25-2 Military Standard transaction Reporting and Accountability Procedures
(MILSTRAP)
MIL-HDBK-263B Electrostatic Discharge Control Handbook for Protection of Electrical and
Electronic Parts, Assemblies and Equipment.
MIL-HDBK-344A Environmental Stress Screening or Electronic Equipment
MIL-HDBK-454A Requirements for Electronic Equipment
MIL-HDBK-1250 Corrosion Prevention and Deterioration Control of Electronic Components and Assemblies
MIL-HDBK-1568 Materials and Processes for Corrosion Prevention and Control in Aerospace
Systems
MIL-I-46508 Insulating Compound, Electrical
MIL-STD-130 Identification Marking of U.S. Military Property
MIL-STD-130L Identification Marking of U.S. Military Property
PR: FD2020-1900009-00 23 V1, 5 SEPTEMBER 2018
MIL-STD-1686C Electrostatic Discharge Control Program for Protection of Electrical and
Electronic Parts, Assemblies and Equipment.
NAS 847 Cap and Plug, Protective, Dust and Moisture Seal
TO 00-20-1 Aerospace Equipment Maintenance Inspection, Documentation,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.