CDRLs.pdf
PDF 808 KB Posted
- Attached to
- F-16 Radar Advanced Programmable Signal Processor (APSP) Repair Federal contract opportunity
- Solicitation number
- FA8251-19-R-0006
About this file
CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA825119R0006.pdf | ||
| RDL.pdf | ||
| QASP.pdf | ||
| Wage_Equivalent.pdf | ||
| Packaging.pdf | ||
| Trasportation.pdf | ||
| DD_254_(FA8251-19-R-0006)__APSP_repair.pdf | ||
| SPI.pdf | ||
| SQS.pdf | ||
| SECTION_L_Proposal_Instructions.pdf | ||
| SECTION_M_Evaluation_Factors_for_Award.pdf | ||
| SOW.pdf | ||
| PWS.pdf | ||
| PWS_Update.pdf | ||
| 19R0006_PreSolicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per, response, including the time for reviewinginstructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, includino suggestions for reducing the burden, to Department of Defense, Washinoton Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT RE1URN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/FR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: MGMT
TDP TM OTHER _____________________________
D. SYSTEM/ITEM (GUB-19-003)
Advanced Programmable Signal Processo
E. CONTRACT/PR NO.
FD2020-19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force (CAV) Reporting
3. SUBTITLE
CFM End Item Reporting
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81838/T
5. CONTRACT REFERENCE
PWS Paragraph: 3.1
6. REQUIRING OFFICE
416 SCMS/GUMAD
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
i.TIA
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11.AS OF DATE
SEE BLK 16
13. DATE OP SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final
Reg Repro
16. REMARKS
1. Block 4: All reporting shall be submitted in the English Language.
2. Blocks 10, 11, 12, 13:
a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.
b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence JAW the CAV AF CFM Reporting Requirements Document.
c. Data shall be current within 24 hours of the last End Item maintenance occurrence.
3. Blocks 7, 8, 14:
a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.
b. The contractor shall submit aDD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website ..
address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.
c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address:
416SCMS.CDRL.Workflow@us.af.mil
416 SCMS/ 1
GUMAD
6070 GumLN Bldg. 1213 Hill AFB, UT 84056-5 825
SEE BLK 16
15. TOTAL 0 1 0
G. PREPARE BY ,
(J / /J
H. DATE
01/11/2019
I. APPROV J.DATE
01/11/2019
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
0.00 bD FORM 1423rFBa2OO1 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 10 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Weshington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 9MB control number. Please DO NOT REtURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TOP TM OTHER _______________________________
D. SYSTEM/ITEM (GUB-19-003)
Advanced Programmable Signal Processo
E. CONTRACT/PR NO.
FD2020- 19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Production Report
3. SUBTITLE
CDM Production Monthly Status Report
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81995/T
5. CONTRACT REFERENCE
PWS Paragraph 3.2
6. REQUIRING OFFICE
416 SCMS/GUMAD
7. DO 250 REQ
LT
9. 01ST STATEMENT
REQUIRED
J-J
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEEBLK16
13. DATE OF SUBSEQUENT
SUBMISSION
SEEBLK16
0 ft Final
Iteg Repro
16. REMARKS
1. Block 4:
a. All reporting shall be submitted in the English Language.
b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities) shop floor, bond room and/or receiving/shipping docks, etc. for each repair.
c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-8 1995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.
d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.
2. Blocks 10,11, 12, 13:
a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.
b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the 416 SCMS/GUMAD, Program Manager (PM) or the Production Management Specialist (PMS),
c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report"
3. Block 9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use. (January 2019). Other requests for this document shall be referred to 416 SMCS/GUMAD.
416 SCMS/ 1
GUMAD
6070 GumLN
Bldg. 1213 Hill AFB, UT 84056-5825
SEE BLK 16
15.TOTAL 0 1 0
G. RED BY H. DATE
01/11/2019
I. AP yE J.DATE
01/11/2019
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
bbFöTh'ii 14'Z1FEB/ PREVIOUS EDITION MAY BE USED. Page of 2 Pages
Form Approved 0MB No. 0704-0 188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions searc(iing existing date sources, gathering and maintaining the date needed, and completing and reviewing the collection of informetion. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware thyt notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of idformation if t doec not display a currently valid 0MB control number. Please DO NOT RE1iURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contractli-'R No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: MGMT
TDP TM OTHER _____________________________
D. SYSTEM/ITEM (GUB-19-003)
Advanced Programmable Signal Processo
E. CONTRACT/PR NO.
FD2020- 19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Government Property Inventory Report
3. SUBTITLE
Annual Government Property Physical Inventory Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80441 CIT
5. CONTRACT REFERENCE
PWS Paragraph 3.3
6. REQUIRING OFFICE
416 SCMSIGUMAD
7. DO 250 REQ
LT
9. DIST STATEMENT
REQUIRED
i-i
LI
10. FREQUENCY
ANNLY
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEEBLK16
13. DATE OF SUBSEQUENT
SUBMISSION
SEEBLK16
Draft Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to thisCDRL.
1. Block4:
a. All reports shall be submitted in the English Language.
2. Blocks 10, 11, 12,13:
a. This report will be provided annually. Reporting Period is one year.
b. The data is representative of the Contractor's Internal Property Control System and shall be current as the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.
c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
3. Block9:
a. DISTRIBUTATION STATEMENT iDI: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use). (January 2019). Other requests for this document shall be referred to 416 SMCS/GUMAD.
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
416 SCMS/ 1
GIJIvIAD
6070 Gum LN Bldg. 1213 Hill AFB, UT 84056-5825
SEE BLK 16
15.TOTAL E 0 1 0
PREP RED BY H. DATE
01/11/2019
I. APPR Y ' J.DATE
01/11/2019
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 20 PREVIOUS EDITION MAY BE USED. / Page 1 of 2 Pages
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 10 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and tompleting and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, SuIte 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT REtURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: MISC
TDP TM OTHER _____________________________
0. SYSTEM/ITEM (GUB-19-003)
Advanced Programmable signal Processo
E. CONTRACT/PR NO.
FD2020- 19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Maintenance Data Collection Record (MDCR)
3. SUBTITLE
Defense Repair Information Logistics System
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-82003/T
5. CONTRACT REFERENCE
PWS Paragraph: 3.4
6. REQUIRING OFFICE
416 SCMS/GUMAD
7. DO 250 REQ
LT
9. 01ST STATEMENT
REQUIRED
N/A
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMMMON
Draft Final
16. REMARKS
1. NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
2. Block 4: See attached Defense Repair Information Logistics System (DRILS) Technician Guide for instruction.
3. Block 9: No Distribution Statement is required as data shall be entered into DRIlLS, a maintenance data database. Reference DRIlLS Field Technician Guide dated, 2003.
4. Blocks: 10, 11, 12, 13:
a. Data shall be generated by the contractor when maintenance is accomplished.
b. Data shall be entered into DRILS as the data is generated in real time.
416 SCMS/ 1
GUMAD
6070 Gum LN Bldg. 1213
Atth:
Program Mgr Hill AFB, UT 84056-5 825
SEE BLK 16
15. TOTAL 0 1 0
G. REPARD BY
D trfr)
H. DATE
01/11/2019
I. APPRO V
ANH
J.DATE
01/11/2019
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
DDFORM 1423-a TEB 2001 PREVIOUS EDI'IliDN MAY BE USED. Page 1 of 1 Pages
(1 Data Item) Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT REtURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block B.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: MISC
TDP TM OTHER _____________________________
D. SYSTEM/ITEM (GUB-19-003)
Advanced Programmable signal Processoi
E. CONTRACT/PR NO.
FD2020- 19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81832/T
5. CONTRACT REFERENCE
PWS Paragraph: 3.5
6. REQUIRING OFFICE
416 SCMS/GUMAD
7. DD 250 REQ
DD
9. DST STATEMENT
REQUIRED
D
10. FREQUENCY
OTIME
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SEE BLK 16
Final
Peg Repro
16. REMARKS .
1. NOTE: Changes to office symbols andlor e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
2. BLOCK 4: All data deliveries shall be submitted in the English language.
3. Blocks 7, 8, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and
Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil using DODAAC FA825 1. MARK FOR: Address in block 14a.
b. The contractor shall submit a Letter of Transmittal (LT) and the Contractors Counterfeit Protection Plan (CPP) via e-mail to the following e-mail address: alan.hozian@us.af.mil
4. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the Counterfeit prevention Plan (CPP) NLT thirty (30) calendar days after contract award. The Government comments will be provided to the contractor within fourteen (14) calendar days after receipt. The contractor shall resubmit the CPP NLT seven (7) calendar days after receipt of Government comments.
5. Block 9: The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and be located in a conspicuous location.
a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (January 2019). Other requests for this document shall be referred to (416 SCMS/GUIMAD, Hill AFB, UT 84056-5826).
EXPORT CONTROL WARNiNG: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
416 SCMS/ 1
GUMAD
6070 Gum LN Bldg. 1213
Attn:
Program Mgr Hill AFB, UT
84056-5825
SEE BLK 16
15.TOTAL 0 1 0
G E RED BY
NA
H. DATE
01/11/2019
I. APP BY
AN
J.DATE
01/11/2019
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
1DD 11M 142 i,FEB 200 PREVIOUS EDITION MAY BE USED. Page 1 of 2 PageS
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewinG instructions searching existing data sources, gathering arid maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thit burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports 10701.01881, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware thyt notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT RE1'URN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: MGM
TDP TM OTHER
T
D. SYSTEM/ITEM (GUB-19-003)
Advanced Programmable Signal Processo
E. CONTRACT/PR NO.
FD2020- 19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Item Unique Identification (J1JID) Marking Plan
3. SUBTITLE
IUID Marking Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81803/T
5. CONTRACT REFERENCE
PWS Paragraph: 3.6
6. REQUIRING OFFICE
416 SCMS/GUMAD
7. DO 250 REQ
DD
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final lteg
Repro
16. REMARKS
1. NOTE:
a. Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
b. All data deliveries shall be submitted in the English language.
2. Block 4: Contractor's format is acceptable using Microsoft Office 2013 compatible products (Word, Powerpoint) or Adobe Portable Document Format
(PDF).
3. Blocks 7, 8, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil using DODAAC FA8251. MARK FOR: Address in block 14a
b. The contractor shall submit a Letter of Transmittal (LT) and the IUTD Marking Plan via e-mail to the following e-mail address: alan.hozian@us.afmil
4. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the IUTD Plan as required NLT thrity (30) days after contract award. The Government will review and provide comments NLT ten (10) business days following receipt. The contract shall then have ten (10) business days to make correction(s) and resubmit.
5. Block 9: The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and be located in a conspicuous location.
a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (January 2019). Other requests for this document shall be referred to (416 SCMS/GUMAD, Hill AFB, UT 84056-5826).
416 SCMS/ 1 1
GUMAD
6070 Gum LN Bldg. 1213
Attn:
Logistics Mgt.
Specialist (LMS)
Hill AFB, UT 84056-5825
SEE BLK 16
15.TOTAL 1 1 0
G./REPA{ED BY H. DATE
01/11/2019
I. APPR D B
A N
J.DATE
01/11/2019
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
'DD 1O1M 1423'li ftB 2001 PREVIOUS EDITION MAY BE USED. ° Page 1 of 2 Pages
Form Approved 0MB No. 0704-0 188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewina instructions searchinci existing data sources, sathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regar8ing this burden estirnale or any other aspect ol this collection of information, includinci suggestions for reducing the burden, to Department of Defense, Washinqton Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 9MB control number. Please DO NOT RE1URN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: MGMT
TOP TM OTHER _____________________________
D. SYSTEM/ITEM (GUB-19-003)
Advanced Programmable Signal Processo
E. CONTRACT/PR NO.
FD2020- 19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
3. SUBTITLE
IIJID Marking Activity & Verification Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81804A/T
5. CONTRACT REFERENCE
PWS Paragraph: 3.6
6. REQUIRING OFFICE
416 SCMS/GUMAD
7. DO 250 REQ
DD
9. 01ST STATEMENT
REQUIRED
1-f
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final leg Repro
16. REMARKS
1. NOTE:
a. Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
b. All data deliveries shall be submitted in the English language.
2. Block 4: Contractor's format is acceptable using Microsoft Office 2013 compatible products (Word, Powerpoint) or Adobe Portable Document Format
(PDF).
3. Blocks 7, 8, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil using DODAAC FA8251. MARK FOR: Address in block 14a
b. DMCA inspector/acceptor may request a hard copy at the contractor's facility during the time of inspection and acceptance.
4. Blocks 8, 10, 11, 12, 13: First submission of information due NLT ninety (90) days after contract award and monthly thereafter. DCMA will review and provide comments in coordination with the F- 16 CCIU Program Office NLT seven (7) calendar days following receipt. Final report is due NLT seven (7) business days after receipt and incorporation of DCMA comments.
5. Block 9: The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and be located in a conspicuous location.
a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (January 2019). Other requests for this document shall be referred to (416 SCMS/GUMAD, Hill AFB, UT 84056-5826).
DCMA 1
SEE BLK 16
15.TOTAL 0 1 0
G. EPA ED BY
S1T(
H. DATE
01/11/2019
I. APP ED BY J.DATE
01/11/2019
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
DO FOBIVI 1423-1, I-I 20 I-'KVIUUS EDIIION MAY E tJLL). rage i orz rages
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average t 10 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports jO7O1 -0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 9MB control number. Please DO NOT REI'URN your form to the above address. Send completed form to the Government Iscuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: MGMT
TDP TM OTHER _____________________________
D. SYSTEM/ITEM (GUB-19-003)
Advanced Programmable Signal Processo
E. CONTRACT/PR NO.
FD2020- 19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Test Tool Security Reporting
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368/T
5. CONTRACT REFERENCE
PWS Paragraph 3.8
6. REQUIRING OFFICE'
416 SCMS/GUMAD
7. DD 250 REQ
DD
9. 01ST STATEMENT
REQUIRED
r-s
LI
10. FREQUENCY
BLK 16
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
5. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final
Rag
Repro
16. REMARKS
1. Block 4:
a. All reporting shall be submitted in the English Language.
b. Contractor format is acceptable.
2. Blocks 7, 10,11,12,13:
a. The inspection will be done at origin by DCMA. Below is their address. '
Reporting shall be submitted on a quarterly basis lAW the CLINS 1008, 2008 and 3008 on the contract.
b. The contractor shall submit a Certificate of Conformance to the called out requirements as proof of compliance.
DCMA NORTHROP GRUMAN BALTIMORE
7323 AVIATION BLVD
MS 1285
BALTIMORE MD 2 1204-2003
UNITED STATES
3. Block9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use). (January 2019). Other requests for this document shall be referred to 416 SMCS/GUMAD.
416 SCMS/ 1
GUMAD
6070 Gum LN
Bldg. 1213 Hill AFB, UT
84056-5825
DCMA
NORTHROP
GRUMAN
BALTIMORE
SEE BLK 16
15.TOTAL 0 2 0
G. E RED BY H. DATE
01/11/2019
I. APP D '
J.DATE
01/11-2019
'17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
DFORM f42iJ' 20 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports O7O1 -0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law no person shall be sublect to any penalty for failing to comply with a collection of information if t does not display a currently valid 0MB control number. Please DO NOT REtURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/uR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: FNCL
TDP TM OTHER _____________________________
D. SYSTEM/ITEM (GIJB-19-003)
Advanced Programmable Signal Processo
E. CONTRACT/PR NO.
FD2020- 19-00009
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Performance and Cost Report
3. SUBTITLE
Manpower Equivalent Report
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80912/T
5. CONTRACT REFERENCE
PWS Paragraph 3.7
6. REQUIRING OFFICE
416 SCMS/GUMAD
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
r'
LI
10. FREQUENCY
SEE BLK 16
'12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final
Reg Repro
16. REMARKS
1. Block4:
a. All reporting shall be submitted in the English Language.
b. Only paragraph 10.2.1 ofDID-FNCL-90912 applies.
c. Contractor format is acceptable.
3. Block 7: The contractor shall submit a Letter of Transmittal to the PCO in conjunction to each submittal to the following email address:
jeffrey.moody.6@us.af.mil
2. Blocks 10,11, 12, 13:
a. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to CMRA help desk.
b. The Contractor shall input data by 31 October of each year. However, due to the delayed implementation, input for FY data is required by 31 March.
3. Block9:
a. DISTRI[BUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or Operational Use). (January 2019). Other requests for this document shall be referred to 416 SMCS/GUIMAD.
AFMC PZABB/ 1
6050 GUMLN
BLDG 1215
HILL AFB, UT
84056-5825
SEE BLK 16
15.TOTAL 0 1 0
G R RED BY H. DATE
01/11/2019
I. AP OVED J. DATE
01/11/2019
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
DD FORM 142TTFEB 200 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
File details come from the government source that posted it.