d-ExhibitA-CDRLSfromCCARupdatedwithspreadsheet.pdf
PDF 2 MB Posted
- Attached to
- Reentry Field Support Equipment Federal contract opportunity
- Solicitation number
- FA8214-15-R-0001
About this file
CDRLs
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 1447 (2/2012)
Prescribed by GSA FAR (48 CFR) 53.215-1(d)
Contract Data Requirements List (CDRL) Program: Reentry Field Support Equipment (RFSE)
Date: 27 October 2014
Version:
1. Introduction
This document was developed in accordance with DOD MIL-STD 310000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.
2. General Guidelines
The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization
Information System (ASSIST) and provide additional direction for data preparation.
3. Communications
Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.
4. Codes used in the DD Form 1423
The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.
4.1 Block 7, DD Form 250 Requirements
Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements.
Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.
Code Inspection Acceptance
SS Source (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
DD Destination (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
SD Source (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
DS Destination (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
Code Inspection
LT Letter of Transmittal only
NO No inspection or acceptance required
XX Inspection and acceptance requirements specified elsewhere in contract
S Indicates the contractor’s facility
D Indicates the primary destination point
4.2 Block 8, Approval Code
When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA).
When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.
Code Description
A Approval Required
N/A Approval Not Required
4.3 Block 10, Frequency of Submittals
DAILY Daily
WEKLY Weekly
BI-WE Each 2 weeks
MTHLY Monthly
BI-MO Each 2 months
QRTLY Quarterly
ANNLY Annually
SEMIA Each 6 months
OTIME One time
ONE/R One time and revisions
R/ASR Revisions as required
ASGEN As generated
ASREQ As required*
DFDEL Deferred delivery
DFORD Deferred ordering
DFREQ Deferred requisitioning
ONE/P One time preliminary draft
XTIME Multiple separate submittals (i.e., 2Time, 3Time)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in
Block 16.
4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions
ATP Authority To Proceed
ASGEN As generated
ASREQ As required*
CDR Critical Design Review
CA Contract Award
CO Change Order
CD Calendar Day(s)
CP/REQ Change page/as required
CP/O Change page/(only)
DCARC Defense Cost and Research Center
DFDEL Deferred delivery
FQT Formal Qualification Test
FCA Functional Configuration Audit
PCA Physical Configuration Audit
TRR Test Readiness Review
SA Supplemental Agreement
WD Working Day(s)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in
Block 16.
5. Supplemental Data Preparation Instructions
5.1 Data Item Description (DID) Tailoring
The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement
(PWS) or Statement of Objectives (SOO).
5.2 Distribution Statement Marking
The designation in Block 9 of the CDRL form indicates that one of the following seven (7) authorized distribution statements from Department of Defense (DoD) Directive 5230.24 and Air Force Instruction
(AFI) 61.204 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1-R. Should Block 9 of the
CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:
Distribution Statement A:
Approved for public release; distribution is unlimited.
Distribution Statement B:
Distribution authorized to U.S. Government
Agencies only (fill in reason) (date of determination). Other requests for this document shall be referred to AFNWC/NI, 6054 Dogwood
Ave Bldg 1255, Hill AFB UT 84056-5816.
Distribution Statement C:
Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to AFNWC/NI, 6054 Dogwood
Ave Bldg 1255, Hill AFB UT 84056-5816.
Distribution Statement D:
Distribution authorized to the DoD and U.S. DoD contractors only for Administrative or Operational
Use determined as of (date of determination). Other requests shall be referred to AFNWC/NI, 6054
Dogwood Ave Bldg 1255, Hill AFB UT
84056-5816.
Distribution Statement E:
Distribution authorized to Department of Defense
(DoD) Components only (fill in reason) (date determination). Other requests shall be referred to
AFNWC/NI, 6054 Dogwood Ave Bldg 1255, Hill
AFB UT 84056-5816.
Distribution Statement F:
Further dissemination only as directed by
AFNWC/NI, 6054 Dogwood Ave Bldg 1255, Hill
AFB UT 84056-5816 (date of determination) or higher Department of Defense (DoD) authority.
Distribution Statement X:
Agencies and private individuals or enterprises eligible to obtain export-controlled technical data in accordance with (IAW) regulations implementing
10 U.S.C. 140 (date of determination). Controlling office is (insert).
5.3 Other Notices
All technical documents marked with Distribution Statements B, C, D, E, F, or X will also be marked with the following notices:
WARNING:
This document/software contains technical data/software whose export is restricted by the Arms Export
Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, (Title 50, U.S.C., App 2401 et seq). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice:
For classified documents, follow the procedures in DOD 5220.22M, National Industrial Security Program
Operating Manual, Chapter 5, Section 7, or DOD 5200.1R, Information Security Program Regulation, Chapter 6, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
5.4 Pricing CDRL Items Separately
If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.
6. Supplemental Data Delivery Instructions
6.1 Due Dates
Due dates for delivery of data are to be construed as receipt at destination.
6.2 Late Delivery
Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain
Time on the date specified in Blocks 12, 13 or 16 of the CDRL.
6.3 Submittal Procedures
6.3.1 CDRL Submittal Procedure
For the purposes of data submittal, unclassified CDRLs are submitted to the government via encrypted email to the recipient outlined in Block 14.
Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:
1. Contract number
2. CDRL sequence number (i.e., A001)
3. Exact title and subtitle (if applicable) of the document being transmitted
4. Line item or CLIN number
5. Modification Number or Order Number
4. Document date, number, and revision information (if applicable)
5. Data delivery method and date of delivery
6. Whether the document is a draft, or final submittal
7. For approval data: State “For Approval”
8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal
9. For periodic reports: The report period that the document covers
10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or
Block 16 of the CDRL Form
6.3.2 Classified CDRL Submittal Procedure
Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW
Appendix B of the DD254. For Classified Disks send two (2) copies.
Outer Envelope:
Address
ATTN: Security Office/Document Control
Inner Envelope:
Address
ATTN: Name of person for whom the document should be delivered
7. Supplemental Data Review and Approval Process
7.1 Approval CDRLs
The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item.
In addition, Block 16 of the form may contain additional directions.
Written Written approval indicates agreement or concurrence with the contractor furnished
Approval data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the Contractual Document Action (CDA) form, signed and dated by the representative stated in ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.
Approved with
Comment or
Disapproved
The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or
PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
Draft Versions of the CDRL
If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval
CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.
7.2 Contractual Document Action (CDA)
After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:
COMMENT CODE CODE DESCRIPTION
C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.
S Substantive Comments of a less serious nature that have noticeable impact on the documents quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.
A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.
7.3 Information Only CDRLs
When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD
Form 1423.
8. Data Accession List (DAL)
During performance of the contract, requests from the PCO for data ordered from the Data Accession List
(DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.
9. Organizational Cross Reference List
The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.
ORG#/ Name Address Attention/To Contact Info
ORG1/AFNWC/NIBC 6030 Gum Ln Bldg 1217 Hill AFB UT 84056-5826
Kurt Schmidt kurt.schmidt.3@us.af.mil
ORG2/AFNWC/NIBF 6030 Gum Ln Bldg 1217 Hill AFB UT 84056-5826
Elliott Burrell elliott.burrell@us.af.mil
ORG3/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056-5816
Pat Rose patricia.rose@us.af.mil
ORG4/AFNWC/NIEI 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056-5816
Nathan Stong nathan.stong@us.af.mil
ORG5/AFNWC/NIEV 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056-5816
Jayme Allred jayme.allred@us.af.mil
ORG6/AFNWC/NIEI 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056-5816
John Vuong john.vuong@us.af.mil
ORG7/AFMC/GULAB 6038 Aspen Ave Bldg 1289 SW Hill AFB UT 84056-5805
Dave Dominguez david.dominguez@us.af.mil
ORG8/AFNWC/NIEV 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056-5816
Shauna Millgate shauna.millgate@us.af.mil
ORG9/AFNWC/PZBE 601e4 Dogwood Ave Bldg 1258 Hill AFB UT 84056-5816
Peggy Japngie Lizotte peggy.japngie_lizotte@us.a f.mil
ORG10/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056-5816
Nancy Baker nancy.baker.1@us.af.mil
10. CDRL Master Listing Index
Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.
CDRL# Description DID
A001 Integrated Program Management Report (IPMR) DI-MGMT-81861/T
A002 Conference Agenda (Meeting Agenda) DI-ADMN-81249A
A003 Briefing Material DI-MGMT-81605
A004 Report, Record of Meeting Minutes (Meeting Minutes) DI-ADMN-81505 mailto:kurt.schmidt.3@us.af.mil mailto:elliott.burrell@us.af.mil mailto:patricia.rose@us.af.mil mailto:nathan.stong@us.af.mil mailto:jayme.allred@us.af.mil mailto:john.vuong@us.af.mil mailto:david.dominguez@us.af.mil mailto:shauna.millgate@us.af.mil mailto:peggy.japngie_lizotte@us.af.mil mailto:peggy.japngie_lizotte@us.af.mil mailto:nancy.baker.1@us.af.mil
A005 Statement of Work (SOW) DI-MGMT-81606
A006 Manufacturing Plan DI-MGMT-81889
A007 Management Plan DI-MGMT-80004A
A008 Management Plan (Subcontractor Management Plan) DI-MGMT-80004A
A009 Contractor’s Configuration Management Plan DI-CMAN-80858B
A010 Quality Assurance Program Plan DI-QCIC-81794
A011 Counterfeit Prevention Plan DI-MISC-81832
A012 Systems Engineering Management Plan (SEMP) DI-SESS-81785
A013 Contractor’s Risk Management Plan DI-MGMT-81808
A014 Electrostatic Discharge (ESD) Control Program Plan DI-RELI-80669A
A015 Handling Procedures for Electrostatic Discharge (ESD) Sensitive Items DI-RELI-80671A
A016 Electromagnetic Interference Control Procedures DI-EMCS-80199C
A017 Integrated Logistics Support Plan (Logistics and Supportability Plan) DI-ILSS-80095
A018 Parts Management Plan (Change Management Plan) DI-SDMP-81748
A019 Operations Security Plan DI-MGMT-80934C
A020 Test Plan (Delta Qualification Test Plan) DI-NDTI-80566A
A021 Test Procedure (Delta Qualification Test Procedure) DI-NDTI-80603A
A022 Test/Inspection Report (Delta Qualification Test Report DI-NDTI-80809B
A023 Acceptance Test Plan DI-QCIC-80553A
A024 Acceptance Test Report (ATR) DI-QCIC-81891
A025 Product Drawings/Models and Associated Lists DI-SESS-81000E/T
A026 Engineering Change Proposal (ECP) DI-CMAN-80639C
A027 Item Unique Identification (IUDI) Marking Plan DI-MGMT-81803
A028 Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
DI-MGMT-81804A
A029 Failure Analysis and Corrective Action Reports DI-SESS-81315B
A030 Quality Assessment Report DI-QCIC-81187
A031 Trip/Travel Report (Troubleshooting Resolution Trip Report) DI-MISC-81943
A032 Technical Report – Study/Services DI-MISC-80508B/T
A033 Technical Report – Study/Services (Trade Studies) DI-MISC-80508B/T
A034 Technical Report – Study/Services (FRACAS Database Output) DI-MISC-80508B/T
A035 Technical Report – Study/Services (Failed Parts Report) DI-MISC-80508B/T
A036 Technical Report – Study Services (Supply chain Risk Management Threat and Vulnerability Products)
DI-MISC-80508B/T
A037 Nuclear Certification Impact Statement (NCIS) DI-NUOR-81888A
A038 Certification Requirements Plan DI-NUOR-81409A
A039 Aircraft Nuclear Safety Analysis Report (NSAR) DI-NUOR-81405A/T
A040 Engineering Evaluation Report (EER) DI-NUOR-81411A
A041 Program Protection Implementation Plan (and Classified Annex) DI-ADMN-81306
A042 Engineering Data for Provisioning (EDFP) DI-SESS-81874
A043 Logistics Product Data DI-SESS-81758A/T
A044 Logistics Product Data Summaries (SE Recommended Data (SERD) – Standard/Modified Hand Tools List
DI-SESS-81759A/T
A045 Hazardous Materials Management Program (HMMP) Plan DI-MGMT-8139C
A046 Training Material DI-ILSS-80872
A047 Special Packing Instructions DI-PACK-80121C
A048 Technical Manual Contract Requirement (TMCR) TM 86-01
A049 Data Accession List (DAL) DI-MGMT-81453A
11. DD Form 1423s (full 1423’s)
*1423’s, block A Reference Number: CLIN number to be added at time of award
**1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER __X___
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
REENTRY FIELD SUPPORT
EQUIPMENT (RFSE)
FD2020-14-50519
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001
INTEGRATED PROGRAM MANAGEMENT
REPORT (IPMR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81861/T SOO Paras 5.1, 5.1.1, 5.2 AFNWC/NIBC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT
ASREQ SEE BLK 16
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A
SEE BLK 16 SEE BLK 16
Reg
Repro
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 4:
Formats 1 & 2: Included in the initial delivery, only WBS and
Organization Structure without cost data.
Format 3: Delivered 20 working days following the Integrated
Baseline Review(s)
Format 5: As Required
Format 6: Monthly
Formats 4 & 7: Not required
BLOCK 9:
Distribution Statement D: (see page 2 &3 for distribution statement, warning, and destruction notices)
BLOCK 10, 11, 12 & 13:
Contractor shall submit above stated Formats as stated above. Initial submittal NLT the 20th day of the second month after contract award.
Government will be allowed 20 working days after receipt from contractor to review for approval/disapproval/comments. Contractor shall resubmit corrected IPMR incorporating Government comments, if applicable, NLT 10 working days after receipt from Government.
BLOCK 14a: Contractor shall submit IMPR to ORG1. (See page 7 for address).
ORG1
ORG9 (Lt of delivery only)
ORG10 (Lt of delivery only)
15. TOTAL 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Data Manager
AFNWC/NIES
27 Oct 14
//signed; kws; 27 Oct 14// Kurt W. Schmidt, GS-12
Program Manager
AFNWC/NIBC
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
LM 13-22
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP_________TM__________OTHER _ X_______
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A002 CONFERENCE AGENDA Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81249A SOO Paras 5.1.2, 5.3 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ASGEN N/A
a. ADDRESSEE
Draft
N/A N/A
Distribution Statement D: (see pages 3 & 4 for distribution statement, BLOCKS 10, 12 &13:
Contractor shall submit Conference Agenda (Meeting Agenda) NLT 5 working days prior to the milestone review or any other meeting deemed necessary by the government. Government will be allowed 2 working days after receipt from contractor to review for approval/ disapproval/comments. Contractor shall submit revised Conference
Agenda (Meeting Agenda) incorporating Government comments, if applicable, NLT 2 working days after receipt from Government and
NLT one day before meeting event.
BLOCK 14a:
Contractor shall submit Conference Agenda (Meeting Agenda) to
ORG1 (See page 7 for address).
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER __X___
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A003 BRIEFING MATERIAL Presentation Material
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81605 SOO Paras 5.1.2, 5.3, 5.4 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
BLOCK 10:
Contractor shall submit Briefing Material (Presentation Material) NLT
10 working days prior to each scheduled meeting or any other meeting deemed necessary by the Government. Government will be allowed 5 working days after receipt from contractor to review for approval/ disapproval/comments. Contractor shall present corrected Briefing
Material (Presentation Material), if applicable, addressing Government comments NLT 2 working days after receipt from Government and
NLT two days before meeting event.
BLOCK 14:
Contractor shall submit Briefing Material (Presentation Material) to
ORG1 (see page 7 for email address).
ORG2
15. TOTAL 2
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP_________TM__________OTHER _ X_______
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A004 REPORT, RECORD OF MEETING/MINUTES Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81505 SOO Paras 5.1.2, 5.3 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Meeting Minutes NLT 10 working days after meeting. Government will be allowed 5 working days after receipt from contractor to review for approval/disapproval/comments.
Contractor shall submit revised Meeting Minutes incorporating
Government comments, if applicable, NLT 2 working days after receipt from Government.
Contractor shall submit Meeting Minutes to ORG1 (See page 7 for
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A005 STATEMENT OF WORK (SOW)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81606 SOO Para 5.1 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
R/ASR SEE BLK 16
a. ADDRESSEE
Draft
BLOCKS 10, 11, 12 & 13:
Contractor shall submit initial Statement of Work (SOW) with proposal. If selected, the SOW will be placed on contract.
BLOCK 14: Contractor shall submit SOW to ORG1 (see page 7 for
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP_________TM__________OTHER _ X_______
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A006 MANUFACTURING PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-81889 SOO Para 5.5 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ONE/R SEE BLK 16
a. ADDRESSEE
Draft
BLOCKS 10, 11, 12 &13:
Contractor shall submit initial Manufacturing Plan with proposal.
Government will be allowed to review Plan prior to award of contract.
Contractor, if selected shall submit revised Manufacturing Plan NLT 20 working days after award of contract. Government will be allowed 15 working days after receipt from contractor to review for approval/disapproval/comments. Contractor shall resubmit corrected
Manufacturing Plan incorporating Government comments, if
BLOCK 14a: Contractor shall submit Manufacturing Plan to ORG1.
(See page 7 for address).
15. TOTAL 2
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A007 MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80004A SOO Paras 5.1, 5.2 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ANNLY SEE BLK 16
a. ADDRESSEE
Draft
Contractor shall submit initial Management Plan with proposal.
Government will be allowed to review Plan prior to award of contract.
Contractor, if selected shall submit revised Management Plan NLT 20 working days after award of contract. Government will be allowed 15 working days after receipt from contractor to review for approval/ disapproval/comments. Contractor shall resubmit corrected
Management Plan incorporating Government comments, if applicable, NLT 10 working days after receipt from Government.
BLOCK 14: Contractor shall submit Management Plan to ORG1 (see page 7 for address).
ORG2 (Lt of delivery only)
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A008 MANAGEMENT PLAN Subcontractor Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80004A SOO Para 5.2, 5.5 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Management Plan (Subcontractor
Management Plan) NLT 30 working days after award of contract.
Government will be allowed 20 working days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit updated Management Plan (Subcontractor Management
Plan) incorporating Government comments, if applicable, NLT 10 working days after receipt from Government.
Contractor shall submit revised Management Plan (Subcontractor
Management Plan) no more than once a year if applicable.
Government will be allowed 15 working days after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit updated change pages incorporating Government comments, if applicable, NLT 10 working days after receipt of comments from Government.
BLOCK 14: Contractor shall submit Management Plan
(Subcontractor Management Plan) to ORG1 (see page 7 for address).
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP_________TM__________OTHER _ X_______
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A009
CONTRACTOR’S CONFIGURATION
MANAGEMNT PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-80858B SOO Para 5.2, 5.5 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
BLOCKS 10, 11, 12 &13:
Contractor shall submit the Contractor’s Configuration Management Plan 45 days after contract award. Government will be allowed 15 working days after receipt from contractor to review for approval/disapproval/ comments. Contractor shall resubmit corrected Contractor’s
Configuration Management Plan incorporating Government comments, if
BLOCK 14a: Contractor shall submit Contractor’s Configuration
Management Plan to ORG1 (See page 7 for address).
ORG3
15. TOTAL 1 1
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A010 QUALITY ASSURANCE PROGRAM PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-QCIC-81794 SOO Paras 5.4, 5.5 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit initial Quality Assurance Program Plan with proposal. Government will be allowed to review Plan prior to award of contract. Contractor, if selected shall submit revised Quality
Assurance Program Plan NLT 30 working days after award of contract. Government will be allowed 15 working days after receipt from contractor to review for approval/disapproval/comments.
Contractor shall resubmit corrected Quality Assurance Program Plan incorporating Government comments, if applicable, NLT 10 working days after receipt from Government.
BLOCK 14: Contractor shall submit Quality Assurance Program
Plan to ORG1 (see page 7 for address).
NOTE: Quality Assurance Program Plan shall be submitted IAW
AS9100.
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
CONTRACT DATA REQUIREMENTSLIST
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A011 COUNTERFEIT PREVENTION PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-81832 SOO Para 5.5 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Counterfeit Prevention Plan NLT 30 working days after contract award. Contractor shall submit annual updates to the Counterfeit Prevention Plan every completed 12 months of the contract. Government will be allowed 20 working days, after receipt from contractor, to review for approval/disapproval/comments.
Contractor shall submit revised Counterfeit Prevention Plan
BLOCK 14: Contractor shall submit Counterfeit Prevention Plan to
ORG1 (see page 7 for address).
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER __X___
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A012
SYSTEM ENGINEERING MANAGEMENT
PLAN (SEMP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81785 SOO Para 5.2 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
OTIME SEE BLK 16
8. APP CODE E 11. AS OF DATE 13. DATE OF SUBSEQUENT
a. ADDRESSEE
Draft
Distribution Statement E: (see pages 3 & 4 for distribution statement, BLOCK 10, 12 & 13:
Contractor shall submit System Engineering Management Plan (SEMP)
NLT 30 after award of contract. Government will be allowed 20 working days after receipt from contractor to review for approval/ disapproval/comments. Contractor shall submit revised SEMP
BLOCK 14:
Contractor shall submit SEMP to ORG1 (see page 7 for email address).
ORG4
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A013 CONTRACTOR’S RISK MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81808 SOO Para 5.2 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
N/A SEE BLK 16
Contractor shall submit Contractor’s Risk Management Plan NLT 30 working days after award of contract. Government will be allowed 20 working days, after receipt from contractor, to review for approval/ disapproval/comment. Contractor shall submit revised Risk
Management Plan incorporating Government comments, if applicable, Contractor shall submit subsequent submittals as required by the
Government.
BLOCK 14: Contractor shall submit Contractor’s Risk Management
Plan to ORG1 (see page 7 for address).
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A014
ELECTROSTATIC DISCHARGE (ESD)
CONTROL PROGRAM PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80566A SOO Para 5.5 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
6. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL
Contractor shall submit Electrostatic Discharge (ESD) Control
Program Plan NLT 30 working days after award of contract.
Government will be allowed 20 working days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised ESD Control Program Plan incorporating
Government comments, if applicable, NLT 10 working days after receipt from Government.
BLOCK 14: Contractor shall submit ESD Control Program Plan to
ORG6
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A015
HANDLING PROCEDURES FOR
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE ITEMS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80566A SOO Para 5.5 AFNWC/NIBC
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Handling Procedures for Electrostatic
Discharge (ESD) Sensitive Items NLT 30 working days after award of contract. Government will be allowed 20 working days, after receipt from contractor, to review for approval/disapproval/comments.
Contractor shall submit revised Handling Procedures for ESD
Sensitive Items incorporating Government comments, if applicable, BLOCK 14: Contractor shall submit Handling Procedures for ESD
Sensitive Items to ORG1 (see page 7 for address).
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
//signed; nnb; 27 Oct 14// Nancy N. Baker, GS-12
Kurt W. Schmidt, GS-12
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .