QALI 20-50076.pdf

PDF 903 KB Posted

Attached to
One Way Transfer Federal contract opportunity
Solicitation number
FA8213-20-R-3020
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines a federal contract opportunity for various explosive ordnance items including one way transfers, drogue severance assemblies, cartridge actuated initiators, and multiple types of time delay units. The solicitation involves multiple line items for first article testing, production quantities, and delivery dates between May and December 2021. Delivery locations include Hill Air Force Base, Tinker Air Force Base, and other Department of Defense sites. Production quantities range from 2 to 364 units per line item. The opportunity is open to Pacific Scientific Energetic Material and Chemring Energetic Devices as incumbents. First article testing and reporting requirements are specified according to DD Form 1423. The Department of the Air Force Materiel Command Lifecycle Management Center is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to One Way Transfer, newest first.
File Type Posted
FA821320R3020_______0002.pdf PDF
FA821320R3020_______0001.pdf PDF
AIR SPEC 20-50076.pdf PDF
Packaing_SOW.pdf PDF
ADC_SOW_Jan_2018.pdf PDF
Air Spec 20-40041_20-50042.pdf PDF
EDLs Combined.pdf PDF
Solicitation FA821320R3020.pdf PDF
AIR SPEC 20-50073.pdf PDF
CDRLs.pdf PDF
QALI 20-50041_20-50042.pdf PDF
ES7034.pdf PDF
QALI 20-50004_20-50087.pdf PDF
GFP_FORM.pdf PDF
CADPAD Item Marking Instruction.pdf PDF
Item Description Combined.pdf PDF
Air Spec 20-50004_20-50087.pdf PDF
SPIs Combined.pdf PDF
QALI_50030_50033.pdf PDF
Air Spec 20-50030_20-50033.pdf PDF
JQRSCombined.pdf PDF
QALI 20-50073.pdf PDF
REPSHIP.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46:
2019-05-10T15:45:09-0600
SWANSON.DEVIN.D.1385800432
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: -
DODIC: MU17, MU16, MU15, MU19, MU79, MU18, MJ93, MU80
Text20: 06331, 93455
Text19:
Part Number Line 2:
Contract No: 20-50076
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: B-1B

File details come from the government source that posted it. Updated .