QALI 20-50076.pdf
PDF 903 KB Posted
- Attached to
- One Way Transfer Federal contract opportunity
- Solicitation number
- FA8213-20-R-3020
About this file
This document outlines a federal contract opportunity for various explosive ordnance items including one way transfers, drogue severance assemblies, cartridge actuated initiators, and multiple types of time delay units. The solicitation involves multiple line items for first article testing, production quantities, and delivery dates between May and December 2021. Delivery locations include Hill Air Force Base, Tinker Air Force Base, and other Department of Defense sites. Production quantities range from 2 to 364 units per line item. The opportunity is open to Pacific Scientific Energetic Material and Chemring Energetic Devices as incumbents. First article testing and reporting requirements are specified according to DD Form 1423. The Department of the Air Force Materiel Command Lifecycle Management Center is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821320R3020_______0002.pdf | ||
| FA821320R3020_______0001.pdf | ||
| AIR SPEC 20-50076.pdf | ||
| Packaing_SOW.pdf | ||
| ADC_SOW_Jan_2018.pdf | ||
| Air Spec 20-40041_20-50042.pdf | ||
| EDLs Combined.pdf | ||
| Solicitation FA821320R3020.pdf | ||
| AIR SPEC 20-50073.pdf | ||
| CDRLs.pdf | ||
| QALI 20-50041_20-50042.pdf | ||
| ES7034.pdf | ||
| QALI 20-50004_20-50087.pdf | ||
| GFP_FORM.pdf | ||
| CADPAD Item Marking Instruction.pdf | ||
| Item Description Combined.pdf | ||
| Air Spec 20-50004_20-50087.pdf | ||
| SPIs Combined.pdf | ||
| QALI_50030_50033.pdf | ||
| Air Spec 20-50030_20-50033.pdf | ||
| JQRSCombined.pdf | ||
| QALI 20-50073.pdf | ||
| REPSHIP.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Rev Date: 5 May 2019
Sheet1
| Text46: | |
| 2019-05-10T15:45:09-0600 | |
| SWANSON.DEVIN.D.1385800432 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: M |
| Text31: 8. Shippers (DD250, Reports) |
| undefined_7: M |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: W |
| Text28: 5. LAT |
| undefined_4: V |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: V |
| Text25: 2. Leak Test |
| undefined: V |
| Text36: 1. Explosive Weight |
2. Verify gross leak and fine leak check are performed.
3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: - |
| DODIC: MU17, MU16, MU15, MU19, MU79, MU18, MJ93, MU80 |
| Text20: 06331, 93455 |
| Text19: |
| Part Number Line 2: |
| Contract No: 20-50076 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: B-1B |
File details come from the government source that posted it. Updated .