QALI 20-50041_20-50042.pdf

PDF 139 KB Posted

Attached to
One Way Transfer Federal contract opportunity
Solicitation number
FA8213-20-R-3020
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a quality assurance letter of instruction and related federal contract opportunity solicitation. The quality assurance letter outlines inspection requirements for various critical flight items and energetic materials to be produced under Defense Contract Management Agency oversight. Key deliverables include drogue severance assemblies, one-way transfers, cartridge actuated initiators, and multiple time delay components. First article tests and production quantities are specified for delivery to Hill Air Force Base, Tinker Air Force Base and other Department of Defense destinations by dates ranging from May 2021 to December 2021. The solicitation seeks these same products across fifty-four line items to fulfill various program requirements. Responses are requested from incumbent contractors Pacific Scientific Energetic Materials and Chemring Energetic Devices.

View the file

Other files for this federal contract opportunity

Other files attached to One Way Transfer, newest first.
File Type Posted
FA821320R3020_______0002.pdf PDF
FA821320R3020_______0001.pdf PDF
SPIs Combined.pdf PDF
QALI_50030_50033.pdf PDF
Air Spec 20-50030_20-50033.pdf PDF
JQRSCombined.pdf PDF
QALI 20-50073.pdf PDF
REPSHIP.pdf PDF
ES7034.pdf PDF
QALI 20-50004_20-50087.pdf PDF
GFP_FORM.pdf PDF
CADPAD Item Marking Instruction.pdf PDF
Item Description Combined.pdf PDF
Air Spec 20-50004_20-50087.pdf PDF
AIR SPEC 20-50076.pdf PDF
Packaing_SOW.pdf PDF
ADC_SOW_Jan_2018.pdf PDF
Air Spec 20-40041_20-50042.pdf PDF
EDLs Combined.pdf PDF
QALI 20-50076.pdf PDF
Solicitation FA821320R3020.pdf PDF
AIR SPEC 20-50073.pdf PDF
CDRLs.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 20-50041, 20-50042
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: ACES II Drogue Severance
DODIC: ZY56
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19: PSEMC, CED
Text20: 06331, 93455
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2018-02-14T12:48:08-0700
HANCEY.ALLEN.R.1386816111
Text46: 29 April 2019
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: 811318-6, 6012100-04

File details come from the government source that posted it. Updated .