Air Spec 20-50030_20-50033.pdf

PDF 228 KB Posted

Attached to
One Way Transfer Federal contract opportunity
Solicitation number
FA8213-20-R-3020
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines a federal contract opportunity for the procurement of various ammunition and explosive products. The solicitation involves line items for one way transfer assemblies, drogue severance assemblies, cartridge actuated initiators, and multiple models of time delay units with delivery dates ranging from December 2021 to June 2022. The opportunity is issued by the Department of the Air Force Materiel Command Lifecycle Management Center and shipments would be sent to Hill Air Force Base and Tinker Air Force Base. First article and lot acceptance testing requirements are specified for each line item.

View the file

Other files for this federal contract opportunity

Other files attached to One Way Transfer, newest first.
File Type Posted
FA821320R3020_______0002.pdf PDF
FA821320R3020_______0001.pdf PDF
AIR SPEC 20-50076.pdf PDF
Packaing_SOW.pdf PDF
ADC_SOW_Jan_2018.pdf PDF
Air Spec 20-40041_20-50042.pdf PDF
EDLs Combined.pdf PDF
QALI 20-50076.pdf PDF
Solicitation FA821320R3020.pdf PDF
ES7034.pdf PDF
QALI 20-50004_20-50087.pdf PDF
GFP_FORM.pdf PDF
CADPAD Item Marking Instruction.pdf PDF
Item Description Combined.pdf PDF
Air Spec 20-50004_20-50087.pdf PDF
AIR SPEC 20-50073.pdf PDF
CDRLs.pdf PDF
QALI 20-50041_20-50042.pdf PDF
SPIs Combined.pdf PDF
QALI_50030_50033.pdf PDF
JQRSCombined.pdf PDF
QALI 20-50073.pdf PDF
REPSHIP.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

FD2020-20-50030 / 50033

NSN: 1377-01-382-0647ES

Alt NSN 1377-01-560-1520ES

NSN: 1377-01-382-0650ES

Alt NSN 1377-01-560-2165ES

NSN: 1377-01-382-0670ES

Alt NSN 1377-01-560-1521ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.

2. Department of Defense Identification Code (DODIC): SP83 (0647/1520), SP81 (0650/2165), SP82 (0670/1521)

3. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043)

4. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.3, 19

Apr 2016, reference attachment.

5. Shelf Life Code marking NOT required per MIL-STD-129R.

6. Hazard Classification Information: NSN 1377-01-382-0647ES

Hazard Class/Division: 1.4

Storage Compatibility Group: S

DOT Marking/EX Number: EX1994120182

DOT Shipping Label: EXPLOSIVE 1.4S

UN Serial No.: 0367

Proper Shipping Name: FUZES, DETONATING

Net Explosive Weight per item (NEW): 0.000463

NEW Unit of Measurement: POUNDS

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or

IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an

ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

7. Hazard Classification Information: Alt NSN 1377-01-560-1520ES

Hazard Class/Division: 1.4

Storage Compatibility Group: S

DOT Marking/EX Number: EX2015050196

DOT Shipping Label: EXPLOSIVE 1.4S

UN Serial No.: 0367

Proper Shipping Name: FUZES, DETONATING

Net Explosive Weight per item (NEW): 0.000479

NEW Unit of Measurement: POUNDS

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or

IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an

ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

8. Hazard Classification Information: NSN 1377-01-382-0650ES

Storage Compatibility Group: S

DOT Marking/EX Number: EX1988090738

DOT Shipping Label: EXPLOSIVE 1.4S

UN Serial No.: 0367

Proper Shipping Name: FUZES, DETONATING

Net Explosive Weight per item (NEW): 0.000463

NEW Unit of Measurement: POUNDS

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or

IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an

9. Hazard Classification Information: Alt NSN 1377-01-560-2165ES

Storage Compatibility Group: C

DOT Marking/EX Number: EX2013090400

DOT Shipping Label: EXPLOSIVE 1.4C

UN Serial No.: 0367

Proper Shipping Name: FUZES, DETONATING

Net Explosive Weight per item (NEW): 0.0005

NEW Unit of Measurement: POUNDS

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or

IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an

10. Hazard Classification Information: NSN 1377-01-382-0670ES

Storage Compatibility Group: S

DOT Marking/EX Number: EX1994120183

DOT Shipping Label: EXPLOSIVE 1.4S

UN Serial No.: 0367

Proper Shipping Name: FUZES, DETONATING

Net Explosive Weight per item (NEW): 0.000463

NEW Unit of Measurement: POUNDS

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or

IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an

11. Hazard Classification Information: Alt NSN 1377-01-560-1521ES

Storage Compatibility Group: C

DOT Marking/EX Number: EX2015050197

DOT Shipping Label: EXPLOSIVE 1.4C

UN Serial No.: 0367

Proper Shipping Name: FUZES, DETONATING

Net Explosive Weight per item (NEW): 0.000479

NEW Unit of Measurement: POUNDS

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or

IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an

12. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For

Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.

Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639D)

NORs – CDRL (DI-SESS-80642D)

RFVs – CDRL (DI-SESS-80640D)

Distribution Statement: B, Reason: ADMINISTRATIVE OR OPERATIONAL USE (ref. DoD

5230.24)

13. Item(s) must pass both gross and fine leak checks. MIL-STD.883K(2), Method 1014-16 may be used as guidance/ The existing leak rate limit established for this item(s) will remain the same.

Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

14. Lot Acceptance Test Requirements are: IAW LATEST GOVT APPROVED ATP, CONTRACTOR

15. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

16. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the

PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHJ, E-mail: matthew.tanner.7@us.af.mil

17. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)

18. If Hexanitrostilbene (HNS) explosive amterial is used in the manufacture of this item, the HNS shall meet requirements of Government Document WS5003F (or latest revision), Purchase

Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

19. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121

(http://www.pmddtc.state.gov/regulations_laws/itar.html).

20. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s

Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of

Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.

Recertification test data for materials shall be provided by vendor upon request at no additional http://www.pmddtc.state.gov/regulations_laws/itar.html charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

21. Percussion primers shall have been certified/recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage, and through final installation in end item.

All primers shall be X-rayed in top and side views for critical defects prior to use.

22. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.

MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA.

23. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment #5).

24. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and

Explosives

Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

File details come from the government source that posted it. Updated .