QALI 20-50004_20-50087.pdf

PDF 140 KB Posted

Attached to
One Way Transfer Federal contract opportunity
Solicitation number
FA8213-20-R-3020
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a federal contract opportunity solicitation for various explosive ordnance items and components. The solicitation includes seven line items for products such as initiators, time delays, and severance assemblies identified by national stock numbers and part numbers. Delivery dates range from May 2021 to December 2021 to locations including Hill Air Force Base, Tinker Air Force Base, and various Department of Defense and foreign military supply centers. The solicitation also includes requirements for first article test plans and reports. The agency issuing this solicitation is the Department of the Air Force Materiel Command Lifecycle Management Center.

View the file

Other files for this federal contract opportunity

Other files attached to One Way Transfer, newest first.
File Type Posted
FA821320R3020_______0002.pdf PDF
FA821320R3020_______0001.pdf PDF
AIR SPEC 20-50076.pdf PDF
Packaing_SOW.pdf PDF
ADC_SOW_Jan_2018.pdf PDF
Air Spec 20-40041_20-50042.pdf PDF
EDLs Combined.pdf PDF
QALI 20-50076.pdf PDF
Solicitation FA821320R3020.pdf PDF
ES7034.pdf PDF
GFP_FORM.pdf PDF
CADPAD Item Marking Instruction.pdf PDF
Item Description Combined.pdf PDF
Air Spec 20-50004_20-50087.pdf PDF
AIR SPEC 20-50073.pdf PDF
CDRLs.pdf PDF
QALI 20-50041_20-50042.pdf PDF
SPIs Combined.pdf PDF
QALI_50030_50033.pdf PDF
Air Spec 20-50030_20-50033.pdf PDF
JQRSCombined.pdf PDF
QALI 20-50073.pdf PDF
REPSHIP.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

NSN

PART NUMBER

DODIC

NOUN

1377-00-238-0552ES

2130300-1

M720

Initiator

1377-01-425-0548ES

6124100-1

M720

Initiator

1377-01-648-8442ES

21301900-2

M679

Initiator

1377-01-414-8933ES

6121100

MU78

Initiator

1377-01-318-7696ES

3123900-6

MT 15

Initiator

1377-01-414-8935ES

6123100

MU84

Initiator

1377-01-318-7697ES

3123900-5

MT14

Initiator

1377-01-414-8934ES

6122100

MU87

Initiator

1377-00-299-1512ES

2271500-1

MC61

Initiator, Canopy Actuated

1377-01-166-4265ES

6028200

MH64

Initiator, Canopy Actuated

Contract No: 20-50004/50087
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-15
DODIC: MC60
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2019-04-17T15:36:32-0600
TIDWELL.QUINN.RAY.1241451913
Text46: 17 Apr 2019
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: 821020-1, 6104100

File details come from the government source that posted it. Updated .