QALI 20-50004_20-50087.pdf
PDF 140 KB Posted
- Attached to
- One Way Transfer Federal contract opportunity
- Solicitation number
- FA8213-20-R-3020
About this file
This document contains a federal contract opportunity solicitation for various explosive ordnance items and components. The solicitation includes seven line items for products such as initiators, time delays, and severance assemblies identified by national stock numbers and part numbers. Delivery dates range from May 2021 to December 2021 to locations including Hill Air Force Base, Tinker Air Force Base, and various Department of Defense and foreign military supply centers. The solicitation also includes requirements for first article test plans and reports. The agency issuing this solicitation is the Department of the Air Force Materiel Command Lifecycle Management Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821320R3020_______0002.pdf | ||
| FA821320R3020_______0001.pdf | ||
| AIR SPEC 20-50076.pdf | ||
| Packaing_SOW.pdf | ||
| ADC_SOW_Jan_2018.pdf | ||
| Air Spec 20-40041_20-50042.pdf | ||
| EDLs Combined.pdf | ||
| QALI 20-50076.pdf | ||
| Solicitation FA821320R3020.pdf | ||
| SPIs Combined.pdf | ||
| QALI_50030_50033.pdf | ||
| Air Spec 20-50030_20-50033.pdf | ||
| JQRSCombined.pdf | ||
| QALI 20-50073.pdf | ||
| REPSHIP.pdf | ||
| AIR SPEC 20-50073.pdf | ||
| CDRLs.pdf | ||
| QALI 20-50041_20-50042.pdf | ||
| ES7034.pdf | ||
| GFP_FORM.pdf | ||
| CADPAD Item Marking Instruction.pdf | ||
| Item Description Combined.pdf | ||
| Air Spec 20-50004_20-50087.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Monitor - R: Will monitor testing, may reduce to verification
Notify - N: By phone or email
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
Date
Sheet1
NSN
PART NUMBER
DODIC
NOUN
1377-00-238-0552ES
2130300-1
M720
Initiator
1377-01-425-0548ES
6124100-1
M720
Initiator
1377-01-648-8442ES
21301900-2
M679
Initiator
1377-01-414-8933ES
6121100
MU78
Initiator
1377-01-318-7696ES
3123900-6
MT 15
Initiator
1377-01-414-8935ES
6123100
MU84
Initiator
1377-01-318-7697ES
3123900-5
MT14
Initiator
1377-01-414-8934ES
6122100
MU87
Initiator
1377-00-299-1512ES
2271500-1
MC61
Initiator, Canopy Actuated
1377-01-166-4265ES
6028200
MH64
Initiator, Canopy Actuated
| Contract No: 20-50004/50087 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: F-15 |
| DODIC: MC60 |
| undefined: V |
| undefined_2: V |
| undefined_3: V |
| undefined_4: M |
| undefined_5: W |
| undefined_6: V |
| undefined_7: V |
| undefined_8: V |
| undefined_9: N |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: 1.Inspection |
| Text25: 2. Leak Test |
| Text26: 3. X-Ray/N-Ray |
| Text27: 4. LAT Sample Selection |
| Text28: 5. LAT |
| Text29: 6. Preparation for Shipment |
| Text30: 7. AMMO Data Card Review |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| Text32: 9. Additional Requirements |
| Text33: |
| Text34: |
| Text35: |
| Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements. |
2. Verify gross/fine leak checks are performed per ATP requirements
3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.
| 2019-04-17T15:36:32-0600 | |
| TIDWELL.QUINN.RAY.1241451913 |
| Text46: 17 Apr 2019 |
| Text49: |
| Type name_1: |
| Type name_4: |
| Part Number: |
| Noun: 821020-1, 6104100 |
File details come from the government source that posted it. Updated .