07QALI.pdf

PDF 87 KB Posted

Attached to
Supplies --Explosives Manufacturing Federal contract opportunity
Solicitation number
FA8213-18-R-0243
Issued by
Department of the Air Force Materiel Command

About this file

This federal contract opportunity notice involves an indefinite delivery indefinite quantity contract for the manufacturing of explosives and related supplies. The solicitation seeks suppliers for fourteen line items of explosives including boosters, delay cartridges, deployment actuators, and mortar cartridges. The contract would have a duration of five years and is issued by the Department of the Air Force Materiel Command. Response is open to all responsible sources with proposals due within forty-five days and award intended for Chemring Energetic Devices, Inc. as the incumbent. Qualification requirements would need to be met at time of any award.

Quality Assurance Letter of Instruction

View the file

Other files for this federal contract opportunity

Other files attached to Supplies --Explosives Manufacturing, newest first.
File Type Posted
FA821318R0243_______0001.pdf PDF
14ExhibitA.pdf PDF
06SPIF0013837702.pdf PDF
10JFQR.pdf PDF
09DataPackage.pdf PDF
01AirSpec.pdf PDF
06SPIF0105282081.pdf PDF
06SPIF0127154831.pdf PDF
03ADCSOWJan2018.pdf PDF
03aSOW1.pdf PDF
04CADPADMarkingInstr1.pdf PDF
08ReworkandRepairofNonconformingMaterial.pdf PDF
06SPIF010528207.pdf PDF
12EDL.pdf PDF
13CDRLs.pdf PDF
01aFA821318R0243.pdf PDF
02REPSHIP11Mar14.pdf PDF
11ItemDescription.pdf PDF
06SPIF010907557.pdf PDF
15PricingMatrixandBestEstimatedQuantities.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 18-50243
Date Contract Awarded:
Final Delivery Date FDD:
Program Name:
DODIC: MD47, MU28, MU32, MU96, MU23, MU29, MU89, MU90, SQ22, JM89
undefined: V
undefined_2: M
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: M
undefined_8: M
undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19: CED
Text20: 93455
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Explosive Weight

2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.

3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Project Engineer

2017-08-31T14:55:13-0600
THOM.TRAVIS.R.1369702315
Text46: 31 AUG 2017
Text49:
Type name_1:
Type name_4:
Part Number: ZY57, ME23, MH57, MH60
Noun:

File details come from the government source that posted it. Updated .