01AirSpec.pdf
PDF 16 KB Posted
- Attached to
- Supplies --Explosives Manufacturing Federal contract opportunity
- Solicitation number
- FA8213-18-R-0243
About this file
This document outlines the requirements for an ammunition specification contract opportunity with the Department of the Air Force Materiel Command. The contract requires the production and delivery of various small arms ammunition items identified by National Stock Numbers. Key details include the production of over 25,000 units across 14 line items of ammunition including cartridges, delay devices, and mortar rounds. The contractor must meet requirements for shipping, packaging, labeling, testing, quality assurance, and hazardous materials handling as defined in the specification documents. Product performance, materials traceability, and energetic component aging requirements are also provided.
Air Specification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821318R0243_______0001.pdf | ||
| 03ADCSOWJan2018.pdf | ||
| 07QALI.pdf | ||
| 03aSOW1.pdf | ||
| 04CADPADMarkingInstr1.pdf | ||
| 08ReworkandRepairofNonconformingMaterial.pdf | ||
| 06SPIF010528207.pdf | ||
| 12EDL.pdf | ||
| 13CDRLs.pdf | ||
| 01aFA821318R0243.pdf | ||
| 02REPSHIP11Mar14.pdf | ||
| 11ItemDescription.pdf | ||
| 06SPIF010907557.pdf | ||
| 15PricingMatrixandBestEstimatedQuantities.pdf | ||
| 06SPIF0105282081.pdf | ||
| 06SPIF0127154831.pdf | ||
| 14ExhibitA.pdf | ||
| 06SPIF0013837702.pdf | ||
| 10JFQR.pdf | ||
| 09DataPackage.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRMUNITION SPECIFICATION (Oct 2017)
FD2020-18-50243
NSN: See attached “NSN LIST”
1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A REPSHIP shall include all the following data in accordance with Attached
REPSHIP.
2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment;
and ensure the DCMA provides one information copy of completed Notice of Availability (NOR) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.
3. DODIC Number: See attached “NSN list”
4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test Units in the remarks block. One hard copy of the ACD shall accompany shipments to each shipping location. CDRL
(DI-MISC-80043B).
5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.3, 19 Apr 2016, Attached.
6. Shelf Life Code Marking NOT required per MIL-STD-129.
7. NIIN 014230804 is Inert.
8. For NIIN 010849358 Hazard Class Division: 1.4
Storage Compatibility Group: S DOT Marking: Cartridges for Weapons, Blank DOT Class: 1.4S DOT Label: Explosive 1.4S UN Serial Number: 0014 UN Proper Shipping Name: Cartridges for Weapons, Blank
For NIINs 010907557, 011661350, 011682559, 011684419, 012164889, 013604900, 013604902, 013604903, 013604904, Hazard Class Division: 1.4 Storage Compatibility Group: S DOT Marking: Cartridges, Small arms DOT Class: 1.4S DOT Label: Explosive 1.4S
UN Serial Number: 0012 UN Proper Shipping Name: Cartridges, Small arms
For NIINs 011664266, 015364060 Hazard Class Division: 1.4 Storage Compatibility Group: C
DOT Marking: Cartridges, Power Device DOT Class: 1.4
DOT Label: Explosive 1.4C UN Serial Number: 0276 UN Proper Shipping Name: Cartridges, Power Device
For NIINs 012999862, Hazard Class Division: 1.4 Storage Compatibility Group: S DOT Marking: Release Devices, Explosive DOT Class: 1.4S DOT Label: Explosive 1.4S UN Serial Number: 0173 UN Proper Shipping Name: Release Devices, Explosive
All NSNs:
Net Explosive Weight per item (NEW): see attached “NSN list” NEW Unit of Measurement: Pounds
NEW for all packaging/shipping document shall reflect the NEW identified JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.
9. All Engineering Change Proposals (ECP’s), Notice of Revisions (NORs), and Requests for Variances RFV’s (formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any time(s) on this contract shall be in accordance with EIA- 649-B. Major ECPs, NORs and Critical/Major RFV’s shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECP’s with NORs and Minor RFVs shall be processed by the Cognizant Government Engineer.
ECPs-CDRL (DI-SESS-80639D) NORs-CDRL (DI-SESS-80642D) RFVs-CDRL (DI-SES-80640D) Distribution Statement: B, Reason: Administration or Operational use only (Engineer – ref. DoD 5230.24)
10. Item(s) must pass both gross and fine checks. MIL-STD-883K, Method 1014.15 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.
Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.
CDRL (DI-QCIC-80553A).
11. Electronic Systems to encompass system, subsystem, pieces parts and assemblies shall not contain any substitutes for Tin-Lead solder and finishes. The use of any Tin-Lead solder substitutes requires approval through PCO and cognizant engineer, REFERENCE:
“Airworthiness Advisory (AA-08-02) Lead-Free Electronics” and GEIA-STD-0005-1 & 2.
CDRL (DI-MGMT-81772)
12. Lot Acceptance Test requirements are: In accordance with latest government approved ATP Contractor Specification.
13. The contractor shall furnish a Lot Acceptance Test/Inspection Report in WAWF, CDRL: (DI-
NDTI-80809B).
14. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day Air Force Engineering Organization AFLCMC/EBHJ, Email travis.thom.1@us.af.mil.
15. In the event of test failure(s), a Failure analysis and Corrective Action Report with proposed corrective actions/recommendations is required. (DI-SESS-80255A).
16. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.
17. The age of energetic materials and components (i.e. ALL explosive, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http:/www.pmddtc.state.gov/regulation_laws/itar_official.html).
18. Raw (non-blended) ingredients and materials are used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s MIL- STD/Specification or Government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/test data and Certificate of analysis/Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor technical authority for this specific contract and contract is executed with materials in compliance with said plan.
Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
19. Percussion primers shall have been certified/recertified by performing sensitivity (all-fire/no fire) and dud testing within the past 24 months unless they are Navy certified and have a 2 year certification.
Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.
20. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: see attached QALI
21. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attached ES7034)
22. The contractor shall host a post award meeting at the contractor’s facility no later than 45 days after contract award and provide minutes of the meeting. PM email: timothy.culbertson.2@us.af.mil.
CDRL (DI-ADMN-81505)
23. Contracts involving ammunition and explosives (AE) will contain:
- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives
- DFARS Title 48 Part 252.223-7003, Change in Place of Performance – Ammunition and
Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
- AFMAN 24-204(T), Preparing Hazardous Materials for Military Air Shipments.
File details come from the government source that posted it. Updated .