Atch13_15_Sample_Tasks.pdf

PDF 2 MB Posted

Attached to
A-10 Teamcenter Engineering Services Federal contract opportunity
Solicitation number
FA8202-16-R-1003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 13-15 Sample Tasks 1 2 and 3

View the file

Other files for this federal contract opportunity

Other files attached to A-10 Teamcenter Engineering Services, newest first.
File Type Posted
TeamCenter_Question_Set__4_draft.docx DOCX document
Atch08-PastPerformanceInformationSheet.docx DOCX document
QandARound326July.pdf PDF
FA820216R1003_______0003.pdf PDF
FA820216R1003_______0002.pdf PDF
Atch7_52212-2_SectionM_Evaluation.pdf PDF
QandA_Round2_20July.pdf PDF
Atch11-CommercialClientAuthorizationLetter.docx DOCX document
Atch12-QuestionnaireCoverLetter.docx DOCX document
Atch10-Subcontractor_TeamingConsentLetter.docx DOCX document
Atch_1_PWS_Teamcenter.pdf PDF
Atch2_Pricing_Table.xlsx XLSX spreadsheet
Atch08-PastPerformanceInformationSheet.docx DOCX document
Atch09-PastPerformanceQuestionnaire.doc DOC document
Atch6_52212-1_SectionL_Instructions.pdf PDF
QandA_Round1_30June.pdf PDF
Atch6_52212-1_SectionL_Instructions.pdf PDF
Atch1_PWS_Teamcenter.pdf PDF
FA820216R1003_______0001.pdf PDF
Atch2_Pricing_Table.xlsx XLSX spreadsheet
Atch5_GFP_UpdateAfterAward.pdf PDF
Atch3_CDRLS.pdf PDF
Atch16_WageDetermination_2005-2531.pdf PDF
Atch7_522122_SectionM_Evaluation.pdf PDF
FA820216R1003.pdf PDF
Atch4_DDForm254.pdf PDF
Atch1_PWS_Teamcenter.pdf PDF
Atch6_522121_SectionLInstructions.pdf PDF
Atch18_GFI_Package.zip ZIP file
Atch18_GovernmentFurnishedInformation_GFI.pdf PDF
Atch08_12_PerformanceConfidence.pdf PDF
Atch17_Email_Encryption_Instructions.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

ATTACHMENT 13

SAMPLE TASK #1

DATA ARCHITECTURE AND INTERFACE PLAN

DIRECTIONS:

In accordance with PWS requirement 3.1.h and skill levels 3.2.a, 3.2.d, and 3.2 f, convert this sample task data into a data architecture and interface plan for 107 Field Assistance Requests that include the following:

1. Define applicable system interface type(s)

2. Define database schema requirements with appropriate relationships between data items using Teamcenter’s management tool, including parent/child relationships based on that data provided.

3. Determine WSMT data extraction requirements and Teamcenter data import formatting

4. Identify Teamcenter architecture requirements (assume needed objects, attributes, workflows, etc. do not already exist)

5. Define the Teamcenter deployment process(s) for getting new Teamcenter architecture items into a production environment

6. Determine needed process(s) to ensure all the WSMT data (107s) is synchronized at the end of the task.

Raw Data Items:

A-10 PLM Environment Diagram

ADES (Files: PLM Data Exchange Specification 12-A10DOC-002 rev F.pdf and PLM

Data Exchange Specification 12-A10DOC-002 Appendix Table Fv0.5.xls)

WSMT 107 database schema (File: 107 Database Schema.xlss)

WSMT 107 data extract (File: 107 Data Extract.xlsx)

PRODTESTDEV

A-10 PLM Environment

ATTACHMENT 14

SAMPLE TASK #2

DATA IMPORT AND VALIDATION PLAN

In accordance with PWS requirement 3.1.k and skill levels 3.2.e, 3.2.l, and 3.2.o, convert this sample task data into a data import and validation plan for CCB data that includes the following:

1. Description of needed ADES change requirements

2. Define process(s) for updating Teamcenter database schema in a Production environment

3. Provide a data import format example file

4. Define data validation process(s)

Raw data items:

Data Exchange Specification 12-A10DOC-002 Appendix Table Fv0.5.xlsx)

WSMT CCB database schema (File: CCB Database Schema.xlsx)

WSMT CCB data extract (File: CCB Data Extract.xlsx)

ATTACHMENT 15

SAMPLE TASK #3

SERIAL NUMBER AND UNIT CONFIGURATION TRACKING PLAN

In accordance with PWS requirement 3.1.i and skill levels 3.2.b, 3.2.c, and 3.2.i, convert this sample task data into a serial number and unit configuration tracking plan that includes the following:

1. Description of unit configuration data to be tracked

2. Determination of which Teamcenter module(s) to be used (assume all are available) and any industry best-practices or concerns with this approach

3. Process(s) to establish all unit configurations (assume a subset of 10 aircraft)

4. Data migration process and import sequencing for historical data

5. Teamcenter process(s) for applying flight hours and modification to a specific serial number (configuration) moving forward

Raw data items:

Data Exchange Specification 12-A10DOC-002 Appendix Table Fv0.5.xlsx)

Serial Number Tracking Data (File: Serial Numbers and Events.xlsx)

TCTO Modifications (File: TCTO Data Extract.xlsx)

Flight Hours (File: Fleet Hours.xlsx)

File details come from the government source that posted it. Updated .