About this file

Lead Based Paint Survey (LBP)

View the file

Other files for this federal contract opportunity

Other files attached to Repair Fire Alarms in Bldg 238, newest first.
File Type Posted
Amendment_to_Solicitation_0002.pdf PDF
SOW_238_mod_(002).pdf PDF
FIRE_PROTECTION_128_129.pdf PDF
ANSWERS_TO_CONTRACTOR_QUESTIONS.pdf PDF
Amendment_to_Solicitation_2.pdf PDF
FIRE_ALARM_128_129.pdf PDF
FA8201-16-B-0008_-_Bldg_238_-_Fire_Alarms_-_Attendance_Records.pdf PDF
Index_of_Specifications.pdf PDF
Asbestos_Inspection_Report.pdf PDF
Schedule_of_Drawings.pdf PDF
SOW_238.pdf PDF
KRSM238_152063_Electrical_Drawings_IFC_12-07-2015.pdf PDF
Pricing_Schedule.pdf PDF
2016_05_05_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
B238_Solicitation.pdf PDF
KRSM238_152063_Fire Protection Drawings IFC 12-07-2015.pdf PDF
Davis_Bacon.pdf PDF
SPECS.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building: 238 Replace fire alarm system with up to date system

WO#: 57334 11 July 2016 1400 Hours

DATE:

75TH CES/CEOHA

Building

Inspector:

Building

Note:

In order to print the entire LBP report select: "File", "Print", then select "Entire Workbook", "OK".

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

FROM:

SUBJECT:

Inspection Date:

SCOPE OF WORK: Replace existing fire alarm system with updated system.

XRF Analyzer XL3t 300 (Serial #30660)

Traver Andreasen (Utah Certified Lead Inspector #PB-2085)

It is possible that lead based paint could be encountered during any renovation project. Additional identification for lead based paint on other building components may be required. The facility manager should ensure that these components are surveyed for lead as well, to meet OSHA Standard 29 CFR 1926.62 construction requirements for lead.

Built in:

Refer to "Readings" tab for all readings.

24-April-2014

Building 238

Niton:

3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000 µg/g by dry weight) by laboratory analysis, or more of lead. All other components tested were less than 1 mg/cm².

4-Any effort to disturb lead paint can create lead dust. Please ensure that appropriate abatement, cleanup, and disposal will be accomplished and that the appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions please feel free to call Nickolas King at 586-7094.

Traver Andreasen (Utah Certified Lead Inspector #PB-2085)

Inspector:

1-Lead based paint was non-detected. Please refer to specific results of this inspection; see attachment 1.

2-Limited lead-based paint identification has been completed for, 11-July-2016

ORGANIZATION:

Niton used for this inspection: XRF Analyzer XL3t 300 (Serial #30660)

REQUESTER: