FIRE_ALARM_128_129.pdf
PDF 200 KB Posted
- Attached to
- Repair Fire Alarms in Bldg 238 Federal contract opportunity
- Solicitation number
- FA8201-16-B-0008
About this file
Fire Alarm 128 and 129 First and Second Floor
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_to_Solicitation_0002.pdf | ||
| SOW_238_mod_(002).pdf | ||
| Amendment_to_Solicitation_2.pdf | ||
| FIRE_PROTECTION_128_129.pdf | ||
| ANSWERS_TO_CONTRACTOR_QUESTIONS.pdf | ||
| FA8201-16-B-0008_-_Bldg_238_-_Fire_Alarms_-_Attendance_Records.pdf | ||
| Index_of_Specifications.pdf | ||
| LBP_Inspection_Report.pdf | ||
| 2016_05_05_BASE_FACILITY_DESIGN_STANDARD.pdf | ||
| B238_Solicitation.pdf | ||
| KRSM238_152063_Fire Protection Drawings IFC 12-07-2015.pdf | ||
| Davis_Bacon.pdf | ||
| SPECS.pdf | ||
| Asbestos_Inspection_Report.pdf | ||
| Schedule_of_Drawings.pdf | ||
| SOW_238.pdf | ||
| KRSM238_152063_Electrical_Drawings_IFC_12-07-2015.pdf | ||
| Pricing_Schedule.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U P
U P
XXXXX
X
F E
C
X X
X
14 15
J
K
L
13.1 14.1
J1
J2
J3
J4
J5
J7
K1
J6
J8
EXIST
EXIST
EXIST
K
EXIST
EXIST
13.1 14.1
EXIST
XXX
XXXX
F E
C
F E
C
F E
C
COMM RM
PRODUCTION
OFFICE
OFFICE
TOOL OFFICE
ENG. OFFICE
OFFICE
CONF. ROOM
HALL
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
U t i l i t y
C a b i n e t
U P
D N
U P
D N
FEC
F E
C
14 15
J
K
L
13.1 14.1
J1
J2
J3
J4
J5
J7
K1
J6
J8
EXIST
EXIST
EXIST
K
EXIST
EXIST
13.1 14.1
EXIST
OFFICE
OFFICE
OFFICE
COMM.
B R
Y C
E
B
I S
H O
P
SCALE: 1/8"=1'-0"
FIRE ALARM - FIRST FLOOR - AREA 128 AND 129
N
Y H
K
D A
M
K B
S
R E
P A
I R
S
T O
Y
O
F F
I C
E
C
O M
P L E
X
A I R
C R
A F
T
M
A I N
T
F
A C
B
L D
G
F I R
E
A
L A
M
S
T
N
D
F
L O
O R
FA101
PLAN NOTES
KEYED NOTES
LEGEND
SCALE: 1/8"=1'-0"
FIRE ALARM - SECOND FLOOR - AREA 128 AND 129
N
8'0 4' 16' 8'0 4' 16'
KEY PLAN
126 125 124
132 131
AISLE
AISLE
AISLE
AISLE
A I S
L E
BUILDING 238
COMPOSITE SHOP
1. INSTALL NEW DEVICES FOR THE RENOVATION AREA 128 AND 129 AS AN
EXTENSION OF THE EXISTING FIRE ALARM SYSTEM. THE NEW DEVICES
SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72, UFC 3-600-01,
AND THE HILL AFB FACILITY DESIGN STANDARD. THE EXISTING FACP IS
FCI SERIES 7200 LOCATED ON THE WEST END OF THE BUILDING. THE
LOCATION OF THE EXISTING FACP IS SHOWN IN THE KEY PLAN.
2. PROVIDE NEW HORN/STROBE DEVICES THROUGHOUT FIRST AND
SECOND FLOOR AT AREA 128 AND 129 IN ACCORDANCE WITH NFPA 72
UFC 3-600-01, AND THE HILL AFB FACILITY DESIGN STANDARD.
3. NEW DEVICES SHALL BE CONNECTED TO THE EXISTING FIRE ALARM
SYSTEM AS CLASS B CIRCUIT IN ACCORDANCE WITH NFPA 72.
4. THE EXISTING FIRE ALARM SYSTEM SHALL NOT BE IMPACTED AND
REMAIN FULLY OPERATIONAL DURING THE RENOVATION.
5. CONTRACTOR SHALL PROVIDE FINAL SYSTEM LAYOUT DRAWINGS
INCLUDING BATTERY CALCULATIONS AND VOLTAGE DROP
CALCULATIONS AND OBTAIN APPROVAL OF ALL AUTHORITIES HAVING
JURISDICTION.
6. IT IS THE INTENT OF THESE DOCUMENTS TO PROVIDE DESIGN,
MATERIALS, AND EQUIPMENT FOR A TOTALLY FUNCTIONING AND
OPERATING FIRE ALARM SYSTEMS, INCLUDING THE PROPER
INTERFACING AND COORDINATION WITH ALL OTHER BUILDING
SYSTEMS.
7. THE GENERAL CHARACTER AND SCOPE OF THE WORK IS ILLUSTRATED
IN THE SPECIFICATIONS AND THE DRAWINGS. THE SPECIFICATIONS
AND DRAWINGS ARE DIVIDED INTO SEVERAL SECTIONS FOR
CONVENIENCE ONLY AND ALL OF THE CONTRACT DOCUMENTS MUST
BE CONSIDERED AS A WHOLE. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE COORDINATION OF ALL TRADES,
SUBCONTRACTORS, AND VENDORS ENGAGED IN WORK.
8. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF FIRE ALARM
SYSTEM EQUIPMENT AND FIELD DEVICES. FINAL LOCATIONS,
QUANTITIES, APPLIANCE RATINGS, ETC. SHALL BE PROVIDED BY THE
INSTALLING CONTRACTOR IN ACCORDANCE WITH THE APPLICABLE
CODES, STANDARDS, AND CONTRACT DOCUMENTS.
9. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND
APPROVALS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION.
THE CONTRACTOR SHALL PAY FOR AND SECURE ALL PERMITS AND
FEES FOR FIRE ALARM SYSTEM WORK.
10. COORDINATE FINAL SYSTEM TESTING WITH OTHER CONTRACTORS TO
PROVIDE FULL SYSTEM OPERATION AT TIME OF TESTING.
11. FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING
AND PERFORMING ALL INSPECTIONS AND TESTS AS REQUIRED BY THE
CONTRACTING OFFICER OR THE AUTHORITY HAVING JURISDICTION.
12. ALL FLOOR AND WALL CONDUIT PENETRATION SHALL BE SLEEVED AND
SEALED.
13. ALL WIRING SHALL BE INSTALLED IN CONDUIT. CONDUIT SIZE AND
PERCENTAGE OF FILL SHALL BE DETERMINED BY THE INSTALLING
CONTRACTOR AND SHALL COMPLY WITH THE APPLICABLE STANDARDS
AND SYSTEM MANUFACTURER'S REQUIREMENTS.
14. FIRE ALARM WIRING SHALL NOT BE INSTALLED IN THE SAME CONDUITS
OR JUNCTION BOXES AS LIGHTNING, POWER, OR OTHER WIRING. ALL
JUNCTION BOXES SHALL BE PAINTED RED AND LABELED "FIRE ALARM".
15. PULL ALL CONDUCTORS SPLICE FREE. THE USE OF WIRE NUTS,
CRIMPED CONNECTORS, OR TWISTING OF CONDUCTORS IS
PROHIBITED.
16. ALL ADDRESSABLE CONTROL MODULES AND MONITOR MODULES
SHALL BE LOCATED WITHIN 3 FEET OF THE DEVICES BEING
MONITORED.
17. COORDINATE DUCT SMOKE DETECTION WITH MECHANICAL DESIGN
CONTRACTORS. ALL DUCT SMOKE DETECTOR REMOTE LAMPS AND
TEST STATION SHALL BE ACCESSIBLE, VISIBLE, AND PERMANENTLY
LABELED.
HORN/STROBE CEILING MOUNTED
HORN DEVICE CEILING MOUNTED
1. PROVIDE CONTROL MODULE AND DUCT SMOKE DETECTOR FOR
SHUTDOWN OF RTU-1. PROVIDE REMOTE LAMPS AND TEST STATION
AT AN ACCESSIBLE LOCATION. COORDINATE WITH MECHANICAL
CONTRACTOR.
2. PROVIDE CONTROL MODULE AND DUCT SMOKE DETECTOR FOR
SHUTDOWN OF RTU-2. PROVIDE REMOTE LAMPS AND TEST STATION
AT AN ACCESSIBLE LOCATION. COORDINATE WITH MECHANICAL
CONTRACTOR.
EXISTING FACP
DUCT SMOKE DETECTOR
CONTROL MODULE