Asbestos Survey

View the file

Other files for this federal contract opportunity

Other files attached to Repair Fire Alarms in Bldg 238, newest first.
File Type Posted
Amendment_to_Solicitation_0002.pdf PDF
SOW_238_mod_(002).pdf PDF
Amendment_to_Solicitation_2.pdf PDF
FIRE_ALARM_128_129.pdf PDF
FIRE_PROTECTION_128_129.pdf PDF
ANSWERS_TO_CONTRACTOR_QUESTIONS.pdf PDF
FA8201-16-B-0008_-_Bldg_238_-_Fire_Alarms_-_Attendance_Records.pdf PDF
Index_of_Specifications.pdf PDF
LBP_Inspection_Report.pdf PDF
2016_05_05_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
B238_Solicitation.pdf PDF
KRSM238_152063_Fire Protection Drawings IFC 12-07-2015.pdf PDF
Schedule_of_Drawings.pdf PDF
SOW_238.pdf PDF
KRSM238_152063_Electrical_Drawings_IFC_12-07-2015.pdf PDF
Pricing_Schedule.pdf PDF
Davis_Bacon.pdf PDF
SPECS.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS

N/A

RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.

This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering laboratory at Hill Air Force Base, Utah.

Entire Facility Remove entirefire alarm system.

Replace with new, up-to-date fire alarm system.

Affected Area:

March 2014 William Blackham

309 MXSG

Date Requested:

Requester:

Organization:

Location & Building:

Inspector:

57334

Statement of Work:

DEPARTMENT OF THE AIR FORCE

75 CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

REPLACE & UPDATE FIRE ALARM SYSTEM

HILL AFB BUILDING, 238

Inspection Date:

Work Order:

LIMITED ASBESTOS INSPECTION REPORT, HILL AFB BUILDING, 238

*Per UDAQ definition.

QUANTITY

N/AN/AN/A

24 April 2016 Traver Andreasen (Utah Certified Asbestos Inspector ASB#-4397)

*RACM

*Category I *Category II

FRIABILITY

(During

Removal)*

N/A N/A

SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND

Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing building materials (ACM) that could potentially be encountered in this area. The information gathered from all current and previous inspections is shown below by homogenous area.

MATERIAL TYPE *LOCATIONS FOUND

Building: 238 Replace fire alarm system

WO#: 57334

11 July 2016 1415 Hours

A total of 40 8

Drywall/Joint Compound Wall System, 20,000 Square Feet

GM141358 Northeast, B-2 Area None-Detected

GM141359

North Center, Southeast

Mezzanine None-Detected

GM141360

South Center, Plating

Room None-Detected

GM141361 North Center, Room 150 None-Detected

Drywall/Joint Compound Ceiling System, 100 Square Feet

ASBESTOS

N/A

MATERIAL TYPE

N/A

Drywall/Joint Compound Wall System Sound Deadening Wall Panel Ceiling Tile 2'x2' Pockmarks/Pinholes, White

GM141354 Southwest, Room 166 None-Detected GM141355 North Center, Room 208 None-Detected GM141356 South Center, Sink Area None-Detected GM141357 Southwest, B-2 Area None-Detected

The following table summarizes the sampling data.

Homogenous Building Material, Description, Location, Quantity.

Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.

Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

Ceiling Tile, 2'x2' Textured, White Ceiling Tile, 2'x4' Similated Pockmarks/Pinholes, White suspect materials assesses as part of the inspection.

Sample #

Drywall/Joint Compound Ceiling System

Summary of materials containing ≤1% was identified via "Point Counting". ≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and

29CFR 1910.1001

Ceiling Tile 2'x4' Pockmarks/Pinholes, White Ceiling Tile 2'x4' Wormygrooves/Pinholes, White

QUANTITY *LOCATIONS FOUND

N/A N/A

Sample Location

Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).

Results

The following is a list of the "Suspect Materials" that were sampled as part of this inspection:

samples reference the

WO#: 57334

11 July 2016 1415 Hours

Sound Deadening Wall Panel, Off-White, 1,000 Square Feet

Ceiling Tile 2'x2' Pockmarks/Pinholes Pattern, White, 1,200 Square Feet

Ceiling Tile, Pockmarks/Pinholes Pattern, White, 900 Square Feet

GM141364 Northeast, 2-EP None-Detected GM141365 Southeast, B-2 Area None-Detected GM141366 Northwest, B-2 Area None-Detected

GM141367

Southwest, Eagle Ave.

Hallway None-Detected

GM141368 Northwest, B-2 Area None-Detected GM141369 East Center, Room 171 None-Detected

GM141362

Exterior Northeast, Room

13040 None-Detected

GM141363 Southwest, Room 121 None-Detected

GM141381

Exterior , Confernece

Room None-Detected

GM141382

None-Detected northeast, Room 162 None-Detected

GM141379

Southeast, 530th Break

Room None-Detected

GM141380 Center, 530th Break Room None-Detected Ceiling This 2'x4' Wormygrooves/Pinholes

Pattern, White, 1,200 Square Feet

GM141370 Southwest, DLA Room 121 None-Detected

GM141371 Center, "Old Grind Room" None-Detected

GM141378 None-Detected

None-Detected

GM141384 Southeast, Room 202 None-Detected

Southeast, 2nd Floor NW Engineer Mezzanine

GM141375 South Center, Room 150 None-Detected

GM141376

GM141383

Southeast, APIS Inspector

Office

Hallway, Exterior Rooms 151 & 154

Southeast, Room 174 None-Detected

None-Detected

None-Detected

GM141377

Southwest, Entry Room

GM141372

GM141373

Southeast, Facility Engineer's Office

None-Detected

GM141374 Northwest, Room 168

None-DetectedNortheast, Room, Exterior Room 208

GM141385

Ceiling Tile 2'x2' Textured Pattern, White, 100

Square Feet GM141386 Northwest, Room 202 None-Detected

WO#: 57334

11 July 2016 1415 Hours

POTENTIAL FOR ADDITIONAL MATERIALS:

Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116.

Asbestos/LBP Shop (801)777-8006

This inspection report only encompasses the areas/materials designated within this report. Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.

Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.

This report was inspected by:

Traver Andreasen (Utah Certified Asbestos Inspector ASB#-4397) of the 75 CES/CEOHA Asbestos/LBP Shop.

Cell: (801)430-4785 Supervisor: Nickolas King: DSN: (801)586-7094

Asbetsos/LBP Shop 75 CES(CEOHA)

GM141393

Southeast, 2nd Floor

MXDVAAA Office None-Detected

2'x4' Similated Ceiling Tile, Pockmarks/Pinholes Pattern, White, 500

Square Feet

GM141391

Southwest, Painter Loading Dock Room

None-Detected

GM141392 Northwest, Room 112E

GM141387

Northwest, Entry Room

None-Detected

CONTACT INFORMATION

None-Detected

GM141388 Southeast, Room 164 None-Detected

GM141389

Nothwest, Mezzanine

Office Area None-Detected

GM141390

Northwest, 530th CMMXS

Office in SE Mezzanine Area

None-Detected

Sheet1