Test_Stand_Q_ _A_from_site_visit.docx

DOCX document 15 KB Posted

Attached to
FUEL PUMP TEST STAND UPGRADE Federal contract opportunity
Solicitation number
FA8126-16-Q-0093
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

QUESTIONS ANSWERS

View the file

Other files for this federal contract opportunity

Other files attached to FUEL PUMP TEST STAND UPGRADE, newest first.
File Type Posted
QUESTION_FUEL_PUMP_TEST_STAND.docx DOCX document
Test_Stand_Picture_2.JPG JPG image
Test_Stand_SOW_OC13309_01-27-16.docx DOCX document
Test_stand_Picture_1.JPG JPG image
Test_drawings_TO.pdf PDF
Test_stand_drawings.pdf PDF
Fuel_pump_upgrade__SOW_OC13309_12-10-15_(2).docx DOCX document
fuel_pump_stands_solicitation.pdf PDF
CDRL_TEST_STAND.pdf PDF
FUEL_TEST_TO_33D4-6-643-1.pdf PDF
NEWEST_WAGE_DETERMINATION.txt TXT text file
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for the Fuel Pump Test Stand site visit on 1/26/15

1. Para 1.5 to 1.8, explosion proof vs. air purge?

Answer: All these items shall be UL Rated/labeled C1D2 (Class 1, Division 2) and installed per NEC Article 501. Air purge is not required.

2. G3 0-10” or 0-60 psig Answer: 0-60 psig

3. Para 1.13 Temp Controller only?

Answer: Yes, temperature control only. Alarm is not required.

4. Can the contractor access the test stand?

Answer: Before upgrade, the Government shall operate the test stand to verify that it is operational. If a component (not listed in the SOW for upgrade) would require repair that constrains the contractor from being able to install the upgrade kit, the contractor shall provide the Government with an estimated cost to repair in efforts to make the test stand operational. The government shall have the right to repair component (s) by the Government or contractor. If the Government provides repair, then all costs associated with the repair will be accepted by Government; if it is determined that the contractor shall provide repair, the contractor shall invoice for all costs associated with the repair and provide receipts coordinated via the Contracting Officer Representative (COR) or Government Point of Contact (POC) and gain approval from the Contracting Officer (CO).

5. E-Stop kills all power?

Answer: Yes, E-Stop shall kill all power.

6. Test screen sign on?

Answer: Yes, test screen shall have logon.

7. Air purged yes/no Answer: No

8. Fuel supply by Tinker AFB?

Answer: Yes, test fluid (fuel) is supplied by Tinker AFB.

9. Test stand pictures?

See attachments