QUESTION ANSWER

View the file

Other files for this federal contract opportunity

Other files attached to FUEL PUMP TEST STAND UPGRADE, newest first.
File Type Posted
Test_Stand_Picture_2.JPG JPG image
Test_Stand_Q_ _A_from_site_visit.docx DOCX document
Test_stand_Picture_1.JPG JPG image
Test_Stand_SOW_OC13309_01-27-16.docx DOCX document
Test_drawings_TO.pdf PDF
Test_stand_drawings.pdf PDF
fuel_pump_stands_solicitation.pdf PDF
CDRL_TEST_STAND.pdf PDF
FUEL_TEST_TO_33D4-6-643-1.pdf PDF
NEWEST_WAGE_DETERMINATION.txt TXT text file
Fuel_pump_upgrade__SOW_OC13309_12-10-15_(2).docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION: It has come to our attention that in order to measure 3-Phase 400Hz power (volts, Amps, Frequency, Watts, P.F. etc.), COTS transducers for such measurements to feed into the Siemens PLC I/O modules ARE NOT rated for Class1, Div. 1, nor Div. 2 group D, as required (Ref SOW par 1.2)

Does the technical team have a source that complies with SOW 1.2 related to the 3-Phase 400Hz measurement components? And if so, can you please advise what brand they are? We can plainly see that Nematron, Siemens, and Strong Arm have been defined in the SOW, so I suspect the 400Hz instrumentation OEM is known as well.

ANSWER:

Contractor shall find out how to be in compliance with National Electrical Code. If the contractor cannot find rated components, below is an option to bring non-rated components to compliance.

All components not rated for use in a hazardous environment shall be mounted in Explosion Proof (EP) enclosures. These enclosures shall be cooled via thermo-electric cooling pads (TECs). The TECs transfer the heat from the enclosure to rear-mounted heat sinks. The heat sinks are cooled by air supplied by the explosion proof blower motor mounted beneath the EP enclosures. The status of the blower motor is monitored by the PLC via a current transducer. The PLC controls the starting and stopping of the compressor via a relay. The temperature within EP enclosure shall be monitored via an RTD in each enclosure.

Also for clarification, Air purged shall not be used if this is questioned.