Question Number Question Answer Comments
Can you release a copy of existing stand design documents?
1.2. Scope ‐ The work stands shall be compatible and interchangeable with existing stands in all ways (hydraulic, electrical, air, vacuum, size and dimensions).
3.1.3.4.7 Acceptable Standards ‐ Stands shall be interchangeable with existing work stands
Existing workstand design documents have been posted for contractor reference.
These drawings are provided to ensure that contractor's can design quoted stands that are compatible with the existing stands. Drawings were posted to FBO on 31 July 2017
2 What is the make and model of existing Cart Caddy? Cart Caddy’s; DJ Products Inc. Model No. 5WP HD
Where can the "CD of the current work stands will be provided to the Contracting Officer" be accessed? Are there specifications on the correct model of "Cart Caddy"?
Existing workstand design documents have been posted for contractor reference. These drawings are provided to ensure that contractor's can design quoted stands that are compatible with the existing stands. Drawings were posted to FBO on 31 July 2017
Cart Caddy’s; DJ Products Inc. Model No. 5WP HD
In our bid, should we line our the extensive engineering and design work as a separate cost from the fabrication?
An amendment to the combined synopsis/solicitation to allow for contractors to break out engineer and design work from actual fabrication
Do you know if specialty cranes are desired (to bring up components or tools from floor level to the platforms) to reduce worker fatigue caused by repeated round trips.
No, The only crane required is the one on the tail stand, capable of 1200 lb lifting capacity.
6 Is there a more specific scope of work available?
The SOW, Specifications, and current stand design are the only documents provided for this requirement
7 Are heavy forklifts onsite to move the larger piece of the scaffolding and stairs? Yes
8 Section 2.2.3.3 states that tables are needed in each of the production zones. How many total tables are required?
15 Total tables will be needed for production zones The government will revise SPECS and
SOW based on this answer
Section 2.2.1.7 states the design should not require that any leg of any aircraft jack be in any specific orientation when installed on the aircraft in order to get the work stand sections fitted to the aircraft and allow for jacks to be added or removed when necessary. This feature was not visible on the site visit set. If required on this stand set, how are the stands interchangeable as stated in the Statement of Work #MXDEB‐SOW‐002‐JK, Section 1.2?
Stand legs will be oriented and constructed in a way that will not interfere with aircraft jacks when installed. The existing set of stands are required to be installed around the aircraft in a specific order and in some cases have to be maneuvered awkwardly around aircraft jacks. This increases risk of equipment damage and employee injury due to the location of aircraft jacks and location of stand legs. Stands can still be interchangeable with existing stands if the working surface shape is compatible and will mate to the new stands. Aircraft stands do not interlock, rather, are parked next to each other to where working surface is uninterrupted. The government will revise SPECS and
SOW based on this answer
10 What is the supplied hanger wall electrical voltage and phase for each of the four (4) stand set connection points?
Hangar supplied power is 120/208V 3 phase 100A with a pin and sleeve plug. The government will revise SPECS and
SOW based on this answer
1. SOW articles 1.2 and 8.6 require ISO 9001 compliance and certification respectively. Is a compliant system acceptable per 1.2?
ISO 9001 certification is required to be submitted to the government prior to the beginning of work per 8.6.
12 Are there any work hour or day restrictions? Refer to MXDEB‐SOW002‐JK section 3.1.3.4.6 "Scheduling".
13 Does the area designated for stand assembly have power?
As per SOW MXDEB‐SOW002‐JK section 3.13.3.32 section g, utility requirements shall be the responsibility of the contractor.
It was noted that most of the vacuum system was not functional. Is it the intent to continue to install vacuum on stands that do not really require it? If there are specific stands that require vacuum, which are they?
The new set of stands will not require a vacuum system. The government will revise SPECS and SOW based on this answer
15 Please confirm that this is a design build where each stand must be interchangeable with existing stands.
This is a design/build requirement. The existing stand design and documentation have been provided to allow contracts to design/build a stand that is compatible with Tinker's existing stands
16 Has a completion date been established? If not a completion date the number of days for the contract?
Stands should be fully constructed and in place no later than 300 days ADC The government will revise SPECS and
SOW based on this answer 17 What was the contract number of the last stand? FA8125‐10‐M0276 18 Have all 5 of the previous stands been built and installed by the same contractor? Yes 19 What was the previously awarded contract number for the stands that we saw at the site visit? FA8125‐10‐M‐0276
B-52 SiteVisit Question and Answers 1
FA8125-17-Q-0099
The collapsible railings for the engine stands, is there a particular way that is preferred for the railings to collapse for Fork lift access?
Existing engine stands have removable railing. The requirement is required to have fully removable railing
The government will revise SPECS and SOW based on this answer
21 What model and serial number is required for the specific cart caddy requested in the SOW? Existing Cart Caddy: Cart Caddy’s; DJ Products Inc. Model No. 5WP HD
22 Does this project require the contractor to be just ISO9000 compliant or ISO9000 certified?
ISO 9000 certification is required to be submitted to the government prior to the beginning of work per 8.6.
23 The drawings that will be provided, are they what is exactly will be required and what we saw at the Site Visit?
Existing workstand design documents have been posted for contractor reference.
These drawings are provided to ensure that contractors' can design quoted stands that are compatible with the existing stands. Drawings were posted to FBO on 31 July 2017
The additional stands that we located on the stands to allow access to the wings, cockpit glass and radomes, are they required to be mobile and adjustable ?
The walk ups to allow access to stated areas should be removable and allow for minor adjustments to accommodate minor variation in stand placement.
The government will revise SPECS and SOW based on this answer
25 We want to request drawings of the existing DAE platforms and associated components currently in use.
Existing workstand design documents have been posted for contractor reference.
These drawings are provided to ensure that contractor's can design quoted stands that are compatible with the existing stands. Drawings were posted to FBO on 31 July 2017
26 Will there be space and utilities available to facilitate the on base assembly?
As per SOW MXDEB‐SOW002‐JK section 3.13.3.32 section g, utility requirements shall be the responsibility of the contractor. As per SOW 4.1, government shall prepare area for final assembly and furnish adequate work space at installation site.
27 Can you provide us with a desired Quote due date and time along with the required final completion date?
Stands should be fully constructed and in place no later than 300 days ADC. The due date for submission of quotes is located on the FBO posting
28 We are also requesting a few wide angle pictures of the existing platforms. (not really close‐up type) Photos cannot be provided. Site visit of stands and specific questions can be addressed to answer any concerns.