Attachment_3_MXDEB-SOW-002-JK__OCT_24_2016.pdf

PDF 76 KB Posted

Attached to
B-52 Work Platform Federal contract opportunity
Solicitation number
FA8125-17-Q-0099
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Attachment 3 MXDEB-SOW-002-JK OCT 24 2016

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MXDEB-SOW-002-JK

STATEMENT OF WORK

(SOW)

B-52 MAINTENANCE WORK STAND SET

TINKER AIR FORCE BASE, OKLAHOMA

STATEMENT OF WORK #: MXDEB – SOW – 002 – JK

24 Oct 2016

1. INTRODUCTION

The Aircraft Maintenance Group (AMXG) requires the fabrication, delivery and assembly of one (1) set comprehensive modular B-52 silhouette maintenance work stand set for use in the aircraft repair docks in Building 2121, at Tinker Air Force Base, Oklahoma. Contractor shall provide a complete turn-key on-site application, fabrication, inspection, testing, documentation, training, delivery, tools, equipment installation, work stand assembly, labor and other incidentals necessary to provide such work stand set in accordance with this Statement of Work (SOW), Specification MXDEB-SOW-002-JK, attachments and supporting data as provided by the government.

Silhouette stands are work platforms (also referred to as work stands, work stand sets, or stand sets) used in maintenance docks to surround the aircraft for personnel access during Programmed Depot Maintenance (PDM) operations. A B-52 Maintenance Work Stand Set consists of stairways, work platforms, auxiliary step platforms and ladders.

Each set provides lighting, compressed shop air and electric supply outlets for operations to be worked below the work stand sections, on the work platform level and on top of the aircraft back and wings. The work stand set provides access to the aircraft work areas for all of the skills needed to perform their operations while serving as fall protection.

1.1. Problem Statement

Currently there is a need for a state-of-the-art, comprehensive modular work stand set to be fabricated to use with the other work stand sets. Production went from four (4) dock to six (6) dock concept, utilizing all six (6) docks in the building to meet the current workload. The new work stand set must be compatible and parts interchangeable with the existing work stands and provide for Lean process improvement, ergonomics, ISO compliance, ease and speed of set-up, utility distribution, easy connectivity, height adjustments, generic modular design, tool placement, or general flexibility to support the new materials, processes or technology; or for requirements specific to exterior and interior maintenance activities around the aircraft.

1.2. Scope

The contractor shall provide fabrication, delivery, assembly and purchase of a comprehensive modular B-52 maintenance work stand set for use in aircraft docks of Building 2121 that is compatible and parts interchangeable with the other existing work stand sets. The work stand set is to facilitate one aircraft dock and be capable of being moved and used in any of the other aircraft docks in Building 2121. Contractor shall provide complete fabrication, inspection, testing, documentation, training, delivery, tools, installation/assembly, labor and other incidentals necessary to make the work stand set operational and usable. The work stands shall be compatible and interchangeable with existing stands in all ways (i.e. hydraulic, electric, air, vacuum, size and dimension). The new stands shall have all hardware recessed; this includes vacuum lines, to prevent damage from collision. New engine stand forward railings shall be collapsible to allow forklift access. The Government will provide current owner manuals and specifications for new work stands. The proposed work stand set will meet as a minimum the requirements of Specification MXDEB-SOW-002-JK. The contractor shall also provide one (1) motorized units to assist in maneuvering the work stands into position around the aircraft. This unit must be equivalent to the existing Cart Caddy’s’ that are in use today.

The assembly drawings will be provided by the government and shall be used for fabrication of this maintenance work stand set purchase supporting the B-52 weapon system in Building 2121. A CD of the current work stands will be provided to the Contracting Officer (CO). The contractor will need to field verify all dimensions before manufacturing and the Contractor shall provide a complete set of drawings, assembly, design, fabrication and manufacturing and any and all other drawings/drafts which would be required to design, fabricate, manufacture and assemble future stand sets for possible Full and Open Competition procurement. This work stand set purchased shall be assembled on-site and accepted by the government. The government owns the design for any future procurement. The contractor shall be ISO 9000 compliant.

1.3. Impact Statement

If an additional stand is not procured, B-52 production operation will remain inefficient and less productive than they could be. In addition, the B-52 aircraft maintenance operation will experience safety, ISO, production, engineering, and maintenance worker problems. Five (5) set of stands is not sufficient to meet the current need to utilize all six

(6) docks in building 2121. Five (5) sets will not allow for proper transformation to a lean enterprise. Reconfiguring the stands to meet different dock as aircraft phase in and out causes delay as each dock floor is leveled differently. Exposure to worn out stands, from lack of maintenance due to constant use and inability to remove from service can cause low productivity, this in addition to possible Foreign Object Damage (FOD) when the stands are moved in and out to different docks; six (6) set for six (6) dock will reduce the need to move the stands.

2. DOCUMENTATION

2.1. Specification. Specification MXDEB-SOW-002-JK describes the requirements and capabilities that shall be incorporated in the new B-52 maintenance work stand set.

2.2. Additional Supporting Data. The government will provide assembly drawings and any additional required supporting data, based on authorized and availability, not provided in this SOW documentation package, as requested by contractor within 30 calendar days after receipt of award.

2.3. References: All work and equipment provided under this solicitation shall follow good engineering practices as documented in accepted engineering literature, and shall satisfy as a minimum the following publications of the issue in effect on the date of request for proposal that form a part of this statement of work.

2.3.1 American Welding Society (AWS)

AWS D1.1: Structural Welding Code – Steel

2.3.2 American Society of Testing and Materials (ASTM)

ASTM A36: Standard Specification for Carbon Structural Steel.

2.3.3 National Fire Protection Association (NFPA)

NFPA 70-2002: National Electric Code

2.3.4 Occupational Safety and Health Administration (OSHA), including but not limited to:

29 CFR 1910 Subpart D: Walking-Working Surfaces 29 CFR 1910.23: Guarding Floor and Wall Openings and Holes 29 CFR 1910.26: Portable Metal Ladders 29 CFR 1910.27: Fixed Ladders 29 CFR 1910.28: Safety Requirements for Scaffolding

29 CFR 1910.29: Manually Propelled Mobile Ladder Stands and Scaffolds (Towers)

29 CFR 1910 Subpart N: Materials Handling and Storage 29 CFR 1910.179: Overhead and Gantry Cranes 29 CFR 1910.184: Slings 29 CFR 1926.450: Scope, Application and Definitions Applicable to

Subpart L (Scaffolds) 29 CFR 1926.451: General Requirements (Scaffolds) 29 CFR 1926.452: Additional Requirements Applicable to Specific Types of Scaffolds

2.3.5 Air Force Occupational Safety and Health (AFOSH), including but not limited to:

AFOSH 91-5: Welding, Cutting, Brazing AFOSH 91-46: Materials Handling and Storage Equipment AFOSH 91-501: Air Force Consolidated Occupational Safety Standard:

Chapter 7: Walking Surfaces, Guarding Floor and Wall

Openings, Fixed Industrial Stairs, and Portable and Fixed Ladders

Chapter 13: Fall Protection

Chapter 16: Vehicle Mounted Elevating and Rotating Work Platforms, Manually Propelled and Self- Propelled Mobile Work Platforms, and Rolling (Mobile) Scaffolds (Towers)

2.3.6 Tinker Air Force Base Instruction (TAFBI)

TAFBI 32-2001: Fire Prevention – Fire Protection Program

2.3.7 U.S. Air Force Technical Orders (T.O.)

T.O. 1B-B52H-3: Structural Repair Instructions (USAF Series B-52H Aircraft)

T.O. 35-1-3: Corrosion Prevention, Painting and Marking, USAF Equipment

2.4 Order of Precedence. In the event of a conflict between the text of this statement of work and the references cited herein, the text of the statement of work shall take precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

2.5 Definition. Work stands or work stand sections in this statement of work are defined as “Mobile Work Platforms” in AFOSH 91-501.

3. REQUIREMENTS

The contractor shall provide all necessary qualified personnel, management, non-personal administrative and technical services, materials and contractor facilities in support of the requirements of this SOW.

3.1. Task Description

The contractor shall provide engineering services and deliverables to support the following tasks:

3.1.1. Program Management

The contractor shall provide a program plan describing work task, schedule, cost and deliverables (CDRL A004). A program kickoff meeting shall be conducted after task award and prior to delivery of the program plan to ensure all parties fully understand the requirements and are ready to proceed. Additionally, Technical Interchange Meetings (TIMs) shall be convened at intervals as required by the CO. The contractor shall prepare the agenda and minutes of the TIMs as required (CDRL A002 and A003). The contractor shall prepare and deliver monthly status reports (CDRL A001).

Informal communication through face-to-face, telephone, electronic mail, and facsimiles throughout the project is encouraged and shall be supported. All communication either formal or informal shall be documented in writing and shall become a permanent portion of the next scheduled TIM minutes. Any communications either formal or informal that are not introduced as official items at the next scheduled TIM shall not be interpreted as approved by or for the government.

3.1.2. Baseline Requirements

The contractor shall provide complete fabrication, inspection, testing, documentation, training, delivery, tools, labor, and other incidentals necessary in accordance with this SOW, the assembly drawings and specification MXDEB-SOW-002-JK.

3.1.2.1. Requirements Review. The contractor shall hold a requirements review at Tinker AFB within 30 calendar days after contract award. The primary purpose of the review will be the identification of key personnel, and for final clarification of the requirements. The contractor shall prepare the agenda and technical report of this review (CDRL A002). Findings and recommendations will be incorporated into the meeting minutes (CDRL A003).

All reports or submittals by the contractor shall be submitted to the Contracting Officer

(CO).

3.1.2.2. Pre-Fabrication Review (PFR). The contractor shall hold a PFR at Tinker AFB within 60 calendar days before work stand fabrication. A fabrication data package and integrated master schedule shall be provided by the contractor five (5) working days prior to the PFR. The contractor shall prepare the agenda and minutes for the PFR (CDRL A002 and A003).

The contractor shall address as a minimum the following:

a. Integrated Master Schedule (Fabrication Schedule)

b. Personnel Training

c. Equipment Technical Data

d. Warranty Description

e. Assembly Drawing

The fabrication shall be reviewed by the government and the CO shall provide the contractor written comments. If any change requested by the contractor and approved by the CO, the CO may require an additional submittal of the updated drawings to be submitted within 30 calendar days after review.

3.1.3. Final Verification / Limited Production

Upon completion and acceptance of the task requirement 3.1.2 of this contract, the manufacturer shall begin the fabrication and delivery of the B-52 Maintenance Work Stand Set. The contractor shall manufacture a single production B-52 work stand set that will be delivered and assembled on-site at Tinker AFB. The contractor shall also support government personnel with a full functional checkout/demonstration of the work stand set with a B-52 aircraft. This fit-check shall be performed by government personnel, with the Contractor present for consultation and documentation of this fit-check. If any discrepancies are noted, the Contractor shall document the deficiencies and corrective actions for submission to the CO for approval prior to making corrections on all applicable drawings, work stand components, and documentation. Any changes necessary (technical or non-technical) shall be requested by the government to the CO and then issued by the CO.

3.1.3.1. Fabrication

The contractor shall procure the equipment and hardware necessary to support the fabrication of the B-52 work stand set. All equipment and hardware shall be off the shelf items to the fullest extent possible.

The Contractor shall perform all fabrication activities at the contractor’s location and assembled on-site at Tinker AFB.

3.1.3.2. Shipment.

The contractor shall be responsible for work stand preservation, packaging, loading, shipping, unloading, on-site placement and storage at Tinker AFB IAW the manufacturer’s commercial practices unless otherwise specified herein. The contractor shall provide a fully authorized representative on-site at all times during the receipt, assembly, installation, testing, and acceptance. The government shall not provide storage for intermittently shipped equipment.

3.1.3.3. Assembly.

3.1.3.3.1. General Assembly. Safety equipment shall be used during work stand assembly. Safety equipment shall contain up-to-date certifications and shall be in good working condition. Remediation of any component that cannot be assembled properly as a result of errors in manufacturing or deformation due to handling or transportation shall be the responsibility of the contractor. The contractor shall immediately report any discoveries to the CO. Repair methods shall have prior approval by the government before any work is performed. The straightening of steel base fames, tubing, angles, connecting devices, casters or other components shall be done by methods approved by the original component manufacturer and shall follow industry. The contractor shall replace all items damaged beyond acceptable repair.

3.1.3.3.2. Assembly Site Limitations. The contractor shall take the following precautions on-site:

a. All assembly work shall be completed in such a manner as to minimize disruption of government activities. The contractor shall perform any on-site work that shall disrupt government activities during non-production hours and shall be coordinated and approved by the CO.

b. The contractor’s work area shall be maintained clean and orderly.

Debris shall be removed and disposed of daily.

c. Material cutting shall not introduce shavings or chips in, onto or around the aircraft, aircraft access panels, or aircraft engines.

d. All phases of work shall be accomplished safely to comply with OSHA

29 CFR 1910.29, 1926.450, 1926.451, 1926.452, and AFOSH 91-501.

e. The contractor tooling shall not be stored on-site unless in a secured container. All tooling shall be removed at the end of each work shift.

f. The contractor shall be responsible for handling equipment and supplies during progress of the contract.

g. Utility requirements shall be the responsibility of the contractor.

Sources of electrical power and compressed air shall be provided on an “as available” basis. The contractor shall be responsible for ensuring adequate utility supplies and hookups are available on-site prior to the time of need.

h. No welding is permitted within fifty (50) feet of an aircraft.

i. Storage of flammable materials such as paints and solvents shall be in authorized areas and approved through the CO.

j. The contractor shall comply with base requirements on handling hazardous materials. Disposal of hazardous materials shall be coordinated with the CO and performed by the contractor.

k. The contractor employees shall not wear watches, rings, or jewelry within aircraft maintenance areas. Proper personal protective equipment (safety glasses, hearing protection, hard hats, safety shoes and protective coveralls) shall be worn in and around all production areas.

3.1.3.4. Installation Requirements.

3.1.3.4.1. General. The contractor shall provide all necessary equipment necessary to support the delivery, assembly and installation of all items identified in this SOW.

The contractor shall supply all necessary manpower for the on-site installations. The contractor shall coordinate the design and installation details with government and Aircraft Facilities and Engineering (76AMXG/MXDEB) prior to start. Failure to obtain appropriate coordination shall be a cause to stop all activities until proper coordination is obtained.

3.1.3.4.2. Supervision. The contractor shall provide technical supervision and shall be available on-site at all times during the installation, testing, and acceptance by the government.

3.1.3.4.3. Storage. The contractor shall provide lockable storage for security of tools and equipment. The government shall not be responsible for the safety and security of contractor property and shall not assume any risk on behalf of the contractor or any sub-contractors.

3.1.3.4.4. Installation. The contractor shall be responsible for any and all equipment and personnel requirements supporting transportation of equipment during receipt, to and from any storage area, and on the installation site. The storage area may not provide weather protection and are subject to change depending on storage space available. Installation will begin no later than 5 working days after receipt of all fabrication equipment with completion being accomplished within 20 working days after start.

3.1.3.4.5. Fit and Function Tests. The contractor shall perform a complete fit and function test on and around the B-52 aircraft. This test shall be conducted in the presence of government personnel under the direction of an authorized contractor representative. Aircraft personnel, familiar with fitting work stands around the aircraft, shall be provided to perform the assembling and fitting of the work stand sections and components to the aircraft under the supervision of the contractor representative. The contractor is responsible for moving the work stand sections and components into the hangar space in the vicinity of the aircraft as designated by the aircraft production foreman.

3.1.3.4.5.1. The entire B-52 work stand set will be fully functional upon completion of installation. All work stand components shall be capable of a total four (4) hour set-up time by 20 aircraft personnel and one (1) towing vehicle.

3.1.3.4.6. Scheduling. Upon notification to the ACO, the government will establish a storage and preassembly location. Within three (3) working days, the contractor will be notified when and where he may off-load materials on-site. All work shall be performed during normal 8-hour day shift hours (6:45 AM to 4:30 PM) Monday through Friday, and must minimize disruptions to government activities. Contractor shall perform any on-site work that will disrupt government activities during non-production hours and shall be coordinated and approved by the CO. No work will be allowed on weekends or government holidays unless coordinated and approved by the CO.

3.1.3.4.7. Acceptance Standards. Work stands shall be fabricated to be compatible and interchangeable with existing work stands.

3.1.3.4.8. Matching Fit. All components shall be installed in a manner to provide for expansion and contraction; prevent shearing of bolts, screws, and other fasteners;

ensure rigidity of all close fitting sections and components.

3.1.4. Technical Data

3.1.4.1. Commercial Off The Shelf (COTS) Manuals. The contractor shall furnish one (1) copy each at completion, of literature and/or catalogs for the following COTS Manuals (CDRL A012):

a. Operation Manuals shall include assembly procedures.

b. Maintenance Manuals. The contractor shall supply his recommendations for an on-going maintenance program. Program recommendations shall include recommended inspection criteria, intervals and periodic and long-term maintenance operations. Recommendations shall also include quantities and frequency of repair parts to be kept on hand for frequent repairs.

c. Inspection Manuals

d. Training Manuals

e. Spare Parts List – Contractor’s recommended spare parts list (CDRL

A013).

3.1.5. Spare Parts and Proprietary Tools. The contractor shall provide a spare parts kit based on the contractor’s recommended spare parts list. Proprietary or uncommon tools required for maintenance or assembly shall be provided with the work stand set in the quantity of two each per work stand set.

3.1.6. Warranty. The contractor shall provide a warranty period equal to the standard industry practice for the entire work stand set, components and tools.

3.2. TASK REQUIREMENT SUMMARY

Task Requirement

SOW

Section

Performance Threshold PROJECT

SUPPORTED

Program Management

3.1.1 Shall meet the SOW

requirements

Program Management

Baseline Requirements

3.1.2 Shall meet the SOW

requirements

Baseline Requirements

Pre-Fabrication Review (PFR)

3.1.2.2. Shall meet the SOW

requirements

Pre-Fabrication

Final Verification / Limited Production

3.1.3 Shall meet the SOW

requirements

Final Verification

Fabrication 3.1.3.1 Shall meet the SOW requirements

Production

Shipment 3.1.3.2 Shall meet the SOW requirements

Production

Assembly 3.1.3.3 Shall meet the SOW requirements

Production

Installation Requirements

3.1.3.4 Shall meet the SOW

requirements

Production

Fit and Function Tests

3.1.3.4.5 Shall meet the SOW

requirements and perform as intended

Production

Scheduling 3.1.3.4.6 Shall meet the SOW requirements

Production

Acceptance Standards

3.1.3.4.7 Shall meet the SOW

requirements and purpose intended

Production

Matching Fit 3.1.3.4.8 Shall meet the SOW requirements and purpose intended

Production

Technical Data 3.1.4 Data is complete and accurate to meet purpose intended

Production

Spare Parts and Proprietary Tools

3.1.5 Spare Parts Kit and Proprietary

Tools are complete and provided IAW SOW

Production

Warranty 3.1.6 Shall meet the SOW requirements

Table 1: Task Requirement Summary

4. GOVERNMENT FURNISHED EQUIPMENT / MATERIAL

4.1. Facilities. Government shall prepare area for final assembly and furnish adequate work space at installation site.

4.2. Personnel. The government shall provide aircraft personnel to assist the contractor in moving the work stand sections into place around the aircraft for performance of fit and function testing, or for contractor requested exceptions when approved by the government. The contractor representative shall coordinate and supervise the movement and placement of the work stand components.

4.3. Technical

4.3.1. The Government shall make available, to the selected contractor, at least one (1) copy of all referenced government regulations and technical orders. The contractor shall not reproduce any government furnished technical data without written approval from the CO.

4.3.2. Existing Drawings. The Government shall make available, to the selected contractor, one (1) assembly drawings of existing work stands. However, all dimensions will need to be field verified by the contractor due to possible manufacturing discrepancies and/or field modifications. These drawings shall not be modified or reproduced without prior approval by the government engineer(s) and contracting officer.

5. SITE VISITS AND CORRESPONDENCE

5.1. Site Visits. The CO is the point of contact scheduling all site visits. Visitor control is located at Pass and ID, at Air Depot and SE 29th St.

5.2. Contractor Representative: The contractor shall appoint and identify to the government a project manager who shall act as the contractor’s representative in all communications with the government throughout the overall project. The project manager shall be qualified to interpret designs and discuss solutions in all areas of the project with government representatives, particularly the using agency (76AMXG/MXDEB). The contractor’s representative shall be on-site to supervise all fabrication, assembly and testing of the equipment.

6. GENERAL INFORMATION

6.1. Quality. The contractor shall comply with all standard industry practices and procedures and manufacturer’s specifications.

6.2. Hours of Operation. The installation site shall be available to the contractor from 0645 to 1630 hours, Monday through Friday, excluding federal holidays.

6.3. Parts and Materials. The contractor shall use only new equipment, hardware, parts, and materials in performance of this statement of work, unless authorized by the Contracting Officer who shall seek technical guidance from the assigned COTR. All equipment, hardware, parts and materials shall be off-the-shelf items to the fullest extent possible.

6.4. Tool Control. The contractor shall comply with the requirements of Tinker AFB’s Tool Control Program while performing contract services in or around the flight line and maintenance production shop areas at Tinker AFB, OK.

6.4.1. The contractor shall maintain a tool inventory checklist of all tools taken to the work site on Tinker AFB, OK.

6.4.2. The contractor shall inventory every tool on their tool inventory checklist at the beginning and end of each day they are working on-site at Tinker AFB, OK and at the end of each job.

6.4.3. The contractor shall secure all tools located at the work site when the contractor is not in the immediate area. No tools shall be left unattended/unsecured at any time.

6.4.4. The contractor shall make the tool inventory checklist and tools available for random inspection by assigned government representatives.

6.5. FOD Prevention. The contractor shall comply with the requirements of Tinker AFB’s Foreign Object Damage and Prevention Program.

6.5.1. The contractor shall practice good housekeeping at all times, in all areas and ensure all tools, equipment, and hardware is accounted for at the end of each task. The contractor personnel shall remove watches, rings, chains, and other jewelry that could be dropped or become loose.

6.5.2. The ACO shall assign government personnel to brief FOD awareness and prevention to the contractor prior to the contractor starting work in FOD critical areas.

The contractor’s on-site project manager shall be responsible for briefing their work force, on Tinker AFB FOD prevention requirements, before each work shift.

6.6. Environmental Protection and Safety.

6.6.1. Environmental Protection. The contractor shall ensure none of their activities on Tinker AFB emit material, fumes or compounds that are hazardous to the ecological systems of Tinker AFB and its surrounding communities. If during this project the Base Environmental Management office determines ecological hazards are being emitted then the contractor shall immediately cease operations until approved mitigation measure are employed. Approval of all mitigation measure shall be at the discretion of the Base Environmental Management and Bioenvironmental offices.

6.6.1.1. Environmental Restrictions. The following materials, substances and compounds are strictly forbidden from use on Tinker AFB and shall not be brought on the installation by the contractor, their direct workers and their subordinate contractors and workers.

6.6.1.2. Lead: Lead and lead-based compounds including lead-based paints are strictly forbidden.

6.6.1.3. Mercury. Mercury, mercury compounds and free mercury are strictly forbidden.

6.6.1.4. Asbestos. Asbestos or asbestos containing materials are strictly forbidden.

6.6.1.5. Ozone Depleting Compounds. All class 1 ozone depleting compounds (ODCs) or any use during manufacture is strictly forbidden.

6.6.2. Bioenvironmental Protection. The contractor shall ensure all activates do not subject worker to bioenvironmental hazards including excessive noise, production of dust particles, toxic fumes, inadequate lighting, inadequate ventilation and excessive heat.

6.6.3. Safety. The contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations and requirements regarding environmental protection. In the event environmental laws or regulations change during the term of this contract, the contractor shall comply with such laws when enacted. The contractor shall comply with all safety practices posted in the assigned work area.

7. DATA ITEM DELIVERABLES

CDRL DID ITEM DESCRIPTION PROJ. SUPPORTED

A001 DI-MGMT-80368/T Status Reports Baseline and

Production A002 DI-ADMN-81249A/T Meeting Agenda Baseline and

Production A003 DI-ADMN-81250A/T Meeting Minutes Baseline and

Production A004 DI-MGMT-8004 Management Plan Baseline and

A009 DI-MISC-81183A Integrated Master Schedule

(IMS)

Baseline and Production

A012 DI-TMSS-80527A/T Commercial Off-the-Shelf (COTS) Manual and Associated. Supplemental Data

Production

A013 DI-ILSS-80134A Proposed Spare Parts List Production Table 2: List of CDRLs

8. SPECIAL REQUIREMENTS

8.1. Security. The contractor shall comply with existing government procedures for obtaining contractor credentials to work on-site, and government procedures for contractor access to government legacy data systems. While inside DoD facilities, the contractor shall wear government-approved identification badges on their outer garment in the chest area. DOD facilities are defined as any space open or covered that is directly owned by or leased to the Department of Defense for the United States of America.

8.2. Base Location. The contractor and contractor representatives shall contact the government representative, assigned by the ACO, for directions to the base. After arriving at the designated entry gate, the contractor shall telephone the assigned government representative for further instructions or to be escorted on to the base.

8.3. Foreign Nationals. A foreign national is defined as any person who does not pose a legal certificate of citizenship in the United States of America. The contractor shall notify the ACO of foreign nationals prior to allowing them entry to any DOD facility.

Special rules shall apply to foreign nationals and shall be explained to the contractor once such individuals have been identified to the ACO.

8.4. Safety Requirements. The contractor shall comply with Industrial Safety Requirements provided in Appendix C of this PWS.

8.5. Travel. The contractor shall travel, as required, to complete this effort.

8.6. Quality Assurance. The contractor shall establish, document, and maintain a quality system certified to the International Organization for Standardization (ISO) 9001 regulation. This certification is required as a means of ensuring quality control for services under this contract. The contractor shall submit a copy of their ISO 9001 certification to the government prior to beginning work.

8.7. Other Information. The contractor may be required to directly interface with competitive system development and/or upgrade source selection sensitive information.

The contractor shall accomplish non-disclosure agreements prior to any access to competition-sensitive or proprietary data, information, or documents.

8.8. Periods of Performance. Period of performance is 12 months through fabrication and installation of any production work stand set.

APPENDIX "A"

APPENDIX "B"

APPENDIX "C"

INDUSTRIAL SAFETY REQUIREMENTS

FILE NO: SEG-04-230

PREPARED BY: OC-ALC/SEG

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements. The contractor shall implement a safety program that ensures protection of Government personnel and property. The program shall consist of, as a minimum:

1. Mishap notification/reporting as defined in Section I.B. below.

2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in THE CONTRACT.

B. Mishap Notification.

1. The contractor shall notify the procuring Safety Office or a designated Government Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who shall forward it to the Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.

2. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.

Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.

SECTION II - SAFETY PROGRAM ELEMENTS

The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements

Element/Requirement Referenced Benchmark

Mishap Notification/Reporting

Housekeeping

Material Handling Equipment (MHE)

Handling, Storage and use of Flammable/Combustible Liquid

Vehicle Operations

Tool Control

Foreign Object Damage (FOD)

Tobacco Use in the Air Force

AFI 91-204

AFOSH Std 91-501

AFOSH Std 91-46 and AFOSH Std 91-501

AFOSH Std 91-501

AFI 91-207

AFMCI 21-107

AFI 21-101, and AFMCI 21-122

AFI 40-102

SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES

These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.

AFI 91-204, May 01, Safety Investigations and Reports

AFI 91-207, Oct 95, USAF Traffic Safety Program

AFOSH Std 91-66, Oct 97, General Industrial Operations

AFOSH Std 91-501, Sep 02, Air Force Consolidated Occupational Safety Standard

AFI 21-101, Oct 02, Foreign Object Damage (FOD)

AFMCI 21-122, Dec 00, Foreign Object Damage (FOD) and Dropped Object (DO) Awareness and Prevention Program

AFMCI 21-107, May 01, Tool Control

AFI 40-102, Jun 02, Tobacco Use in the Air Force