Attachment_3.doc

DOC document 41 KB Posted

Attached to
Cooling Water Testing Services Federal contract opportunity
Solicitation number
FA8125-14-R-0009
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Attachment 3

View the file

Other files for this federal contract opportunity

Other files attached to Cooling Water Testing Services, newest first.
File Type Posted
Appendix_D.pdf PDF
FA8125-14-R-0009_Amendment_0001.doc DOC document
Attachment_2doc.doc DOC document
FA8125-14-R-0009_Draft_Solicitation.pdf PDF
Appendix_C.pdf PDF
Wage_Determination_(19_June_13).pdf PDF
PWS.pdf PDF
Appendix_A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

CHEMICAL USAGE

EQUIPMENT LISTING

(PMXG)

NO
COOLING SYSTEM
BUILDING LOCATION
OC

Numbers

CHEMICALS
ESTIMATED ANNUAL USAGE
1
HEAT TREAT ANNEX - FURNACES

Fluid Cooler/Open Loop (East)

3001 Post Location On Roof H.T.
OC#17692
Tower Pack 2

Algaecide NF

Liquid Chlorine 200 gal

50 gal

25 gal

2
HEAT TREAT ANNEX - FURNACES

Fluid Cooler/Open Loop (West)

3001 Post Location On Roof
OC#16520
Tower Pack 2

Algaecide NF

Liquid Chlorine 200 gal

50 gal

25 gal

3
HEAT TREAT ANNEX - FURNACES

Closed Loop Post Location D-9

OC#16855
CST-90

350 gal

4
HEAT TREAT - FURNACES

Fluid Cooler/Open Loop Post Location Outside N. End H.T

OC#13887
Tower Pack 2

Algaecide NF

Liquid Chlorine 300 gal

100 gal

100 gal

5
HEAT TREAT - FURNACES

Closed Loop Post Location North of J-2

OC#14542
Propylene Glycol

N/A

6
HEAT TREAT - POLYCOLDS

Closed Loop Post Location G-75 E. Wall/H.T

OC#14952
CST-90

10 gal

A-3

File details come from the government source that posted it. Updated .