Appendix_A.pdf

PDF 188 KB Posted

Attached to
Cooling Water Testing Services Federal contract opportunity
Solicitation number
FA8125-14-R-0009
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Appendix A Equipment Listing

View the file

Other files for this federal contract opportunity

Other files attached to Cooling Water Testing Services, newest first.
File Type Posted
Attachment_3.doc DOC document
Attachment_2doc.doc DOC document
Appendix_D.pdf PDF
FA8125-14-R-0009_Amendment_0001.doc DOC document
FA8125-14-R-0009_Draft_Solicitation.pdf PDF
Appendix_C.pdf PDF
Wage_Determination_(19_June_13).pdf PDF
PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A

OC No./

Equipment ID Description Manufacturer Model No. Serial No.

Owning

Organization Location

System Type/

Testing Frequency

1 OC11516 Cooling Tower Marley Cooling Quadraflow 23203 85290 CMXG

B212

(Exterior)

2 OC11517 Cooling Tower Marley Cooling Quadraflow 23203 85290 CMXG

B212

(Exterior)

3 OC11518 Cooling Tower Marley Cooling Quadraflow 23203 85290 CMXG

B212

(Exterior)

4 OC17692

Fluid Cooler

(East) Baltimore Air Coil FXV-364-31R U053394503 PMXG

B3001 Heat Treat

(Annex Roof)

5 OC15620

Fluid Cooler

(West) Baltimore Air Coil FXV-364-31R U053394501 PMXG

B3001 Heat Treat

(Annex Roof)

6 OC16855 Control Panel

Automated Building

Systems MPCST52NDJ00T 21051200085 PMXG

B3001 Heat Treat

(Column D9)

7 OC13887 Fluid Cooler Recold JWH-115C 991006 PMXG

B3001 Heat Treat

(Exterior)

8 OC14542

Furnace Cooling

Water System Process Equipment PMXG

B3001 Heat Treat

(Column J2)

9 OC14952

Chilled Water

System Matherly Mechanical PMXG

B3001 Heat Treat

(Column G75)

Closed Loop - Weekly

(Molybdate)

15-Nov-13

Cooling Water Test and Treatement

Open Loop - Weekly

Open Loop - Weekly

Closed Loop - Weekly

(Molybdate)

Open Loop - Weekly

Closed Loop - Quarterly

(Prop. Glycol)

File details come from the government source that posted it. Updated .