FA811814R0001_______0002.pdf

PDF 95 KB Posted

Attached to
Repair/Overhaul of B-2 Flight Control Actuators (FCA)
Solicitation number
FA8118-14-R-0001
Issued by

About this file

RFP AMENDMENT 0002

View the file

Other files

File Type Posted
FA811814R0001_REDACTED_JA.pdf PDF
AppxA_27Jan15.docx DOCX document
SGFP_Attachment0002_Addendum.xlsx XLSX spreadsheet
SGFP_Attachment0001_Addendum.xlsx XLSX spreadsheet
AppxB_10Feb15.docx DOCX document
CDRLS_28MAR13_Rev1.pdf PDF
SGFP_Attachment0003.pdf PDF
SGFP_Attachment0003_Addendum.xlsx XLSX spreadsheet
SGFP_Attachment0001.pdf PDF
SGFP_Attachment0002.pdf PDF
FA811814R0001_______0001.pdf PDF
12_35936_SPI_5488.pdf PDF
12_35936_SPI_1089.pdf PDF
12_35936_Packaging_158.pdf PDF
12_35936_SPI_01_262_2689.pdf PDF
DRAFT_Implementation_Agreement.pdf PDF
12_35936_CAV_AF_SOW.pdf PDF
12_35936_DID_81178.pdf PDF
12_35936_Bond_room_list.pdf PDF
12_35936_DID_80728A.pdf PDF
12_35936_DID_81749A.pdf PDF
12_35936_DID_81634B.pdf PDF
12_35936_SPI_01_262_2686.pdf PDF
12_35936_SPI_01_262_2687.pdf PDF
Moog_and_OC-ALC_PA_FINAL_SIGNED_11_DEC_13.pdf PDF
12_35936_DID_81220A.pdf PDF
12_35936_DID_80807.pdf PDF
12_35936_SPI_01_262_2688.pdf PDF
12_35936_Packaging_158.pdf PDF
12_35936_DID_81255.pdf PDF
12_35936_Transportation.pdf PDF
12_35936_Rotable_Pool_List.pdf PDF
12_35936_PWS.pdf PDF
12_35936_SPI_01_262_2685.pdf PDF
12_35936_DID_81534.pdf PDF
12_35936_CDRLs1.pdf PDF
AF_Proposal_Adequacy_Checklist.pdf PDF
FA811814R0001.pdf PDF
12_35936_Safety_Specification.pdf PDF
12_35936_SPI_01_266_2270.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NO.

FA8118-14-R-0001-0002

3. EFFECTIVE DATE

10 FEB 2015

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFSC PZABB

3001 STAFF DR STE 1AC4 99A

TINKER AFB OK 73145-3303

BUYER: Michelle Syth/AFSC/PZABB michelle.syth@us.af.mil Phone: (405) 739- 9444 Fax: (000) 000-0000 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8118

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA811814R0001

9B. DATED (SEE ITEM 11)

19-DEC-2013

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12-FEB-2015 4:00 PM

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Routine

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Amendment/Modification FA8118-14-R-0001-0002

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to revise Section B, Section D, Section I, and Section J as denoted herein:

FIRST: The required delivery for repairs, overhauls, and TT&E’s is hereby changed as follows. This required delivery applies to ALL repair, overhaul, and TT&E line items under this RFP.

FROM:

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

TO:

Required delivery:

A) All Repairs and Overhauls shall be delivered as follows:

For Basic Year, Option II, and Option IV delivery shall be at least 4 each servocylinders due every 30 calendar days ARO funded order and assets.

For Option I and Option III, delivery shall be at least 6 each servocylinders due every 30 calendar days ARO funded order and assets.

**Except as otherwise specified, the Contractor has full discretion as to which servocylinders are to be delivered each month. If notified by the Government that a MICAP or priority backorder situation arises on any particular servocylinder(s), the Contractor shall rearrange production so as to expedite delivery of the affected servocylinder(s).

B) For Basic Year and Option I, all TT&E shall be completed within 30 calendar days ARO funded order and asset.

C) See schedule for all other items.

SECOND: The Best Estimated Quantities (BEQs) for several line items have been reduced. See SECTION B, SUPPLIES OR SERVICES AND PRICES/COSTS, herein, for applicable line items and revised BEQs.

THIRD: SECTION D, PACKAGING AND MARKING is hereby added as denoted herein.

FOURTH: AFFARS clause 5352.242-9001, Common Access Cards (CAC) for Contractor Personnel (NOV 2012) is hereby added (see SECTION I, CONTRACT CLAUSES, herein).

5352.242-9001 COMMON ACCESS CARDS (CAC) FOR CONTRACTOR PERSONNEL (NOV 2012)

(a) For installation(s)/location(s) cited in the contract, contractors shall ensure Common Access Cards (CACs) are obtained by all contract or subcontract personnel who meet one or both of the following criteria:

(1) Require logical access to Department of Defense computer networks and systems in either:

(i) the unclassified environment; or

(ii) the classified environment where authorized by governing security directives.

(2) Perform work, which requires the use of a CAC for installation entry control or physical access to facilities and buildings.

(b) Contractors and their personnel shall use the following procedures to obtain CACs:

(1) Contractors shall provide a listing of personnel who require a CAC to the contracting officer. The government will provide the contractor instruction on how to complete the Contractor Verification System (CVS) application and then notify the contractor when approved.

(2) Contractor personnel shall obtain a CAC from the nearest Real Time Automated Personnel Identification Documentation System (RAPIDS) Issuing Facility (typically the local Military Personnel Flight (MPF)).

(c) While visiting or performing work on installation(s)/location(s), contractor personnel shall wear or prominently display the CAC as required by the governing local policy.

(d) During the performance period of the contract, the contractor shall:

(1) Within 7 working days of any changes to the listing of the contract personnel authorized a CAC, provide an updated listing to the contracting officer who will provide the updated listing to the authorizing government official;

(2) Return CACs in accordance with local policy/directives within 7 working days of a change in status for contractor personnel who no longer require logical or physical access;

(3) Return CACs in accordance with local policy/directives within 7 working days following a CACs expiration date; and

(4) Report lost or stolen CACs in accordance with local policy/directives.

(e) Within 7 working days following completion/termination of the contract, the contractor shall return all CACs issued to their personnel to the issuing office or the location specified by local policy/directives.

(f) Failure to comply with these requirements may result in withholding of final payment.

FIFTH: SECTION J, LIST OF ATTACHMENTS is hereby changed as denoted below:

(see Section J, herein, for the full list of applicable attachments for this RFP)

The following attachments are hereby removed from Section J:

Form Number Description/File Name Date Number of Pages DD FORM 1653 Transportation Data 06DEC2011 3

DD FORM 1664 Data Item Description (DID) Depot Maintenance Production Report

DI-ALSS-80728A

24JAN1997 2

Bond Room List 01MAR2013 31

AFMC FORM 158 Packaging Requirements 30JAN2014 2

Rotable Pool List UNDATED 1

DD FORM 1423-1 Contract Data Requirements List (CDRL) 28MAR2013 37

Performance Work Statement (PWS) 04MAY2011 23

Draft Direct Sales Implementation Agreement UNDATED 44

Partnership Agreement 12DEC2013 32

The following attachments are hereby added to Section J:

Form Number Description/File Name Date Number of Pages AppxA_27Jan15.docx Appendix A/PWS

27JAN2015 25

DD FORM 1423-1 CDRLS_28MAR13_Rev1.pdf Contract Data Requirements List Exhibits A thru E

28MAR2013 32

AppxB_10Feb15.docx Appendix B GOVERNMENT PROPERTY

MANAGEMENT

10FEB2015 9

SGFP_Attachment0001.pdf Scheduled Government Furnished Property Attachment 0001 Authorized Government-Furnished Equipment Listing

10FEB2015 100

SGFP_Attachment0001_Addendum.xlsx Addendum to SFGP_Attachment 0001Authorized Government-Furnished Equipment Listing

10FEB2015 38

SGFP_Attachment0002.pdf Scheduled Government Furnished Property Attachment 0002 Rotable Pool for CFM Production Listing

10FEB2015 2

SGFP_Attachment0002_Addendum.xlsx Addendum to SGFP Attachment 0002 Rotable Pool for CFM Production Listing

10FEB2015 1

SGFP_Attachment0003.pdf Scheduled Government Furnished Property Attachment 0003 Government-Furnished Material (Burndown List)

10FEB2015 30

SGFP_Attachment0003_Addendum.xlsx Addendum to SGFP Attachment 0003 Government-Furnished Material (Burndown List)

10FEB2015 18

SIXTH: As a result of FIRST thru FOURTH, the hour and date specified for receipt of Offers is hereby extended as denoted on pg. 1, block 11.

SEVENTH: By signing this solicitation amendment, THE OFFEROR AGREES TO EXTEND THE VALIDITY DATE OF ITS PROPOSAL TO 60 CALENDAR DAYS AFTER THE DATE SPECIFIED IN PG.1, BLOCK 11.

EIGHTH: All other terms and conditions remain unchanged.

Request for Proposal FA8118-14-R-0001-0002

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

BASIC YEAR

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA

NSN: 1650-01-376-1089

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43873-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Applicability: None ;

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed Delivery

A TBD 5 EA

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

BASIC YEAR

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

7 EA

NSN: 1650-01-376-1090

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43718-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 7 EA TBD

Proposed

A TBD 7 EA

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

BASIC YEAR

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA

NSN: 1650-01-378-1942

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43876-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Option Year I

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA

NSN: 1650-01-381-3209 FW

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43872-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

A TBD 10 EA

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Option Year I

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA

NSN: 1650-01-376-1089

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43873-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Applicability: None ;

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Option Year I

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA

NSN: 1650-01-420-5488

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43874-2

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Option Year I

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA

NSN: 1650-01-376-1090

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43718-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Option Year I

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA

NSN: 1650-01-378-1942

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43876-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA

NSN: 1650-01-381-3209 FW

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43872-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA To be Negotiated To be Negotiated

NSN: 1650-01-376-1088 FW

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43871-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-381-3209 FW

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43872-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA To be Negotiated To be Negotiated

NSN: 1650-01-376-1089

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43873-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Applicability: None ;

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-420-5488

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43874-2

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-376-1090

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43718-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-378-1942

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43876-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Option Year III

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA

NSN: 1650-01-381-3209 FW

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43872-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year III

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-381-3209 FW

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43872-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year III

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA To be Negotiated To be Negotiated

NSN: 1650-01-376-1089

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43873-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Applicability: None ;

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year III

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-376-1090

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43718-1 Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year III

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-378-1942

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43876-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Option Year IV

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA

NSN: 1650-01-381-3209 FW

REPAIR OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43872-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year IV

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA To be Negotiated To be Negotiated

NSN: 1650-01-376-1088 FW

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43871-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year IV

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-381-3209 FW

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43872-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year IV

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

5 EA To be Negotiated To be Negotiated

NSN: 1650-01-376-1089

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43873-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Applicability: None ;

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 5 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year IV

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-420-5488

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43874-2

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year IV

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-376-1090

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43718-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Option Year IV

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA To be Negotiated To be Negotiated

NSN: 1650-01-378-1942

OVERHAUL OF B-2 HYDRAULIC SERVOCYLINDER

Manufacturer Part Number 94697 B43876-1

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: IAW Widearea Workflow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) To be determined _ Req No / Pri

Required Delivery

A TBD 10 EA TBD

Proposed

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A TBD

TO BE DETERMINED 00000-0000

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

D.01 PACKAGING REQUIREMENTS (AUG 2014)

WOODEN LUMBER, WOODEN PALLET AND PACKAGING/CONTAINER STATEMENT:

The following statement is in compliance with the United Nations-Implemented restrictions on wood packaging material (WPM). This requirement is specifically concerned with invasive species such as the pinewood nematode. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats.

The statement below cites the requirements in detail and covers lumber for building containers and pallets used for deliveries resulting in shipments worldwide (direct, or through Air Logistics Centers, container consolidations points, or other bases).

All wooden lumber, wooden pallets, and wooden containers produced entirely or in part of wood packaging material (WPM) shall be constructed from debarked wood in addition to the application of heat-treated (HT) material (HT 56 degrees centigrade or 133 degrees Fahrenheit for 30 minutes). Certification/marking is required by an accredited agency recognized by the American Lumber Standards committee (ALSC). For reference documentation, see latest revision of “International Standards for Phytosanitary Measures (ISPM) No. 15, “Regulation of wood packaging material in international trade.”

PACKAGING REQUIREMENTS

PACRN: Qty Per Unit

(QUP)

PRESERVATION

LEVEL:

PACKING

LEVEL:

SPI: SPI

REV:

SPI DATE

PAA 001 MIL-STD-2073-1 B 01-376-1089

PAB 001 MIL-STD-2073-1 B 01-420-5488

ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:

Items shall be packed IAW MIL-STD-2073-1D & marked IAW 129P

PACKAGING REQUIREMENTS (CONTINUED)

SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:

-Items shall be packed IAW MIL-STD-2073-1E & marked IAW 129P

-PRESERVATION, PACKAGING, AND PACKING FOR REPAIR CONTRACTS:

PRESERVATION, PACKAGING, AND PACKING REQUIREMENTS. Assets shipped or received shall meet the preservation, packaging, and packing requirements stated in the contract. The term “Preservation, Packaging, and Packing” is to mean the entire package; this includes, but is not limited to the assets’ wraps, barriers, cushioning, blocking, bracing, and unit an intermediate containers.

PACKAGING DISCREPANCIES. If assets are received in other than the contracted packaging requirements (coded data or Special Packaging Instructions (SPI) drawings) the contractor shall initiate a Supply Deficiency Report (SDR) in accordance with AFJMAN 23-215, Reporting of Supply Discrepancies.

The following exceptions to these requirements may be authorized by the Prime Packaging Specialist at Coml (405) 734-2798. Exceptions when no damage has occurred are as follows:

-Items packaged before the current SPI date.

-The use of an alternate pack provided the prime ALC approved and a deviation number is annotated on the exterior container.

-The next larger size type, I or type II fast pack is used for shipments with priorities 01-08.

-The use of a larger standard pack container for unserviceable items.

ASSET DAMAGES. Damages to assets or containers, attributed to negligence, will be referred to the ACO for action. Damages attributed to improper preservation, packaging, packing or marking will also be referred to the ACO for action in accordance with AFJMAN 23-215, Reporting of Supply Discrepancies.

REUSABLE CONTAINERS. Contractors shall maximize the use of reusable containers by reclaiming and reusing containers marked as “Reusable Container” for the return of assets to the contract designated activity.

Cost reimbursements or material replenishment associated with operation shall be negotiated as part of the contract.

MANUFACTURER/PROCUREMENT OF CONTAINERS. Manufacturing or procurement of fiberboard or wood containers and the costs associated with these functions shall be in accordance with the terms of the contract. Special design containers or fixtures of metal or plastic construction, shall not be manufactured or procured without prior approval of the program manager/ item manager. Negotiation shall be conducted through the applicable ACO.

EXCESS MATERIAL. Government owned material in excess to contract fulfillment and being reclaimed by the government shall be packaged in accordance with contract terms. Packaging Instructions for material not covered in the contract shall be obtained from the ACO.

CONDITION. Material condition code will be placed inside the package along with the repaired asset, and also attached to the outside of the shipping container.

D.02 TRANSPORTATION APPROPRIATION CHARGEABLE (AUG 2014)

The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example, the TAI “TAA” is for the same line item(s) as ACRN “AA”.

FMS TRANSPORTATION ALLOTMENT SHALL BE USED ONLY WHEN SHIPMENT ON GOVERNMENT BILL OF

LADING IS AUTHORIZED.

Insert 3 if movement via surface mode or 2 if movement via airlift in place of any “#” shown. Insert last digit of current fiscal year in place of any asterisk “*” shown when material is shipped.

TAI ATAC FMS ALLOTMENT/NOTE

TAA F2RS

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.242-9001 COMMON ACCESS CARDS (CAC) FOR CONTRACTOR PERSONNEL (NOV 2012)

(IAW AFFARS 5342.490-2)

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Form Number Description/File Name Date Number of Pages CAV_AF_SOW.pdf

CAV AF CFMSTATEMENT OF WORK

13FEB2013 9

DD FORM 1664 DID_80807.pdf Data Item DescriptionFailure Data and Traceability Record DI-RELI-80807

28APR1989 6

DD FORM 1664 DID_81178.pdf Data Item DescriptionReport, Production, or Delivery Problem(s) DI-MGMT-81178

28MAR1991 2

DD FROM 1664 DID_81220A.pdf Data Item DescriptionEI and CI Consumption Repair DI-ALSS-81220A

24JAN1997 4

DD FORM 1664 DID_81255.pdf Data Item DescriptionProduction Status Report

DI-MGMT-81255

02MAR1992 4

DID_81534.pdf Data Item DescriptionTeardown Deficiency Report DI-ALSS-81534

24JAN1997 1

DID_81634B.pdf Data Item DescriptionCAV AF Report

DI-MGMT-81634B

10AUG2007 2

DID_81749A.pdf Data Item Description50/50 Requirement Report

DI-MGMT-81749A

30JUL2012 6

Safety_Specification.pdf 11AUG2011 3

DD FORM 2169 SPI_1089.pdf Special Packaging Instruction 01-376-1089

16JUL2013 3

DD FORM 2169 SPI_5488.pdf Special Packaging Instruction 01-420-5488

09SEP2013 8

AppxA_27Jan15.docx Appendix A/PWS

27JAN2015 25

DD FORM 1423-1 CDRLS_28MAR13_Rev1.pdf Contract Data Requirements List Exhibits A thru E

28MAR2013 32

AppxB_10Feb15.docx Appendix B GOVERNMENT PROPERTY

MANAGEMENT

10FEB2015 9

SGFP_Attachment0001.pdf Scheduled Government Furnished Property Attachment 0001 Authorized Government-Furnished Equipment Listing

10FEB2015 100

SGFP_Attachment0001_Addendum.xlsx Addendum to SFGP_Attachment 0001Authorized Government-Furnished Equipment Listing

10FEB2015 38

SGFP_Attachment0002.pdf Scheduled Government Furnished Property Attachment 0002 Rotable Pool for CFM Production Listing

10FEB2015 2

SGFP_Attachment0002_Addendum.xlsx Addendum to SGFP Attachment 0002 Rotable Pool for CFM Production Listing

10FEB2015 1

SGFP_Attachment0003.pdf Scheduled Government Furnished Property Attachment 0003 Government-Furnished Material (Burndown List)

10FEB2015 30

SGFP_Attachment0003_Addendum.xlsx Addendum to SGFP Attachment 0003 Government-Furnished Material (Burndown List)

10FEB2015 18