12_35936_DID_81178.pdf

PDF 79 KB Posted

Attached to
Repair/Overhaul of B-2 Flight Control Actuators (FCA)
Solicitation number
FA8118-14-R-0001
Issued by

About this file

Data Item Description (DID) Report Production or Delivery Problem(s) DI-MGMT-81178

View the file

Other files

File Type Posted
FA811814R0001_REDACTED_JA.pdf PDF
AppxA_27Jan15.docx DOCX document
SGFP_Attachment0002_Addendum.xlsx XLSX spreadsheet
SGFP_Attachment0001_Addendum.xlsx XLSX spreadsheet
AppxB_10Feb15.docx DOCX document
CDRLS_28MAR13_Rev1.pdf PDF
FA811814R0001_______0002.pdf PDF
SGFP_Attachment0003.pdf PDF
SGFP_Attachment0003_Addendum.xlsx XLSX spreadsheet
SGFP_Attachment0001.pdf PDF
SGFP_Attachment0002.pdf PDF
FA811814R0001_______0001.pdf PDF
12_35936_SPI_5488.pdf PDF
12_35936_SPI_1089.pdf PDF
12_35936_Packaging_158.pdf PDF
12_35936_SPI_01_262_2689.pdf PDF
DRAFT_Implementation_Agreement.pdf PDF
12_35936_CAV_AF_SOW.pdf PDF
12_35936_Bond_room_list.pdf PDF
12_35936_DID_80728A.pdf PDF
12_35936_DID_81749A.pdf PDF
12_35936_DID_81634B.pdf PDF
12_35936_SPI_01_262_2686.pdf PDF
12_35936_SPI_01_262_2687.pdf PDF
Moog_and_OC-ALC_PA_FINAL_SIGNED_11_DEC_13.pdf PDF
12_35936_DID_81220A.pdf PDF
12_35936_DID_80807.pdf PDF
12_35936_SPI_01_262_2688.pdf PDF
12_35936_Packaging_158.pdf PDF
12_35936_DID_81255.pdf PDF
12_35936_Transportation.pdf PDF
12_35936_Rotable_Pool_List.pdf PDF
12_35936_PWS.pdf PDF
12_35936_SPI_01_262_2685.pdf PDF
12_35936_DID_81534.pdf PDF
12_35936_CDRLs1.pdf PDF
AF_Proposal_Adequacy_Checklist.pdf PDF
FA811814R0001.pdf PDF
12_35936_Safety_Specification.pdf PDF
12_35936_SPI_01_266_2270.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTIOtIJ I

FmY14v@8d Oaura 07woIsa

: nlLs- 1. IDENTIFICATION NuMBER

RSPORT , PRODUCTION OR DELIVERY PROBLEM(S) DI-tKM~- al178

-XWW710NJFURFOSE

3.1 The report is used to inform the procuring activity of crises which have developad, or are developing, emd which have the potsmtial to stop, interrupt or severely impact the production or delivery of contract end itsma.

(continued on page 2)

5.OFFICEOP Pai66enYFfEFwJslelu’Tv(em 6b.GIDEP R5WIRE0

910328

‘4Pn.KaTloN/lNleRRElN10N5iaP

7.1 This data item description (DID) contains the format-and content prapsration instructions for the data prodnct generated by the specific sad discrete task requirsmemt sc delineated in the contract.

7.2 This DID is applicable to the acquisition of both hardvare and software systama, aubsystams, components and sqnipmant. It mey be applied to sny contract covering the acquisition of enpplies/sertices, the delivery of which, if stopped

(continwl Oa page 2) “VPROVAL UMITAIION 98. APPLICABLEFORME 9h AMECNUMBER i PREPaaAnori INSTRUCTION

10.1 FormSt. The report shell ha in contractor format.

10.2 Content. The report still confein the following:

10.2.1

10.2.2

Idamtificatioa. Tbe first page of the ieport shall contain the following:

n. Identification of the system/eampanemt/program/project/hull/ectivity involved.

b. Contract f7umber.

c. Preparing activity.

d. 8srial/idantific.stion mnmbar (assignsd by the preparin8 activity), and the date.

e. “’Securityclassification, when required.

Sady of Report. The report shall “contain .Scamplete, but concise, explemation as to the nature and cause of the crisis or problsm snd the current or potential In addition, impact on contract end itsm production, delivery, cost or sckdding.

the report ehall include the following as applicable snd appropriate:

(continued on page 2) i rIIETRISmON 57ATEMEW

Distribution Statement A: Approved for public release; distribution is 1imited.

i Form 1S60.JIJNSS m.iau ddo s am 017s01em PAGE ~ Or ~ PAGEs <m ,,m. .-.301-$ 641 lr— .nna,n-,w/cc,.,..,..“ICI,..,,, -’”- ‘---

I

DI-MGNT- 81178 “

I

Block 3, DESCRIPTION/PORPOSE (centirmed)

3.2. !ixamplesof such crises are: accidents, strikes, %bkontracto’r” “or vendor difficulties or slippage, shortage of material, transportation tie-ups, or othez petential kttlenecks which may impact ceatract snd item production or delivery. . .

Bliick7, APPLIcATION/I NTERRSMTIONSRIP (continued) or interrupted, will adversely effect e military program, project or operation, or the constnction, conversion, overhaul, alteration or maintenance of military ships, systems or equipment.

Block 10, PREPARATION INSTRUCTIONS (centinued) a.

b.

c.

d.

e.

10.2.3 the re

Action(.s) Taken. Describe contractor action(s) taken to remedy the crisis or problem. If no contractor action has been taken, provide a brief explanation.

Action(s) Required. Clearly indicate the action(s) required, the date by which the action is required, and tbe respa-ibl~ party. e.g., contractor, procurina activity, other agency or actznty. ● Revised Data. Revised/updated product ion, delivery, cost or scheduling data should be provided, if available.

Contractor Recommendations. Delineate contractor recommendation(s), if any, to solve the turrent crisis or problcm, to prevent a recurrence, or for procuring activity follow-up.

Appandicss. Tables, references, cherts or other descriptive material or informctiun that vill clarify the crisis or probl~m, or that will support tbe rationale for contractor recomrnmdations, if any, should be prnvided as appendices. Each appendix shall be identified and referenced in the expropriate area of tbe repnrt.

RnDort Preparer. Name and telephone number of the person(s) preparing port.

page 2 of 2 pages

File details come from the government source that posted it. Updated .