G-9_Space_Data_Collection_Requirements_Template_-_28_Oct_15.xlsx
XLSX spreadsheet 3 MB Posted
- Attached to
- Cost Estimating and Modeling (CEM) Federal contract opportunity
- Solicitation number
- FA7014-16-R-5004
About this file
Attachment G-9
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Program
| ProgramTemplate | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| AFCAA CEM Templates | TagName2 | TagValue2 | |
| Program Template | TagName3 | TagValue3 |
| ColumnHead | Parameter Name | Value | Unit of Measure | Estimate or Actual | Source | Notes | Definition of Parameter | VocabularyID |
| Program Name | Program Name | DCARCMetadata | ||||||
| Program Name | DCARC defined Program Name | DCARCMetadata | ||||||
| Name - Short | DCARC defined, acronym | CEMVocab | ||||||
| Name - Popular | An optional alternative name | CEMVocab | ||||||
| Program Description | DCARC defined program description | CEMVocab | ||||||
| Program Number | Program Number | DCARCMetadata | ||||||
| Mil-Handbook | Mil-STD-881 Appendix | DCARCMetadata | ||||||
| Weapon System Type | DCARC defined | DCARCMetadata | ||||||
| Lead Service | DCARC defined Service/Component | DCARCMetadata | ||||||
| Other Services | If a program is "Joint", then list other services involved in the program. | DCARCMetadata | ||||||
| Procuring Organization | SysCom | DCARCMetadata | ||||||
| Program Office | PEO or Program Office | DCARCMetadata | ||||||
| Initial Selected Acquisition Review (SAR) | Date from DAMIR | DCARCMetadata | ||||||
| Latest Selected Acquisition Review (SAR) | Date from DAMIR | DCARCMetadata | ||||||
| Upgrade/Modernization | Yes/No category | CEMVocab | ||||||
| Subprogram Name | Subprogram name if applicable | CEMVocab | ||||||
| Model | Specific configuration or designated model number | CEMVocab |
UOM is N/A for this sheet. Column included only for shape consistency.
Est/Act is N/A for this sheet. Column included only for shape consistency.
Enter text for each parameter.
Copy additional rows as needed for multiple subprograms and models.
Milestone
| MilestoneTable | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| AFCAA CEM Templates | TagName2 | TagValue2 | |
| Milestone Template | TagName3 | TagValue3 |
| ColumnHead | Subprogram Name | |||||||||||||
| Parameter Name | Subprogram | Value | Units | Estimate or Actual | Source | Notes | Value | Units | Estimate or Actual | Source | Notes | Definition of Parameter | VocabularyID | |
| Material Development Decision | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Completion Date | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Milestone A | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Contract Award | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Capability Development Document (CDD) Validation | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Development RFP Release Decision | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Risk Reduction Build | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Milestone B | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| EMD Contract Award | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| System Requirements Review (SRR) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Preliminary Design Review (PDR) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Critical Design Review (CDR) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| First Delivery | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| First Flight | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Development Test & Evaluation Begin | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Development Test & Evaluation End | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Operational Test & Evaluation Begin | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Operational Test & Evaluation End | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Limited Deployment Decision | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Integration Build | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Milestone C | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Limited Deployment | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Deployment Decision (FDD) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Low Rate Initial Production Contract Award | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Rate Production (FRP) Decision | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Rate Production Contract Award | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Initial Operational Capability (IOC) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Deployment (FD) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Operational Capability (FOC) | Date | DDMMMYY | Milestone Date | CEMVocab |
Enter parameter values as a single date value in this column.
Identify if the parameter value is an actual value or an estimated value.
Enter parameter values as a single date value in this column.
Identify if the parameter value is an actual value (A) or an estimated value (E).
If these columns are expanded and used to convey a second subprogram or model, take care to each case in the first column heading cell.
When any parameter calls for additional detail, insert rows underneath and indent sub-names as needed.
For additional columns to express alternative designs, hit Ungroup button above.
When parameter varies by subprogram, enter subprogram name in this column.
If no subprograms, then leave this column empty.
Acquisition (CEM)
| AcquisitionTemplate | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| AFCAA CEM Templates | TagName2 | TagValue2 | |
| Acquisition Template | TagName3 | TagValue3 |
| Material Solution Analysis | Technology Maturation and Risk Reduction | Engineering and Manufacturing Development | Production and Deployment | Sustainment | Disposal | ||||||||||||||||||
| LRIP 1 | LRIP 2 | FRP 1 | FRP 2 | ||||||||||||||||||||
| Contract A | Contract B | Contract A | Contract B | Contract A | Contract B | Contract (Prime) | Contract (Sub) | Contract (Prime) | Contract (Sub) | Contract (Prime) | Contract (Sub) | Contract (Prime) | Contract (Sub) |
| ColumnHead | Parameter name | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Unit of Measure | Units Qualifier | Definition of Parameter | VocabularyID |
| Name - Phase/Contract/Lot | Name/Number | The common name of this phase, contract, or lot. | CEMVocab | ||||||||||||||||||||||||||
| Subphase Name | Name/Number | The common name of this subphase. | CEMVocab | ||||||||||||||||||||||||||
| Contract Number | Name/Number | Prime contract number | CEMVocab | ||||||||||||||||||||||||||
| Option Number | Name/Number | Contract option number if applicable | CEMVocab | ||||||||||||||||||||||||||
| Subcontract Number | Name/Number | Subcontract number. | CEMVocab | ||||||||||||||||||||||||||
| Model | Name/Number | Specific configuration or designated model number | CEMVocab | ||||||||||||||||||||||||||
| Quantity | Quantity | The number of units produced for this Phase | CEMVocab | ||||||||||||||||||||||||||
| Quantity | Quantity | Units for the quantity cited above (e.g. Aircraft, Missiles, Pods, Kits, etc.) | CEMVocab | ||||||||||||||||||||||||||
| Award Date | Date | Date of contract award announcement or beginning of phase. | CEMVocab | ||||||||||||||||||||||||||
| First Delivery Date | Date | The date of the first delivery. | CEMVocab | ||||||||||||||||||||||||||
| End Date | Date | The end data of this phase, contract, or lot. | CEMVocab | ||||||||||||||||||||||||||
| Contracting Strategy | Description | by Phase | Describe this phase's contracting strategy. | CEMVocab | |||||||||||||||||||||||||
| Competition Approach | List | List the Competition Approach: None; Full Phase Competed; Competition thru CDR; etc. | CEMVocab | ||||||||||||||||||||||||||
| Warranty | List | Is there a warranty for this lot? | CEMVocab | ||||||||||||||||||||||||||
| Warranty Type | Description | Describe Warranty | CEMVocab | ||||||||||||||||||||||||||
| Capital Investment | List | Is this the first lot to benefit from capital investment, tooling, plant rearrangement, etc.? | CEMVocab | ||||||||||||||||||||||||||
| Capital Investment Description | Description | Describe capital improvements. | CEMVocab | ||||||||||||||||||||||||||
| Government Test Agency | Name/Number | List Agencies and MIPR or WR numbers | CEMVocab | ||||||||||||||||||||||||||
| Production Rate - Planned Minimum Sustaining | Quantity | Minimum | Minimum economic rate of production. | CEMVocab | |||||||||||||||||||||||||
| Production Rate - Planned 1-8-5 | Quantity | Planned 1-8-5 | Rate of production with factory operating at a single shift. | CEMVocab | |||||||||||||||||||||||||
| Production Rate - Planned Maximum | Quantity | Maximum | Maximum production rate without shift constraints. | CEMVocab | |||||||||||||||||||||||||
| Contractor Name | Name/Number | Name of contractor | CEMVocab | ||||||||||||||||||||||||||
| Special Cases | Description | Define. | CEMVocab | ||||||||||||||||||||||||||
| Additional Information - Program Level | Description | Program Level | Define. | CEMVocab | |||||||||||||||||||||||||
| Funding Appropriation | List | Appropriation code | CEMVocab | ||||||||||||||||||||||||||
| Funding Year | Year | Purpose to track to Budget Exhibits (e.g. capture GFE cost) | CEMVocab | ||||||||||||||||||||||||||
| Multiyear Production | List | Is this lot part of a multiyear contract? | CEMVocab | ||||||||||||||||||||||||||
| Concurrent Production | List | Are there other customers during this phase/lot such as Foreign Military Sales? | CEMVocab | ||||||||||||||||||||||||||
| Information Assurance | Description | List amount of information assurance required. | CEMVocab | ||||||||||||||||||||||||||
| Launch Vehicle Type | List | What type(s) and variant(s) of Launch Vehicle(s) will the Space Vehicle be launched on? | CEMVocab | ||||||||||||||||||||||||||
| Scope of contract | Description | Define. | CEMVocab | ||||||||||||||||||||||||||
| GFE payloads | Description | ??? | Is the Space Vehicle hosting any other payloads for other missions? List and provide description.M44 | CEMVocab | |||||||||||||||||||||||||
| Contract Type | List | What contract type(s) are associated with the program? (Ex: CPFF, CPIF, CPAF, FPIF, FFP, T&M, etc) | CEMVocab | ||||||||||||||||||||||||||
| System Integration Contract | List | Is the system integration effort on this contract? | CEMVocab | ||||||||||||||||||||||||||
| Fee Structure Type | List | What Fee/Incentive structure is associated with the contract(s)? (Ex: Incentive Fee, Award Fee, Performance Fee, Fixed Fee, Milestone Payments, etc) | CEMVocab | ||||||||||||||||||||||||||
| Government Provided Facility | List | List of available facilities where vehicle can be processed and launched | CEMVocab |
The column headings shown are an example only. Modify headings and insert additional columns as needed to fully describe the acquisition plan.
Describe each Phase, Contract, and/or Lot.
Consider using a time-phased Table to fully describe annual quantities. See adjacent sheet "Quantities and O&S Time Phased" Copy the Model and Quantity rows and repeat for each Model or Configured End Item as needed
Acquisition (CARD)
| AcquisitionTable | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| CARD | TagName2 | TagValue2 | |
| Acquisition Table | TagName3 | TagValue3 |
| Material Solution Analysis | Technology Maturation and Risk Reduction | Engineering and Manufacturing Development | Production and Deployment | Sustainment | Disposal | |||||||||||
| Lot 1 | Lot 2 | Lot 3 | Lot 4 | Lot 5 | Lot n | |||||||||||
| ColumnHead | Parameter name | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Unit of Measure | Units Qualifier | Definition of Parameter | VocabularyID |
| Name - Phase/Contract/Lot | LRIP 1 | LRIP 2 | FRP 1 | FRP 2 | FRP 3 | FRP 4 | Text | The common name of this phase, contract, or lot. | CEMVocab | |||||||
| Award Date | Date | Date of contract award announcement or beginning of phase. | CEMVocab | |||||||||||||
| First Delivery Date | Date | The date of the first delivery. | CEMVocab | |||||||||||||
| End Date | Date | The end data of this phase, contract, or lot. | CEMVocab | |||||||||||||
| Contracting Strategy | Description | Describe this phase's contracting strategy. | CEMVocab | |||||||||||||
| Competition Approach | List | List the Competition Approach: None; Full Phase Competed; Competition thru CDR; etc. | CEMVocab | |||||||||||||
| Warranty | List | Is there a warranty for this lot? | CEMVocab | |||||||||||||
| Warranty Type | Description | Describe Warranty | CEMVocab | |||||||||||||
| Capital Investment | List | Is this the first lot to benefit from capital investment, tooling, plant rearrangement, etc.? | CEMVocab | |||||||||||||
| Capital Investment Description | Description | Describe capital improvements. | CEMVocab | |||||||||||||
| Government Test Agency | Text | List Agencies and MIPR or WR numbers | CEMVocab | |||||||||||||
| Production Rate - Planned Minimum Sustaining | Quantity | Minimum economic rate of production. | CEMVocab | |||||||||||||
| Production Rate - Planned 1-8-5 | Quantity | Rate of production with factory operating at a single shift. | CEMVocab | |||||||||||||
| Production Rate - Planned Maximum | Quantity | Maximum production rate without shift constraints. | CEMVocab | |||||||||||||
| Contractor Name | Text | Name of contractor | CEMVocab | |||||||||||||
| Special Cases | Description | Define. | CEMVocab | |||||||||||||
| Additional Information - Program Level | Description | Define. | CEMVocab | |||||||||||||
| Funding Appropriation | List | Appropriation code | CEMVocab | |||||||||||||
| Funding Year | Year | Purpose to track to Budget Exhibits (e.g. capture GFE cost) | CEMVocab | |||||||||||||
| PE Code 1…n | Description | List all applicable Program Element Codes. | CEMVocab | |||||||||||||
| Withhold Rate | Percentage | The percent of budget withheld by parent organization. Aka taxes not directly expended on the program. | CEMVocab | |||||||||||||
| Multiyear Production | List | Is this lot part of a multiyear contract? | CEMVocab | |||||||||||||
| Concurrent Production | List | Are there other customers during this phase/lot such as Foreign Military Sales? | CEMVocab | |||||||||||||
| Government Provided Facility | List | List of available facilities where vehicle can be processed and launched | CEMVocab | |||||||||||||
| Acquisition Table - Contract Detail | ||||||||||||||||
| Contract Number | Name/Number | Prime contract number | Prime contract number | CEMVocab | ||||||||||||
| Option Number | Name/Number | Contract option number if applicable | Contract option number if applicable | CEMVocab | ||||||||||||
| Subcontract Number | Name/Number | Subcontract number. | Subcontract number. | CEMVocab | ||||||||||||
| Scope of contract | Description | Define. | Define. | CEMVocab | ||||||||||||
| GFE payloads | Description | Is the Space Vehicle hosting any other payloads for other missions? List and provide description.M44 | Is the Space Vehicle hosting any other payloads for other missions? List and provide description.M44 | CEMVocab | ||||||||||||
| Contract Type | List | What contract type(s) are associated with the program? (Ex: CPFF, CPIF, CPAF, FPIF, FFP, T&M, etc) | What contract type(s) are associated with the program? (Ex: CPFF, CPIF, CPAF, FPIF, FFP, T&M, etc) | CEMVocab | ||||||||||||
| System Integration Contract | List | Is the system integration effort on this contract? | Is the system integration effort on this contract? | CEMVocab | ||||||||||||
| Fee Structure Type | List | What Fee/Incentive structure is associated with the contract(s)? (Ex: Incentive Fee, Award Fee, Performance Fee, Fixed Fee, Milestone Payments, etc) | What Fee/Incentive structure is associated with the contract(s)? (Ex: Incentive Fee, Award Fee, Performance Fee, Fixed Fee, Milestone Payments, etc) | CEMVocab |
Provide quantitiy information on the Acquisition and O&S Time Phased Table.
Describe each Phase and Production Lot.
The column headings shown are an example only. Modify headings and insert additional columns as needed to fully describe the program model.
List all planned lots in sequence. Insert additional columns as needed.
Quantities and O&S Time Phase
| TimePhasedTableQuantity | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| AFCAA CEM Templates | TagName2 | TagValue2 | |
| Acquisition Quantities, Fielding, and O&S Time Phased Template | TagName3 | TagValue3 |
| ColumnHead | Item Name | YR 1 | YR 2 | YR 3 | YR 4 | YR 5 | YR 6 | YR 7 | YR 8 | YR 9 | YR 10 | YR n … | Long Lead Requirements | Unit of Measure | Unit Qualifier | Source | Notes | Definition of Parameter | VocabularyID |
| Designate each column as Estimate or Actual ---> |
| Quantity - Prototype | Quantity | Prototype Systems | Prototypes delivered per year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Quantity - Procurement | Quantity | Systems | Equipment procured by year funded. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Quantity - Concurrent Production | Quantity | Systems | Concurrent production represents units produced by the contractor for other parties such as Foreign Military Sales or any other customer. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of Deliveries | Quantity | Systems | Equipment delivered by year delivered or installations by year installed | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Launch Schedule - Actual | Quantity | by Year | CEMVocab |
| End Item #1 | |||
| End Item #2 | |||
| End Item #3 | |||
| End Item #4 | |||
| … | |||
| Training Item #1 | |||
| Training Item #2 | |||
| … | |||
| Support Equipment Item #1 | |||
| Support Equipment Item #2 | |||
| … |
| Inventory or Fielded Density | Quantity | Systems | Total number of systems supported by year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Inventory or Fielded Density | Quantity | Systems | Total number of systems supported by year. | CEMVocab |
| Squadron #1/Base #1 | ||||
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … | ||||
| Squadron #2/Base #2 | ||||
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … | ||||
| Squadron #3/Base #3 | ||||
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … | ||||
| Operational Activity | Hours, Miles, Sorties | System usage expressed as hours or miles per system per year by various operational states. | CEMVocab | |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Operational Activity |
| System Use (OPTEMPO), miles driven |
| Location #1 or Operational State #1 |
| End Item #1 |
| End Item #2 |
| End Item #3 |
| End Item #4 |
| … |
| System Use (OPTEMPO), hours operated |
| Location #1 or Operational State #1 |
| End Item #1 |
| End Item #2 |
| End Item #3 |
| End Item #4 |
| … |
| Number of Caps/Sorties |
| Number of Users |
| Number of Concurrent Users |
| System Throughput (Transactions) |
| Data Storgage |
| Number of Disposals | Quantity | Systems | Annual quantity of items leaving service at end of useful life. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of Overhauls or Scheduled Depot Maintenance | Quantity | Systems | The planned number of depot scheduled events by year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of Hardware Modification Kit Procurement | Quantity | Kits | The planned number of kits procured by year to support hardware modification events. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of Hardware Modification Installs | Quantity | Installs | The planned number of hardware modification events by year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of NDI Refresh Events | Quantity | Refreshes | The number of Information Systems related refreshes (number of hardware items procured and installed) per year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … | ||||
| Number of Training Events | Quantity | Classes | The number of training events per class per year. | CEMVocab |
| Class #1 | ||||
| Class #2 | ||||
| Class #3 | ||||
| Class #4 |
| Number of Base Activation | Quantity | Bases | The number of sites activated per year. | CEMVocab |
| Test Squadron | ||||
| Operator Training | ||||
| Maintainer Training | ||||
| Squadron #1/Base #1 | ||||
| Squadron #2/Base #2 | ||||
| Squadron #3/Base #3 | ||||
| Squadron #4/Base #4 | ||||
| … |
Enter name of item.
Use headings in bold and indent wherever it is useful to do so.
All entries below are examples only.
Enter annual values here.
Note early years may be know and future years forecasted. Designate in row 6.
For procurement quantities, enter text describing long-lead requirements. Could be expressed as a percent of funds or names of specific items that must be purchased early.
Otherwise leave blank.
Unit of Measure is Aircraft, Engines, AURs, Radars, Silos, Sites, etc.
Enter annual quantities here. For prototypes convey the year delivered.
Include non-PME as well as PME.
Enter annual quantity installed or delivered here.
This is pertinent for modeling fielding event costs.
Enter the cumulative quantities delivered and supported here.
This is pertinent for modeling O&S costs.
Show ramp-down of items leaving service at end of useful life.
Enter quantity of sites activated here.
Entries often will simply be 1 if each site is explicitly named in column C..
This is pertinent for modeling base activation costs and to begin O&S of location costs.
Enter annual quantity of kits purchased for modification events here.
This is pertinent for modeling Mods costs.
Enter annual quantity of items leaving service at end of useful life.
This is pertinent for modeling disposal costs as well as density ramp-down.
Begin at earliest year quantity data is applicable.
List all program years. Avoid using Prior and To-complete columns - be explicit.
Enter the cumulative quantities delivered and supported by location here.
This is pertinent for modeling O&S costs.
Show ramp-down of items leaving service at end of useful life.
Enter annual quantities here. For procurement convey the year funded.
Include non-PME as well as PME.
Enter annual quantity of overhauls or any other scheduled Depot activity here.
This is pertinent for modeling Depot costs.
Enter annual quantity of NDA refresh events here.
This is pertinent for modeling refresh cycle costs.
Other potential usage measures. Enter annual activity. Expand by Location or End Item as needed.
Enter annual quantity of modification installs here.
This is pertinent for modeling Mods costs.
Enter annual concurrent production quantities here. Concurrent production represents units produced by the contractor for other parties such as Foreign Military Sales or any other customer.
For each Operational Activity row, expand by Location or or operational state. Then further expand by End Item/Variant as needed. Enter annual activity in columns.
Roles
| RolesTable | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| AFCAA CEM Templates | TagName2 | TagValue2 | |
| Roles Template | TagName3 | TagValue3 |
| ColumnHead | WBS/CRS Number | WBS/CRS Element | Government Role | Prime Contractor | Secondary Subcontractor/Supplier/Third Party | Tertiary Subcontractor/Supplier/Third Party | Notes |
| 1.0 | Space System | ||||||
| 1.1 | SEIT/PM and Support Equipment (1…s) | ||||||
| 1.1.1 | Systems Engineering | ||||||
| 1.1.2 | Assembly, Integration and Test | ||||||
| 1.1.3 | Program Management | ||||||
| 1.1.4 | Support Equipment | ||||||
| 1.2 | Space Vehicle 1…n (Specify) | ||||||
| 1.2.1 | SEIT/PM and Support Equipment | ||||||
| 1.2.1.1 | Systems Engineering | ||||||
| 1.2.1.2 | Assembly, Integration and Test | ||||||
| 1.2.1.3 | Program Management | ||||||
| 1.2.1.4 | Support Equipment | ||||||
| 1.2.2 | Bus | ||||||
| 1.2.2.1 | SEIT/PM and Support Equipment | ||||||
| 1.2.2.1.1 | Systems Engineering | ||||||
| 1.2.2.1.2 | Assembly, Integration and Test | ||||||
| 1.2.2.1.3 | Program Management | ||||||
| 1.2.2.1.4 | Support Equipment | ||||||
| 1.2.2.2 | Structures and Mechanisms (SMS) | ||||||
| 1.2.2.2.1 | SEPM | ||||||
| 1.2.2.2.2 | Assembly, Integration and Test | ||||||
| 1.2.2.2.3 | Support Equipment | ||||||
| 1.2.2.2.4 | Structures | ||||||
| 1.2.2.2.5 | Mechanisms and Pyrotechnics | ||||||
| 1.2.2.2.6 | SMS Other | ||||||
| 1.2.2.3 | Thermal Control (TCS) | ||||||
| 1.2.2.3.1 | SEPM | ||||||
| 1.2.2.3.2 | Assembly, Integration and Test | ||||||
| 1.2.2.3.3 | Support Equipment | ||||||
| 1.2.2.3.4 | Cryogenic Devices | ||||||
| 1.2.2.3.5 | Liquid Loops | ||||||
| 1.2.2.3.6 | Electric Coolers | ||||||
| 1.2.2.3.7 | Heaters, Themisters and Thermostats | ||||||
| 1.2.2.3.8 | Passive Devices | ||||||
| 1.2.2.3.9 | TCS Other | ||||||
| 1.2.2.4 | Electrical Power (EPS) | ||||||
| 1.2.2.4.1 | SEPM | ||||||
| 1.2.2.4.2 | Assembly, Integration and Test | ||||||
| 1.2.2.4.3 | Support Equipment | ||||||
| 1.2.2.4.4 | Solar Array | ||||||
| 1.2.2.4.5 | Solar Array Positioner | ||||||
| 1.2.2.4.6 | Radioisotope Thermionic Generator | ||||||
| 1.2.2.4.7 | Other Power Sources | ||||||
| 1.2.2.4.8 | Power Control, Switching and Distrobution Electronics | ||||||
| 1.2.2.4.9 | Power Conditioning, Conversion and Regulation | ||||||
| 1.2.2.4.10 | Power Dissipation Devices | ||||||
| 1.2.2.4.11 | Rechargeable Batteries | ||||||
| 1.2.2.4.12 | Charge Control Electronics | ||||||
| 1.2.2.4.13 | Harnesses and Cables | ||||||
| 1.2.2.4.14 | EPS Other | ||||||
| 1.2.2.5 | Attitude Control (ACS) | ||||||
| 1.2.2.5.1 | SEPM | ||||||
| 1.2.2.5.2 | Assembly, Integration and Test | ||||||
| 1.2.2.5.3 | Support Equipment | ||||||
| 1.2.2.5.4 | Star Tracker/Sensors 1…n (Specify) | ||||||
| 1.2.2.5.5 | Earth (Horizon) Sensors 1…n (Specify) | ||||||
| 1.2.2.5.6 | Sun Sensors 1…n (Specify) | ||||||
| 1.2.2.5.7 | Magnetometers | ||||||
| 1.2.2.5.8 | Global Positioning System (GPS) Receiver | ||||||
| 1.2.2.5.9 | Inertial Reference Unit-IRU/Inertial Measurement Unit-IMU 1…n (Specify) | ||||||
| 1.2.2.5.10 | Rate Gyros 1…n (Specify) | ||||||
| 1.2.2.5.11 | Accelerometers 1…n (Specify) | ||||||
| 1.2.2.5.12 | Bearing and Power Transfer Assembly (BAPTA) | ||||||
| 1.2.2.5.13 | Attitude Control Wheels 1…n (Specify) | ||||||
| 1.2.2.5.14 | Magnetic Control Devices | ||||||
| 1.2.2.5.15 | Spin Control Devices | ||||||
| 1.2.2.5.16 | Control Electronics 1…n (Specify) | ||||||
| 1.2.2.5.17 | ACS Other | ||||||
| 1.2.2.6 | Propulsion 1…n (Specify) | ||||||
| 1.2.2.6.1 | SEPM | ||||||
| 1.2.2.6.2 | Assembly, Integration and Test | ||||||
| 1.2.2.6.3 | Support Equipment | ||||||
| 1.2.2.6.4 | Tanks 1…n (Specify) | ||||||
| 1.2.2.6.5 | Plumbing | ||||||
| 1.2.2.6.6 | Thrusters 1…n (Specify) | ||||||
| 1.2.2.6.7 | Solid Rocket Motors | ||||||
| 1.2.2.6.8 | Liquid Propellant and Pressurant | ||||||
| 1.2.2.6.9 | Power Electronics | ||||||
| 1.2.2.6.10 | Propulsion Other | ||||||
| 1.2.2.7 | Telemetry, Tracking, and Command (TTandC) | ||||||
| 1.2.2.7.1 | SEPM | ||||||
| 1.2.2.7.2 | Assembly, Integration and Test | ||||||
| 1.2.2.7.3 | Support Equipment | ||||||
| 1.2.2.7.4 | Antennas | ||||||
| 1.2.2.7.5 | Passive Signal Flow Control | ||||||
| 1.2.2.7.6 | Transmitter/Receiver/Transceiver/Transponder 1…n (Specify) | ||||||
| 1.2.2.7.7 | Modulators/Demodulators/Modems | ||||||
| 1.2.2.7.8 | Amplifiers | ||||||
| 1.2.2.7.9 | Frequency Upconverter/Downconverter | ||||||
| 1.2.2.7.10 | Computers and Processors 1…n (Specify) | ||||||
| 1.2.2.7.11 | Command/Telemetry Units 1…n (Specify) | ||||||
| 1.2.2.7.12 | Command Sensors 1…n (Specify) | ||||||
| 1.2.2.7.13 | Frequency and Timing | ||||||
| 1.2.2.7.14 | Signal Conditioners | ||||||
| 1.2.2.7.15 | Communications Security 1…n (Specify) | ||||||
| 1.2.2.7.16 | Data Storage, Handling and Interface 1…n (Specify) | ||||||
| 1.2.2.7.17 | TTandC Other | ||||||
| 1.2.2.7.18 | CONTRACTOR TECHNICAL SUPPORT | ||||||
| 1.2.2.8 | Bus Flight Software | ||||||
| 1.2.2.8.1 | SEPM | ||||||
| 1.2.2.8.2 | Assembly, Integration and Test | ||||||
| 1.2.2.8.3 | Support Equipment | ||||||
| 1.2.2.8.4 | CSCI 1…n (Specify) | ||||||
| 1.2.3 | SEIT/PM and Support Equipment (is applicable for integration of Multiple Payloads) | ||||||
| 1.2.3.1 | Systems Engineering | ||||||
| 1.2.3.2 | Assembly, Integration and Test | ||||||
| 1.2.3.3 | Program Management | ||||||
| 1.2.3.4 | Support Equipment | ||||||
| 1.2.4 | Payload 1…n (Specify) | ||||||
| 1.2.4.1 | SEIT/PM and Support Equipment | ||||||
| 1.2.4.1.1 | Systems Engineering | ||||||
| 1.2.4.1.2 | Assembly, Integration and Test | ||||||
| 1.2.4.1.3 | Program Management | ||||||
| 1.2.4.1.4 | Support Equipment | ||||||
| 1.2.4.2 | Structures and Mechanisms (SMS) | ||||||
| 1.2.4.2.1 | SEPM | ||||||
| 1.2.4.2.2 | Assembly, Integration and Test | ||||||
| 1.2.4.2.3 | Support Equipment | ||||||
| 1.2.4.2.4 | Structures | ||||||
| 1.2.4.2.5 | Mechanisms and Pyrotechnics | ||||||
| 1.2.4.2.6 | Structures and Mechanisms Other | ||||||
| 1.2.4.3 | Thermal Control (TCS) | ||||||
| 1.2.4.3.1 | SEPM | ||||||
| 1.2.4.3.2 | Assembly, Integration and Test | ||||||
| 1.2.4.3.3 | Support Equipment | ||||||
| 1.2.4.3.4 | Cryogenic Devices | ||||||
| 1.2.4.3.5 | Liquid Loops | ||||||
| 1.2.4.3.6 | Electric Coolers | ||||||
| 1.2.4.3.7 | Electric Heater, Thermisters and Thermostats | ||||||
| 1.2.4.3.8 | Passive Devices | ||||||
| 1.2.4.3.9 | Sun Shields | ||||||
| 1.2.4.3.10 | Thermal Control Other | ||||||
| 1.2.4.4 | Electrical Power | ||||||
| 1.2.4.4.1 | SEPM | ||||||
| 1.2.4.4.2 | Assembly, Integration and Test | ||||||
| 1.2.4.4.3 | Support Equipment | ||||||
| 1.2.4.4.4 | Power Sources | ||||||
| 1.2.4.4.5 | Power Control Switching and Distrobution Electronics | ||||||
| 1.2.4.4.6 | Power Conditioning, Conversion and Regulation | ||||||
| 1.2.4.4.7 | Harnesses and Cables | ||||||
| 1.2.4.4.8 | Electrical Power Other | ||||||
| 1.2.4.5 | Pointing, Command, and Control Interface | ||||||
| 1.2.4.5.1 | SEPM | ||||||
| 1.2.4.5.2 | Assembly, Integration and Test | ||||||
| 1.2.4.5.3 | Support Equipment | ||||||
| 1.2.4.5.4 | Computers and Processors 1…n (Specify) | ||||||
| 1.2.4.5.5 | Command/Telemetry Units 1…n (Specify) | ||||||
| 1.2.4.5.6 | Control Electronics 1…n (Specify) | ||||||
| 1.2.4.5.7 | Pointing Sensors 1…n (Specify) | ||||||
| 1.2.4.5.8 | Payload Positioners 1…n (Specify) | ||||||
| 1.2.4.5.9 | Security, Encryption and Decryption Devices 1…n (Specify) | ||||||
| 1.2.4.5.10 | Data Storage, Handling and Interface 1…n (Specify) | ||||||
| 1.2.4.5.11 | Multifunctional Digital Electronic Boxes 1…n (Specify) | ||||||
| 1.2.4.5.12 | Pointing, Command, and Control Interface Other | ||||||
| 1.2.4.6 | Payload Antenna 1…n (Specify) | ||||||
| 1.2.4.6.1 | SEPM | ||||||
| 1.2.4.6.2 | Assembly, Integration and Test | ||||||
| 1.2.4.6.3 | Support Equipment | ||||||
| 1.2.4.6.4 | Structures and Mechanisms | ||||||
| 1.2.4.6.5 | Antenna Positioners | ||||||
| 1.2.4.6.6 | Reflector/Horn 1…n (Specify) | ||||||
| 1.2.4.6.7 | Feed 1…n (Specify) | ||||||
| 1.2.4.6.8 | Waveguide/Coax/Cabling | ||||||
| 1.2.4.6.9 | Transmit/Receive Modules | ||||||
| 1.2.4.6.10 | Antenna Other | ||||||
| 1.2.4.7 | Payload Signal Electronics | ||||||
| 1.2.4.7.1 | SEPM | ||||||
| 1.2.4.7.2 | Assembly, Integration and Test | ||||||
| 1.2.4.7.3 | Support Equipment | ||||||
| 1.2.4.7.4 | Passive Signal Flow Control | ||||||
| 1.2.4.7.5 | Transmitter/Receiver/Transceiver/Transponder 1…n (Specify) | ||||||
| 1.2.4.7.6 | Modulators/Demodulators/Modems 1…n (Specify) | ||||||
| 1.2.4.7.7 | Multiplexers/Demultiplexers 1…n (Specify) | ||||||
| 1.2.4.7.8 | Apmplifiers 1…n (Specify) | ||||||
| 1.2.4.7.9 | Frequnency Upconverters/Downcoverters 1…n (Specify) | ||||||
| 1.2.4.7.10 | Frequnency and Timing 1…n (Specify) | ||||||
| 1.2.4.7.11 | Signal Conditioners 1…n (Specify) | ||||||
| 1.2.4.7.12 | Multifunctional Signal Electronic Boxes 1…n (Specify) | ||||||
| 1.2.4.7.13 | Signal Electronics Other | ||||||
| 1.2.4.8 | Optitcal Assembly | ||||||
| 1.2.4.8.1 | SEPM | ||||||
| 1.2.4.8.2 | Assembly, Integration and Test | ||||||
| 1.2.4.8.3 | Support Equipment | ||||||
| 1.2.4.8.4 | Structure/Outerbarrel/Cover 1…n (Specify) | ||||||
| 1.2.4.8.5 | Mirror/Optics 1…n (Specify) | ||||||
| 1.2.4.8.6 | Aft Optics Assembly | ||||||
| 1.2.4.8.7 | Alignment and Calibration 1…n (Specify) | ||||||
| 1.2.4.8.8 | Optitcal Assembly Other | ||||||
| 1.2.4.9 | Sensor | ||||||
| 1.2.4.9.1 | SEPM | ||||||
| 1.2.4.9.2 | Assembly, Integration and Test | ||||||
| 1.2.4.9.3 | Support Equipment | ||||||
| 1.2.4.9.4 | Enclosure 1…n (Specify) | ||||||
| 1.2.4.9.5 | Focal Plane Array 1…n (Specify) | ||||||
| 1.2.4.9.6 | Sensor Positioners 1…n (Specify) | ||||||
| 1.2.4.9.7 | Sensor Electronics 1…n (Specify) | ||||||
| 1.2.4.9.8 | Alignment and Calibration 1…n (Specify) | ||||||
| 1.2.4.9.9 | Magnetometer 1…n (Specify) | ||||||
| 1.2.4.9.10 | Spectrometer 1…n (Specify) | ||||||
| 1.2.4.9.11 | Radiometer 1…n (Specify) | ||||||
| 1.2.4.9.12 | Camera 1…n (Specify) | ||||||
| 1.2.4.9.13 | Sounder 1…n (Specify) | ||||||
| 1.2.4.9.14 | Other Sensor Types 1…n (Specify) | ||||||
| 1.2.4.9.15 | Mission Sensor Other | ||||||
| 1.2.4.10 | Payload Flight Software | ||||||
| 1.2.4.10.1 | SEPM | ||||||
| 1.2.4.10.2 | Assembly, Integration and Test | ||||||
| 1.2.4.10.3 | Support Equipment | ||||||
| 1.2.4.10.4 | CSCI 1…n (Specify) | ||||||
| 1.2.4.11 | Payload Other | ||||||
| 1.2.5 | Booster Adapter | ||||||
| 1.2.6 | Space Vehicle Storage | ||||||
| 1.2.7 | Launch Systems Integration (LSI) | ||||||
| 1.2.8 | Launch Operations | ||||||
| 1.2.9 | Mission Operations Support | ||||||
| 1.2.10 | Space Vehicle Other | ||||||
| 1.3 | Ground Operations and Processing Center 1…n (Specify) | ||||||
| 1.3.1 | SEIT/PM and Support Equipment | ||||||
| 1.3.1.1 | Systems Engineering | ||||||
| 1.3.1.2 | Assembly, Integration and Test | ||||||
| 1.3.1.3 | Program Management | ||||||
| 1.3.1.4 | Support Equipment | ||||||
| 1.3.2 | Function 1…F | ||||||
| 1.3.2.1 | SEIT/PM and Support Equipment | ||||||
| 1.3.2.1.1 | Systems Engineering | ||||||
| 1.3.2.1.2 | Assembly, Integration and Test | ||||||
| 1.3.2.1.3 | Program Management | ||||||
| 1.3.2.1.4 | Support Equipment | ||||||
| 1.3.2.2 | COTS Hardware | ||||||
| 1.3.2.2.1 | SEPM | ||||||
| 1.3.2.2.2 | Assembly, Integration and Test | ||||||
| 1.3.2.2.3 | Support Equipment | ||||||
| 1.3.2.2.4 | Workstations 1…n (Specify) | ||||||
| 1.3.2.2.5 | Servers 1…n (Specify) | ||||||
| 1.3.2.2.6 | Storage and Archive 1…n (Specify) | ||||||
| 1.3.2.2.7 | Network Eqiupment | ||||||
| 1.3.2.2.8 | Interface Equipment | ||||||
| 1.3.2.2.9 | Security, Encryption/Decryption 1…n (Specify) | ||||||
| 1.3.2.2.10 | Data Processing 1…n (Specify) | ||||||
| 1.3.2.2.11 | COTS Hardware Other | ||||||
| 1.3.2.2.12 | Pre-Ops Maintenance 1…n (Specify) | ||||||
| 1.3.2.3 | Custom Hardware | ||||||
| 1.3.2.3.1 | SEPM | ||||||
| 1.3.2.3.2 | Assembly, Integration and Test | ||||||
| 1.3.2.3.3 | Support Equipment | ||||||
| 1.3.2.3.4 | Custom Hardware Configured Item 1…n (Specify) | ||||||
| 1.3.2.3.5 | Pre-Ops Maintenance 1…n (Specify) | ||||||
| 1.3.2.4 | GOPC Software | ||||||
| 1.3.2.4.1 | SEPM | ||||||
| 1.3.2.4.2 | Assembly, Integration and Test | ||||||
| 1.3.2.4.3 | Support Equipment | ||||||
| 1.3.2.4.4 | CSCI 1…n (Specify) | ||||||
| 1.3.2.4.5 | Pre-Ops Maintenance 1…n (Specify) | ||||||
| 1.3.2.5 | Pre-Operations Mission Support | ||||||
| 1.4 | Ground Terminal/Gateway (GT) 1…n (Specify) | ||||||
| 1.4.1 | SEIT/PM and Support Equipment | ||||||
| 1.4.1.1 | Systems Engineering | ||||||
| 1.4.1.2 | Assembly, Integration and Test | ||||||
| 1.4.1.3 | Program Management | ||||||
| 1.4.1.4 | Support Equipment | ||||||
| 1.4.2 | Antenna 1…n (Specify) | ||||||
| 1.4.2.1 | SEPM | ||||||
| 1.4.2.2 | Assembly, Integration and Test | ||||||
| 1.4.2.3 | Support Equipment | ||||||
| 1.4.2.4 | Pedestal | ||||||
| 1.4.2.5 | Radome | ||||||
| 1.4.2.6 | Other Structure and Mechanisms | ||||||
| 1.4.2.7 | Aperture | ||||||
| 1.4.2.8 | Feed 1…n (Specify) | ||||||
| 1.4.2.9 | Waveguide/Coax/Cabling | ||||||
| 1.4.2.10 | Antenna Other | ||||||
| 1.4.3 | Optical Communication Assembly 1…n (Specify) | ||||||
| 1.4.3.1 | SEPM | ||||||
| 1.4.3.2 | Assembly, Integration and Test | ||||||
| 1.4.3.3 | Support Equipment | ||||||
| 1.4.3.4 | Structure/Outerbarrel/Cover | ||||||
| 1.4.3.5 | Mirror/Optics 1…n (Specify) | ||||||
| 1.4.3.6 | Aft Optics and Bench | ||||||
| 1.4.3.7 | Alignment Sensors/Calibration | ||||||
| 1.4.3.8 | Optical Assembly Other | ||||||
| 1.4.4 | RF Electronics (Band 1…n (Specify)) | ||||||
| 1.4.4.1 | SEPM | ||||||
| 1.4.4.2 | Assembly, Integration and Test | ||||||
| 1.4.4.3 | Support Equipment | ||||||
| 1.4.4.4 | Pasive Signal Flow Control | ||||||
| 1.4.4.5 | Transmitter/Receiver/Transceiver/Transponder 1…n (Specify) | ||||||
| 1.4.4.6 | Modulators/Demodulators/Modems 1…n (Specify) | ||||||
| 1.4.4.7 | Multiplexers/Demultiplexers 1…n (Specify) | ||||||
| 1.4.4.8 | Power Amplifiers 1…n (Specify) | ||||||
| 1.4.4.9 | Frequnency Upconverters/Downcoverters 1…n (Specify) | ||||||
| 1.4.4.10 | Signal Conditioners 1…n (Specify) | ||||||
| 1.4.4.11 | Signal Electronic Boxes 1…n (Specify) | ||||||
| 1.4.4.12 | Focal Plane Array 1…n (Specify) | ||||||
| 1.4.4.13 | RF Electronics Other | ||||||
| 1.4.5 | Timing | ||||||
| 1.4.5.1 | SEPM | ||||||
| 1.4.5.2 | Assembly, Integration and Test | ||||||
| 1.4.5.3 | Support Equipment | ||||||
| 1.4.5.4 | Receiver | ||||||
| 1.4.5.5 | Antenna 1…n (Specify) | ||||||
| 1.4.5.6 | Frequency and Timing Generators | ||||||
| 1.4.5.7 | Amplifier and Distrobution 1…n (Specify) | ||||||
| 1.4.5.8 | Timing Other | ||||||
| 1.4.6 | Baseband-network | ||||||
| 1.4.6.1 | SEPM | ||||||
| 1.4.6.2 | Assembly, Integration and Test | ||||||
| 1.4.6.3 | Support Equipment | ||||||
| 1.4.6.4 | Switches/Hubs and Routers | ||||||
| 1.4.6.5 | Network Interface and Other Hardware | ||||||
| 1.4.6.6 | Modems | ||||||
| 1.4.6.7 | Security/Encryption and Decryption Devices 1…n (Specify) | ||||||
| 1.4.6.8 | Baseband-network Electronic Boxes 1…n (Specify) | ||||||
| 1.4.6.9 | Baseband-network Other | ||||||
| 1.4.7 | Monitor and Control Hardware | ||||||
| 1.4.7.1 | SEPM | ||||||
| 1.4.7.2 | Assembly, Integration and Test | ||||||
| 1.4.7.3 | Support Equipment | ||||||
| 1.4.7.4 | Workstations 1…n (Specify) | ||||||
| 1.4.7.5 | Servers 1…n (Specify) | ||||||
| 1.4.7.6 | Hardware Configured Item 1…n (Specify) | ||||||
| 1.4.8 | GT Software | ||||||
| 1.4.8.1 | SEPM | ||||||
| 1.4.8.2 | Assembly, Integration and Test | ||||||
| 1.4.8.3 | Support Equipment | ||||||
| 1.4.8.4 | CSCI 1…n (Specify) | ||||||
| 1.4.9 | Pre-Operations Maintenance 1…n (Specify) | ||||||
| 1.4.10 | Pre-Operations Mission Support | ||||||
| 1.5 | External Network (T-COMM) | ||||||
| 1.5.1 | SEIT/PM and Support Equipment | ||||||
| 1.5.1.1 | Systems Engineering | ||||||
| 1.5.1.2 | Assembly, Integration and Test | ||||||
| 1.5.1.3 | Program Management | ||||||
| 1.5.1.4 | Support Equipment | ||||||
| 1.5.2 | Leased Circuits | ||||||
| 1.5.2.1 | Leased Circuits 1…n (Specify) | ||||||
| 1.5.3 | Purchased Curcuits | ||||||
| 1.5.3.1 | Purchased Curcuit 1…n (Specify) | ||||||
| 1.5.3.2 | Pre-Ops Maintenance 1…n (Specify) | ||||||
| 1.6 | User Equipment | ||||||
| 1.6.1 | SEIT/PM and Support Equipment | ||||||
| 1.6.1.1 | Systems Engineering | ||||||
| 1.6.1.2 | Assembly, Integration and Test | ||||||
| 1.6.1.3 | Program Management | ||||||
| 1.6.1.4 | Support Equipment | ||||||
| 1.6.2 | Equipment 1…n (Specify) | ||||||
| 1.6.2.1 | SEPM | ||||||
| 1.6.2.2 | Assembly, Integration and Test | ||||||
| 1.6.2.3 | Support Equipment | ||||||
| 1.6.2.4 | Hardware Configured Item 1…n (Specify) | ||||||
| 1.6.2.5 | CSCI 1…n (Specify) | ||||||
| 1.6.3 | Pre-Ops Maintenance 1…n (Specify) | ||||||
| 1.7 | Facilities 1…n (Specify) | ||||||
| 1.7.1 | SEIT/PM and Support Equipment | ||||||
| 1.7.1.1 | Systems Engineering | ||||||
| 1.7.1.2 | Assembly, Integration and Test | ||||||
| 1.7.1.3 | Program Management | ||||||
| 1.7.1.4 | Support Equipment | ||||||
| 1.7.2 | Site Preparation | ||||||
| 1.7.2.1 | SEPM | ||||||
| 1.7.2.2 | Assembly, Integration and Test | ||||||
| 1.7.2.3 | Support Equipment | ||||||
| 1.7.2.4 | Graded Land | ||||||
| 1.7.2.5 | Roads | ||||||
| 1.7.2.6 | Pads | ||||||
| 1.7.2.7 | Retaining Walls/Fencing | ||||||
| 1.7.2.8 | Utilities | ||||||
| 1.7.2.9 | Site Preparation Other | ||||||
| 1.7.3 | Landscape | ||||||
| 1.7.4 | Buildings 1…n (Specify) | ||||||
| 1.7.4.1 | SEPM | ||||||
| 1.7.4.2 | Assembly, Integration and Test | ||||||
| 1.7.4.3 | Support Equipment | ||||||
| 1.7.4.4 | Foundation and Sub Structure | ||||||
| 1.7.4.5 | Superstructure and Finishing | ||||||
| 1.7.4.6 | Buildings Other | ||||||
| 1.7.5 | Equipment and Building Fit Out 1…n (Specify) | ||||||
| 1.7.5.1 | SEPM | ||||||
| 1.7.5.2 | Assembly, Integration and Test | ||||||
| 1.7.5.3 | Support Equipment | ||||||
| 1.7.5.4 | HVAC | ||||||
| 1.7.5.5 | Power Conditioning/UPS | ||||||
| 1.7.5.6 | Network Wiring/Cable Trays | ||||||
| 1.7.5.7 | Generators | ||||||
| 1.7.5.8 | Computer Flooring | ||||||
| 1.7.5.9 | Appliances | ||||||
| 1.7.5.10 | Furniture | ||||||
| 1.7.5.11 | Equipment and Building Fit Out | ||||||
| 1.7.6 | Pre-Operations Maintenance 1…n (Specify) | ||||||
| 1.8 | Vehicles and Shelters | ||||||
| 1.8.1 | SEIT/PM and Support Equipment | ||||||
| 1.8.1.1 | Systems Engineering | ||||||
| 1.8.1.2 | Assembly, Integration and Test | ||||||
| 1.8.1.3 | Program Management | ||||||
| 1.8.1.4 | Support Equipment | ||||||
| 1.8.2 | Vehicles | ||||||
| 1.8.2.1 | Vehicle 1…n (Specify) | ||||||
| 1.8.3 | Shelters | ||||||
| 1.8.3.1 | Shelter 1…n (Specify) | ||||||
| 1.8.4 | Pre-Operations Maintenance 1…n (Specify) | ||||||
| 1.9 | Insurance | ||||||
| 1.9.1 | SEPM | ||||||
| 1.9.2 | Insurance Policy | ||||||
| 1.9.3 | Insurance Settlements | ||||||
| 1.10 | Task Orders | ||||||
| 1.10.1 | Task Orders 1…n (Specify) | ||||||
| 1.11 | Orbital Transfer Vehicle (OTV) | ||||||
| 1.12 | Launch Vehicle 1…n (Specify) |
Specify Government's Role by WBS Element (e.g. GFE, Test, Depot Activation).
Specify Prime Contractor Name by WBS Element.
Specify Subcontractor/Supplier/3rd Party by name. Elaborate on specific role or contracting arrangement in Notes if needed.
HW Tech Table
| HardwareTechnicalDetailTable | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| CARD | TagName2 | TagValue2 | |
| PMP Hardware Technical Table, Aircraft, Engine | TagName3 | TagValue3 |
| ColumnHead | Second Reference Design (e.g. Contractor A) | Third Reference Design (e.g. Contractor B) | Time each parameter is expected to be available | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/CRS Number | WBS/CRS Element | Parameter Name | Value | Low | High | Margin | Unit of Measure | Unit Qualifier | Estimate or Actual | Objective | Threshold | Source | Notes | Value | Low | High | Margin | Unit of Measure | Unit Qualifier | Estimate or Actual | Source | Notes | Value | Low | High | Margin | Unit of Measure | Unit Qualifier | Estimate or Actual | Source | Notes | Definition | VocabularyID | List Item 1 | List Item 2 | List Item 3 | List Item 4 | List Item 5 | List Item 6 | List Item 7 | List Item 8 | List Item 9 | List Item 10 | List Item n=… | . | MS A | PDR | MS B | |
| 1.0 | Space System | ||||||||||||||||||||||||||||||||||||||||||||||||
| Duration of Autonomous Operation | Days | Number of days to operate autonomously without contact with a ground station. | x | x | x | ||||||||||||||||||||||||||||||||||||||||||||
| Survivability Requirement | List | Survivability requirement to operate after a nearby EMP or similar nuclear type burst | Yes | No | x | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Survivability Requirement | List | Survivability requirement to operate after a distant EMP or similar nuclear type burst | Yes | No | x | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Survivability Requirement | List | Survivability requirement to be able to detect a nuclear type event and recover from its affects | Yes | No | x | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Rad Hardened | List | Enter "Yes" if some accommodation for radiation survivability is included within the design. Otherwise enter "No". | Yes | No | |||||||||||||||||||||||||||||||||||||||||||||
| Mission Type | List | Defines the primary mission being executed (e.g. Communication, surveillance, scientific, navigation, experimental, environmental) | Communication | surveillance | scientific | navigation | experimental | environmental | Other | x | x | x | |||||||||||||||||||||||||||||||||||||
| First Time Integration | List | Enter Yes if this is a New 1st Time Integration, otherwise enter No. | Yes | No | x | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Orbit Regime | List | Enter best fit from the below Data Lookup Values list. For Geocentric (Earth) orbits, the geocentric orbit type (inclination, eccentricity, etc.) or altitude classification (LEO, GEO, etc.). For non-Earth orbits specify Planetary. Apoapsis refers to th | LEO | GEO | Planetary | Other | x | x | x | ||||||||||||||||||||||||||||||||||||||||
| Constellation size | Quantity | Enter the number (quantity) of operating satellites required for the mission. | x | x | x | ||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | Space Vehicle 1…n (Specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| Weight | Kilograms | Basic Mass | Enter the basic mass in kilograms (kg): |
| This value is based on an assessment of the most recent baseline design, excluding mass growth allowance. Total dry weight of the product or box in kilograms (exclude propellants, pressurants, refrigerants, etc.). | x | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||
| Weight - Growth Allowance | Kilograms | Growth Allowance | Enter the mass growth allowance in kilograms (kg). This value is the likely change to the basic mass, based on an assessment of the design maturity, allowing for design changes that may occur, excluding changes due to contract/requirements changes. Note | x | x | x | x | Contractor | 1 | 1 | ||||||||||||
| Weight - Including Growth Allowance | Kilograms | Predicted Mass | Enter the Predicted Mass of the flight quantity of the product/unit/assembly/box. This value is a calculation resulting in the current predicted weight, including contingency, of the sum all the flight units of a particular unit/box/assembly or lot of co | x | x | x | x | Contractor | 1 | 1 | ||||||||||||
| Weight - Contractor Specification Limit | Kilograms | x | x | x | x | Contractor | 3 | 3 | ||||||||||||||
| Weight - Launch Vehicle Limit | Kilograms | Launch Vehicle Capability | x | x | x | x | Government | 3 | 3 | |||||||||||||
| Launch Vehicle Capability | x | x | x | x | Government | 3 | 3 | |||||||||||||||
| Total Predicted Wet Mass | Contractor | 1 | 1 | |||||||||||||||||||
| Design Life | Months | Enter the period of time during which the Space Vehicle (SV) is expected by its designers to work within its specified parameters; in other words, the life expectancy of the SV. It is the length of time between placement into service of a single SV and it | x | x | x | x | x | Government | 1 | 1 | ||||||||||||
| Flight Heritage | Name/Number | Enter the heritage or most similar previous product from which the subject product was derived. | x | x | x | x | Contractor | 1 | 1 | |||||||||||||
| Mean Mission Duration (MMD) | Years | Enter the Mean Mission Duration. | x | x | x | x | Government | 1 | 1 | |||||||||||||
| Orbit Altitude | Kilometer | For planet orbiting vehicles (satellites) enter the average orbital altitude of the vehicle from planet surface (Avg). For earth orbiting satellites, enter the average height above sea level. | x | x | x | x | Government | 2 | 2 | |||||||||||||
| Orbit Inclination | Degrees Angular | Enter the angular distance (in degrees) of the Space Vehicle (SV) orbital plane from the equator or the ecliptic from the orbited object. | x | x | x | x | Government | 2 | 2 | |||||||||||||
| Pointing Accuracy | Degrees Angular | Enter pointing accuracy in degrees using an appropriate number of significant digits. | x | x | x | x | Contractor | 3 | 3 | |||||||||||||
| Pointing Knowledge | Degrees Angular | Enter pointing knowledge in degrees using an appropriate number of significant digits. | x | x | x | x | Contractor | 3 | 3 | |||||||||||||
| Number of Deployables - Space Vehicle Level | Quantity | Space Vehicle Level | Contractor | 2 | 2 | |||||||||||||||||
| Reliability | ??? | Space Vehicle Level | Entered at 3 different levels of WBS; Bus, Payload, and Space Vehicle (SV). | x | x | x | x | Contractor | 3 | 3 | ||||||||||||
| 1.2.2 | Bus | |||||||||||||||||||||
| Weight | Kilograms | Basic Mass | Enter the basic mass in kilograms (kg): |
| This value is based on an assessment of the most recent baseline design, excluding mass growth allowance. Total dry weight of the product or box in kilograms (exclude propellants, pressurants, refrigerants, etc.). | x | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||||||||||
| Weight - Growth Allowance | Kilograms | Growth Allowance | Enter the mass growth allowance in kilograms (kg). This value is the likely change to the basic mass, based on an assessment of the design maturity, allowing for design changes that may occur, excluding changes due to contract/requirements changes. Note | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||||||||
| Weight - Including Growth Allowance | Kilograms | Predicted Mass | Enter the Predicted Mass of the flight quantity of the product/unit/assembly/box. This value is a calculation resulting in the current predicted weight, including contingency, of the sum all the flight units of a particular unit/box/assembly or lot of co | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||||||||
| Bus Model | Name/Number | Enter Model name or designation number, specific to manufacturers, for the space product. (e.g. A2100AX, 601) | x | x | x | x | Contractor | 1 | 1 | |||||||||||||||||||||
| Voltage - Bus | Volts | Enter common voltage provided by and across Spacecraft Bus available to Bus and Payload Subsystem boxes. | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||||
| Number of Deployables - Bus Level | Quantity | Bus Level | Enter the number of deployable appendages; E.g. enter antenna deployables at Antenna S/S level; total deployables at Space Vehicle (SV) and Bus levels. | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||||
| Flight Heritage | Name/Number | Enter the heritage or most similar previous product from which the subject product was derived. | x | x | x | x | Contractor | 1 | 1 | |||||||||||||||||||||
| Number of Processors | Quantity | The number of processors within a given unit | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||||
| Pointing Accuracy | Degrees Angular | Enter pointing accuracy in degrees using an appropriate number of significant digits. | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||||
| Pointing Knowledge | Degrees Angular | Enter pointing knowledge in degrees using an appropriate number of significant digits. | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||||
| Reliability | ??? | Bus Level | Entered at 3 different levels of WBS; Bus, Payload, and Space Vehicle (SV). | x | x | x | x | Contractor | 3 | 3 | ||||||||||||||||||||
| Number of Unique Designs - ASIC | Quantity | Enter the number of Application Specific Integrated Circuit (ASIC) (unspecified type) designs required. | x | x | x | x | Contractor | 1 | 1 | |||||||||||||||||||||
| Memory - Data Storage Capacity | Megabits per Day | Enter the effective daily data storage capacity (capture ability) in terms of Megabits Per Day as a result of to compression, offline storage, download and other techniques in excess of physical computer/processor memory. | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||||
| Memory - OnBoard Storage Capacity | Megabytes | Enter the physical data storage (memory) capacity at a single instance in time. This includes capacity from compression, recorders, other storage devices. | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||||
| Technology Readiness Level (TRL) | List | Technology Readiness Levels (TRL) are a method of estimating technology maturity of Critical Technology Elements (CTE) of a program during the acquisition process. Lookup TRL level values at bottom of the tab. | TRL 1 | TRL 2 | TRL 3 | TRL 4 | TRL 5 | TRL 6 | TRL 7 | TRL 8 | TRL 9 | x | x | x | x | Government | 1 | 1 | ||||||||||||
| 1.2.2.2 | Structures and Mechanisms (SMS) | |||||||||||||||||||||||||||||
| Weight | Kilograms | Basic Mass | Enter the basic mass in kilograms (kg): |
| This value is based on an assessment of the most recent baseline design, excluding mass growth allowance. Total dry weight of the product or box in kilograms (exclude propellants, pressurants, refrigerants, etc.). | x | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||||||||||
| Weight - Growth Allowance | Kilograms | Growth Allowance | Enter the mass growth allowance in kilograms (kg). This value is the likely change to the basic mass, based on an assessment of the design maturity, allowing for design changes that may occur, excluding changes due to contract/requirements changes. Note | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||||||||
| Weight - Including Growth Allowance | Kilograms | Predicted Mass | Enter the Predicted Mass of the flight quantity of the product/unit/assembly/box. This value is a calculation resulting in the current predicted weight, including contingency, of the sum all the flight units of a particular unit/box/assembly or lot of co | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||||||||
| Material - Structures | List | Enter material predominately used to for structural portion of product. | Items | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||||
| Number of Deployables - Bus Subsystem Level | Quantity | Bus Subsystem Level | Enter the number of deployable appendages; E.g. enter antenna deployables at Antenna S/S level; total deployables at Space Vehicle (SV) and Bus levels. | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||||
| New Design | Percentage | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||||||||||
| Technology Readiness Level (TRL) | List | Technology Readiness Levels (TRL) are a method of estimating technology maturity of Critical Technology Elements (CTE) of a program during the acquisition process. Lookup TRL level values at bottom of the tab. | TRL 1 | TRL 2 | TRL 3 | TRL 4 | TRL 5 | TRL 6 | TRL 7 | TRL 8 | TRL 9 | x | x | x | x | Government | 1 | 1 | ||||||||||||
| 1.2.2.2.4 | Structures |