G-9_Space_Data_Collection_Requirements_Template_-_28_Oct_15.xlsx

XLSX spreadsheet 3 MB Posted

Attached to
Cost Estimating and Modeling (CEM) Federal contract opportunity
Solicitation number
FA7014-16-R-5004
Issued by
Department of the Air Force Headquarters District Washington

About this file

Attachment G-9

View the file

Other files for this federal contract opportunity

Other files attached to Cost Estimating and Modeling (CEM), newest first.
File Type Posted
Attachment_I_Total_Proposed_Pricing_Worksheet_20160627.Rev.xlsx XLSX spreadsheet
Attachment_O-FINAL_Q AS_20160630.pdf PDF
SF_30_FA7014-16-R-5004_AMEND_0005.pdf PDF
Attachment_L-AFCAA_Notional_POAM.xlsx XLSX spreadsheet
Attachment_I_Total_Proposed_Pricing_Worksheet_20160627.Rev.xlsx XLSX spreadsheet
FINAL_CEM_Solicitation_20160627.pdf PDF
Attachment_O.1-ADDITIONAL_Q AS.pdf PDF
SF_30_FA7014-16-R-5004_AMEND_0004.pdf PDF
FINAL_CEM_Solicitation_20160623.pdf PDF
Attachment_O.1-QUESTION_AND_ANSWERS_FROM_RFP.pdf PDF
Attachment_I_Total_Proposed_Pricing_Worksheet_20160622.xlsx XLSX spreadsheet
Attachment_M_Technical_Reference_Matrix_FA7014-16-R-5004.docx DOCX document
Attachment_B_CEM_Fee_Schedule_20160620.xlsx XLSX spreadsheet
Section_L-_2_Volume_III_Past_Performance_Information_Form.docx DOCX document
FINAL_CEM_Solicitation_20160622.pdf PDF
SF_30_FA7014-16-R-5004_AMEND_0002_Q As.pdf PDF
SF_30_FA7014-16-R-5004_AMEND_0001_1.pdf PDF
Attachment_H._1_-TDN_Instructions.pdf PDF
G-4_EW_PMP_Data_Collection_Requirements_Template_-_30_Oct_15.xlsx XLSX spreadsheet
Section_L-_3_Past_Performance_Questionnaire.docx DOCX document
G-2_AIS_Data_Collection_Requirements_Template_-_29_Oct_15.xlsx XLSX spreadsheet
Section_L-1_Cross_Reference_Matrix_FA7014-16-R-5004.docx DOCX document
Section_L-_2_Volume_III_Past_Performance_Information_Form.docx DOCX document
Attachment_N_Visitors_Pass.pdf PDF
G-8_Radar_Data_Collection_Requirements_Template_-_30_Oct_15.xlsx XLSX spreadsheet
G-6_Launch_Vehicle_Data_Collection_ReqTemplate_-_28_Oct_15.xlsx XLSX spreadsheet
Attachment_K.1_to_DD254-_Block_13_20160210.doc DOC document
FINAL_CEM_Solicitation_20160603.pdf PDF
Attachment_K.2_to_DD254-_Item_10a_COMSEC_20160210.rtf RTF text file
G-3_C4I_Electronics_Data_Collection_ReqTemplate_-_30_Oct_15.xlsx XLSX spreadsheet
Attachment_I_Total_Proposed_Pricing_Worksheet_20160603.xlsx XLSX spreadsheet
Attachment_B_CEM_Fee_Schedule_20160504.xlsx XLSX spreadsheet
Attachment_M_Technical_Reference_Matrix_FA7014-16-R-5004.docx DOCX document
Attachment_K.3_to_DD254_-_Item_10b_RD_20160210.rtf RTF text file
G-1_Aircraft_Data_Collection_Req_Template_-_30_Oct_15.xlsx XLSX spreadsheet
Section_L-5_Questionnaire_Cover_Letter.pdf PDF
G-10_UAV_Data_Collection_Requirements_Template_-_30_Oct_15.xlsx XLSX spreadsheet
Section_M_-_M0002_Pricing_Reference_Matrix_FA7014-16-R-5004.docx DOCX document
Attachment_H_-_Technical_Direction_Memo_Form_CEM.pdf PDF
G-7_Missile_Data_Collection_Requirements_Template_-_3_Nov_15.xlsx XLSX spreadsheet
G-5_ICBM_Data_Collection_Requirements_Template_-_28_Oct_15.xlsx XLSX spreadsheet
Attachment_K.4_to_DD254_-_Item_10d_FRD_20160210.rtf RTF text file
Attachment_K_DD254_AFCAA_CEM-20160506.pdf PDF
Attachment_J_CEM_QASP_FINAL_20160525.pdf PDF
Attachment_L_AFCAA_POAM.xlsx XLSX spreadsheet
Attachment_O_Industry_Day_Draft_Pre-Sol_Q As.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Program

ProgramTemplateUNCLASSIFIED, FOR OFFICIAL USE ONLYTagName1TagValue1
AFCAA CEM TemplatesTagName2TagValue2
Program TemplateTagName3TagValue3
ColumnHeadParameter NameValueUnit of MeasureEstimate or ActualSourceNotesDefinition of ParameterVocabularyID
Program NameProgram NameDCARCMetadata
Program NameDCARC defined Program NameDCARCMetadata
Name - ShortDCARC defined, acronymCEMVocab
Name - PopularAn optional alternative nameCEMVocab
Program DescriptionDCARC defined program descriptionCEMVocab
Program NumberProgram NumberDCARCMetadata
Mil-HandbookMil-STD-881 AppendixDCARCMetadata
Weapon System TypeDCARC definedDCARCMetadata
Lead ServiceDCARC defined Service/ComponentDCARCMetadata
Other ServicesIf a program is "Joint", then list other services involved in the program.DCARCMetadata
Procuring OrganizationSysComDCARCMetadata
Program OfficePEO or Program OfficeDCARCMetadata
Initial Selected Acquisition Review (SAR)Date from DAMIRDCARCMetadata
Latest Selected Acquisition Review (SAR)Date from DAMIRDCARCMetadata
Upgrade/ModernizationYes/No categoryCEMVocab
Subprogram NameSubprogram name if applicableCEMVocab
ModelSpecific configuration or designated model numberCEMVocab

UOM is N/A for this sheet. Column included only for shape consistency.

Est/Act is N/A for this sheet. Column included only for shape consistency.

Enter text for each parameter.

Copy additional rows as needed for multiple subprograms and models.

Milestone

MilestoneTableUNCLASSIFIED, FOR OFFICIAL USE ONLYTagName1TagValue1
AFCAA CEM TemplatesTagName2TagValue2
Milestone TemplateTagName3TagValue3
ColumnHeadSubprogram Name
Parameter NameSubprogramValueUnitsEstimate or ActualSourceNotesValueUnitsEstimate or ActualSourceNotesDefinition of ParameterVocabularyID
Material Development DecisionDateDDMMMYYMilestone DateCEMVocab
Completion DateDateDDMMMYYMilestone DateCEMVocab
Milestone ADateDDMMMYYMilestone DateCEMVocab
Contract AwardDateDDMMMYYMilestone DateCEMVocab
Capability Development Document (CDD) ValidationDateDDMMMYYMilestone DateCEMVocab
Development RFP Release DecisionDateDDMMMYYMilestone DateCEMVocab
Risk Reduction BuildDateDDMMMYYMilestone DateCEMVocab
Milestone BDateDDMMMYYMilestone DateCEMVocab
EMD Contract AwardDateDDMMMYYMilestone DateCEMVocab
System Requirements Review (SRR)DateDDMMMYYMilestone DateCEMVocab
Preliminary Design Review (PDR)DateDDMMMYYMilestone DateCEMVocab
Critical Design Review (CDR)DateDDMMMYYMilestone DateCEMVocab
First DeliveryDateDDMMMYYMilestone DateCEMVocab
First FlightDateDDMMMYYMilestone DateCEMVocab
Development Test & Evaluation BeginDateDDMMMYYMilestone DateCEMVocab
Development Test & Evaluation EndDateDDMMMYYMilestone DateCEMVocab
Operational Test & Evaluation BeginDateDDMMMYYMilestone DateCEMVocab
Operational Test & Evaluation EndDateDDMMMYYMilestone DateCEMVocab
Limited Deployment DecisionDateDDMMMYYMilestone DateCEMVocab
Integration BuildDateDDMMMYYMilestone DateCEMVocab
Milestone CDateDDMMMYYMilestone DateCEMVocab
Limited DeploymentDateDDMMMYYMilestone DateCEMVocab
Full Deployment Decision (FDD)DateDDMMMYYMilestone DateCEMVocab
Low Rate Initial Production Contract AwardDateDDMMMYYMilestone DateCEMVocab
Full Rate Production (FRP) DecisionDateDDMMMYYMilestone DateCEMVocab
Full Rate Production Contract AwardDateDDMMMYYMilestone DateCEMVocab
Initial Operational Capability (IOC)DateDDMMMYYMilestone DateCEMVocab
Full Deployment (FD)DateDDMMMYYMilestone DateCEMVocab
Full Operational Capability (FOC)DateDDMMMYYMilestone DateCEMVocab

Enter parameter values as a single date value in this column.

Identify if the parameter value is an actual value or an estimated value.

Enter parameter values as a single date value in this column.

Identify if the parameter value is an actual value (A) or an estimated value (E).

If these columns are expanded and used to convey a second subprogram or model, take care to each case in the first column heading cell.

When any parameter calls for additional detail, insert rows underneath and indent sub-names as needed.

For additional columns to express alternative designs, hit Ungroup button above.

When parameter varies by subprogram, enter subprogram name in this column.

If no subprograms, then leave this column empty.

Acquisition (CEM)

AcquisitionTemplateUNCLASSIFIED, FOR OFFICIAL USE ONLYTagName1TagValue1
AFCAA CEM TemplatesTagName2TagValue2
Acquisition TemplateTagName3TagValue3
Material Solution AnalysisTechnology Maturation and Risk ReductionEngineering and Manufacturing DevelopmentProduction and DeploymentSustainmentDisposal
LRIP 1LRIP 2FRP 1FRP 2
Contract AContract BContract AContract BContract AContract BContract (Prime)Contract (Sub)Contract (Prime)Contract (Sub)Contract (Prime)Contract (Sub)Contract (Prime)Contract (Sub)
ColumnHeadParameter nameValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueValueUnit of MeasureUnits QualifierDefinition of ParameterVocabularyID
Name - Phase/Contract/LotName/NumberThe common name of this phase, contract, or lot.CEMVocab
Subphase NameName/NumberThe common name of this subphase.CEMVocab
Contract NumberName/NumberPrime contract numberCEMVocab
Option NumberName/NumberContract option number if applicableCEMVocab
Subcontract NumberName/NumberSubcontract number.CEMVocab
ModelName/NumberSpecific configuration or designated model numberCEMVocab
QuantityQuantityThe number of units produced for this PhaseCEMVocab
QuantityQuantityUnits for the quantity cited above (e.g. Aircraft, Missiles, Pods, Kits, etc.)CEMVocab
Award DateDateDate of contract award announcement or beginning of phase.CEMVocab
First Delivery DateDateThe date of the first delivery.CEMVocab
End DateDateThe end data of this phase, contract, or lot.CEMVocab
Contracting StrategyDescriptionby PhaseDescribe this phase's contracting strategy.CEMVocab
Competition ApproachListList the Competition Approach: None; Full Phase Competed; Competition thru CDR; etc.CEMVocab
WarrantyListIs there a warranty for this lot?CEMVocab
Warranty TypeDescriptionDescribe WarrantyCEMVocab
Capital InvestmentListIs this the first lot to benefit from capital investment, tooling, plant rearrangement, etc.?CEMVocab
Capital Investment DescriptionDescriptionDescribe capital improvements.CEMVocab
Government Test AgencyName/NumberList Agencies and MIPR or WR numbersCEMVocab
Production Rate - Planned Minimum SustainingQuantityMinimumMinimum economic rate of production.CEMVocab
Production Rate - Planned 1-8-5QuantityPlanned 1-8-5Rate of production with factory operating at a single shift.CEMVocab
Production Rate - Planned MaximumQuantityMaximumMaximum production rate without shift constraints.CEMVocab
Contractor NameName/NumberName of contractorCEMVocab
Special CasesDescriptionDefine.CEMVocab
Additional Information - Program LevelDescriptionProgram LevelDefine.CEMVocab
Funding AppropriationListAppropriation codeCEMVocab
Funding YearYearPurpose to track to Budget Exhibits (e.g. capture GFE cost)CEMVocab
Multiyear ProductionListIs this lot part of a multiyear contract?CEMVocab
Concurrent ProductionListAre there other customers during this phase/lot such as Foreign Military Sales?CEMVocab
Information AssuranceDescriptionList amount of information assurance required.CEMVocab
Launch Vehicle TypeListWhat type(s) and variant(s) of Launch Vehicle(s) will the Space Vehicle be launched on?CEMVocab
Scope of contractDescriptionDefine.CEMVocab
GFE payloadsDescription???Is the Space Vehicle hosting any other payloads for other missions? List and provide description.M44CEMVocab
Contract TypeListWhat contract type(s) are associated with the program? (Ex: CPFF, CPIF, CPAF, FPIF, FFP, T&M, etc)CEMVocab
System Integration ContractListIs the system integration effort on this contract?CEMVocab
Fee Structure TypeListWhat Fee/Incentive structure is associated with the contract(s)? (Ex: Incentive Fee, Award Fee, Performance Fee, Fixed Fee, Milestone Payments, etc)CEMVocab
Government Provided FacilityListList of available facilities where vehicle can be processed and launchedCEMVocab

The column headings shown are an example only. Modify headings and insert additional columns as needed to fully describe the acquisition plan.

Describe each Phase, Contract, and/or Lot.

Consider using a time-phased Table to fully describe annual quantities. See adjacent sheet "Quantities and O&S Time Phased" Copy the Model and Quantity rows and repeat for each Model or Configured End Item as needed

Acquisition (CARD)

AcquisitionTableUNCLASSIFIED, FOR OFFICIAL USE ONLYTagName1TagValue1
CARDTagName2TagValue2
Acquisition TableTagName3TagValue3
Material Solution AnalysisTechnology Maturation and Risk ReductionEngineering and Manufacturing DevelopmentProduction and DeploymentSustainmentDisposal
Lot 1Lot 2Lot 3Lot 4Lot 5Lot n
ColumnHeadParameter nameValueValueValueValueValueValueValueValueValueValueValueUnit of MeasureUnits QualifierDefinition of ParameterVocabularyID
Name - Phase/Contract/LotLRIP 1LRIP 2FRP 1FRP 2FRP 3FRP 4TextThe common name of this phase, contract, or lot.CEMVocab
Award DateDateDate of contract award announcement or beginning of phase.CEMVocab
First Delivery DateDateThe date of the first delivery.CEMVocab
End DateDateThe end data of this phase, contract, or lot.CEMVocab
Contracting StrategyDescriptionDescribe this phase's contracting strategy.CEMVocab
Competition ApproachListList the Competition Approach: None; Full Phase Competed; Competition thru CDR; etc.CEMVocab
WarrantyListIs there a warranty for this lot?CEMVocab
Warranty TypeDescriptionDescribe WarrantyCEMVocab
Capital InvestmentListIs this the first lot to benefit from capital investment, tooling, plant rearrangement, etc.?CEMVocab
Capital Investment DescriptionDescriptionDescribe capital improvements.CEMVocab
Government Test AgencyTextList Agencies and MIPR or WR numbersCEMVocab
Production Rate - Planned Minimum SustainingQuantityMinimum economic rate of production.CEMVocab
Production Rate - Planned 1-8-5QuantityRate of production with factory operating at a single shift.CEMVocab
Production Rate - Planned MaximumQuantityMaximum production rate without shift constraints.CEMVocab
Contractor NameTextName of contractorCEMVocab
Special CasesDescriptionDefine.CEMVocab
Additional Information - Program LevelDescriptionDefine.CEMVocab
Funding AppropriationListAppropriation codeCEMVocab
Funding YearYearPurpose to track to Budget Exhibits (e.g. capture GFE cost)CEMVocab
PE Code 1…nDescriptionList all applicable Program Element Codes.CEMVocab
Withhold RatePercentageThe percent of budget withheld by parent organization. Aka taxes not directly expended on the program.CEMVocab
Multiyear ProductionListIs this lot part of a multiyear contract?CEMVocab
Concurrent ProductionListAre there other customers during this phase/lot such as Foreign Military Sales?CEMVocab
Government Provided FacilityListList of available facilities where vehicle can be processed and launchedCEMVocab
Acquisition Table - Contract Detail
Contract NumberName/NumberPrime contract numberPrime contract numberCEMVocab
Option NumberName/NumberContract option number if applicableContract option number if applicableCEMVocab
Subcontract NumberName/NumberSubcontract number.Subcontract number.CEMVocab
Scope of contractDescriptionDefine.Define.CEMVocab
GFE payloadsDescriptionIs the Space Vehicle hosting any other payloads for other missions? List and provide description.M44Is the Space Vehicle hosting any other payloads for other missions? List and provide description.M44CEMVocab
Contract TypeListWhat contract type(s) are associated with the program? (Ex: CPFF, CPIF, CPAF, FPIF, FFP, T&M, etc)What contract type(s) are associated with the program? (Ex: CPFF, CPIF, CPAF, FPIF, FFP, T&M, etc)CEMVocab
System Integration ContractListIs the system integration effort on this contract?Is the system integration effort on this contract?CEMVocab
Fee Structure TypeListWhat Fee/Incentive structure is associated with the contract(s)? (Ex: Incentive Fee, Award Fee, Performance Fee, Fixed Fee, Milestone Payments, etc)What Fee/Incentive structure is associated with the contract(s)? (Ex: Incentive Fee, Award Fee, Performance Fee, Fixed Fee, Milestone Payments, etc)CEMVocab

Provide quantitiy information on the Acquisition and O&S Time Phased Table.

Describe each Phase and Production Lot.

The column headings shown are an example only. Modify headings and insert additional columns as needed to fully describe the program model.

List all planned lots in sequence. Insert additional columns as needed.

Quantities and O&S Time Phase

TimePhasedTableQuantityUNCLASSIFIED, FOR OFFICIAL USE ONLYTagName1TagValue1
AFCAA CEM TemplatesTagName2TagValue2
Acquisition Quantities, Fielding, and O&S Time Phased TemplateTagName3TagValue3
ColumnHeadItem NameYR 1YR 2YR 3YR 4YR 5YR 6YR 7YR 8YR 9YR 10YR n …Long Lead RequirementsUnit of MeasureUnit QualifierSourceNotesDefinition of ParameterVocabularyID
Designate each column as Estimate or Actual --->
Quantity - PrototypeQuantityPrototype SystemsPrototypes delivered per year.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Quantity - ProcurementQuantitySystemsEquipment procured by year funded.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Quantity - Concurrent ProductionQuantitySystemsConcurrent production represents units produced by the contractor for other parties such as Foreign Military Sales or any other customer.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Number of DeliveriesQuantitySystemsEquipment delivered by year delivered or installations by year installedCEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Launch Schedule - ActualQuantityby YearCEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Inventory or Fielded DensityQuantitySystemsTotal number of systems supported by year.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Inventory or Fielded DensityQuantitySystemsTotal number of systems supported by year.CEMVocab
Squadron #1/Base #1
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Squadron #2/Base #2
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Squadron #3/Base #3
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Operational ActivityHours, Miles, SortiesSystem usage expressed as hours or miles per system per year by various operational states.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Operational Activity
System Use (OPTEMPO), miles driven
Location #1 or Operational State #1
End Item #1
End Item #2
End Item #3
End Item #4
…
System Use (OPTEMPO), hours operated
Location #1 or Operational State #1
End Item #1
End Item #2
End Item #3
End Item #4
…
Number of Caps/Sorties
Number of Users
Number of Concurrent Users
System Throughput (Transactions)
Data Storgage
Number of DisposalsQuantitySystemsAnnual quantity of items leaving service at end of useful life.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Number of Overhauls or Scheduled Depot MaintenanceQuantitySystemsThe planned number of depot scheduled events by year.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Number of Hardware Modification Kit ProcurementQuantityKitsThe planned number of kits procured by year to support hardware modification events.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Number of Hardware Modification InstallsQuantityInstallsThe planned number of hardware modification events by year.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Number of NDI Refresh EventsQuantityRefreshesThe number of Information Systems related refreshes (number of hardware items procured and installed) per year.CEMVocab
End Item #1
End Item #2
End Item #3
End Item #4
…
Training Item #1
Training Item #2
…
Support Equipment Item #1
Support Equipment Item #2
…
Number of Training EventsQuantityClassesThe number of training events per class per year.CEMVocab
Class #1
Class #2
Class #3
Class #4
Number of Base ActivationQuantityBasesThe number of sites activated per year.CEMVocab
Test Squadron
Operator Training
Maintainer Training
Squadron #1/Base #1
Squadron #2/Base #2
Squadron #3/Base #3
Squadron #4/Base #4
…

Enter name of item.

Use headings in bold and indent wherever it is useful to do so.

All entries below are examples only.

Enter annual values here.

Note early years may be know and future years forecasted. Designate in row 6.

For procurement quantities, enter text describing long-lead requirements. Could be expressed as a percent of funds or names of specific items that must be purchased early.

Otherwise leave blank.

Unit of Measure is Aircraft, Engines, AURs, Radars, Silos, Sites, etc.

Enter annual quantities here. For prototypes convey the year delivered.

Include non-PME as well as PME.

Enter annual quantity installed or delivered here.

This is pertinent for modeling fielding event costs.

Enter the cumulative quantities delivered and supported here.

This is pertinent for modeling O&S costs.

Show ramp-down of items leaving service at end of useful life.

Enter quantity of sites activated here.

Entries often will simply be 1 if each site is explicitly named in column C..

This is pertinent for modeling base activation costs and to begin O&S of location costs.

Enter annual quantity of kits purchased for modification events here.

This is pertinent for modeling Mods costs.

Enter annual quantity of items leaving service at end of useful life.

This is pertinent for modeling disposal costs as well as density ramp-down.

Begin at earliest year quantity data is applicable.

List all program years. Avoid using Prior and To-complete columns - be explicit.

Enter the cumulative quantities delivered and supported by location here.

This is pertinent for modeling O&S costs.

Show ramp-down of items leaving service at end of useful life.

Enter annual quantities here. For procurement convey the year funded.

Include non-PME as well as PME.

Enter annual quantity of overhauls or any other scheduled Depot activity here.

This is pertinent for modeling Depot costs.

Enter annual quantity of NDA refresh events here.

This is pertinent for modeling refresh cycle costs.

Other potential usage measures. Enter annual activity. Expand by Location or End Item as needed.

Enter annual quantity of modification installs here.

This is pertinent for modeling Mods costs.

Enter annual concurrent production quantities here. Concurrent production represents units produced by the contractor for other parties such as Foreign Military Sales or any other customer.

For each Operational Activity row, expand by Location or or operational state. Then further expand by End Item/Variant as needed. Enter annual activity in columns.

Roles

RolesTableUNCLASSIFIED, FOR OFFICIAL USE ONLYTagName1TagValue1
AFCAA CEM TemplatesTagName2TagValue2
Roles TemplateTagName3TagValue3
ColumnHeadWBS/CRS NumberWBS/CRS ElementGovernment RolePrime ContractorSecondary Subcontractor/Supplier/Third PartyTertiary Subcontractor/Supplier/Third PartyNotes
1.0Space System
1.1SEIT/PM and Support Equipment (1…s)
1.1.1Systems Engineering
1.1.2Assembly, Integration and Test
1.1.3Program Management
1.1.4Support Equipment
1.2Space Vehicle 1…n (Specify)
1.2.1SEIT/PM and Support Equipment
1.2.1.1Systems Engineering
1.2.1.2Assembly, Integration and Test
1.2.1.3Program Management
1.2.1.4Support Equipment
1.2.2Bus
1.2.2.1SEIT/PM and Support Equipment
1.2.2.1.1Systems Engineering
1.2.2.1.2Assembly, Integration and Test
1.2.2.1.3Program Management
1.2.2.1.4Support Equipment
1.2.2.2Structures and Mechanisms (SMS)
1.2.2.2.1SEPM
1.2.2.2.2Assembly, Integration and Test
1.2.2.2.3Support Equipment
1.2.2.2.4Structures
1.2.2.2.5Mechanisms and Pyrotechnics
1.2.2.2.6SMS Other
1.2.2.3Thermal Control (TCS)
1.2.2.3.1SEPM
1.2.2.3.2Assembly, Integration and Test
1.2.2.3.3Support Equipment
1.2.2.3.4Cryogenic Devices
1.2.2.3.5Liquid Loops
1.2.2.3.6Electric Coolers
1.2.2.3.7Heaters, Themisters and Thermostats
1.2.2.3.8Passive Devices
1.2.2.3.9TCS Other
1.2.2.4Electrical Power (EPS)
1.2.2.4.1SEPM
1.2.2.4.2Assembly, Integration and Test
1.2.2.4.3Support Equipment
1.2.2.4.4Solar Array
1.2.2.4.5Solar Array Positioner
1.2.2.4.6Radioisotope Thermionic Generator
1.2.2.4.7Other Power Sources
1.2.2.4.8Power Control, Switching and Distrobution Electronics
1.2.2.4.9Power Conditioning, Conversion and Regulation
1.2.2.4.10Power Dissipation Devices
1.2.2.4.11Rechargeable Batteries
1.2.2.4.12Charge Control Electronics
1.2.2.4.13Harnesses and Cables
1.2.2.4.14EPS Other
1.2.2.5Attitude Control (ACS)
1.2.2.5.1SEPM
1.2.2.5.2Assembly, Integration and Test
1.2.2.5.3Support Equipment
1.2.2.5.4Star Tracker/Sensors 1…n (Specify)
1.2.2.5.5Earth (Horizon) Sensors 1…n (Specify)
1.2.2.5.6Sun Sensors 1…n (Specify)
1.2.2.5.7Magnetometers
1.2.2.5.8Global Positioning System (GPS) Receiver
1.2.2.5.9Inertial Reference Unit-IRU/Inertial Measurement Unit-IMU 1…n (Specify)
1.2.2.5.10Rate Gyros 1…n (Specify)
1.2.2.5.11Accelerometers 1…n (Specify)
1.2.2.5.12Bearing and Power Transfer Assembly (BAPTA)
1.2.2.5.13Attitude Control Wheels 1…n (Specify)
1.2.2.5.14Magnetic Control Devices
1.2.2.5.15Spin Control Devices
1.2.2.5.16Control Electronics 1…n (Specify)
1.2.2.5.17ACS Other
1.2.2.6Propulsion 1…n (Specify)
1.2.2.6.1SEPM
1.2.2.6.2Assembly, Integration and Test
1.2.2.6.3Support Equipment
1.2.2.6.4Tanks 1…n (Specify)
1.2.2.6.5Plumbing
1.2.2.6.6Thrusters 1…n (Specify)
1.2.2.6.7Solid Rocket Motors
1.2.2.6.8Liquid Propellant and Pressurant
1.2.2.6.9Power Electronics
1.2.2.6.10Propulsion Other
1.2.2.7Telemetry, Tracking, and Command (TTandC)
1.2.2.7.1SEPM
1.2.2.7.2Assembly, Integration and Test
1.2.2.7.3Support Equipment
1.2.2.7.4Antennas
1.2.2.7.5Passive Signal Flow Control
1.2.2.7.6Transmitter/Receiver/Transceiver/Transponder 1…n (Specify)
1.2.2.7.7Modulators/Demodulators/Modems
1.2.2.7.8Amplifiers
1.2.2.7.9Frequency Upconverter/Downconverter
1.2.2.7.10Computers and Processors 1…n (Specify)
1.2.2.7.11Command/Telemetry Units 1…n (Specify)
1.2.2.7.12Command Sensors 1…n (Specify)
1.2.2.7.13Frequency and Timing
1.2.2.7.14Signal Conditioners
1.2.2.7.15Communications Security 1…n (Specify)
1.2.2.7.16Data Storage, Handling and Interface 1…n (Specify)
1.2.2.7.17TTandC Other
1.2.2.7.18CONTRACTOR TECHNICAL SUPPORT
1.2.2.8Bus Flight Software
1.2.2.8.1SEPM
1.2.2.8.2Assembly, Integration and Test
1.2.2.8.3Support Equipment
1.2.2.8.4CSCI 1…n (Specify)
1.2.3SEIT/PM and Support Equipment (is applicable for integration of Multiple Payloads)
1.2.3.1Systems Engineering
1.2.3.2Assembly, Integration and Test
1.2.3.3Program Management
1.2.3.4Support Equipment
1.2.4Payload 1…n (Specify)
1.2.4.1SEIT/PM and Support Equipment
1.2.4.1.1Systems Engineering
1.2.4.1.2Assembly, Integration and Test
1.2.4.1.3Program Management
1.2.4.1.4Support Equipment
1.2.4.2Structures and Mechanisms (SMS)
1.2.4.2.1SEPM
1.2.4.2.2Assembly, Integration and Test
1.2.4.2.3Support Equipment
1.2.4.2.4Structures
1.2.4.2.5Mechanisms and Pyrotechnics
1.2.4.2.6Structures and Mechanisms Other
1.2.4.3Thermal Control (TCS)
1.2.4.3.1SEPM
1.2.4.3.2Assembly, Integration and Test
1.2.4.3.3Support Equipment
1.2.4.3.4Cryogenic Devices
1.2.4.3.5Liquid Loops
1.2.4.3.6Electric Coolers
1.2.4.3.7Electric Heater, Thermisters and Thermostats
1.2.4.3.8Passive Devices
1.2.4.3.9Sun Shields
1.2.4.3.10Thermal Control Other
1.2.4.4Electrical Power
1.2.4.4.1SEPM
1.2.4.4.2Assembly, Integration and Test
1.2.4.4.3Support Equipment
1.2.4.4.4Power Sources
1.2.4.4.5Power Control Switching and Distrobution Electronics
1.2.4.4.6Power Conditioning, Conversion and Regulation
1.2.4.4.7Harnesses and Cables
1.2.4.4.8Electrical Power Other
1.2.4.5Pointing, Command, and Control Interface
1.2.4.5.1SEPM
1.2.4.5.2Assembly, Integration and Test
1.2.4.5.3Support Equipment
1.2.4.5.4Computers and Processors 1…n (Specify)
1.2.4.5.5Command/Telemetry Units 1…n (Specify)
1.2.4.5.6Control Electronics 1…n (Specify)
1.2.4.5.7Pointing Sensors 1…n (Specify)
1.2.4.5.8Payload Positioners 1…n (Specify)
1.2.4.5.9Security, Encryption and Decryption Devices 1…n (Specify)
1.2.4.5.10Data Storage, Handling and Interface 1…n (Specify)
1.2.4.5.11Multifunctional Digital Electronic Boxes 1…n (Specify)
1.2.4.5.12Pointing, Command, and Control Interface Other
1.2.4.6Payload Antenna 1…n (Specify)
1.2.4.6.1SEPM
1.2.4.6.2Assembly, Integration and Test
1.2.4.6.3Support Equipment
1.2.4.6.4Structures and Mechanisms
1.2.4.6.5Antenna Positioners
1.2.4.6.6Reflector/Horn 1…n (Specify)
1.2.4.6.7Feed 1…n (Specify)
1.2.4.6.8Waveguide/Coax/Cabling
1.2.4.6.9Transmit/Receive Modules
1.2.4.6.10Antenna Other
1.2.4.7Payload Signal Electronics
1.2.4.7.1SEPM
1.2.4.7.2Assembly, Integration and Test
1.2.4.7.3Support Equipment
1.2.4.7.4Passive Signal Flow Control
1.2.4.7.5Transmitter/Receiver/Transceiver/Transponder 1…n (Specify)
1.2.4.7.6Modulators/Demodulators/Modems 1…n (Specify)
1.2.4.7.7Multiplexers/Demultiplexers 1…n (Specify)
1.2.4.7.8Apmplifiers 1…n (Specify)
1.2.4.7.9Frequnency Upconverters/Downcoverters 1…n (Specify)
1.2.4.7.10Frequnency and Timing 1…n (Specify)
1.2.4.7.11Signal Conditioners 1…n (Specify)
1.2.4.7.12Multifunctional Signal Electronic Boxes 1…n (Specify)
1.2.4.7.13Signal Electronics Other
1.2.4.8Optitcal Assembly
1.2.4.8.1SEPM
1.2.4.8.2Assembly, Integration and Test
1.2.4.8.3Support Equipment
1.2.4.8.4Structure/Outerbarrel/Cover 1…n (Specify)
1.2.4.8.5Mirror/Optics 1…n (Specify)
1.2.4.8.6Aft Optics Assembly
1.2.4.8.7Alignment and Calibration 1…n (Specify)
1.2.4.8.8Optitcal Assembly Other
1.2.4.9Sensor
1.2.4.9.1SEPM
1.2.4.9.2Assembly, Integration and Test
1.2.4.9.3Support Equipment
1.2.4.9.4Enclosure 1…n (Specify)
1.2.4.9.5Focal Plane Array 1…n (Specify)
1.2.4.9.6Sensor Positioners 1…n (Specify)
1.2.4.9.7Sensor Electronics 1…n (Specify)
1.2.4.9.8Alignment and Calibration 1…n (Specify)
1.2.4.9.9Magnetometer 1…n (Specify)
1.2.4.9.10Spectrometer 1…n (Specify)
1.2.4.9.11Radiometer 1…n (Specify)
1.2.4.9.12Camera 1…n (Specify)
1.2.4.9.13Sounder 1…n (Specify)
1.2.4.9.14Other Sensor Types 1…n (Specify)
1.2.4.9.15Mission Sensor Other
1.2.4.10Payload Flight Software
1.2.4.10.1SEPM
1.2.4.10.2Assembly, Integration and Test
1.2.4.10.3Support Equipment
1.2.4.10.4CSCI 1…n (Specify)
1.2.4.11Payload Other
1.2.5Booster Adapter
1.2.6Space Vehicle Storage
1.2.7Launch Systems Integration (LSI)
1.2.8Launch Operations
1.2.9Mission Operations Support
1.2.10Space Vehicle Other
1.3Ground Operations and Processing Center 1…n (Specify)
1.3.1SEIT/PM and Support Equipment
1.3.1.1Systems Engineering
1.3.1.2Assembly, Integration and Test
1.3.1.3Program Management
1.3.1.4Support Equipment
1.3.2Function 1…F
1.3.2.1SEIT/PM and Support Equipment
1.3.2.1.1Systems Engineering
1.3.2.1.2Assembly, Integration and Test
1.3.2.1.3Program Management
1.3.2.1.4Support Equipment
1.3.2.2COTS Hardware
1.3.2.2.1SEPM
1.3.2.2.2Assembly, Integration and Test
1.3.2.2.3Support Equipment
1.3.2.2.4Workstations 1…n (Specify)
1.3.2.2.5Servers 1…n (Specify)
1.3.2.2.6Storage and Archive 1…n (Specify)
1.3.2.2.7Network Eqiupment
1.3.2.2.8Interface Equipment
1.3.2.2.9Security, Encryption/Decryption 1…n (Specify)
1.3.2.2.10Data Processing 1…n (Specify)
1.3.2.2.11COTS Hardware Other
1.3.2.2.12Pre-Ops Maintenance 1…n (Specify)
1.3.2.3Custom Hardware
1.3.2.3.1SEPM
1.3.2.3.2Assembly, Integration and Test
1.3.2.3.3Support Equipment
1.3.2.3.4Custom Hardware Configured Item 1…n (Specify)
1.3.2.3.5Pre-Ops Maintenance 1…n (Specify)
1.3.2.4GOPC Software
1.3.2.4.1SEPM
1.3.2.4.2Assembly, Integration and Test
1.3.2.4.3Support Equipment
1.3.2.4.4CSCI 1…n (Specify)
1.3.2.4.5Pre-Ops Maintenance 1…n (Specify)
1.3.2.5Pre-Operations Mission Support
1.4Ground Terminal/Gateway (GT) 1…n (Specify)
1.4.1SEIT/PM and Support Equipment
1.4.1.1Systems Engineering
1.4.1.2Assembly, Integration and Test
1.4.1.3Program Management
1.4.1.4Support Equipment
1.4.2Antenna 1…n (Specify)
1.4.2.1SEPM
1.4.2.2Assembly, Integration and Test
1.4.2.3Support Equipment
1.4.2.4Pedestal
1.4.2.5Radome
1.4.2.6Other Structure and Mechanisms
1.4.2.7Aperture
1.4.2.8Feed 1…n (Specify)
1.4.2.9Waveguide/Coax/Cabling
1.4.2.10Antenna Other
1.4.3Optical Communication Assembly 1…n (Specify)
1.4.3.1SEPM
1.4.3.2Assembly, Integration and Test
1.4.3.3Support Equipment
1.4.3.4Structure/Outerbarrel/Cover
1.4.3.5Mirror/Optics 1…n (Specify)
1.4.3.6Aft Optics and Bench
1.4.3.7Alignment Sensors/Calibration
1.4.3.8Optical Assembly Other
1.4.4RF Electronics (Band 1…n (Specify))
1.4.4.1SEPM
1.4.4.2Assembly, Integration and Test
1.4.4.3Support Equipment
1.4.4.4Pasive Signal Flow Control
1.4.4.5Transmitter/Receiver/Transceiver/Transponder 1…n (Specify)
1.4.4.6Modulators/Demodulators/Modems 1…n (Specify)
1.4.4.7Multiplexers/Demultiplexers 1…n (Specify)
1.4.4.8Power Amplifiers 1…n (Specify)
1.4.4.9Frequnency Upconverters/Downcoverters 1…n (Specify)
1.4.4.10Signal Conditioners 1…n (Specify)
1.4.4.11Signal Electronic Boxes 1…n (Specify)
1.4.4.12Focal Plane Array 1…n (Specify)
1.4.4.13RF Electronics Other
1.4.5Timing
1.4.5.1SEPM
1.4.5.2Assembly, Integration and Test
1.4.5.3Support Equipment
1.4.5.4Receiver
1.4.5.5Antenna 1…n (Specify)
1.4.5.6Frequency and Timing Generators
1.4.5.7Amplifier and Distrobution 1…n (Specify)
1.4.5.8Timing Other
1.4.6Baseband-network
1.4.6.1SEPM
1.4.6.2Assembly, Integration and Test
1.4.6.3Support Equipment
1.4.6.4Switches/Hubs and Routers
1.4.6.5Network Interface and Other Hardware
1.4.6.6Modems
1.4.6.7Security/Encryption and Decryption Devices 1…n (Specify)
1.4.6.8Baseband-network Electronic Boxes 1…n (Specify)
1.4.6.9Baseband-network Other
1.4.7Monitor and Control Hardware
1.4.7.1SEPM
1.4.7.2Assembly, Integration and Test
1.4.7.3Support Equipment
1.4.7.4Workstations 1…n (Specify)
1.4.7.5Servers 1…n (Specify)
1.4.7.6Hardware Configured Item 1…n (Specify)
1.4.8GT Software
1.4.8.1SEPM
1.4.8.2Assembly, Integration and Test
1.4.8.3Support Equipment
1.4.8.4CSCI 1…n (Specify)
1.4.9Pre-Operations Maintenance 1…n (Specify)
1.4.10Pre-Operations Mission Support
1.5External Network (T-COMM)
1.5.1SEIT/PM and Support Equipment
1.5.1.1Systems Engineering
1.5.1.2Assembly, Integration and Test
1.5.1.3Program Management
1.5.1.4Support Equipment
1.5.2Leased Circuits
1.5.2.1Leased Circuits 1…n (Specify)
1.5.3Purchased Curcuits
1.5.3.1Purchased Curcuit 1…n (Specify)
1.5.3.2Pre-Ops Maintenance 1…n (Specify)
1.6User Equipment
1.6.1SEIT/PM and Support Equipment
1.6.1.1Systems Engineering
1.6.1.2Assembly, Integration and Test
1.6.1.3Program Management
1.6.1.4Support Equipment
1.6.2Equipment 1…n (Specify)
1.6.2.1SEPM
1.6.2.2Assembly, Integration and Test
1.6.2.3Support Equipment
1.6.2.4Hardware Configured Item 1…n (Specify)
1.6.2.5CSCI 1…n (Specify)
1.6.3Pre-Ops Maintenance 1…n (Specify)
1.7Facilities 1…n (Specify)
1.7.1SEIT/PM and Support Equipment
1.7.1.1Systems Engineering
1.7.1.2Assembly, Integration and Test
1.7.1.3Program Management
1.7.1.4Support Equipment
1.7.2Site Preparation
1.7.2.1SEPM
1.7.2.2Assembly, Integration and Test
1.7.2.3Support Equipment
1.7.2.4Graded Land
1.7.2.5Roads
1.7.2.6Pads
1.7.2.7Retaining Walls/Fencing
1.7.2.8Utilities
1.7.2.9Site Preparation Other
1.7.3Landscape
1.7.4Buildings 1…n (Specify)
1.7.4.1SEPM
1.7.4.2Assembly, Integration and Test
1.7.4.3Support Equipment
1.7.4.4Foundation and Sub Structure
1.7.4.5Superstructure and Finishing
1.7.4.6Buildings Other
1.7.5Equipment and Building Fit Out 1…n (Specify)
1.7.5.1SEPM
1.7.5.2Assembly, Integration and Test
1.7.5.3Support Equipment
1.7.5.4HVAC
1.7.5.5Power Conditioning/UPS
1.7.5.6Network Wiring/Cable Trays
1.7.5.7Generators
1.7.5.8Computer Flooring
1.7.5.9Appliances
1.7.5.10Furniture
1.7.5.11Equipment and Building Fit Out
1.7.6Pre-Operations Maintenance 1…n (Specify)
1.8Vehicles and Shelters
1.8.1SEIT/PM and Support Equipment
1.8.1.1Systems Engineering
1.8.1.2Assembly, Integration and Test
1.8.1.3Program Management
1.8.1.4Support Equipment
1.8.2Vehicles
1.8.2.1Vehicle 1…n (Specify)
1.8.3Shelters
1.8.3.1Shelter 1…n (Specify)
1.8.4Pre-Operations Maintenance 1…n (Specify)
1.9Insurance
1.9.1SEPM
1.9.2Insurance Policy
1.9.3Insurance Settlements
1.10Task Orders
1.10.1Task Orders 1…n (Specify)
1.11Orbital Transfer Vehicle (OTV)
1.12Launch Vehicle 1…n (Specify)

Specify Government's Role by WBS Element (e.g. GFE, Test, Depot Activation).

Specify Prime Contractor Name by WBS Element.

Specify Subcontractor/Supplier/3rd Party by name. Elaborate on specific role or contracting arrangement in Notes if needed.

HW Tech Table

HardwareTechnicalDetailTableUNCLASSIFIED, FOR OFFICIAL USE ONLYTagName1TagValue1
CARDTagName2TagValue2
PMP Hardware Technical Table, Aircraft, EngineTagName3TagValue3
ColumnHeadSecond Reference Design (e.g. Contractor A)Third Reference Design (e.g. Contractor B)Time each parameter is expected to be available
WBS/CRS NumberWBS/CRS ElementParameter NameValueLowHighMarginUnit of MeasureUnit QualifierEstimate or ActualObjectiveThresholdSourceNotesValueLowHighMarginUnit of MeasureUnit QualifierEstimate or ActualSourceNotesValueLowHighMarginUnit of MeasureUnit QualifierEstimate or ActualSourceNotesDefinitionVocabularyIDList Item 1List Item 2List Item 3List Item 4List Item 5List Item 6List Item 7List Item 8List Item 9List Item 10List Item n=….MS APDRMS B
1.0Space System
Duration of Autonomous OperationDaysNumber of days to operate autonomously without contact with a ground station.xxx
Survivability RequirementListSurvivability requirement to operate after a nearby EMP or similar nuclear type burstYesNoxxx
Survivability RequirementListSurvivability requirement to operate after a distant EMP or similar nuclear type burstYesNoxxx
Survivability RequirementListSurvivability requirement to be able to detect a nuclear type event and recover from its affectsYesNoxxx
Rad HardenedListEnter "Yes" if some accommodation for radiation survivability is included within the design. Otherwise enter "No".YesNo
Mission TypeListDefines the primary mission being executed (e.g. Communication, surveillance, scientific, navigation, experimental, environmental)CommunicationsurveillancescientificnavigationexperimentalenvironmentalOtherxxx
First Time IntegrationListEnter Yes if this is a New 1st Time Integration, otherwise enter No.YesNoxxx
Orbit RegimeListEnter best fit from the below Data Lookup Values list. For Geocentric (Earth) orbits, the geocentric orbit type (inclination, eccentricity, etc.) or altitude classification (LEO, GEO, etc.). For non-Earth orbits specify Planetary. Apoapsis refers to thLEOGEOPlanetaryOtherxxx
Constellation sizeQuantityEnter the number (quantity) of operating satellites required for the mission.xxx
1.2Space Vehicle 1…n (Specify)
WeightKilogramsBasic MassEnter the basic mass in kilograms (kg):
This value is based on an assessment of the most recent baseline design, excluding mass growth allowance. Total dry weight of the product or box in kilograms (exclude propellants, pressurants, refrigerants, etc.).xxxxxContractor11
Weight - Growth AllowanceKilogramsGrowth AllowanceEnter the mass growth allowance in kilograms (kg). This value is the likely change to the basic mass, based on an assessment of the design maturity, allowing for design changes that may occur, excluding changes due to contract/requirements changes. NotexxxxContractor11
Weight - Including Growth AllowanceKilogramsPredicted MassEnter the Predicted Mass of the flight quantity of the product/unit/assembly/box. This value is a calculation resulting in the current predicted weight, including contingency, of the sum all the flight units of a particular unit/box/assembly or lot of coxxxxContractor11
Weight - Contractor Specification LimitKilogramsxxxxContractor33
Weight - Launch Vehicle LimitKilogramsLaunch Vehicle CapabilityxxxxGovernment33
Launch Vehicle CapabilityxxxxGovernment33
Total Predicted Wet MassContractor11
Design LifeMonthsEnter the period of time during which the Space Vehicle (SV) is expected by its designers to work within its specified parameters; in other words, the life expectancy of the SV. It is the length of time between placement into service of a single SV and itxxxxxGovernment11
Flight HeritageName/NumberEnter the heritage or most similar previous product from which the subject product was derived.xxxxContractor11
Mean Mission Duration (MMD)YearsEnter the Mean Mission Duration.xxxxGovernment11
Orbit AltitudeKilometerFor planet orbiting vehicles (satellites) enter the average orbital altitude of the vehicle from planet surface (Avg). For earth orbiting satellites, enter the average height above sea level.xxxxGovernment22
Orbit InclinationDegrees AngularEnter the angular distance (in degrees) of the Space Vehicle (SV) orbital plane from the equator or the ecliptic from the orbited object.xxxxGovernment22
Pointing AccuracyDegrees AngularEnter pointing accuracy in degrees using an appropriate number of significant digits.xxxxContractor33
Pointing KnowledgeDegrees AngularEnter pointing knowledge in degrees using an appropriate number of significant digits.xxxxContractor33
Number of Deployables - Space Vehicle LevelQuantitySpace Vehicle LevelContractor22
Reliability???Space Vehicle LevelEntered at 3 different levels of WBS; Bus, Payload, and Space Vehicle (SV).xxxxContractor33
1.2.2Bus
WeightKilogramsBasic MassEnter the basic mass in kilograms (kg):
This value is based on an assessment of the most recent baseline design, excluding mass growth allowance. Total dry weight of the product or box in kilograms (exclude propellants, pressurants, refrigerants, etc.).xxxxxContractor11
Weight - Growth AllowanceKilogramsGrowth AllowanceEnter the mass growth allowance in kilograms (kg). This value is the likely change to the basic mass, based on an assessment of the design maturity, allowing for design changes that may occur, excluding changes due to contract/requirements changes. NotexxxxContractor11
Weight - Including Growth AllowanceKilogramsPredicted MassEnter the Predicted Mass of the flight quantity of the product/unit/assembly/box. This value is a calculation resulting in the current predicted weight, including contingency, of the sum all the flight units of a particular unit/box/assembly or lot of coxxxxContractor11
Bus ModelName/NumberEnter Model name or designation number, specific to manufacturers, for the space product. (e.g. A2100AX, 601)xxxxContractor11
Voltage - BusVoltsEnter common voltage provided by and across Spacecraft Bus available to Bus and Payload Subsystem boxes.xxxxContractor33
Number of Deployables - Bus LevelQuantityBus LevelEnter the number of deployable appendages; E.g. enter antenna deployables at Antenna S/S level; total deployables at Space Vehicle (SV) and Bus levels.xxxxContractor22
Flight HeritageName/NumberEnter the heritage or most similar previous product from which the subject product was derived.xxxxContractor11
Number of ProcessorsQuantityThe number of processors within a given unitxxxxContractor33
Pointing AccuracyDegrees AngularEnter pointing accuracy in degrees using an appropriate number of significant digits.xxxxContractor33
Pointing KnowledgeDegrees AngularEnter pointing knowledge in degrees using an appropriate number of significant digits.xxxxContractor33
Reliability???Bus LevelEntered at 3 different levels of WBS; Bus, Payload, and Space Vehicle (SV).xxxxContractor33
Number of Unique Designs - ASICQuantityEnter the number of Application Specific Integrated Circuit (ASIC) (unspecified type) designs required.xxxxContractor11
Memory - Data Storage CapacityMegabits per DayEnter the effective daily data storage capacity (capture ability) in terms of Megabits Per Day as a result of to compression, offline storage, download and other techniques in excess of physical computer/processor memory.xxxxContractor33
Memory - OnBoard Storage CapacityMegabytesEnter the physical data storage (memory) capacity at a single instance in time. This includes capacity from compression, recorders, other storage devices.xxxxContractor33
Technology Readiness Level (TRL)ListTechnology Readiness Levels (TRL) are a method of estimating technology maturity of Critical Technology Elements (CTE) of a program during the acquisition process. Lookup TRL level values at bottom of the tab.TRL 1TRL 2TRL 3TRL 4TRL 5TRL 6TRL 7TRL 8TRL 9xxxxGovernment11
1.2.2.2Structures and Mechanisms (SMS)
WeightKilogramsBasic MassEnter the basic mass in kilograms (kg):
This value is based on an assessment of the most recent baseline design, excluding mass growth allowance. Total dry weight of the product or box in kilograms (exclude propellants, pressurants, refrigerants, etc.).xxxxxContractor11
Weight - Growth AllowanceKilogramsGrowth AllowanceEnter the mass growth allowance in kilograms (kg). This value is the likely change to the basic mass, based on an assessment of the design maturity, allowing for design changes that may occur, excluding changes due to contract/requirements changes. NotexxxxContractor11
Weight - Including Growth AllowanceKilogramsPredicted MassEnter the Predicted Mass of the flight quantity of the product/unit/assembly/box. This value is a calculation resulting in the current predicted weight, including contingency, of the sum all the flight units of a particular unit/box/assembly or lot of coxxxxContractor11
Material - StructuresListEnter material predominately used to for structural portion of product.ItemsxxxxContractor22
Number of Deployables - Bus Subsystem LevelQuantityBus Subsystem LevelEnter the number of deployable appendages; E.g. enter antenna deployables at Antenna S/S level; total deployables at Space Vehicle (SV) and Bus levels.xxxxContractor22
New DesignPercentagexxxxContractor11
Technology Readiness Level (TRL)ListTechnology Readiness Levels (TRL) are a method of estimating technology maturity of Critical Technology Elements (CTE) of a program during the acquisition process. Lookup TRL level values at bottom of the tab.TRL 1TRL 2TRL 3TRL 4TRL 5TRL 6TRL 7TRL 8TRL 9xxxxGovernment11
1.2.2.2.4Structures

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .