G-7_Missile_Data_Collection_Requirements_Template_-_3_Nov_15.xlsx
XLSX spreadsheet 2 MB Posted
- Attached to
- AFCAA Cost Estimating Modeling (CEM) Support Federal contract opportunity
- Solicitation number
- FA7014-16-R-5004
About this file
G-7 Missle Data Collections Requirements Template (DRAFT) 3 Nov 15
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Program
| ProgramTemplate | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| CEM Templates | TagName2 | TagValue2 | |
| Program CEM Template | TagName3 | TagValue3 |
| ColumnHead | Parameter Name | Value | Unit of Measure | Estimate or Actual | Source | Notes | Definition of Parameter | VocabularyID |
| Program Name | Program Name | DCARCMetadata | ||||||
| Program Name | DCARC defined Program Name | DCARCMetadata | ||||||
| Name - Short | DCARC defined, acronym | CEMVocab | ||||||
| Name - Popular | An optional alternative name | CEMVocab | ||||||
| Program Description | DCARC defined program description | CEMVocab | ||||||
| Program Number | Program Number | DCARCMetadata | ||||||
| Mil-Handbook | Mil-STD-881 Appendix | DCARCMetadata | ||||||
| Weapon System Type | DCARC defined | DCARCMetadata | ||||||
| Lead Service | DCARC defined Service/Component | DCARCMetadata | ||||||
| Other Services | If a program is "Joint", then list other services involved in the program. | DCARCMetadata | ||||||
| Procuring Organization | SysCom | DCARCMetadata | ||||||
| Program Office | PEO or Program Office | DCARCMetadata | ||||||
| Initial Selected Acquisition Review (SAR) | Date from DAMIR | DCARCMetadata | ||||||
| Latest Selected Acquisition Review (SAR) | Date from DAMIR | DCARCMetadata | ||||||
| Upgrade/Modernization | Yes/No category | CEMVocab | ||||||
| Subprogram Name | Subprogram name if applicable | CEMVocab | ||||||
| Model | Specific configuration or designated model number | CEMVocab |
UOM is N/A for this sheet. Column included only for shape consistency.
Est/Act is N/A for this sheet. Column included only for shape consistency.
Enter text for each parameter.
Milestone
| MilestoneTable | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| CEM Templates | TagName2 | TagValue2 | |
| Milestone CEM Template | TagName3 | TagValue3 |
| ColumnHead | Subprogram Name | |||||||||||||
| Parameter Name | Subprogram | Value | Units | Estimate or Actual | Source | Notes | Value | Units | Estimate or Actual | Source | Notes | Definition of Parameter | VocabularyID | |
| Material Development Decision | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Completion Date | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Milestone A | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Contract Award | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Capability Development Document (CDD) Validation | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Development RFP Release Decision | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Risk Reduction Build | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Milestone B | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| EMD Contract Award | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| System Requirements Review (SRR) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Preliminary Design Review (PDR) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Critical Design Review (CDR) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| First Delivery | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| First Flight | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Development Test & Evaluation Begin | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Development Test & Evaluation End | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Operational Test & Evaluation Begin | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Operational Test & Evaluation End | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Limited Deployment Decision | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Integration Build | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Milestone C | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Limited Deployment | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Deployment Decision (FDD) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Low Rate Initial Production Contract Award | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Rate Production (FRP) Decision | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Rate Production Contract Award | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Initial Operational Capability (IOC) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Deployment (FD) | Date | DDMMMYY | Milestone Date | CEMVocab | ||||||||||
| Full Operational Capability (FOC) | Date | DDMMMYY | Milestone Date | CEMVocab |
Enter parameter values as a single date value in this column.
Identify if the parameter value is an actual value or an estimated value.
Enter parameter values as a single date value in this column.
Identify if the parameter value is an actual value (A) or an estimated value (E).
If these columns are expanded and used to convey a second subprogram or model, take care to each case in the first column heading cell.
When any parameter calls for additional detail, insert rows underneath and indent sub-names as needed.
For additional columns to express alternative designs, hit Ungroup button above.
When parameter varies by subprogram, enter subprogram name in this column.
If no subprograms, then leave this column empty.
Acquisition (CEM)
| AcquisitionTemplate | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| CEM Templates | TagName2 | TagValue2 | |
| Acquisition CEM Template | TagName3 | TagValue3 |
| Material Solution Analysis | Technology Maturation and Risk Reduction | Engineering and Manufacturing Development | Production and Deployment | Sustainment | Disposal | ||||||||||||||||||
| LRIP 1 | LRIP 2 | FRP 1 | FRP 2 | ||||||||||||||||||||
| Contract A | Contract B | Contract A | Contract B | Contract A | Contract B | Contract (Prime) | Contract (Sub) | Contract (Prime) | Contract (Sub) | Contract (Prime) | Contract (Sub) | Contract (Prime) | Contract (Sub) |
| ColumnHead | Parameter name | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Value | Unit of Measure | Units Qualifier | Definition of Parameter | VocabularyID |
| Name - Phase/Contract/Lot | Text | The common name of this phase, contract, or lot. | CEMVocab | ||||||||||||||||||||||||||
| Subphase Name | Text | The common name of this subphase. | CEMVocab | ||||||||||||||||||||||||||
| Contract Number | Text | Prime contract number | CEMVocab | ||||||||||||||||||||||||||
| Option Number | Text | Contract option number if applicable | CEMVocab | ||||||||||||||||||||||||||
| Subcontract Number | Text | Subcontract number. | CEMVocab | ||||||||||||||||||||||||||
| Model | Text | Specific configuration or designated model number | CEMVocab | ||||||||||||||||||||||||||
| Quantity | Quantity | Units for the quantity cited (e.g. Aircraft, Missiles, Pods, Kits, etc.) | The number of units produced for this Phase | CEMVocab | |||||||||||||||||||||||||
| Award Date | Date | Date of contract award announcement or beginning of phase. | CEMVocab | ||||||||||||||||||||||||||
| First Delivery Date | Date | The date of the first delivery. | CEMVocab | ||||||||||||||||||||||||||
| End Date | Date | The end data of this phase, contract, or lot. | CEMVocab | ||||||||||||||||||||||||||
| Contracting Strategy | Description | Describe this phase's contracting strategy. | CEMVocab | ||||||||||||||||||||||||||
| Competition Approach | List | List the Competition Approach: None; Full Phase Competed; Competition thru CDR; etc. | CEMVocab | ||||||||||||||||||||||||||
| Warranty | List | Is there a warranty for this lot? | CEMVocab | ||||||||||||||||||||||||||
| Warranty Type | Description | Describe Warranty | CEMVocab | ||||||||||||||||||||||||||
| Capital Investment | List | Is this the first lot to benefit from capital investment, tooling, plant rearrangement, etc.? | CEMVocab | ||||||||||||||||||||||||||
| Capital Investment Description | Description | Describe capital improvements. | CEMVocab | ||||||||||||||||||||||||||
| Government Test Agency | Name/Number | List Agencies and MIPR or WR numbers | CEMVocab | ||||||||||||||||||||||||||
| Production Rate - Planned Minimum Sustaining | Quantity | Minimum economic rate of production. | CEMVocab | ||||||||||||||||||||||||||
| Production Rate - Planned 1-8-5 | Quantity | Rate of production with factory operating at a single shift. | CEMVocab | ||||||||||||||||||||||||||
| Production Rate - Planned Maximum | Quantity | Maximum production rate without shift constraints. | CEMVocab | ||||||||||||||||||||||||||
| Contractor Name | Name/Number | Name of contractor | CEMVocab | ||||||||||||||||||||||||||
| Special Cases | Description | Define. | CEMVocab | ||||||||||||||||||||||||||
| Additional Information - Program Level | Description | Define. | CEMVocab | ||||||||||||||||||||||||||
| Funding Appropriation | List | Appropriation code | CEMVocab | ||||||||||||||||||||||||||
| Funding Year | Year | Purpose to track to Budget Exhibits (e.g. capture GFE cost) | CEMVocab | ||||||||||||||||||||||||||
| PE Code 1…n | Description | List all applicable Program Element Codes. | CEMVocab | ||||||||||||||||||||||||||
| Withhold Rate | Percentage | The percent of budget withheld by parent organization. Aka taxes not directly expended on the program. | CEMVocab | ||||||||||||||||||||||||||
| Multiyear Production | List | Is this lot part of a multiyear contract? | CEMVocab | ||||||||||||||||||||||||||
| Concurrent Production | List | Are there other customers during this phase/lot such as Foreign Military Sales? | CEMVocab |
The column headings shown are an example only. Modify headings and insert additional columns as needed to fully describe the acquisition plan.
Describe each Phase, Contract, and/or Lot.
Consider using a time-phased Table to fully describe annual quantities. See adjacent sheet "Quantities and O&S Time Phased" Copy the Model and Quantity rows and repeat for each Model or Configured End Item as needed
Quantities and O&S Time Phased
| TimePhasedTableQuantity | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| CEM Templates | TagName2 | TagValue2 | |
| Acquisition Quantities, Fielding, and O&S Time Phased CEM Template | TagName3 | TagValue3 |
| ColumnHead | Item Name | YR 1 | YR 2 | YR 3 | YR 4 | YR 5 | YR 6 | YR 7 | YR 8 | YR 9 | YR 10 | YR n … | Long Lead Requirements | Unit of Measure | Unit Qualifier | Source | Notes | Definition of Parameter | VocabularyID |
| Designate each column as Estimate or Actual ---> |
| Quantity - Prototype | Quantity | Prototype Systems | Prototypes delivered per year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Quantity - Procurement | Quantity | Systems | Equipment procured by year funded. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Quantity - Concurrent Production | Quantity | Systems | Concurrent production represents units produced by the contractor for other parties such as Foreign Military Sales or any other customer. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of Deliveries | Quantity | Systems | Equipment delivered by year delivered or installations by year installed | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Inventory or Fielded Density | Quantity | Systems | Total number of systems supported by year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Inventory or Fielded Density | Quantity | Systems | Total number of systems supported by year. | CEMVocab |
| Squadron #1/Base #1 | ||||
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … | ||||
| Squadron #2/Base #2 | ||||
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … | ||||
| Squadron #3/Base #3 | ||||
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … | ||||
| Operational Activity | Hours, Miles, Sorties | System usage expressed as hours or miles per system per year by various operational states. | CEMVocab | |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Operational Activity |
| System Use (OPTEMPO), miles driven |
| Location #1 or Operational State #1 |
| End Item #1 |
| End Item #2 |
| End Item #3 |
| End Item #4 |
| … |
| System Use (OPTEMPO), hours operated |
| Location #1 or Operational State #1 |
| End Item #1 |
| End Item #2 |
| End Item #3 |
| End Item #4 |
| … |
| Number of Caps/Sorties |
| Number of Users |
| Number of Concurrent Users |
| System Throughput (Transactions) |
| Data Storgage |
| Number of Disposals | Quantity | Systems | Annual quantity of items leaving service at end of useful life. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of Overhauls or Scheduled Depot Maintenance | Quantity | Systems | The planned number of depot scheduled events by year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of Hardware Modification Kit Procurement | Quantity | Kits | The planned number of kits procured by year to support hardware modification events. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of Hardware Modification Installs | Quantity | Installs | The planned number of hardware modification events by year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … |
| Number of NDI Refresh Events | Quantity | Refreshes | The number of Information Systems related refreshes (number of hardware items procured and installed) per year. | CEMVocab |
| End Item #1 | ||||
| End Item #2 | ||||
| End Item #3 | ||||
| End Item #4 | ||||
| … | ||||
| Training Item #1 | ||||
| Training Item #2 | ||||
| … | ||||
| Support Equipment Item #1 | ||||
| Support Equipment Item #2 | ||||
| … | ||||
| Number of Training Events | Quantity | Classes | The number of training events per class per year. | CEMVocab |
| Class #1 | ||||
| Class #2 | ||||
| Class #3 | ||||
| Class #4 |
| Number of Base Activation | Quantity | Bases | The number of sites activated per year. | CEMVocab |
| Test Squadron | ||||
| Operator Training | ||||
| Maintainer Training | ||||
| Squadron #1/Base #1 | ||||
| Squadron #2/Base #2 | ||||
| Squadron #3/Base #3 | ||||
| Squadron #4/Base #4 | ||||
| … |
Enter name of item.
Use headings in bold and indent wherever it is useful to do so.
All entries below are examples only.
Enter annual values here.
Note early years may be know and future years forecasted. Designate in row 6.
For procurement quantities, enter text describing long-lead requirements. Could be expressed as a percent of funds or names of specific items that must be purchased early.
Otherwise leave blank.
Unit of Measure is Aircraft, Engines, AURs, Radars, Silos, Sites, etc.
Enter annual quantities here. For prototypes convey the year delivered.
Include non-PME as well as PME.
Enter annual quantity installed or delivered here.
This is pertinent for modeling fielding event costs.
Enter the cumulative quantities delivered and supported here.
This is pertinent for modeling O&S costs.
Show ramp-down of items leaving service at end of useful life.
Enter quantity of sites activated here.
Entries often will simply be 1 if each site is explicitly named in column C..
This is pertinent for modeling base activation costs and to begin O&S of location costs.
Enter annual quantity of kits purchased for modification events here.
This is pertinent for modeling Mods costs.
Enter annual quantity of items leaving service at end of useful life.
This is pertinent for modeling disposal costs as well as density ramp-down.
Begin at earliest year quantity data is applicable.
List all program years. Avoid using Prior and To-complete columns - be explicit.
Enter the cumulative quantities delivered and supported by location here.
This is pertinent for modeling O&S costs.
Show ramp-down of items leaving service at end of useful life.
Enter annual quantities here. For procurement convey the year funded.
Include non-PME as well as PME.
Enter annual quantity of overhauls or any other scheduled Depot activity here.
This is pertinent for modeling Depot costs.
Enter annual quantity of NDA refresh events here.
This is pertinent for modeling refresh cycle costs.
Other potential usage measures. Enter annual activity. Expand by Location or End Item as needed.
Enter annual quantity of modification installs here.
This is pertinent for modeling Mods costs.
Enter annual concurrent production quantities here. Concurrent production represents units produced by the contractor for other parties such as Foreign Military Sales or any other customer.
For each Operational Activity row, expand by Location or or operational state. Then further expand by End Item/Variant as needed. Enter annual activity in columns.
Roles
| RolesTable | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| CEM Templates | TagName2 | TagValue2 | |
| Roles CEM Template | TagName3 | TagValue3 |
| ColumnHead | WBS/CRS Number | WBS/CRS Element | Government Role | Prime Contractor | Secondary Subcontractor/Supplier/Third Party | Tertiary Subcontractor/Supplier/Third Party | Notes |
| 1.0 | Missile System | ||||||
| 1.1 | Air Vehicle | ||||||
| 1.1.1 | Airframe | ||||||
| 1.1.1.1 | Airframe Integration, Assembly, Test and Checkout | ||||||
| 1.1.1.2 | Primary Structure | ||||||
| 1.1.1.3 | Secondary Structure | ||||||
| 1.1.1.4 | Aero-Structures | ||||||
| 1.1.1.5 | Other Airframe Components 1…n (Specify) | ||||||
| 1.1.2 | Propulsion | ||||||
| 1.1.2.1 | Propulsion Integration, Assembly, Test and Checkout | ||||||
| 1.1.2.2 | Motor/Engine (Solid Rocket Motor) | ||||||
| 1.1.2.2 | Motor/Engine (Liquid Rocket Engine) | ||||||
| 1.1.2.2 | Motor/Engine (Air Breathing Engine) | ||||||
| 1.1.2.3 | Thrust Vector Actuation | ||||||
| 1.1.2.4 | Attitude Control System | ||||||
| 1.1.2.5 | Fuel/Oxidizer Liquid Management | ||||||
| 1.1.2.7 | Flight Termination/Mission Termination | ||||||
| 1.1.2.6 | Arm/Fire Device | ||||||
| 1.1.2.8 | Propulsion Software Release 1…n | ||||||
| 1.1.2.8.1 | Propulsion Software Release 1…n CSCI 1…n | ||||||
| 1.1.2.9 | Other Propulsion Subsystems 1…n (Specify) | ||||||
| 1.1.3 | Power and Distribution | ||||||
| 1.1.3.1 | Power and Distribution Integration, Assembly, Test and Checkout | ||||||
| 1.1.3.2 | Primary Power | ||||||
| 1.1.3.3 | Power Conditioning Electronics | ||||||
| 1.1.3.4 | Distribution Harness | ||||||
| 1.1.3.5 | Power and Distribution Software Release 1…n | ||||||
| 1.1.3.5.1 | Power and Distribution Software Release 1…n CSCI 1…n | ||||||
| 1.1.3.6 | Other Power and Distribution Subsystems 1…n (Specify) | ||||||
| 1.1.4 | Guidance | ||||||
| 1.1.4.1 | Guidance Integration, Assembly, Test and Checkout | ||||||
| 1.1.4.2 | Dome Assembly | ||||||
| 1.1.4.3 | Seeker Assemblies (IR Seeker) | ||||||
| 1.1.4.3.1 | Focal Plane Array | ||||||
| 1.1.4.3.2 | Optics | ||||||
| 1.1.4.3.3 | Cooling | ||||||
| 1.1.4.3.4 | Gimbal | ||||||
| 1.1.4.3.5 | Seeker Electronics (Specify) | ||||||
| 1.1.4.3.6 | Seeker Structure (Specify) | ||||||
| 1.1.4.3.7 | Seeker Integration, Assembly, Test and Checkout | ||||||
| 1.1.4.3 | Seeker Assemblies (RF Seeker) | ||||||
| 1.1.4.3.1 | Antenna | ||||||
| 1.1.4.3.2 | Transmitter | ||||||
| 1.1.4.3.3 | Receiver/Exciter | ||||||
| 1.1.4.3.4 | Gimbal | ||||||
| 1.1.4.3.5 | Seeker Electronics (Specify) | ||||||
| 1.1.4.3.6 | Seeker Structure (Specify) | ||||||
| 1.1.4.3.7 | Seeker Integration, Assembly, Test and Checkout | ||||||
| 1.1.4.3 | Seeker Assemblies (Laser Seeker) | ||||||
| 1.1.4.4 | Guidance Software Release 1…n | ||||||
| 1.1.4.4.1 | Guidance Software Release 1…n CSCI 1…n | ||||||
| 1.1.4.5 | Other Guidance Subsystems (Mission Computer) | ||||||
| 1.1.4.5 | Other Guidance Subsystems 1…n (Specify) | ||||||
| 1.1.5 | Navigation | ||||||
| 1.1.5.1 | Navigation Integration, Assembly, Test and Checkout | ||||||
| 1.1.5.2 | Sensor Assemblies | ||||||
| 1.1.5.3 | Navigation Software Release 1…n (Specify) | ||||||
| 1.1.5.3.1 | Navigation Software Release 1…n (Specify) CSCI 1…n | ||||||
| 1.1.5.4 | Other Navigation Subsystems 1…n (Specify) | ||||||
| 1.1.6 | Controls | ||||||
| 1.1.6.1 | Controls Integration, Assembly, Test and Checkout | ||||||
| 1.1.6.2 | Primary Structure | ||||||
| 1.1.6.3 | Fin/Canard Deployment System | ||||||
| 1.1.6.4 | Actuators | ||||||
| 1.1.6.5 | Control Power | ||||||
| 1.1.6.6 | Controls Software Release 1…n | ||||||
| 1.1.6.6.1 | Controls Software Release 1…n CSCI 1…n | ||||||
| 1.1.6.7 | Other Control Subsystems 1…n (Specify) | ||||||
| 1.1.7 | Communications | ||||||
| 1.1.7.1 | Communications Integration, Assembly, Test and Checkout | ||||||
| 1.1.7.2 | Antenna Assembly | ||||||
| 1.1.7.3 | Communications Software Release 1…n | ||||||
| 1.1.7.3.1 | Communications Software Release 1…n CSCI 1…n | ||||||
| 1.1.7.4 | Other Communications Subsystems 1…n (Specify) | ||||||
| 1.1.8 | Payload | ||||||
| 1.1.8.1 | Payload Integration, Assembly, Test and Checkout | ||||||
| 1.1.8.2 | Target Defeat Mechanism | ||||||
| 1.1.8.3 | Target Detection Device | ||||||
| 1.1.8.4 | Fuze | ||||||
| 1.1.8.5 | Payload Software Release 1…n | ||||||
| 1.1.8.5.1 | Payload Software Release 1…n CSCI 1…n | ||||||
| 1.1.8.6 | Other Payload Subsystems 1…n (Specify) | ||||||
| 1.1.9 | Reentry System | ||||||
| 1.1.10 | Post Boost System | ||||||
| 1.1.11 | Ordnance Initiation Set | ||||||
| 1.1.12 | On Board Test Equipment | ||||||
| 1.1.12.1 | Test instrumentation Kit | ||||||
| 1.1.12.2 | Other On Board Test Equipment (Specifiy) | ||||||
| 1.1.13 | On Board Training Equipment | ||||||
| 1.1.14 | Auxiliary Equipment | ||||||
| 1.1.15 | Air Vehicle Software Release 1…n | ||||||
| 1.1.15.1 | Air Vehicle Software Release 1…n CSCI 1…n | ||||||
| 1.1.16 | Air Vehicle Integration, Assembly, Test and Checkout | ||||||
| 1.2 | Encasement Device | ||||||
| 1.3 | Command and Launch | ||||||
| 1.3.1 | Command and Launch Integration, Assembly, Test and Checkout | ||||||
| 1.3.2 | Surveillance, Identification and Tracking Sensors | ||||||
| 1.3.3 | Launch and Guidance Control | ||||||
| 1.3.4 | Communications | ||||||
| 1.3.5 | Launcher Equipment | ||||||
| 1.3.6 | Auxiliary Equipment | ||||||
| 1.3.7 | Command and Launch Software Release 1...n | ||||||
| 1.3.7.1 | Command and Launch Software Release 1...n CSCI 1…n | ||||||
| 1.3.8 | Other Command and Launch 1...n (Specify) | ||||||
| 1.4 | Missile System Software Release 1...n | ||||||
| 1.4.1 | Missile System Software Release 1...n CSCI 1…n | ||||||
| 1.5 | Missile System Integration, Assembly, Test and Checkout | ||||||
| 1.6 | System Engineering | ||||||
| 1.7 | Program Management | ||||||
| 1.8 | System Test and Evaluation | ||||||
| 1.8.1 | Development Test and Evaluation | ||||||
| 1.8.1.1 | Engineering Development Tests | ||||||
| 1.8.1.2 | System Qualification | ||||||
| 1.8.1.3 | Platform Integration 1…n (specify) | ||||||
| 1.8.1.4 | Service/Agency DT&E 1…n (specify) | ||||||
| 1.8.2 | Operational Test and Evaluation | ||||||
| 1.8.3 | Mock-ups / System Integration Labs (SILs) | ||||||
| 1.8.4 | Test and Evaluation Support | ||||||
| 1.8.5 | Test Facilities | ||||||
| 1.9 | Training | ||||||
| 1.9.1 | Equipment | ||||||
| 1.9.2 | Services | ||||||
| 1.9.2.1 | Services (Development of Training Materials) | ||||||
| 1.9.2.2 | Services (Provide Training) | ||||||
| 1.9.3 | Facilities | ||||||
| 1.10 | Data | ||||||
| 1.10.1 | Technical Publications | ||||||
| 1.10.2 | Engineering Data | ||||||
| 1.10.3 | Management Data | ||||||
| 1.10.4 | Support Data | ||||||
| 1.10.5 | Data Depository | ||||||
| 1.11 | Peculiar Support Equipment | ||||||
| 1.11.1 | Test and Measurement Equipment | ||||||
| 1.11.2 | Support and Handling Equipment | ||||||
| 1.12 | Common Support Equipment | ||||||
| 1.12.1 | Test and Measurement Equipment | ||||||
| 1.12.2 | Support and Handling Equipment | ||||||
| 1.13 | Operational/Site Activation | ||||||
| 1.13.1 | System Assembly, Installation and Checkout on Site | ||||||
| 1.13.1.1 | Site 1…n | ||||||
| 1.13.1.1.1 | Deployment HW and SW | ||||||
| 1.13.1.1.2 | Site Activation | ||||||
| 1.13.2 | Contractor Technical Support | ||||||
| 1.13.3 | Site Construction | ||||||
| 1.13.4 | Site/Ship/Vehicle Conversion | ||||||
| 1.13.5 | Sustainment/Interim Contractor Support | ||||||
| 1.14 | Industrial Facilities | ||||||
| 1.14.1 | Construction/Conversion/Expansion | ||||||
| 1.14.2 | Equipment Acquisition or Modernization | ||||||
| 1.14.3 | Maintenance (Industrial Facilities) | ||||||
| 1.15 | Initial Spares and Repair Parts | ||||||
| 1.16 | Rate Tooling | ||||||
| 1.16.n | Rate Tooling by End Item/Subsystem 1…n (Specify) | ||||||
| 1.17 | Warranty | ||||||
| 1.17.n | Warranty by End Item/Subsystem 1…n (Specify) | ||||||
| 2.0 | Sustainment Effort | ||||||
| 2.1 | Unit-Level Manpower (System Level Cost Only) | ||||||
| 2.1.1 | Operations Manpower | ||||||
| 2.1.2 | Unit-Level Maintenance Manpower | ||||||
| 2.1.3 | Other Unit-Level Manpower (Specify In Remarks) | ||||||
| 2.2 | Unit Operations (System Level Cost Only) | ||||||
| 2.2.1 | Operating Material | ||||||
| 2.2.1.1 | Energy (Fuel; Petroleum, Oil, and Lubricants (POL); Electricity) | ||||||
| 2.2.1.1.1 | Fuel | ||||||
| 2.2.1.1.2 | POL | ||||||
| 2.2.1.1.3 | Electricity | ||||||
| 2.2.1.2 | Training Munitions/Expendable Stores | ||||||
| 2.2.1.2.1 | Ammunition | ||||||
| 2.2.1.2.2 | Bombs | ||||||
| 2.2.1.2.3 | Rockets | ||||||
| 2.2.1.2.4 | Training Missiles | ||||||
| 2.2.1.2.5 | Sonobuoys | ||||||
| 2.2.1.2.6 | Pyrotechnics | ||||||
| 2.2.1.2.7 | Other Munitions | ||||||
| 2.2.1.3 | Other Operating Material (Specify in Remarks) | ||||||
| 2.2.2 | Support Services (Including Non-Maintenance FSRs) | ||||||
| 2.2.2.1 | Communication Services | ||||||
| 2.2.2.2 | Facility/Storage Services | ||||||
| 2.2.2.3 | Transportation Services | ||||||
| 2.2.2.4 | Other Support Services | ||||||
| 2.2.3 | Temporary Duty | ||||||
| 2.3 | Maintenance | ||||||
| 2.3.1 | Overhaul Of End Items | ||||||
| 2.3.1.1 | Scheduled Overhaul | ||||||
| 2.3.1.1.1 | Airframe/Hull Overhaul | ||||||
| 2.3.1.1.2 | Propulsion Overhaul | ||||||
| 2.3.1.1.3 | Vehicle Subsystems | ||||||
| 2.3.1.1.4 | Electronics/Avionics Overhaul | ||||||
| 2.3.1.1.5 | Other Overhaul | ||||||
| 2.3.1.2 | Unscheduled Overhaul | ||||||
| 2.3.1.2.1 | Airframe/Hull Overhaul | ||||||
| 2.3.1.2.2 | Propulsion Overhaul | ||||||
| 2.3.1.2.3 | Vehicle Subsystems | ||||||
| 2.3.1.2.4 | Electronics/Avionics Overhaul | ||||||
| 2.3.1.2.5 | Other Overhaul | ||||||
| 2.3.2 | Depot Level Reparables (DLR) / Repair of Reparables (ROR) | ||||||
| 2.3.2.1 | Airframe/Hull DLRs | ||||||
| 2.3.2.2 | Propulsion DLRs | ||||||
| 2.3.2.3 | Vehicle Subsystems DLRs | ||||||
| 2.3.2.4 | Electronics/Avionics DLRs | ||||||
| 2.3.2.5 | Other DLRs | ||||||
| 2.3.3 | Consumables and Repair Parts | ||||||
| 2.3.3.1 | Airframe/Hull Consumables and Repair Parts | ||||||
| 2.3.3.2 | Propulsion Consumables and Repair Parts | ||||||
| 2.3.3.3 | Vehicle Subsystems Consumables and Repair Parts | ||||||
| 2.3.3.4 | Electronics/Avionics Consumables and Repair Parts | ||||||
| 2.3.3.5 | Other Consumables and Repair Parts | ||||||
| 2.3.4 | Other Maintenance Services (Including FSRs) (Explain in Remarks) | ||||||
| 2.3.4.1 | Packing, Handling, Shipping and Transportation | ||||||
| 2.3.4.2 | O-Level Maintenance Services | ||||||
| 2.3.4.3 | I-Level Maintenance Services | ||||||
| 2.3.5 | Depot Level Maintenance Services | ||||||
| 2.4 | Sustaining Support (System Level Cost Only) | ||||||
| 2.4.1 | System Specific Training | ||||||
| 2.4.1.1 | Operator Training | ||||||
| 2.4.1.2 | Maintenance Training | ||||||
| 2.4.1.3 | Other Training | ||||||
| 2.4.2 | Support Equipment Replacement and Repair | ||||||
| 2.4.2.1 | Support Equipment Replacement | ||||||
| 2.4.2.2 | Support Equipment Repair | ||||||
| 2.4.3 | Sustaining/Systems Engineering | ||||||
| 2.4.3.1 | Reliability and Maintainability Engineering | ||||||
| 2.4.3.2 | Logistics Engineering (LSA Updates, Logistics Analysis) | ||||||
| 2.4.3.3 | Supply Analysis Efforts | ||||||
| 2.4.3.4 | Safety/Human Systems Integration Engineering | ||||||
| 2.4.3.5 | Affordability Engineering | ||||||
| 2.4.3.6 | Obsolescence Engineering | ||||||
| 2.4.3.7 | Availability Management | ||||||
| 2.4.3.8 | Product Engineering Support | ||||||
| 2.4.3.9 | Cybersecurity | ||||||
| 2.4.3.10 | Configuration Management | ||||||
| 2.4.3.11 | System Performance Analysis | ||||||
| 2.4.3.12 | Supply | ||||||
| 2.4.3.13 | Data Analysis | ||||||
| 2.4.3.14 | Physical Security | ||||||
| 2.4.4 | Program Management | ||||||
| 2.4.4.1 | Contractor Logistics Support (CLS) Management | ||||||
| 2.4.4.2 | CLS Supply Management | ||||||
| 2.4.4.3 | Financial/Schedule Planning and Reporting | ||||||
| 2.4.4.4 | Transition to Lead Service | ||||||
| 2.4.4.5 | Quality Assurance (Program Level) | ||||||
| 2.4.4.6 | Administrative Security | ||||||
| 2.4.4.7 | Transition to Performance Based Logistics (PBL) | ||||||
| 2.4.4.8 | Risk Mitigation | ||||||
| 2.4.5 | Information Systems | ||||||
| 2.4.5.1 | Tech Refreshes | ||||||
| 2.4.5.1.1 | Servers | ||||||
| 2.4.5.1.1.1 | Web Servers | ||||||
| 2.4.5.1.1.2 | Application Servers | ||||||
| 2.4.5.1.1.3 | Database Servers | ||||||
| 2.4.5.1.1.4 | Other Servers | ||||||
| 2.4.5.1.2 | Data Storage | ||||||
| 2.4.5.1.3 | Workstations | ||||||
| 2.4.5.1.4 | Communication Hardware | ||||||
| 2.4.5.1.4.1 | Wide-Area Gateways | ||||||
| 2.4.5.1.4.2 | Wide-Area Networks (WAN) | ||||||
| 2.4.5.1.4.3 | Local Area Networks (LAN) | ||||||
| 2.4.5.1.4.4 | Modems and Switches | ||||||
| 2.4.5.1.4.5 | CRYPTO | ||||||
| 2.4.5.1.4.6 | Other Communication Hardware | ||||||
| 2.4.5.1.5 | Peripheral Devices | ||||||
| 2.4.5.1.6 | Other Hardware | ||||||
| 2.4.5.2 | IS Related License Fees | ||||||
| 2.4.5.3 | System Support / Maintenance | ||||||
| 2.4.5.3.1 | Help Desk | ||||||
| 2.4.5.3.1.1 | Tier 1 | ||||||
| 2.4.5.3.1.2 | Tier 2 | ||||||
| 2.4.5.3.1.3 | Tier 3 | ||||||
| 2.4.5.3.2 | System Database/Administration | ||||||
| 2.4.5.3.3 | Follow On User Training | ||||||
| 2.4.5.3.4 | Independent Verification and Validation (IV&V) | ||||||
| 2.4.6 | Data and Technical Publications | ||||||
| 2.4.7 | Simulator Operations and Training Devices | ||||||
| 2.4.7.1 | Simulator Operations Hardware Support | ||||||
| 2.4.7.2 | Simulator Operations Manpower | ||||||
| 2.4.7.3 | Simulator Tech Refresh | ||||||
| 2.4.8 | Other Sustaining Support (Specify in Remarks) | ||||||
| 2.5 | Continuing System Improvements | ||||||
| 2.5.1 | Hardware Modifications or Modernization | ||||||
| 2.5.1.1 | Mod Kit Development | ||||||
| 2.5.1.2 | Mod Kit Procurement | ||||||
| 2.5.1.3 | Mod Kit Initial Spares | ||||||
| 2.5.1.4 | Mod Kit Installation | ||||||
| 2.5.2 | Software Maintenance or Modification | ||||||
| 2.5.2.1 | Software Change | ||||||
| 2.5.2.1.1 | Correction of Deficiencies | ||||||
| 2.5.2.1.1.1…n (Specify) | Release 1…n (Specify) | ||||||
| 2.5.2.1.2 | Enhancements | ||||||
| 2.5.2.1.2.1…n (Specify) | Release 1…n (Specify) | ||||||
| 2.5.2.2 | Software License Management | ||||||
| 2.5.2.3 | System Facilities | ||||||
| 2.5.2.4 | Field Software Engineering (FSE) | ||||||
| 2.5.2.5 | Operational Management | ||||||
| 2.6 | Installation and Personnel Support (System Level Only) |
Specify Government's Role by WBS Element (e.g. GFE, Test, Depot Activation).
Specify Prime Contractor Name by WBS Element.
Specify Subcontractor/Supplier/3rd Party by name. Elaborate on specific role or contracting arrangement in Notes if needed.
Enter Commodity WBS/CRS in these two columns
PMP Hardware Technical
| HardwareTechnicalTable | UNCLASSIFIED, FOR OFFICIAL USE ONLY | TagName1 | TagValue1 |
| CEM Templates | TagName2 | TagValue2 | |
| PMP Hardware Technical Template, Missiles and Munitions | TagName3 | TagValue3 |
| ColumnHead | Second Reference Design (e.g. Contractor A) | Third Reference Design (e.g. Contractor B) | Time each parameter is expected to be available | ||||||||||||||||||||||||||||||||||||||||||||||
| WBS/CRS Number | WBS/CRS Element | Parameter Name | Value | Low | High | Margin | Unit of Measure | Unit Qualifier | Estimate or Actual | Objective | Threshold | Source | Notes | Value | Low | High | Margin | Unit of Measure | Unit Qualifier | Estimate or Actual | Source | Notes | Value | Low | High | Margin | Unit of Measure | Unit Qualifier | Estimate or Actual | Source | Notes | Definition | VocabularyID | List Item #1 | List Item #2 | List Item #3 | List Item #4 | List Item #5 | List Item #6 | List Item #7 | List Item #8 | List Item #9 | List Item #10 | List Item #n | MS A | PDR | MS B | ||
| 1.0 | Missile System | The complex of hardware, software, data, services, and facilities required to develop and produce the capability of employing a missile weapon in an operational environment to detect and defeat selected targets. | |||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | Air Vehicle | An Air vehicle is a guided weapon self-propelled after leaving its launching device that has as its purpose the delivery of a payload for destruction (or defeat) of some object or target. Missiles may be classified as tactical or strategic (such as ballistic missiles). It also includes the design, development, and production of complete units (i.e., the prototype or operationally configured units, which satisfy the requirements of their applicable specification(s), regardless of end use). | |||||||||||||||||||||||||||||||||||||||||||||||
| Designation | Name/Number | Name/Number | Name/Number | The item's formal designation as governed by a recognized system such as the Aeronautical and Support Equipment Type Designation System (ASETDS), Joint Electronics Type Designations System (JETDS), or Mission-Design-Series (MDS). | CEMVocab | x | |||||||||||||||||||||||||||||||||||||||||||
| Name - Short | Name/Number | Name/Number | Name/Number | The item's common, popular name. | CEMVocab | x | x | x | |||||||||||||||||||||||||||||||||||||||||
| Manufacturer | Name/Number | Name/Number | Name/Number | The primary supplier of the item. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Part Number | Name/Number | Name/Number | Name/Number | The item's part number as assigned by the Manufacturer. | CEMVocab | ||||||||||||||||||||||||||||||||||||||||||||
| National Stock Number (NSN) | Name/Number | Name/Number | Name/Number | The thirteen-digit National Stock Number (NSN) which contain sub-groups that identify the Federal Supply Groups (FSG) , Federal Supply Classes (FSC) , NATO Country Code, National Item Identification Number NIIN) and the serial number of the product. | CEMVocab | ||||||||||||||||||||||||||||||||||||||||||||
| State of Technology | Year | Year | Year | The year a representative model or prototype is tested. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| New Design | Percent | Percent | Percent | The extent of the item's design that is new. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Predecessor System - Percent New | Name/Number | Name/Number | Name/Number | When Percent New Design is less than 100%, cite the system's from which design is inherited. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Technology Readiness Level (TRL) | List | List | List | Technology Readiness Levels (TRL) are a method of estimating technology maturity of Critical Technology Elements (CTE) of a program during the acquisition process. | CEMVocab | List | TRL 1 | TRL 2 | TRL 3 | TRL 4 | TRL 5 | TRL 6 | TRL 7 | TRL 8 | TRL 9 | x | x | ||||||||||||||||||||||||||||||||
| Manufacturing Readiness Level (MRL) | List | List | List | Manufacturing Readiness Levels (MRL) are a measurement scale and vocabulary for assessing and discussing manufacturing maturity and risk. | CEMVocab | List | MRL 1 | MRL 2 | MRL 3 | MRL 4 | MRL 5 | MRL 6 | MRL 7 | MRL 8 | MRL 9 | MRL 10 | |||||||||||||||||||||||||||||||||
| Weight | Pounds | Total | Pounds | Total | Pounds | Total | The item's total weight | Modified | x | x | x | ||||||||||||||||||||||||||||||||||||||
| Weight - Structural | Pounds | Structural | Pounds | Structural | Pounds | Structural | The item's mechanical/structural weight. | CEMVocab | x | x | |||||||||||||||||||||||||||||||||||||||
| Weight - Electronics | Pounds | Electronics | Pounds | Electronics | Pounds | Electronics | The item's electronics weight. | CEMVocab | x | x | |||||||||||||||||||||||||||||||||||||||
| Length | Inches | Inches | Inches | The length of the item. | CEMVocab | x | x | x | |||||||||||||||||||||||||||||||||||||||||
| Diameter | Inches | Inches | Inches | The diameter of the item. | CEMVocab | x | x | x | |||||||||||||||||||||||||||||||||||||||||
| Dimension - Description | Description | Description | Description | Enter additional dimensional information for items when length and diameter alone are insufficient. | CEMVocab | x | x | x | |||||||||||||||||||||||||||||||||||||||||
| Material Mix 1…n | Percent | Weight by Material Name | Percent | Weight by Material Name | Percent | Weight by Material Name | List primary materials comprising the item. (Cite one or more materials as applicable) | Modified | x | x | |||||||||||||||||||||||||||||||||||||||
| Manufacturing Process 1…n | Description | Description | Description | List the item's primary fabrication processes. (Cite one or more processes as applicable) | New | ||||||||||||||||||||||||||||||||||||||||||||
| Power - Maximum Consumption Rate | Watts | Maximum | Watts | Maximum | Watts | Maximum | Maximum rate of power consumption by the item. | CEMVocab | x | x | |||||||||||||||||||||||||||||||||||||||
| Quantity - Next Higher Assembly | Quantity | Quantity | Quantity | Number of units of this item to be assembled into its parent assembly. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Air Vehicle Type | List | List | List | The Air Vehicle type. | Modified | List | Air-to-Air | Air-to-Surface | Surface-to-Air | Surface-to-Surface | Other | x | x | ||||||||||||||||||||||||||||||||||||
| Weight - Burn Out | Pounds | Burn Out | Pounds | Burn Out | Pounds | Burn Out | The Air Vehicle's Burn Out Weight. | CEMVocab | x | x | |||||||||||||||||||||||||||||||||||||||
| Wingspan | Inches | Inches | Inches | The distance between a pair of wing tips. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Mean Time Between Failure (MTBF) | Hours | Hours | Hours | The Air Vehicle's MTBF. Mean time between failures (MTBF) is the predicted elapsed time between inherent failures of a system during operation. MTBF can be calculated as the arithmetic mean (average) time between failures of a system. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Mean Time To Repair (MTTR) | Hours | Hours | Hours | The Air Vehicle's MTTR. Mean time to repair (MTTR) is the average time required to troubleshoot and repair failed equipment and return it to normal operating conditions. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Effective Range - Maximum | Nautical Miles | Maximum | Nautical Miles | Maximum | Nautical Miles | Maximum | The Air Vehicle's Maximum Effective Missile Range. | CEMVocab | x | x | |||||||||||||||||||||||||||||||||||||||
| Flight Time | Seconds | Seconds | Seconds | The Air Vehicle's Flight Time is the period during which a particular air vehicle remains airborne. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Operating Altitude - Maximum | Feet | Maximum | Feet | Maximum | Feet | Maximum | The Air Vehicle's Maximum Operating Altitude Or Ceiling. | CEMVocab | x | x | |||||||||||||||||||||||||||||||||||||||
| Velocity - Maximum | Feet per Second | Maximum | Feet per Second | Maximum | Feet per Second | Maximum | The Air Vehicle's Maximum Velocity. | CEMVocab | x | x | |||||||||||||||||||||||||||||||||||||||
| Velocity Cruising | Feet per Second | Feet per Second | Feet per Second | The Air Vehicle's Velocity Cruising. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Lateral Acceleration | Gravitational Force | Gravitational Force | Gravitational Force | The Air Vehicle's Lateral Acceleration. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Accuracy - Circular Error Probable | Feet | Feet | Feet | An indicator of the delivery accuracy of a weapon system, used as a factor in determining probable damage to a target. It is the radius of a circle within which half of a missile’s projectiles are expected to fall or there is a 50% probability that a single projectile shall impact. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Mission Area Type | List | List | List | Mission area is a segment of the defense mission as established by the Secretary of Defense. Each DoD component has a mission area (i.e. Navy - sea control) for which it must equip its forces. | |||||||||||||||||||||||||||||||||||||||||||||
| CEMVocab | List | Loitering | Missile Defense | Nuclear | Other | x | x | x | x | x | Government | ||||||||||||||||||||||||||||||||||||||
| Target Type | List | List | List | The Air Vehicle's Target Type. | CEMVocab | List | Aircraft | Armor | Personnel | Structures | Other | x | x | x | |||||||||||||||||||||||||||||||||||
| Rail - Launch | Name/Number | Name/Number | Name/Number | The Air Vehicle's Launch Rail. | CEMVocab | x | x | ||||||||||||||||||||||||||||||||||||||||||
| Stealth Features | List | List | List | Does the Air Vehicle include Stealth features? | CEMVocab | List | Yes | No | x | x | |||||||||||||||||||||||||||||||||||||||
| Nuclear Environment Survivability | List | List | List | Does the Air Vehicle include Nuclear Environment Survivability? | CEMVocab | List | Yes | No | x | x | |||||||||||||||||||||||||||||||||||||||
| Supersonic Survivability | List | List | List | Does the Air Vehicle include Supersonic Survivability? | CEMVocab | List | Yes | No | x | x | |||||||||||||||||||||||||||||||||||||||
| New Materials | List | List | List | Does the item's design include New Materials or Processes? | CEMVocab | List | Yes | No | x | x | |||||||||||||||||||||||||||||||||||||||
| 1.1.1 | Airframe | This element comprises the structural framework that provides the aerodynamic shape, mounting surfaces and environmental protection for the air vehicle components, which are not directly applicable to other specific Level 3 air vehicle subsystems. |
McDowell, Jeff HSV Tecolote: C.4.2.1 Airframe. This element comprises the structural framework that provides the aerodynamic shape, mounting surfaces and environmental protection for the air vehicle components, which are not directly applicable to other specific Level 3 air vehicle subsystems.
Includes, for example:
a. Wings and fins that provide aerodynamic flight control in response to electro-mechanical signals and are attached to the air vehicle body
b. Structural body assemblies including the structure, fuel tanks that integral with the structure, covers, skins, adhesives, and fairings not directly applicable to any other Level 3 air vehicle subsystem
c. Protection devices for stressing environmental conditions such as thermal protection system or rain erosion that are not directly applicable to other Level 3 air vehicle subsystems
| Designation | Name/Number | Name/Number | Name/Number | The item's formal designation as governed by a recognized system such as the Aeronautical and Support Equipment Type Designation System (ASETDS), Joint Electronics Type Designations System (JETDS), or Mission-Design-Series (MDS). | CEMVocab | x | x | x | Government | 2 | 2 | ||||||||||||||||||||
| Name - Short | Name/Number | Name/Number | Name/Number | The item's common, popular name. | CEMVocab | x | x | x | x | x | Government | 3 | 3 | ||||||||||||||||||
| Manufacturer | Name/Number | Name/Number | Name/Number | The primary supplier of the item. | CEMVocab | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||
| Part Number | Name/Number | Name/Number | Name/Number | The item's part number as assigned by the Manufacturer. | CEMVocab | x | x | Contractor | 3 | 3 | |||||||||||||||||||||
| National Stock Number (NSN) | Name/Number | Name/Number | Name/Number | The thirteen-digit National Stock Number (NSN) which contain sub-groups that identify the Federal Supply Groups (FSG) , Federal Supply Classes (FSC) , NATO Country Code, National Item Identification Number NIIN) and the serial number of the product. | CEMVocab | x | Government | 3 | 3 | ||||||||||||||||||||||
| State of Technology | Year | Year | Year | The year a representative model or prototype is tested. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | |||||||||||||||||||
| New Design | Percent | Percent | Percent | The extent of the item's design that is new. | CEMVocab | x | x | x | x | Contractor | 1 | 3 | |||||||||||||||||||
| Predecessor System - Percent New | Name/Number | Name/Number | Name/Number | When Percent New Design is less than 100%, cite the system's from which design is inherited. | CEMVocab | x | x | x | x | Contractor | 2 | 3 | |||||||||||||||||||
| Technology Readiness Level (TRL) | List | List | List | Technology Readiness Levels (TRL) are a method of estimating technology maturity of Critical Technology Elements (CTE) of a program during the acquisition process. | CEMVocab | List | TRL 1 | TRL 2 | TRL 3 | TRL 4 | TRL 5 | TRL 6 | TRL 7 | TRL 8 | TRL 9 | x | x | x | x | Government | 2 | 2 | |||||||||
| Manufacturing Readiness Level (MRL) | List | List | List | Manufacturing Readiness Levels (MRL) are a measurement scale and vocabulary for assessing and discussing manufacturing maturity and risk. | CEMVocab | List | MRL 1 | MRL 2 | MRL 3 | MRL 4 | MRL 5 | MRL 6 | MRL 7 | MRL 8 | MRL 9 | MRL 10 | x | Government | 2 | 2 | |||||||||||
| Weight | Pounds | Total | Pounds | Total | Pounds | Total | The item's total weight | Modified | x | x | x | x | x | Contractor | 2 | 2 | |||||||||||||||
| Weight - Structural | Pounds | Structural | Pounds | Structural | Pounds | Structural | The item's mechanical/structural weight. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Weight - Electronics | Pounds | Electronics | Pounds | Electronics | Pounds | Electronics | The item's electronics weight. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Length | Inches | Inches | Inches | The length of the item. | CEMVocab | x | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||
| Diameter | Inches | Inches | Inches | The diameter of the item. | CEMVocab | x | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||
| Dimension - Description | Description | Description | Description | Enter additional dimensional information for items when length and diameter alone are insufficient. | CEMVocab | x | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||
| Material Mix 1…n | Percent | Weight by Material Name | Percent | Weight by Material Name | Percent | Weight by Material Name | List primary materials comprising the item. (Cite one or more materials as applicable) | Modified | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Manufacturing Process 1…n | Description | Description | Description | List the item's primary fabrication processes. (Cite one or more processes as applicable) | New | x | x | Contractor | 2 | 2 | |||||||||||||||||||||
| Power - Maximum Consumption Rate | Watts | Maximum | Watts | Maximum | Watts | Maximum | Maximum rate of power consumption by the item. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Quantity - Next Higher Assembly | Quantity | Quantity | Quantity | Number of units of this item to be assembled into its parent assembly. | CEMVocab | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||
| Item Type | Description | Description | Description | Enter text describing the type, class, or configuration of the item. | New | x | x | x | x | Contractor | 2 | 2 | |||||||||||||||||||
| Wing Chord | Inches | Inches | Inches | The distance from the leading edge (the front of the wing at the bottom) to trailing edges the (back of the wing at the top). | CEMVocab | x | x | x | x | Contractor | 1 | 1 | |||||||||||||||||||
| Oswald Efficiency Factor | Dimensionless | Dimensionless | Dimensionless | The Oswald efficiency, similar to the span efficiency, is a correction factor that represents the change in drag with lift of a three-dimensional wing or airplane, as compared with an ideal wing having the same aspect ratio and an elliptical lift distribution | CEMVocab | x | x | x | x | Contractor | 2 | 2 | |||||||||||||||||||
| Zero Lift Drag Coefficient | Dimensionless | Dimensionless | Dimensionless | A dimensionless parameter which relates an air vehicle's zero-lift drag force to its size, speed, and flying altitude. | CEMVocab | x | x | x | x | Contractor | 1 | 1 | |||||||||||||||||||
| Fin Structure Type | Description | Description | Description | The Airframe Aero-Structure's Fin Structure Type. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | |||||||||||||||||||
| Wing Structure Type | Description | Description | Description | The Airframe Aero-Structure's Wing Structure Type. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | |||||||||||||||||||
| New Materials | List | List | List | Does the item's design include New Materials or Processes? | CEMVocab | List | Yes | No | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Number of Wings | Quantity | Wings | Quantity | Wings | Quantity | Wings | The Airframe Aero-Structure's Number of Wings. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Number of Fins | Quantity | Fins | Quantity | Fins | Quantity | Fins | The Airframe Aero-Structure's Number of Fins. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Number of Canards | Quantity | Canards | Quantity | Canards | Quantity | Canards | The Airframe Aero-Structure's Number of Canards. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Number of Surfaces - Movable | Quantity | Surfaces | Quantity | Surfaces | Quantity | Surfaces | The number of movable surfaces providing aerodynamic steering. | CEMVocab | x | x | x | x | Contractor | 1 | 1 | ||||||||||||||||
| 1.1.1.1 | Airframe Integration, Assembly, Test and Checkout | This element includes all effort of technical and functional activities associated with the design, development, and production of mating surfaces, structures, equipment, parts, materials, interconnect harnessing and software required for the integration, assembly and checkout of the Level 4 elements below into their Level 3 element, Airframe. | |||||||||||||||||||||||||||||
| Designation | Name/Number | Name/Number | Name/Number | The item's formal designation as governed by a recognized system such as the Aeronautical and Support Equipment Type Designation System (ASETDS), Joint Electronics Type Designations System (JETDS), or Mission-Design-Series (MDS). | CEMVocab | x | x | x | Government | 2 | 2 | ||||||||||||||||||||
| Name - Short | Name/Number | Name/Number | Name/Number | The item's common, popular name. | CEMVocab | x | x | x | x | x | Government | 3 | 3 | ||||||||||||||||||
| Manufacturer | Name/Number | Name/Number | Name/Number | The primary supplier of the item. | CEMVocab | x | x | x | x | Contractor | 3 | 3 | |||||||||||||||||||
| Part Number | Name/Number | Name/Number | Name/Number | The item's part number as assigned by the Manufacturer. | CEMVocab | x | x | Contractor | 3 | 3 | |||||||||||||||||||||
| National Stock Number (NSN) | Name/Number | Name/Number | Name/Number | The thirteen-digit National Stock Number (NSN) which contain sub-groups that identify the Federal Supply Groups (FSG) , Federal Supply Classes (FSC) , NATO Country Code, National Item Identification Number NIIN) and the serial number of the product. | CEMVocab | x | Government | 3 | 3 | ||||||||||||||||||||||
| State of Technology | Year | Year | Year | The year a representative model or prototype is tested. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | |||||||||||||||||||
| New Design | Percent | Percent | Percent | The extent of the item's design that is new. | CEMVocab | x | x | x | x | Contractor | 1 | 3 | |||||||||||||||||||
| Predecessor System - Percent New | Name/Number | Name/Number | Name/Number | When Percent New Design is less than 100%, cite the system's from which design is inherited. | CEMVocab | x | x | x | x | Contractor | 2 | 3 | |||||||||||||||||||
| Technology Readiness Level (TRL) | List | List | List | Technology Readiness Levels (TRL) are a method of estimating technology maturity of Critical Technology Elements (CTE) of a program during the acquisition process. | CEMVocab | List | TRL 1 | TRL 2 | TRL 3 | TRL 4 | TRL 5 | TRL 6 | TRL 7 | TRL 8 | TRL 9 | x | x | x | x | Government | 2 | 2 | |||||||||
| Manufacturing Readiness Level (MRL) | List | List | List | Manufacturing Readiness Levels (MRL) are a measurement scale and vocabulary for assessing and discussing manufacturing maturity and risk. | CEMVocab | List | MRL 1 | MRL 2 | MRL 3 | MRL 4 | MRL 5 | MRL 6 | MRL 7 | MRL 8 | MRL 9 | MRL 10 | x | Government | 2 | 2 | |||||||||||
| Weight | Pounds | Total | Pounds | Total | Pounds | Total | The item's total weight | Modified | x | x | x | x | x | Contractor | 2 | 2 | |||||||||||||||
| Weight - Structural | Pounds | Structural | Pounds | Structural | Pounds | Structural | The item's mechanical/structural weight. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Weight - Electronics | Pounds | Electronics | Pounds | Electronics | Pounds | Electronics | The item's electronics weight. | CEMVocab | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Length | Inches | Inches | Inches | The length of the item. | CEMVocab | x | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||
| Diameter | Inches | Inches | Inches | The diameter of the item. | CEMVocab | x | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||
| Dimension - Description | Description | Description | Description | Enter additional dimensional information for items when length and diameter alone are insufficient. | CEMVocab | x | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||||
| Material Mix 1…n | Percent | Weight by Material Name | Percent | Weight by Material Name | Percent | Weight by Material Name | List primary materials comprising the item. (Cite one or more materials as applicable) | Modified | x | x | x | x | Contractor | 2 | 2 | ||||||||||||||||
| Manufacturing Process 1…n | Description | Description | Description | List the item's primary fabrication processes. (Cite one or more processes as applicable) | New | x | x | Contractor | 2 | 2 | |||||||||||||||||||||
| Power - Maximum Consumption Rate | Watts | Maximum | Watts | Maximum | Watts | Maximum | Maximum rate of power consumption by the item. | CEMVocab | x | x | x | x | Contractor | 2 | 2 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .