FA7014-16-R-5004_DRAFT_Solicitation_20151217.pdf
PDF 774 KB Posted
- Attached to
- AFCAA Cost Estimating Modeling (CEM) Support Federal contract opportunity
- Solicitation number
- FA7014-16-R-5004
About this file
DRAFT Solicitation
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
A
X B
C
D
EX
X
G
F
H
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 57
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
FA7014 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2
3 - 14
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
15 - 16
17 - 19 K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
20 - 26
PART II - CO NTRACT CLAUSES
FA7014- AIR FORCE DISTRICT OF WASHINGTON
1500 W PERIMETER RD SUITE 2720 (PK)
ANDREWS AFB MD 20762
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
FA7014-16-R-5004
Section A - Solicitation/Contract Form
SPECIAL NOTICE TO INDUSTRY
FA7014-16-R-5004 AFCAA Cost Estimating Modeling (CEM) Effort/Support
This is a Special Notice from Air Force District of Washington (AFDW), SAF Enterprise Support (PKS) the Solicitation
No. FA7014-16-R-5004 which serves as a notice to industry concerning procurement of Cost Estimating Modeling (CEM) support to meet the requirements of the Air Force Cost Analysis Agency (AFCAA).
This notice is issued solely for information and planning purposes - it does not constitute an RFP or a promise to issue an
RFP in the future. This notice does not commit the Government to contract for any supply or service whatsoever. Further, the Government is not at this time seeking proposals and will not accept unsolicited proposals. Respondents are advised that the Government will not pay for any information or administrative costs incurred in responding to this notice; all costs associated with responding to this notice will be solely at the interested parties' expense. Not responding to this notice does not preclude participation in any future RFP, if issued. If an RFP is released, it will be synopsized on the Federal Business
Opportunities (FedBizOpps) website. It is the responsibility of the potential responder to monitor these sites for additional information pertaining to this requirement.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Program Management
COST PLUS FIXED FEE
Program Management, Interfacing meetings and establishing the NonDisclosure
Agreements (NDAs) for CEM R&D effort IAW Para 3.0, 3.1.1 and 3.2.3.
FOB: Destination
ESTIMATED COST
FIXED FEE
STIMATED TOTAL
ITEM
NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
R&D Service Support
COST PLUS FIXED FEE
Research and Development services in support of the following tasks:
Task 1 - Establish required NDAs IAW PWS Para 3.1.1
Task 2 - Develop a Plan of Action and Milestones (POA&M) IAW PWS Para
3.1.2
Task 3 - Data collection and normalization IAW PWS 3.1.4
Task 4 - Analysis of Data Sources and Data Availability IAW PWS 3.1.4
Task 5: Refine Existing Templates and Develop New Commodity Specific Data
Collection Templates (PWS 3.2.1)
Task 6: Develop Methods/Tools/CERs and Other Analytic Approaches for Cost
Estimating (PWS 3.2.2)
FOB: Destination
ESTIMATED COST
FIXED FEE
ESTIMATED TOTAL
ITEM
NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Data for Base Period
NSP
Data support to CEM IAW Par 3.1 and 5.0.
FOB: Destination
ESTIMATED COST
NSP
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Travel
COST
Travel for the base period. Travel will be reimbursed IAW PWS Paragraph 7.1.
FOB: Destination
ESTIMATED COST
ITEM
NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Other Direct Costs
COST
Other Direct Costs associated to the CEM support. ODCs will be reimbursed
IAW Paragraph 7.3.
FOB: Destination
ESTIMATED COST
ITEM
NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CEM R & D Surge Support
COST
CEM Research and Development Surge Support during the base year IAW all tasks areas and the guidance of the Government.
FOB: Destination
ESTIMATED COST
ESTIMATED TOTAL
Program Management
COST
Program Management, Interfacing meetings and establishing the NonDisclosure
Agreements (NDAs) for CEM R&D effort IAW Para 3.0, 3.1.1 and 3.2.3.
FOB: Destination
NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
R&D Service Support
COST
Research and Development services in support of the following tasks:
Task 1 - Establish required NDAs IAW PWS Para 3.1.1
Task 2 - Develop a Plan of Action and Milestones (POA&M) IAW PWS Para
3.1.2
Task 3 - Data collection and normalization IAW PWS 3.1.4
Task 4 - Analysis of Data Sources and Data Availability IAW PWS 3.1.4
Task 5: Refine Existing Templates and Develop New Commodity Specific Data
Collection Templates (PWS 3.2.1)
Task 6: Develop Methods/Tools/CERs and Other Analytic Approaches for Cost
Estimating (PWS 3.2.2)
Data for Option Period 1
COST - NSP
Data support to CEM IAW Par 3.1 and 5.0.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Travel
COST
Travel for Option Period 1. Travel will be reimbursed IAW PWS Paragraph 7.1.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Other Direct Costs
COST
Other Direct Costs associated to the CEM support. ODCs will be reimbursed IAW
Paragraph 7.3.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CEM R & D Surge Support
COST
CEM Research and Development Surge Support during option period 1 IAW all tasks areas and the guidance of the Government.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Program Management
COST
Program Management, Interfacing meetings and establishing the NonDisclosure
Agreements (NDAs) for CEM R&D effort IAW Para 3.0, 3.1.1 and 3.2.3.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Task 7 - Product Finalization
FFP
Task 7 Product Finalization (PWS 3.4.1) Tasks 1 - 6 are still applicable as necessary per the direction of the Government
NET AMT
Data for Option Period 2
COST NSP
Data for Option Period 2 IAW PWS Para 3.4.3 and Para 5.0
Travel
COST
Travel for Option Period 2. Travel will be reimbursed IAW PWS Paragraph 7.1.
FOB: Destination
ESTIMATED COST
ITEM
NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Other Direct Costs
COST
Other Direct Costs (ODCs) for Option Period 2. ODCs will be reimbursed IAW
Paragraph 7.3.
Section C – Performance Work Statement
AFDW/PKS
PERFORMANCE WORK STATEMENT (PWS)
Research and Development for Cost Estimating Modeling (CEM)
Cost Data Improvement Methods & Tools Development
For
Air Force Cost Analysis Agency (AFCAA)
17 DEC 2015
AFCAA Cost Estimating Modeling (CEM) Effort
1.0 INTRODUCTION/BACKGROUND: The DoD cost community—including the Cost Assessment and Program Evaluation (CAPE) office, the service cost centers, and the Air Force Cost Analysis
Agency (AFCAA) have committed to improving the efficiency and effectiveness of our cost estimating capabilities. The Air Force has recently identified numerous gaps in the databases (DBs), methods, models and tools they regularly use for cost estimating and analysis. Although this effort addresses these gaps for the Air Force, the solutions will be made available to the entire cost community, leading to improved quality, timeliness and effectiveness of DoD acquisition program cost estimates.
2.0 OBJECTIVE: The objective is to research, analyze, design and modernize current cost data and estimating methods and tools. In collaboration with the OSD Cost Assessment Data Enterprise
(CADE) project, this research, analysis and assessments will improve the quality, timeliness, and effectiveness of the acquisition program cost estimates required by statute (e.g., 10 USC 2366, 2433, 2434) and regulation (e.g. DoDI 5000.02) in support of the AF and DoD acquisition decisions, programming and execution decisions and Congressional mandates.
3.0 TASK REQUIREMENTS: The Contractor will collect data and populate government provided templates for designated weapon systems. While collecting data, the Contractor will also recommend changes to the templates, develop new templates as needed and quality check and normalize received data. Following data collection, the Contractor will use the data to develop methods and tools for use by cost estimators to meet the AFCAA CEM objectives of an up-to-date, searchable, user-friendly, centrally available data repository that enables higher volume, timely delivery, high quantity, effective program cost estimates. The Contractor shall provide all deliverables, material, equipment, labor and supplies, tools, transportation, supervision and other expenditures necessary to fulfill this effort as described in the following tasks and subtasks for each of the weapon system commodity groups outlined below.
Systematically and continuously document Air Force and associated joint service cost estimating data requirements, then collect, store, and retrieve the required data, and provide analysis and tools for use by cost estimators. Data will be collected using commodity specific data collection templates developed for AFCAA (see attachment B) that identify and define the required cost, technical, schedule and programmatic data elements. This effort also includes making recommendations to improve data collection to make it more systematic and consistent, loading the collected data into the
Cost Assessment Data Enterprise (CADE) managed by the OSD CAPE to centrally house and make data available to the entire cost community, and assisting the government in implementing approved recommendations. Templates will be provided by AFCAA for the following weapon system commodity groups:
1. Aircraft/Unmanned Air Vehicles (UAVs)
2. Missiles/Munitions
3. Intercontinental Ballistic Missiles (ICBMs)
4. Automated Information Systems (AIS) & associated equipment
5. C4I/Electronics and associated equipment
6. Software
7. Other Government Costs (OGC)
8. Operations and Support (O&S) Costs for All Commodities
9. Space and Launch Systems
The Contractor shall be directly responsible for ensuring the accuracy, timeliness, and completion of all tasks under this effort, none of which are considered inherently governmental functions as defined in FAR 2.101 or Subpart 7.5. Replacement or substitute personnel for vacancies shall be filled with qualified personnel within 5 days of vacancy, unless approved in writing or otherwise directed in advance by the Contracting Officer (CO) or the Contracting Officer Representative (COR).
The Contractor shall meet with the AFCAA COR and Program Manager (PM) to track performance, resolve issues and ensure compliance with this PWS. The Contractor shall provide meeting minutes as required. Meetings will include, as a minimum an initial kick-off meeting within 10 days after contract award, weekly status meetings between the Contractor Program/Technical Manager and
AFCAA PM, by teleconference and quarterly in-person formal reviews with AFCAA Technical
Director(TD), PM and commodity Technical Leads (TLs). Interim/ad-hoc, in-person or teleconference meetings with the AFCAA TD, PM and TLs as required, and an in-person final review at least 30 days before the period of performance ends. Meetings will be informal, and will use teleconferencing or government provided on-line conferencing resources as much as possible.
Interim and final products will be presented. Meeting agenda and meeting minutes for this program are outlined in Section 5.0 – Deliverables.
3.1 Data Collection Program
3.1.1 Task 1 – Establish Required Nondisclosure Agreements (NDAs)
The Contractor shall develop and sign NDAs with the source agencies (government, weapon system type and/or cost category vendors, commercial and non-government) to access and evaluate program data sources. During the period of performance for all tasks, the Contractor will work with AFCAA to identify NDA requirements for all OEM Contractors and major subcontractors, and ensure actions to complete NDAs are finalized. The Contractor must, within 6 months of contract award have all necessary NDAs to ensure full and open access at a minimum to all Department of Defense (DoD)
ACAT I program data, past and present, with no limitations. The Contractor must assist in identifying other non-AF programs for data collection, and ensure full and open access to data subject to applicable security and/or proprietary rights for all identified OEM Contractors and major subcontractors for those identified programs. NDAs must carry through all option contracts. The
Contractor is required to provide signed NDA forms for all Contractors and subcontractors working on this contract to the COR.
3.1.2 Task 2 – Develop a Plan of Action and Milestones (POA&M) for the tasks and subtasks.
The Contractor shall develop and submit, for government review and approval, a POA&M describing the Contractor’s approach to satisfy all requirements that includes each weapon system commodity group within 30 calendar days after contract award. The POA&M shall include, as a minimum:
a. A detailed description of the approach to complete each task and subtask to include any risk associated with each task and subtask.
b. A task activity and milestone schedule, including interim, draft, and final milestones, products, and contract project deliverables and a description of risk associated with completing the planned schedule. The schedule will be used for tracking purposes and should be included in each monthly report
(reference paragraph 5.1)
c. A management plan explaining the Contractor’s approach to staffing, schedule management, business management and reporting. Include contractor Program/Technical Manager capability plan (reference paragraph
4.1)
d. Support and refinement of CEM deliverables to the CADE program necessary to institutionalize the collection of CEM developed deliverables.
These will include but are not limited to all documents, manuals, Data Item
Descriptions, training material, dictionaries required to institutionalize the collection of the CEM products.
The Contractor shall be available to brief the POA&M to the government along with any risk areas associated with completing the planned schedule in person to the AFCAA Technical Director. The
POA&M is a ‘living document’ and the Contractor will provide recommended changes/updates to the government at the quarterly meetings or as needed and will be given direction by the Government on the recommended changes/updates to this document.
3.1.3 Task 3 – Data Collection and Normalization
The Contractor shall work with the COR and the AFCAA PM to develop a data collection plan to collect data using the data collection templates in Task 5 for selected on-going and historical programs. The PM will identify the programs to be pursued given the time and resources available. The data collection plan will describe the approach to collect the data, which includes developing a schedule for the Base and
Option Periods of this effort and identifying all potential sources. Prior to starting any data collection effort, the Contractor shall first compare existing data sources with data elements defined on the templates to identify specific data elements that have not yet been collected or are not already available from the CADE.
3.1.3.1 Data Collection: Following the COR or the PM approval of the schedule and approach recommended for each source, the Contractor shall collect time phased data from the AFCAA approved sources. Because the templates allow for data collection throughout the life cycle of a program, the templates can be used to capture data at any point in the program, to include initial estimated data based on initial requirements as well as actual data based on final designs and costs. The precedence for data collection will be: Air Force programs and databases; other DOD sources; other government sources;
weapon system type and/or cost category vendor databases; all other commercial (non-government) sources. Government sources and databases will be used to the maximum extent practical before evaluating non-government sources. Existing data sources for available data will be used to the fullest extent possible prior to contacting government program offices or industry data sources for missing, incomplete or inaccurate data elements. All information collected will be normalized to include the creation of metadata not collected via the raw data collection. The COR or TL and the Contractor will jointly decide which programs and associated government/industry organizations/agencies will be contacted. The Contractor shall collaborate with other cost organizations in data collection efforts to include but not limited to AFLCMC and SMC staff and program offices, NCCA, NAVAIR, DASA CE, OSD CAPE, and HQDA ASA.
3.1.3.2 Documentation: All information collected will be documented to include collected data, data pedigree, data sources, and definitions (if not part of the template standard). The Contractor shall deliver the completed data collection templates to the COR or PM, along with an explanation of any issues, assumptions, or normalization affecting the reported data. Data sources used to populate the templates will be clearly identified and provided as reference material. The data will be organized and provided in the current AFCAA approved format at the time of submission with the goal of ensuring the data is provided in a format that will be easily integrated/ incorporated into CADE. In addition to providing the COR or PM with all information related to this effort, any and all data collected and developed during the course of completing the requirements of this contract must be deleted from the Contractor’s server’s and computers. All materials and information produced and/or required by the contractor in performance of the contract shall become the sole property of the government and will be turned in to the COR and Government PM at the end of contract in manner as described in the deliverable section of the PWS.
3.1.4 Task 4 – Analysis of Data Sources and Data Availability
While collecting data, the Contractor shall continue to compare the data templates provided by the government against all data sources to identify gaps in the data available for existing programs, and use the information to develop data collection plans under Task 3. The Contractor shall identify and recommend new studies, documents, or data sources found during this task that should be incorporated into this requirement.
The Contractor’s review of any additional sources identified during this task shall establish, as a minimum:
Data storage – How is data stored and maintained, and is the data accessible by the government
(e.g., storage medium, non-disclosure requirements);
Data quality – Accuracy, completeness, and fidelity of data;
Data normalization and the basis for the normalization (e.g., inflation/price escalation indices, work breakdown structures, cost element structures);
Data availability – Security classifications, proprietary/competitive restrictions;
Other source database characteristics that will affect data collection, management and use by the government;
Ability to incorporate/integrate the data source into the CADE.
3.1.4.1 Documentation The Contractor shall summarize their review of each new data source, to include points of contact to include name, position, organization/company, telephone number, e-mail and mailing address for each source and provide this summary to the COR or PM. Their report shall also address potential data collection or data disclosure issues by source, and provide feedback on the status of Non-Disclosure Agreements (NDAs) initiated with potential sources. Subscription based data sources are not applicable for the data collection tasks.
3.2 Refine Existing Templates and Develop New Commodity Specific Data Collection
Templates
3.2.1 Task 5 – Existing Templates and Development of New Commodity Specific Data:
The Contractor will use any information gained from Task 4 to refine the existing data collection templates for the weapon system type and/or cost categories and develop any additional templates necessary to cover the full content of the commodities described in Paragraph 3.0.
3.2.1.1 Refine Templates: The Contractor shall work with COR or PM to refine cost/technical/ programmatic data collection templates. The templates will provide a standardized format that ensures the cost community will have the appropriate technical and programmatic data available for the weapon system type and/or cost categories as part of the cost reporting process. Templates will allow for collecting and documenting data by phase (development, production, operations and sustainment) and by fiscal year within each phase. The revisions shall be developed and delivered using Microsoft Office (Excel). Templates shall be compatible with the format being used by Defense
Cost and Resource Center (DCARC) and/or CADE to collect and display cost data.
3.2.1.2 These revisions will include, as a minimum:
a) A cost work breakdown structure (e.g., tailored to Mil-Std-881C current O&S CAPE guide or
AFCAA Data Templates) to organize data by commodity for each weapon system type and/or cost category.
b) A list of common data element names and definitions to ensure similar data from all sources can be normalized to the standard names and definitions.
c) A format to enter unique programmatic (i.e. schedule) and technical characteristics (such as:
size, weight, power, form factor, digital technology, nuclear hardening, and specialized security). The Contractor shall provide and use a consistent method of specifying weights and measures, electrical power (e.g. 220 volt, 60 Hz. AC) and other characteristics to ensure effective usage of each item for cost analysis and estimating.
d) Any additional data fields, changes in cost work breakdown structures, etc need to be fully documented. New data fields will be evaluated for inclusion in all commodity templates, and if so will require consistent naming conventions and definitions in the commodity templates.
3.2.1.3 Develop New Templates: The Contractor shall develop, in accordance with the format and structure of existing templates, any new templates that are identified to cover the full content of the various commodity groups. These new templates may address expansion of templates to address subsystem level breakouts within each commodity, reworking of existing templates to cover variations within a commodity group (such as different mission types for aircraft), and reworking existing templates to ensure they adequately capture information associated with modification programs and minimize impacts on the use of existing templates that are not modified.
3.2.1.4 Documentation: The Contractor shall document the template revisions, such as new data elements and sources, and provide detailed instructions with examples for populating the templates, to include how to deal with issues identified during the Review and Analysis (Task 4). The Contractor will identify how the templates differ from Mil-Std-881C formats, the O&S OSD CAPE guide or
AFCAA Data Templates (if differences exist).
3.2.1.5 Data Template Configuration Compliance: The contractor shall ensure the overall
PM/Technical Manager is responsible for ensuring there is commonality and configuration compliance within all of the Data Templates. The contractor is responsible for ensuring template integration amongst all of the weapon system commodity groups (reference paragraph 3.0).
3.2.1.6 Coordination and Approval: The Contractor shall present the finalized revised and new templates and instructions to the COR or PM to ensure complete understanding of the data fields and structure of the templates. The Contractor will present the templates and deliverables as well as interim results/changes from this project to the COR or PM identified working groups, IPTs, or other forums with the purpose of collecting feedback to refine the templates and get government and industry coordination and approval of the products. The Contractor will continue to document a full representation of OSD, Air Force, Navy, and Army cost community concerns as well as industry concerns. The Contractor will fully support coordination activities with industry and other DOD organizations to accomplish a seamless transition and integration of the final template products into
OSD CADE.
3.3 Task 6– Develop Methods/Tools/CERs and Other Analytic Approaches for Cost Estimating:
As data for multiple Air Force weapon systems and commodities are collected and loaded into the
CADE environment, and as required by the COR or PM, the Contractor shall use the data to develop/validate cost estimating tools, methods, CERs, factors or other estimating approaches.
3.3.1 Task Specific Project Plan. Each study or analysis requirement identified by the COR or PM under this task will be described to the Contractor through a written request, to include the scope, objective, desired schedule and desired outcomes for the study or analysis. The Contractor will then provide a detailed Project Plan to describe the approach, staffing, scaling, schedule, deliverables, expected difficulties and resources required for the task. Following the COR or PM approval, the
Contractor will be allowed to execute the task as additional CEM related efforts in both the Base
Period and Option Periods.
3.3.2 Documentation. All studies, analyses and other reports generated by the Contractor under this task will be documented by a formal report delivered to the COR or PM no later than 10 days after the end of the study. Each report will be in the Contractor’s recommended format, but will include as a minimum the following sections: Purpose, Background, Scope and Limitations, Ground Rules and
Assumptions, an explanation of the Methodology (Data, Normalization, and Analytic methods), Risk/Uncertainty, Results/ Conclusions/ Recommendations.
3.4 Task 7 - Product Finalization
3.4.1 The Contractor shall continue their current efforts to update, provide Lessons Learned while finalizing all studies, analysis, and templates based on all areas of the PWS to include addressing and meeting all objectives for each phase. The Contractor shall prepare the policies, white papers, briefings, and reports as instructed by the Government for the data collection conducted for this contract. These DRAFT policies, white papers, briefings, and reports will be due 60 days prior to the contract ending for the final option year so that the government can review the documents and provide feedback to the Contractor to update, revise and provide the final documents to close out this final phase.
3.4.2 The Contractor shall periodically hold meetings throughout the last option year with all of the
AFCAA stakeholders to update, review, develop and provide recommendations to the Government addressing any new data collected and the impact it might have to the AFCAA organization as designated by AFCAA. The COR will inform the Contractor of the type of meeting, the subject matter, and what, if anything, will be needed to be provided at the meeting.
3.4.3 The Contractor shall ensure that all policy reports, white papers, briefings, and other reports as instructed by the Government are finalized no-later-than (NTL) 60 days prior to the end of the contract. The Contractor shall also provide the COR with all passwords to the systems, data collected, processes utilized and any other information obtained throughout the period of performance. The COR will meet with the Contractor within the 60 days to ensure that all information is received and stored for the permanent records.
4.0 Knowledge Skills and Abilities (KSA). The following KSA’s are required and applicable for each task and subtask to accomplish and achieve overall success. Specific KSA’s are identified below by labor category for each of the weapon system commodity groups identified in paragraph 3.0. The
Contractor is responsible for ensuring its assigned personnel (to include subcontractors) fully comply with the minimum experience and knowledge addressed below: The contractor shall provide an
Integrated Program/Technical Manager and task leaders for each of the weapon system commodity groups identified in paragraph 3.0, who shall be responsible for the performance of the work.
Integrated program/technical management support required to manage and oversee all activities performed by contractor personnel, including subcontractors, to satisfy the requirements identified in this Performance Work Statement (PWS). The Program/Technical Manager’s responsibilities include ensuring there is commonality and configuration compliance within all of the Data Templates, per paragraph 3.2.1.5. Administrative and clerical support under this contract shall not be considered a direct task or labor category.
4.1 General Requirements. At a minimum, Contractor shall:
Provide a program management capability plan to manage all PWS tasks per POA&M requirements (reference paragraph 3.1.2.c)
Provide a primary point of contact to work with the Government on all CEM issues.
4.1.1 Overall Program/Technical Manager
Personnel in this category must have a minimum of 10 years as a Program Manager managing projects of comparable scope to the CEM effort. Must have a minimum of 5 years as a cost estimator or cost estimating experience and possess at least a Masters of Science/Masters of Arts education level.
4.2 Subject Matter Expert or Engineers
4.2.1 Engineers/Technical Experts on Large DOD/AF Weapon System Programs: Personnel in this category serve as subject matter experts to provide, as needed, a technical understanding of major
DOD or AF weapon system technologies/designs/manufacturing experience and to help identify key parameters and cost drivers that affect life cycle cost. The contractor personnel must have reach-back access, as needed to experts with knowledge related to each of the specific commodity areas located in paragraph 3.0. These professional(s) must comply with the following knowledge and experience:
a. Must have at least five (5) years of progressive systems engineering, design engineering, or manufacturing.
b. Must have experience in the following subject areas:
1) Technical – major DOD or AF weapon system requirements analysis, systems analysis, engineering, system design.
2) Cost – Knowledge of technical cost drivers and how they are used in common cost estimating methodologies
4.3Senior Cost Estimator/Analyst
4.3.1 Aircraft/UAV and associated subsystems: Must have at least ten (10) years of technical cost analysis experience. Must have at least seven (7) years of progressive DOD or AF ACAT I level aircraft/UAV acquisition program cost analysis experience. Must have experience in cost analysis principles including, but not limited to: (a) Cost estimating – demonstrated expertise in aircraft/UAV/related subsystem estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of aircraft/UAV programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle. (b) Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities. Knowledge of the Defense Cost and
Resource Center (DCARC) data collection process and demonstrated experience in use of and analysis of the CSDRs and CPRs. Knowledge of data sources such as DACIMS, CADE, and
AFTOC. (c) Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. (d) Data analysis & cost tools – demonstrated knowledge and demonstrated expertise/ability to analyze data and develop cost estimating methods and tools.
4.3.2 Missiles/Munitions: Must have at least ten (10) years of technical cost analysis experience.
Must have at least seven (7) years of progressive DOD or AF ACAT I level missile/munitions acquisition program cost analysis experience. Must have experience in cost analysis principles including, but not limited to: (a) Cost estimating – demonstrated expertise in missile/munition related subsystem estimating methodologies that will facilitate identification of data collection parameters.
Includes an in-depth understanding of missile/munition programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle. (b) Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from
Government and Industry entities. Knowledge of the Defense Cost and Resource Center (DCARC) data collection process and demonstrated experience in use of and analysis of the CSDRs and CPRs.
Knowledge of data sources such as DACIMS, CADE, and AFTOC. (c) Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. (d) Data analysis & cost tools – demonstrated knowledge and demonstrated expertise/ability to analyze data and develop cost estimating methods and tools.
4.3.3 AIS: Must have at least ten (10) years of technical cost analysis experience. These professional(s) must comply with the following knowledge and experience: Must have at least seven
(7) years of progressive DOD or AF ACAT I level AIS program cost analysis experience. Must have experience in cost analysis principles including, but not limited to: (a) Cost estimating – demonstrated expertise in AIS/DBMS systems and equipment estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of AIS system programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle. (b) Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities. Knowledge of the Defense
Cost and Resource Center (DCARC) data collection process and demonstrated experience in use of and analysis of the CSDRs and CPRs. Knowledge of data sources such as DACIMS, CADE, and
AFTOC. Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. Cost tools – demonstrated knowledge and demonstrated expertise/ability to analyze data and develop cost estimating methods and tools.
4.3.4 C4I: Must have at least ten (10) years of technical cost analysis experience. Must have at least seven (7) years of progressive DOD or AF ACAT I level C4I systems cost analysis experience.
Must have experience in cost analysis principles including, but not limited to:
(a) Cost estimating – demonstrated expertise in C4I/Electronics systems and equipment estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of C4I programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle. (b) Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities.
Knowledge of the Defense Cost and Resource Center (DCARC) data collection process and demonstrated experience in use of and analysis of the CSDRs and CPRs. Knowledge of data sources such as DACIMS, CADE, and AFTOC. Leading teams – demonstrated ability to lead cost research project teams to successful conclusion.
Cost tools – demonstrated knowledge and demonstrated expertise/ability to analyze data and develop
4.3.5 - ICBM: Must have at least ten (10) years of technical cost analysis experience. Must have at least seven (7) years of progressive DOD or AF ACAT I level ICBM acquisition program cost analysis experience. Must have experience in cost analysis principles including, but not limited to:
Cost estimating – demonstrated expertise in ICBM related subsystem estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of
ICBM programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle. Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities. Knowledge of the
Defense Cost and Resource Center (DCARC) data collection process and demonstrated experience in use of and analysis of the CSDRs and CPRs. Knowledge of data sources such as DACIMS, CADE, and AFTOC. Ability to lead teams – demonstrated ability to lead cost research project teams to successful conclusion. Data analysis & cost tools – demonstrated knowledge and demonstrated expertise/ability to analyze data and develop cost estimating methods and tools.
4.3.6 - OGC: These professional(s) must comply with the following knowledge and experience.
Must have at least seven (7) years of progressive DOD or AF ACAT I level acquisition program cost analysis experience. Must have experience in cost analysis principles including, but not limited to: (a)
Cost estimating – demonstrated expertise in at least one OGC cost estimate for major weapon system and automated information system estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of programmatic and technical cost drivers associated with missile/aircraft/UAV systems test and depot activation costs. (b) Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from
Government and Industry entities. Knowledge of the Defense Cost and Resource Center (DCARC) data collection process and demonstrated experience in use of and analysis of the CSDRs and CPRs.
Knowledge of data sources such as DACIMS, CADE, and AFTOC. (c) Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. (d) Data analysis & cost tools – demonstrated knowledge and demonstrated expertise/ability to analyze data and develop
4.3.7 - O&S: Person must be able to integrate with the experts in the other commodity systems to incorporate technical understanding into the O&S solution. This professional must comply with the following knowledge and experience: Must have at least seven (7) years of progressive DOD or AF
ACAT I level acquisition program O&S cost analysis experience. Must have experience in cost analysis principles including, but not limited to: Cost estimating – demonstrated expertise in O&S estimating methodologies used to prepare budget or milestone cost analysis. Demonstrated an in-depth understanding of programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle. Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities.
Knowledge of the Defense Cost and Resource Center (DCARC) data collection process and demonstrated experience in use of and analysis of the CSDRs and CPRs. Knowledge of data sources such as DACIMS, CADE, and AFTOC. Must have demonstrated knowledge of and expertise in using
AFTOC and other service VAMOSC systems. Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. Cost tools – demonstrated knowledge and expertise of O&S cost estimating models and tools.
4.3.8 - Space: Must have at least ten (10) years of technical cost analysis experience.
Must have at least seven (7) years of progressive DOD or AF ACAT I level Space (satellite/ground) acquisition program cost analysis experience. Must have experience in cost analysis principles including, but not limited to: Cost estimating – demonstrated expertise in space subsystem estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of space programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle. Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities.
Knowledge of the Defense Cost and Resource Center (DCARC) data collection process and demonstrated experience in use of and analysis of the CSDRs and CPRs. Knowledge of data sources such as DACIMS, CADE, and AFTOC. Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. Data analysis & cost tools – demonstrated knowledge and demonstrated expertise/ability to analyze data and develop cost estimating methods and tools.
4.3.9 - Weapon system software: Must have at least ten (10) years of technical cost analysis experience. Must have at least seven (7) years of progressive DOD or AF ACAT I level weapon system acquisition program software cost analysis experience. Must have experience in cost analysis principles including, but not limited to: Cost estimating – demonstrated expertise in software estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle for software. Must have knowledge of the major activities performed in software development to include large weapon system software requirements analysis, systems analysis, software design, software coding and testing, software analysis, computer programming, engineering, system design, and management. Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities. Knowledge of the Defense Cost and Resource Center (DCARC) data collection process
(specifically the SRDRs) and demonstrated experience in use of and analysis of the CSDRs and
CPRs. Knowledge of data sources such as DACIMS, CADE, and AFTOC. Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. Data analysis & cost tools – demonstrated knowledge and ability to analyze software data and develop software cost estimating methods and tools.
4.3.10 - Large Enterprise Resource Planning (ERP) or Business Management system software:
Must have at least ten (10) years of technical cost analysis experience. Must have at least five (5) years of progressive DOD or AF ACAT I level automated information system (ERP type) program software cost analysis experience. Must have experience in cost analysis principles including, but not limited to: Cost estimating – demonstrated expertise in software estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle for software. Must have knowledge of the major activities performed in software development to include large weapon system software requirements analysis, systems analysis, software design, software coding and testing, software analysis, computer programming, engineering, system design, and management. Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities.
Knowledge of the Defense Cost and Resource Center (DCARC) data collection process (specifically the SRDRs) and demonstrated experience in use of and analysis of the CSDRs and CPRs. Knowledge of data sources such as DACIMS, CADE, and AFTOC. Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. Data analysis & cost tools – demonstrated knowledge and ability to analyze software data and develop software cost estimating methods and tools.
4.3.11 - Other Automated Information System/Information Technology System Software (i.e., C2 Centers, C4I Systems, Mission Planning Systems): Must have at least ten (10) years of technical cost analysis experience. Must have at least seven (7) years of progressive DOD or AF
ACAT I level automated information system acquisition program software cost analysis experience.
Must have experience in cost analysis principles including, but not limited to: Cost estimating – demonstrated expertise in software estimating methodologies that will facilitate identification of data collection parameters. Includes an in-depth understanding of programmatic and technical cost drivers associated with both acquisition and operating & support phases of the life cycle for software. Must have knowledge of the major activities performed in software development to include large weapon system software requirements analysis, systems analysis, software design, software coding and testing, software analysis, computer programming, engineering, system design, and management. Data collection – demonstrated expertise collecting and normalizing cost, technical, and programmatic data from Government and Industry entities. Knowledge of the Defense Cost and Resource Center
(DCARC) data collection process (specifically the SRDRs) and demonstrated experience in use of and analysis of the CSDRs and CPRs. Knowledge of data sources such as DACIMS, CADE, and
AFTOC. Leading teams – demonstrated ability to lead cost research project teams to successful conclusion. Data analysis & cost tools – demonstrated knowledge and ability to analyze software data and develop software cost estimating methods and tools.
4. 4 Software Engineer/Systems Analyst:
4.4.1 - Automated Information Systems/Information Technology Systems and Software: These professional(s) must comply with the following knowledge and experience: Must have at least five (5) years of progressive systems engineering experience. Must have experience in the following subject areas: 1) Technical – AIS/DBMS system requirements analysis, systems analysis, software design, software analysis, computer programming, engineering, system design, management of information technology systems. 2) Cost – Knowledge of cost drivers that drive common cost estimating methodologies.
4.4.2 – OTHER SOFTWARE:
4.4.2.1 Specialized C4I: Personnel in this category will serve as subject matter experts to provide a technical understanding of Specialized C4I Software, and to help identify key equipment parameters and cost drivers that affect life cycle cost. These professional(s) must comply with the following knowledge and experience: These professional(s) must comply with the following knowledge and experience: a. Must have at least five (5) years of progressive systems engineering and/or cost analysis experience. b. Must have experience in the following subject areas: 1) Technical – Specialized C4I
Software requirements analysis, systems analysis, software design, software analysis, computer programming, engineering, system design, management of information technology systems. 2) Cost –
Knowledge of cost drivers that drive common cost estimating methodologies.
4.4.2.2 Major DoD or AF Weapon System Software: Personnel in this category will serve as subject matter experts to provide a technical understanding of major DOD or AF weapon system software, and to help identify key equipment parameters and cost drivers that affect life cycle cost.
These professional(s) must comply with the following knowledge and experience: These professional(s) must comply with the following knowledge and experience: a. Must have at least five
(5) years of progressive systems engineering and/or cost analysis experience. b.