FX101_REV(01).pdf

PDF 618 KB Posted

Attached to
Renovate/Add for AGE Shop/Offices B129
Solicitation number
FA671221B0001
Issued by

About this file

This document contains details for a federal construction contract solicitation to renovate and add facilities for an Air Force Reserve Command aerospace ground equipment shop and offices. The solicitation is designated as a 100% HUBZone small business set-aside, with a single award to be made to a HUBZone certified contractor. The scope of work includes renovating portions of Hangar 129 for C-17 maintenance shops, offices, bathrooms, storage and outdoor equipment areas. A 550 square foot building addition is required for an aircraft jack tester foundation and building. The contract value is estimated between $1 million to $5 million, with a 270 calendar day period of performance. The solicitation will be issued on the SAM website on or about January 20, 2021, with proposals due around February 17, 2021. The work location is at the 911th Air Wing in Pittsburgh, Pennsylvania.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE SUPPRESSION LEGEND

SYMBOL DESCRIPTION

OH HAZARD CLASSIFICATION

(.2 GPM / FT² OVER 2500 FT² WITH 250 GPM HOSE, 8.0K)

M L K J H G

AGE

MAINTENANCE

BAY

UNIVERSAL

JACK TESTER

WASH BAY

AGE

PARTS/TOOLS/BATTERY

AGE

CLASS/BREAK/COMPUTER

ROOM

EXISTING

MECHANICAL

EXISTING

MECHANICAL

AGE OFFICES

WOMENS

ROOM

MENS ROOM

AGE PARTS

ROOM

COMM

A

KEY PLAN

LOC

J H

LOCKERS

Poole Fire Protection

19910 West 161st Street

Olathe, KS 66062

913.829.8650 office 913.829.8690 fax www.poolefire.com

DRAWING NO.BASE CIVIL ENG.CHIEF ENG. FLIGHT PLATE

SCALE:DATE:PROJECT NO:CHIEF CE OPERATIONS

USING AGENCY

COMMUNICATIONS

BIO ENVIRONMENTAL

ENVIRONMENTAL ENG.

FIRE

SAFETY

SECURITY

ANTI-TERRORISM

CDM SMITH PROJECT #

CHECK BY:

DRAWN BY:

DESIGN BY:

REV. NO. DATE DESCRIPTION BY

REVIEW

COORDINATION DATE

SHEET OF

ISSUED FOR CONSTRUCTION

FOR OFFICIAL USE ONLY

U.S. AIR FORCE

911TH AIRLIFT WING

PITTSBURGH INTERNATIONAL AIRPORT, ARS

MOON TOWNSHIP, PA 15108-5000:

54321 6

B

C

D

E

A

C

D

E

106718-231406

JLSS-17-0011 10/8/2019 42

GTP 210-168

503 Martindale Street, Suite 400

Pittsburgh, PA 15212-5722

Tel: (412) 201-5500

As indicated

RENOVATE/ADD FOR AGE SHOP/OFFICES, B129

ZAP

SAB

KAB

FX101

FIRST FLOOR PLAN

FIRE SUPPRESSION

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

FIRE SUPPRESSION GENERAL NOTES:

SCALE: 1/8" = 1'-0"

FIRE SUPPRESSION FIRST FLOOR PLAN

4'0 8' 16'

SHEET KEYNOTES

KEY

VALUE

KEYNOTE TEXT

01 PROVIDE SPRINKLERS BELOW WASH BAY CEILING. THE DESIGN

DENSITY OF THE AREA MUST BE ORDINARY HAZARD.

SCALE: 1/4" = 1'-0"

FIRE SUPPRESSION MEZZANINE FLOOR PLAN

0 2' 4' 8'

N

MODIFY THE SYSTEM AS NEEDED TO

ACCOMODATE WORK.

THE DESIGN AND INSTALLATION OF THE FIRE

SUPPRESSION SYSTEMS MUST BE IN

ACCORDANCE WITH UFC 3-600-01 (8 AUGUST

2016; CHANGE 1, 28 NOVEMBER 2016), NFPA 13

(2016 EDITION), NFPA 24 (2016 EDITION), AND THE

DESIGN SPECIFICATIONS.

ALL HANGERS MUST BE PROVIDED AND

INSTALLED IN ACCORDANCE WITH NFPA 13.

THE INSPECTOR'S TEST VALVES MUST BE

LOCATED NO MORE THAN 7 FEET AFF.

WHERE PIPES PASS THROUGH FIRE RESISTANCE

RATED CONSTRUCTION, THE PENETRATION

MUST BE PROTECTED WITH A LISTED OR

APPROVED FIRESTOPPING ASSEMBLY.

ALL VALVES (DRAINS, INSPECTOR'S TEST, &

CONTROL) MUST BE IDENTIFIED AS REQUIRED

BY NFPA 13.

PIPING MUST BE ARRANGED FOR FLUSHING.

READILY REMOVABLE FITTINGS MUST BE

PROVIDED AT THE END OF ALL CROSS MAINS.

ALL PENDENT SPRINKLERS MUST BE INSTALLED

IN THE CENTER OF THE CEILING TILES.

DRAINS MUST BE LOCATED TO PROVIDE

DRAINAGE IN ACCORDANCE WITH NFPA 13. ALL

DRAINS AND TEST CONNECTIONS MUST

DISCHARGE TO THE EXTERIOR OF THE BUILDING

ON TO A SPLASH BLOCK.

ALL SPRINKLER SYSTEM ALARM INITIATING

DEVICES MUST BE CONNECTED TO THE FIRE

ALARM SYSTEM.

DRAWINGS ARE DIAGRAMMATIC, INTENDED TO

CONVEY THE SCOPE OF WORK AND GENERAL

ARRANGEMENTS OF THE SYSTEM. COORDINATE

THE SYSTEM LAYOUT WITH ALL OTHER

DISCIPLINES.

PROVIDE CLEARANCE AROUND ALL PIPING

EXTENDING THROUGH WALLS AND FLOORS IN

ACCORDANCE WITH NFPA 13, SECTION 9.3.4.

03/16/2021 REVISION 01 BDK

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .