FX101_REV(01).pdf
PDF 618 KB Posted
- Attached to
- Renovate/Add for AGE Shop/Offices B129
- Solicitation number
- FA671221B0001
About this file
This document contains details for a federal construction contract solicitation to renovate and add facilities for an Air Force Reserve Command aerospace ground equipment shop and offices. The solicitation is designated as a 100% HUBZone small business set-aside, with a single award to be made to a HUBZone certified contractor. The scope of work includes renovating portions of Hangar 129 for C-17 maintenance shops, offices, bathrooms, storage and outdoor equipment areas. A 550 square foot building addition is required for an aircraft jack tester foundation and building. The contract value is estimated between $1 million to $5 million, with a 270 calendar day period of performance. The solicitation will be issued on the SAM website on or about January 20, 2021, with proposals due around February 17, 2021. The work location is at the 911th Air Wing in Pittsburgh, Pennsylvania.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE SUPPRESSION LEGEND
SYMBOL DESCRIPTION
OH HAZARD CLASSIFICATION
(.2 GPM / FT² OVER 2500 FT² WITH 250 GPM HOSE, 8.0K)
M L K J H G
AGE
MAINTENANCE
BAY
UNIVERSAL
JACK TESTER
WASH BAY
AGE
PARTS/TOOLS/BATTERY
AGE
CLASS/BREAK/COMPUTER
ROOM
EXISTING
MECHANICAL
EXISTING
MECHANICAL
AGE OFFICES
WOMENS
ROOM
MENS ROOM
AGE PARTS
ROOM
COMM
A
KEY PLAN
LOC
J H
LOCKERS
Poole Fire Protection
19910 West 161st Street
Olathe, KS 66062
913.829.8650 office 913.829.8690 fax www.poolefire.com
DRAWING NO.BASE CIVIL ENG.CHIEF ENG. FLIGHT PLATE
SCALE:DATE:PROJECT NO:CHIEF CE OPERATIONS
USING AGENCY
COMMUNICATIONS
BIO ENVIRONMENTAL
ENVIRONMENTAL ENG.
FIRE
SAFETY
SECURITY
ANTI-TERRORISM
CDM SMITH PROJECT #
CHECK BY:
DRAWN BY:
DESIGN BY:
REV. NO. DATE DESCRIPTION BY
REVIEW
COORDINATION DATE
SHEET OF
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000:
54321 6
B
C
D
E
A
C
D
E
106718-231406
JLSS-17-0011 10/8/2019 42
GTP 210-168
503 Martindale Street, Suite 400
Pittsburgh, PA 15212-5722
Tel: (412) 201-5500
As indicated
RENOVATE/ADD FOR AGE SHOP/OFFICES, B129
ZAP
SAB
KAB
FX101
FIRST FLOOR PLAN
FIRE SUPPRESSION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
FIRE SUPPRESSION GENERAL NOTES:
SCALE: 1/8" = 1'-0"
FIRE SUPPRESSION FIRST FLOOR PLAN
4'0 8' 16'
SHEET KEYNOTES
KEY
VALUE
KEYNOTE TEXT
01 PROVIDE SPRINKLERS BELOW WASH BAY CEILING. THE DESIGN
DENSITY OF THE AREA MUST BE ORDINARY HAZARD.
SCALE: 1/4" = 1'-0"
FIRE SUPPRESSION MEZZANINE FLOOR PLAN
0 2' 4' 8'
N
MODIFY THE SYSTEM AS NEEDED TO
ACCOMODATE WORK.
THE DESIGN AND INSTALLATION OF THE FIRE
SUPPRESSION SYSTEMS MUST BE IN
ACCORDANCE WITH UFC 3-600-01 (8 AUGUST
2016; CHANGE 1, 28 NOVEMBER 2016), NFPA 13
(2016 EDITION), NFPA 24 (2016 EDITION), AND THE
DESIGN SPECIFICATIONS.
ALL HANGERS MUST BE PROVIDED AND
INSTALLED IN ACCORDANCE WITH NFPA 13.
THE INSPECTOR'S TEST VALVES MUST BE
LOCATED NO MORE THAN 7 FEET AFF.
WHERE PIPES PASS THROUGH FIRE RESISTANCE
RATED CONSTRUCTION, THE PENETRATION
MUST BE PROTECTED WITH A LISTED OR
APPROVED FIRESTOPPING ASSEMBLY.
ALL VALVES (DRAINS, INSPECTOR'S TEST, &
CONTROL) MUST BE IDENTIFIED AS REQUIRED
BY NFPA 13.
PIPING MUST BE ARRANGED FOR FLUSHING.
READILY REMOVABLE FITTINGS MUST BE
PROVIDED AT THE END OF ALL CROSS MAINS.
ALL PENDENT SPRINKLERS MUST BE INSTALLED
IN THE CENTER OF THE CEILING TILES.
DRAINS MUST BE LOCATED TO PROVIDE
DRAINAGE IN ACCORDANCE WITH NFPA 13. ALL
DRAINS AND TEST CONNECTIONS MUST
DISCHARGE TO THE EXTERIOR OF THE BUILDING
ON TO A SPLASH BLOCK.
ALL SPRINKLER SYSTEM ALARM INITIATING
DEVICES MUST BE CONNECTED TO THE FIRE
ALARM SYSTEM.
DRAWINGS ARE DIAGRAMMATIC, INTENDED TO
CONVEY THE SCOPE OF WORK AND GENERAL
ARRANGEMENTS OF THE SYSTEM. COORDINATE
THE SYSTEM LAYOUT WITH ALL OTHER
DISCIPLINES.
PROVIDE CLEARANCE AROUND ALL PIPING
EXTENDING THROUGH WALLS AND FLOORS IN
ACCORDANCE WITH NFPA 13, SECTION 9.3.4.
03/16/2021 REVISION 01 BDK