This solicitation package outlines requirements for a federal construction contract. The project consists of renovating and adding to an aircraft ground equipment shop and offices located at the Pittsburgh Air Reserve Station. Work includes remodeling shops, offices, bathrooms, and storage areas, constructing a 550 square foot addition for a jack stand tester, and building an equipment wash bay. The contract is valued between $1 million and $5 million and has a performance period of 270 calendar days. The solicitation will be a 100% HUBZone small business set-aside awarded as a firm-fixed-price contract. The closing date for submissions is February 17, 2021. Interested parties should register on the Interested Vendors List at beta.sam.gov to receive updates. Prime contractors must be registered in SAM to be eligible for award. The pre-bid site visit is scheduled for February 10, 2021.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST FLOOR
+0"
ROOF @ 36'
+36' - 0"
ROOF @ 46'
+46' - 0"
M BCDEFGHJKL A
ROOF @ 30'
+30' - 0"
A-310
21' - 0" 20' - 0" 19' - 11" 20' - 0" 20' - 0" 40' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 21' - 0"
AGE
MAINTENANCE
BAY
WASHBAY
ENCLOSURE LID
12'-0"H x 12'-0"W
OPENING
A-310
A-310
FENCING
FIRST FLOOR
+0"
ROOF @ 32'
+32' - 0"
ROOF @ 20'
+20' - 0"
ROOF @ 36'
+36' - 0"
A-310
2345678 1
MEZZANINE
+10' - 0"
5' - 8" 14' - 9" 15' - 0" 15' - 0" 20' - 0" 19' - 0" 19' - 0"
AGE
MAINTENANCE
BAY
WASH BAY
AGE
CLASS/BREAK/COMPUTER
ROOM
AGE
PARTS/TOOLS/BATTERY
WASHBAY
ENCLOSURE LID
12'-0"H x 12'-0"W
OPENING
EXISTING OVER HEAD
DOOR TO REMAIN
EPOXY PAINTED
GWB CEILING
A-310
A
1' - 1" 9"
RETURN GWB AND
EPOXY COATING
VERTICALLY IN FRONT
OF OVERHEAD DOOR
FIRST FLOOR
+0"
TOP OF MASONRY -
HANGAR
+16' - 0"
M L
ROOF @ 30'
+30' - 0"
27' - 4 7/8"
M O
E
21' - 0"A-311
A-310
A-311
FIRST FLOOR
+0"
ROOF @ 32'
+32' - 0"
TOP OF MASONRY -
HANGAR
+16' - 0"
ROOF @ 20'
+20' - 0"
TOP OF PARAPET -
SUPPORT SPACES 1980
+18' - 0"
ROOF @ 36'
+36' - 0"
A-310 34
ROOF @ 30'
+30' - 0"
A-311
A-311
5/8" GWB
(PAINT)
5/8" GWB (PAINT)
4" 4"
8" 5/8"3/4"
9 3/8"
3/4" PLYWOOD
SUSPENDED
5/8" GWB CEILING (PAINT)
8" METAL STUD
AT 16" O.C.
12" METAL STUD
AT 16" O.C.
STEEL MEMBER,
SEE STRUCTURAL
MEMBER
/8
/8
/4
/8
2-1/2" METAL
STUD INFILLNOTE:
WASHBAY GWB TO
BE MOISTURE AND
MILDEW RESISTANT
FRP LINER
DRAWING NO.BASE CIVIL ENG.CHIEF ENG. FLIGHT PLATE
SCALE:DATE:PROJECT NO:CHIEF CE OPERATIONS
USING AGENCY
COMMUNICATIONS
BIO ENVIRONMENTAL
ENVIRONMENTAL ENG.
FIRE
SAFETY
SECURITY
ANTI-TERRORISM
CDM SMITH PROJECT #
CHECK BY:
DRAWN BY:
DESIGN BY:
REV. NO. DATE DESCRIPTION BY
REVIEW
COORDINATION DATE
SHEET OF
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
U.S. AIR FORCE
911TH AIRLIFT WING
PITTSBURGH INTERNATIONAL AIRPORT, ARS
MOON TOWNSHIP, PA 15108-5000:
54321 6
B
C
D
E
A
C
D
E
106718-231406
JLSS-17-0011 10/08/2019
GTP 210-168
503 Martindale Street, Suite 400 Pittsburgh, PA 15212-5722 Tel: (412) 201-5500
As indicated2 /2
/2
:0
:4
A
M
RENOVATE/ADD FOR AGE SHOP/OFFICES, B129KAW
RAD
TLK
A-310
BUILDING SECTIONS
ARCHITECTURAL
_ 1/8" = 1'-0"
1 BUILDING 129 - EAST-WEST SECTION
_ 1/8" = 1'-0"
2 BUILDING 129 - SECTION THRU WASH BAY
_ 1/4" = 1'-0"
3 BUILDING 129 - EAST-WEST SECTION @ JACK STAND TESTER
_ 1/4" = 1'-0"
4 BUILDING 129 - EAST-WEST SECTION @ ADDITION
DETAIL
1 1/2" = 1'-0"
A
WASHBAY CEILING
| Sheets |
| A-310 - BUILDING SECTIONS |
672547000
File details come from the government source that posted it. Updated .