A15_Attachment_2_Specifications.pdf

PDF 11 MB Posted

Attached to
Renovate Facility for AFE, Bldg 411 Federal contract opportunity
Solicitation number
FA671219BA001
Issued by
Department of the Air Force Reserve Command

About this file

Attachment 2-Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Facility for AFE, Bldg 411, newest first.
File Type Posted
A15_Attachment_6_Bid_Opening_Entry_Authority_List_Requirements_(Bid_Opening.pdf PDF
B411_Drawings_Revision_2_20190521_p1-12.pdf PDF
A15_Revised_QA_Number_7.docx DOCX document
B411_Specifications_-_Rev_2_20190521.pdf PDF
A15_Amendment_2.pdf PDF
B411_Drawings_Revision_2_20190521_p13-End.pdf PDF
A-16_QAs_B411.docx DOCX document
A16_Site_visit_attendees.pdf PDF
A16_AGENDA.docx DOCX document
A15_Amendment_One__FA671219BA0010001_SF_30.pdf PDF
A15_Attachment_3_Drawings_Rev_1_part_1_of_2.pdf PDF
A15_Attachment_3_Drawings.pdf PDF
WagesAttachment1_B411.docx DOCX document
A15_Solicitation_-_FA671219BA001.pdf PDF
A15_Attachment_5_Request_for_Information.doc DOC document
A15_Attachment_4_Responsiblility_Questionair_B411.docx DOCX document
A15_Attachment_6_Entry_Authority_List_Requirements.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Official Use Only

PROJECT

MANUAL

SPECIFICATIONS

Renovate Facility for AFE, B-411

JLSS 16-0014

Contract FA6712-17-D-0001

GTP 210-168

CONSTRUCTION BID SET

Prepared By:

CDM Smith Inc.

503 Martindale St., Suite 400

Pittsburgh, PA 15212

911th Airlift Wing

Moon Township, PA

April 30, 2018

December 10, 2018 - 911th CES Revision 1

Construction Bid Set

911th Airlift Wing, Renovate Facility for AFE, B-411 Contents

JLSS-16-0014 00 01 10-1

911th Airlift Wing

Renovate Facility for AFE, B-411

JLSS 16-0014

Technical Specifications

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 - PROCUREMENT REQUIREMENTS

000000 Cover Sheet

000110 Table of Contents

Balance of Requirements provided by 911th

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

DIVISION 01 - GENERAL REQUIREMENTS

010100 Summary of Work

010100a Office Furniture Relocations Worksheet

011400 Work Restrictions

013200 Construction Progress Documentation

013400 Submittal Procedures

014000 Quality Requirements

014100 Environmental Protection

014100a Final Hazmat Survey Report

015000 Temporary Facilities and Controls

015950 Safety Requirements

017300 Closeout Procedures

017389 Cutting and Patching

017830 Project Record Documents

018130 Green Procurement Requirements

018130a Green Procurement Reporting Form

FACILITIES CONSTRUCTION SUBGROUP

DIVISION 02 - EXISTING CONDITIONS

024119 Selective Demolition

028319 Lead Based Paint Remediation

DIVISION 03 - CONCRETE

030131 Modifications to Existing Concrete

031000 Concrete Formwork

031500 Concrete Joints and Joint Accessories

JLSS-16-0014 00 01 10-2

DIVISION 03 - CONCRETE (CON’T)

032000 Concrete Reinforcement

033000 Cast-In-Place Concrete

033500 Concrete Finishes

036000 Grout

DIVISION 04 - MASONRY

042000 Unit Masonry

DIVISION 05 - METALS

051200 Structural Steel

053600 Non-composite Steel Floor Deck

054000 Cold Formed Metal Framing

055000 Miscellaneous Metals

055100 Metal Stairs

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 Rough Carpentry

061643 Gypsum Sheathing

064000 Architectural Woodwork

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

072100 Thermal Insulation

076200 Sheet Metal Flashing and Trim

079200 Joint Sealants

DIVISION 08 - OPENINGS

081113 Hollow Metal Doors and Frames

085113 Aluminum Windows

087100 Door Hardware

088043 Specialty Glazing

089119 Fixed Louver

DIVISION 09 - FINISHES

092116 Gypsum Board Assemblies

093013 Ceramic Tiling

095113 Acoustical Panel Ceilings

096513 Resilient Base and Accessories

096523 Resilient Flooring

099100 Painting

DIVISION 10 - SPECIALTIES

101400 Signage

102113 Stainless Steel Toilet Compartments

102800 Toilet Accessories

DIVISION 11 - EQUIPMENT - NONE

JLSS-16-0014 00 01 10-3

DIVISION 12 - FURNISHINGS - NONE

DIVISION 21 - FIRE SUPPRESSION

211313 Wet-Pipe Sprinkler Systems

DIVISION 22 - PLUMBING

220000 Plumbing General Provisions

220010 Plumbing Demolition

221000 Plumbing Piping Systems

223000 Plumbing Equipment

224000 Plumbing Fixtures and Trim

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

230000 HVAC General Provisions

230010 HVAC Demolition

230593 Testing, Adjusting, and Balancing for HVAC

230700 Thermal Insulation

230913 Automatic Temperature Control System

230915 Control Sequences for Automatic Temperature Control Systems

233100 Ductwork and Accessories

237301 Air-Handling Units

238126 Split-System Air Conditioners

DIVISION 26 - ELECTRICAL

260000 Electrical General Provisions

260510 Wires and Cables 600V Maximum

260533 Raceway, Boxes, Fittings, and Supports

260536 Cable Trays for Electrical Systems

260810 Electrical System Testing and Settings

261800 Wiring Devices

261900 Miscellaneous Equipment

262417 Panelboard Modifications

265100 Lighting System

DIVISION 27 - COMMUNICATIONS

271500 Data Cabling

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY - NONE

SITE AND INFRASTRUCTURE SUBGROUP

DIVISION 30 - DIVISION 39 - NONE

PROCESS EQUIPMENT SUBGROUP

DIVISION 40 - DIVISION 49 - NONE

JLSS-16-0014 00 01 10-4

THIS PAGE INTENTIONALLY LEFT BLANK

911th Airlift Wing, Renovate Facility for AFE, B-411 Summary of Work

JLSS 16-0014 01 01 00 - 1

SECTION 01 01 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 TITLE OF WORK

A. Project includes one work scope at 911th Airlift Wing/LGC, 2550 Defense Avenue, Pittsburgh IAP ARS, Moon Township, PA 15108-4495 as follows:

1. Renovate Facility for AFE, Building B-411; Government’s Project Number JLSS 16-0014.

1.03 DEFINITIONS

A. Provide shall mean: to furnish all materials/equipment, to install all labor and services and to make the item of work or equipment fully complete, operable, and acceptable to intended use.

B. The words "Project Coordinator" used in some of these specifications shall refer to the "Contracting Officer".

C. The word “Owner” shall refer to the “Government”.

D. Deleted.

E. Deleted.

F. Deleted.

G. Any referenced standards used are to be the latest version at the time of bidding.

1.04 WORK COVERED BY CONTRACT DOCUMENTS

A. The following Paragraphs are a general Summary of the Work. Review entire set of Contract Documents for a comprehensive referencing of required work.

B. This project includes renovating an existing one story building that consists of a high bay center area that is surrounded by lower height rooms at building perimeters. The project incorporates general construction, plumbing, HVAC, and electrical work and in summary includes the following work scopes.

1. Remove wall and ceiling between existing Office Rooms E-101 and E-102 to make a single room that will be utilized as the NVG Helmet Storage Room A-101. Provide new ceiling and touch-up of room finishes.

2. Remove and replace plumbing fixtures with new as shown in Women’s Restroom A-102 (E-103) and Men’s Restroom A-104 (E-105). Provide ceramic tile flooring and base and paint walls. Remove, salvage, and reinstall toilet compartments.

JLSS 16-0014 01 01 00 - 2

3. Modify entry to existing Men’s Locker Room E-105C and install new wall partition between Locker Room E-105C and Men’s Restroom E-105 to create a new NVG Testing Room A-105.

4. Make modifications to plumbing and HVAC equipment in Existing Mechanical Room A- 106 (E-106).

5. Modify existing Parts Cleaning E-107 to become Break Room A-107 including new casework and sink. Remove existing room finishes and provide new flooring, base, ceiling, and paint.

6. Construct new partition in existing Break/Training Room E-109 to create two new rooms, Oxygen Testing Room A-108 and Sewing Fabrication Room A-109. Remove existing room finishes and provide new flooring, base, ceiling, and paint in both rooms. Provide casework, countertop, and sink in Oxygen Testing Room A-108. Remove existing wall to create opening for new double door assembly in Sewing Fabrication Room A-109.

7. Construct various new partitions to create Rooms A-110 through A-113 and Rooms A-114 through A-116. To create A-115 and A-116, remove existing overhead door assembly and close the opening with a new exterior wall assembly consisting of face brick, rigid insulation, and interior CMU. New rooms include specified floor, base, wall, and ceiling finishes.

8. Over Rooms A-110 through A-116, construct a new L-shaped Mezzanine A-200 that is accessible via two new metal open grate stair assemblies with metal handrails. Mezzanine requires construction of new concrete footings, structural steel framing systems, elevated concrete slab, and metal guardrails. Patch epoxy type finish floor where existing concrete slab-on-grade is repaired after construction of new Mezzanine footings.

9. Remove and replace existing water, gas, and electric meters with smart meters.

10. Perform plumbing, HVAC, and electrical work scopes indicated on Drawings.

11. Repair exterior gutter and flashing.

12. Remove existing cranes, rails, and controls and return to the Government.

13. Remove, relocate, and reinstall various existing Government owned materials in Building Number B411:

a. Cabinets, drawers, and equipment from existing Oxygen Room in Building Number B419 to new Oxygen Testing Room A-108.

b. Parachute tables from Building Number B408 to new Parachute Room A-115.

c. Lockers from Building Number B419 to new NVG Helmet Storage Room A-101.

d. Shelving from Building Numbers B408 and B320 to new Mezzanine Storage Room A-200.

JLSS 16-0014 01 01 00 - 3

14. Remove, relocate, and reinstall various existing Government owned materials from other Buildings to designated rooms in Building Number B411. Refer to the Office Furniture Relocation listing following this Section.

1.05 CONTRACT METHOD

A. Construct the Work identified in Contract Documents under a single lump sum, fixed price contract for all project work.

1.06 CONTRACTOR USE OF PREMISES AND RESPONSIBILITIES

A. Coordinate use of premises under direction of Contracting Officer.

B. Assume full responsibility for protection and safekeeping of products under this Contract.

C. Contractor shall be responsible for protecting installed Work and existing adjacent building materials and systems that remain.

D. Work is prohibited on UTA training weekends, which typically occurs the first and third weekends each month.

E. Obtain and pay for use of additional storage or work areas needed for operations under this Contract.

F. Refer to Division 01 Section “Work Restrictions” for additional project requirements.

G. Following existing and stored materials in Building 411 will be removed by the Government prior to it being turned over to the Contractor to perform the Contract Work:

1. Aircraft maintenance components stored in the High Bay area.

2. Movable interior office, break room, and training room type furniture.

3. Washer and dryer in existing Parts Cleaning Room E-107.

H. Any correspondence between Contractor and the Government or the Architect, Engineer, Inspector or Users must coordinate with the Contracting Officer.

1.07 WORK UNDER OTHER CONTRACTS

A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts.

1.08 GOVERNMENT’S OCCUPANCY REQUIREMENTS

A. Repair Work required by this Contract relates to interior and exterior work scopes and does not require direct action in interior spaces occupied by Government workers.

B. Government Occupancy: Government will not occupy Building B-411 during the entire construction period. Government will occupy adjacent buildings and other areas at the site, including aircraft areas during Renovate Facility for AFE Contract Work.

JLSS 16-0014 01 01 00 - 4

1. Maintain access to existing walkways, corridors, means of egress, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Contracting Officer.

2. Provide not less than 3 working days’ notice to Contracting Officer of activities that will affect Government’s operations.

C. Completed Areas of Construction:

1. Contracting Officer will prepare one Certificate of Substantial Completion for the entire Contract Work.

2. Contractor shall be responsible for cleanup and related maintenance in all work areas, until Substantial Completion.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

END OF SECTION

FURNITURE RELOCATION FOR RENOVATE FACILITY FOR AFE, BLDG 411

Ship From Ship To B411

Ro om

Bu ild in g

De sk s

Ch ai rs

Ta bl es

Bo ok C as es

To ol bo xe s

C ab in et s

Ot he r

Ot he r

Ro om

No te s

1 B408 7 Para (A1‐A7) 114 Items marked with orange labels

1 B408 5 Para Table (A1‐A5) 114

1 B408 7 Para (B1‐B6) 114

1 B408 5 Para Table (B1‐B5) 114

1 B408 2 Para Work station(A1‐A2) 114

1 B408 2 Para Work station Table(A1‐A2) 114

1 B408 3 Para work station cabinet(A1‐A3) 114

1 B408 1 Para Cabinet(A1) 114

1 B408 4 Work station table(B1‐B4) 114

1 B408 2 Work station box(B1‐B2) 114

1 B408 3 Work station(B1‐B3) 114

1 B408 1 Embroidery Machine 114Work station box(B1 B2)

1 B408 1 Embroidery Work station 114

1 B408 1 Embroidery Machine cabinet 114

1 B408 1 Office Supply cabinet 114

1 B408 1 Flotation cabinet 114

1 B408 1 Bookcase 114

1 B408 1 Flotation table(A1) 109

1 B408 1 Flotation table(B1) 109

1 B408 1 Flotation(B1) 109

1 B408 1 Flotation(B2) 109

1 B408 1 Vacuum Sealer 109

1 B408 1 Para CTK06 109

1 B408 1 Flightline CTK03 109

1 B408 1 Flammable Locker 100

1 B408 1 Surv. Cabinet(A1) 109

1 B408 1 Surv. Cabinet(A2) 109

1 B408 1 Surv. Cabinet(B1) 109

1 B408 1 Surv. Cabinet(B2) 109

1 B408 4 6 Surv. Cabinet(C1‐C6) with table top 109Smart Board Workstation

1 B408 2 3 Surv. Cabinet(D1‐D3) with table top 109

1 B408 25 All chairs will be moved into main room for move 100

1 B408 1 Computer Printer 115B408

1 B408 7 Sewing Station(1‐7) includes sewing machines 109

1 B408 1 Fabric Carousel 100

1 B408 1 Smart Board with speakers and projector 112

1 B408 1 Smart Board Work station 112Smart Board Workstation

1 B408 1 Cabinet(Coffee Machine, Microwave) 107

2 B408 1 Pharmacy Locker 100

2 B408 1 Snap on toolbox 100

2 B408 1 2 Raft Work station 109

2 B408 5 Rollaway Bins (5) 100 Front near garage door

2 B408 1 Laser Etcher machine 114

2 B408 1 20Man Bottle Cabinet 100

3 B408 4 Desks with mounted filing cabinets attached 115

3 B408 5 Clothing Cabinets(3) Paper filing cabinets(2) 115

Addendum #5 30 April 2018

Ro om

Bu ild in g

De sk s

Ch ai rs

Ta bl es

Bo ok C as es

To ol bo xe s

C ab in et s

Ot he r

Ot he r

Ro om

No te s

4 B408 2 2 With attached filing cabinets 115

4 B408 7 standalone under desk(5) Clothing cabinets(2) 115

4 B408 1 Couch 112

5 B408 1 Cabinet(Mens Bathroom) 104

6 B408 1 Comsec Safe 110

6 B408 1 PPE lockers 100

6 B408 2 Red tag cabinet, Steve's clothes Cabinet, 100

6 B408 2 Steve's Desk 115

6 B408 1 Parachute Simulator Desk 100

6 B408 2 Refridgerator 107

6 B408 1 Food/Dishes cabinet 107

6 B408 1 2 Comsec table top with 2 cabinets 110

6 B408 1 Battery storage locker 110

6 B408 1 Rolling food cart 107

6 B408 2 Grey lockers 100

6 B408 1 Drill Press 100

Garage H129 4 Rollaways, Large, Blue, 4 EA + end shelving 100 Under mezzanine

Garage H129 1 Training CCA Shelves ‐1 EA 112

Garage H129 2 3 3 Cabinets with 2 table tops 112

Garage H129 5 Rolling storage bins 5 EA (grey) 112

Garage H129 6 PMEL Shelves ‐ 6 Shelves 100

Garage H129 1 Yellow Storage locker 100

Garage H129 1 Red Toolbox 100

Garage H129 4 Training equipment Shelves ‐ 4 large sections 112

Burt's office H129 1 Burt's Desk 116

Burt's office H129 4 Storage Cabinet 116

Burt's office H129 1 Refridgerator 116

Burt's office H129 1 Microwave 116

Burt's office H129 4 Office Chairs 116

Burt's office H129 1 Wardrobe 116

NVG Rm B419 3 Table Tops 105

NVG Rm B419 8 Cabinets 105

NVG Rm B419 2 Office chairs 105

NVG Rm B419 2 Shelves with outlets 105

OXYGEN Rm B419 1 3 Computer Desk with 3 Cabinet 108

OXYGEN Rm B419 1 Pharmacy Locker 108

OXYGEN Rm B419 4 4 Office Chairs 108

OXYGEN Rm B419 1 Oxygen CTK 108

OXYGEN Rm B419 4 4 Piece Cabinet Oxygen parts 108

OXYGEN Rm B419 1 Quick Don cabinet 108

Ro om

Bu ild in g

De sk s

Ch ai rs

Ta bl es

Bo ok C as es

To ol bo xe s

C ab in et s

Ot he r

Ot he r

Ro om

No te s

Helmet Rm B419 3 Helmet Lockers(3 Large Sections) 101

Helmet Rm B419 1 Rolling Cart for Tester 101

Helmet Rm B419 1 Post Flight table 101

Chem Rm B320 12 Rollaway bins (12) 113

Chem Rm B320 2 Battery Flammable Lockers 113

Chem Rm B320 2 Washer and Dryer 107 107 or 108 wherever the hookups are located

Chem Rm B320 1 Refridgerator 107

Chem Rm B320 2 Table Tops 113

Chem Rm B320 5 Chem Stock Cabinets 113

Chem Rm B320 1 Clothing Cabinet 113

Chem Rm B320 2 2 Desks with Mounted Cabinets 113

Chem Rm B320 2 Office Chair2 113

Chem Rm B320 1 Standalone Shelves 113

Chem Rm B320 1 Microwave 107

Chem Rm B320 1 Coffee Machine 107

Chem Rm B320 1 Pharmacy Locker on rollaway shelf 113

911th Airlift Wing, Renovate Facility for AFE, B-411 Work Restrictions

JLSS 16-0014 01 14 00 - 1

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 CONTRACTOR USE OF PREMISES AND RESPONSIBILITIES

A. Coordinate use of premises under direction of Contracting Officer. Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated. Cooperate with 911th Airlift Wing personnel during construction operations to minimize conflicts and facilitate 911th Airlift Wing usage.

1. Limits: Confine construction to areas indicated on construction drawings and/or as designated by the Contracting Officer. Confine storage area as designated by the Contracting Officer.

2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to 911th Airlift Wing employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

3. Perform the work so as not to interfere with 911th Airlift Wing operations.

4. Building Occupancy: Building will not be occupied during the entire construction period.

B. Assume full responsibility for protection and safekeeping of products under this Contract.

C. Work schedule shall be as follows:

1. Normal work hours shall be between 0700 to 1600 (7:00 AM to 4:00 PM), Monday through Friday, with no work on federal holidays.

2. Any deviations from the normal working hours must be approved 3 working days in advance by the Contracting Officer.

D. The Contractor shall be responsible for protecting all remaining permanent equipment.

E. Work is prohibited on UTA training weekends, which typically occurs the first and third weekends each month.

F. Obtain and pay for use of additional storage or work areas needed for operations under this contract.

G. Comfort stations are not provided by 911th Airlift Wing.

911th Airlift Wing, Renovate Facility for AFE, B-411 Work Restrictions

JLSS 16-0014 01 14 00 - 2

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

911th Airlift Wing, Renovate Facility for AFE, B-411 Construction Progress Documentation

JLSS 16-0014 01 32 00-1

SECTION 01 32 00

CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SCOPE OF WORK

A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Submittals Schedule.

2. Construction Progress Schedule.

3. Contract Progress Report.

4. Daily construction reports.

5. Field condition reports.

6. Special reports.

B. Related Sections include the following:

1. Division 01 Section "Submittal Procedures" for submitting schedules and reports.

2. Division 01 Section "Quality Requirements" for submitting a schedule of tests and inspections.

3. Division 01 Section "Closeout Procedures" for submitting photographic negatives as

Project Record Documents at Project closeout.

1.03 SUBMITTALS

A. Submittals Schedule: Submit (4) four copies of schedule. Arrange the following information in a tabular format:

1. Scheduled date for first submittal.

2. Specification Section number and title.

3. Submittal category (action or informational).

4. Name of subcontractor.

JLSS 16-0014 01 32 00-2

5. Description of the Work covered.

6. Scheduled date for Contracting Officer’s final release or approval.

B. Construction Progress Schedule: Submit original and (2) two printed copies.

C. Contract Progress Report: Submit original and (2) two printed copies.

D. Daily Reports: Submit electronically to Contracting Officer.

E. Field Condition Reports: Submit (2) two copies at time of discovery of differing conditions.

F. Special Reports: Submit (2) two copies at time of unusual event.

1.04 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.

B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from parties involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

2.01 SUBMITTALS SCHEDULE

A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates.

1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and

Contractor's Construction Schedule.

2. Initial Submittal: Submit concurrently with preliminary bar-chart schedule. Include submittals required during the first 30 days of construction. List those required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.

3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's

Construction Schedule.

JLSS 16-0014 01 32 00-3

2.02 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Procedures: Comply with procedures contained in The Associated General Contractor’s

Construction Planning and Scheduling.

B. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final

Completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by modification.

C. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. Comply with the following:

1. Activity Duration: Define activities in time frame coordinated with Contracting Officer.

2. Procurement Activities: Include procurement process activities for long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule.

Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

3. Submittal Review Time: Include review and resubmittal times indicated in Division 01

Section "Submittal Procedures" in schedule. Coordinate submittal review times in

Contractor's Construction Schedule with Submittals Schedule.

4. Startup and Testing Time: Include not less than (10) ten days for startup and testing.

5. Substantial Completion: Indicate completion in advance of date established for

Substantial Completion, and allow time for Contracting Officer’s administrative procedures necessary for certification of Substantial Completion.

D. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule in order that the work will be accomplished.

E. Products Ordered in Advance: Include a separate activity for each product. Include delivery date indicated in Division 01 Section "Summary of Work." Delivery dates indicated stipulate the earliest possible delivery date.

1. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction.

b. Limitations of continued occupancies.

c. Uninterruptible services.

d. Partial occupancy before Substantial Completion.

e. Use of premises restrictions.

f. Seasonal variations.

g. Environmental control.

JLSS 16-0014 01 32 00-4

F. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using fragnets to demonstrate the effect of the proposed change on the overall project schedule.

2.03 CONSTRUCTION CONTRACT PROGRESS SCHEDULES AND REPORTS

A. AF Form 3064, Contract Progress Schedule, shall be submitted in original and two copies.

Computer generated schedules may be used at the discretion of Contracting Officer. When approved, the original shall be retained by the contracting office. Signed copies shall be provided to the Civil Engineer and the Contractor.

B. Separate progress reports (AF Form 3065, Contract Progress Report) covering the same period shall be prepared by the Civil Engineer or their designee and the Contractor, and submitted twice monthly. The periods shall be the same as stated on the Contract Progress Schedule. At the discretion of the Contracting Officer, this time period may be extended to monthly for projects of 180 days or more. This decision shall be documented in the contract file.

2.04 REPORTS

A. Daily Construction Report (DCR): It is very important to record each day’s Work and resources used; especially those that are impacting the Project Schedule. Prepare a daily construction report recording at minimum the following information concerning events at

Project site:

1. Contract Number, Name of Project, Prime Contractor

2. Report Number (sequentially starting with 1) and date

3. Temperature; general description, range (low- high), precipitation and if it affected work

4. Any delays in work progress (all items needed on-hand, any equipment down for repairs)

5. List of Subcontractors at Project site, hours on site and area of responsibility

6. Number of personnel at Project site. Indicate trades and (foreperson, journey person, or apprentice

7. Indicate General description of work going on (Ex; XZY Corp, Carpenter (1-F, 2-J, 1-A);

installed blocking at roof perimeter)

8. Accidents.

9. Meetings, inspections, and significant decisions.

10. Unusual events (refer to special reports).

11. Stoppages, delays, shortages, and losses.

12. Materials received (complete, damage, correct)

13. Emergency procedures.

JLSS 16-0014 01 32 00-5

14. Concrete placed; include mix tickets attached to report. Tickets to show type of mix, supplier, time left plant, time started to mix, time of placement).

15. Orders and requests of the Contracting Officer.

16. Change Orders received and implemented

17. Services connected and disconnected.

18. Equipment or system tests and startups, pass/ fail information.

19. Tests and their results

20. Partial Completions and occupancies.

21. Substantial Completions authorized.

22. Other general comments, as needed.

23. Signed and dated; signature of Superintendent or acting Supt. certifies that the report is true and accurate and that work is in compliance with contract plans and specifications.

24. Use form approved by Contracting Officer and provide electronically to the Contracting

Officer before COB the following day unless another submission time is authorized.

B. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare a detailed report. Submit with a request for information

(RIF). Include a detailed description of the differing conditions, together with recommendations for changing the Contract documents.

2.05 SPECIAL REPORTS

A. General: Submit special reports directly to Contracting Officer within one day of an occurrence. Distribute copies of report to parties affected by the occurrence.

B. Reporting Unusual Events: When an event of an unusual and significant nature occurs at

Project site, whether or not related directly to the Work, prepare and submit a special report.

List chain of events, persons participating, response by Contractor's personnel, evaluation of results or effects, and similar pertinent information. Advise Contracting Officer in advance when these events are known or predictable.

PART 3 - EXECUTION

3.01 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.

JLSS 16-0014 01 32 00-6

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate Actual Completion percentage for each activity.

B. Distribution: Distribute copies of approved schedule to Contracting Officer, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1. Post copies in Project meeting rooms and temporary field offices.

2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

911th Airlift Wing, Renovate Facility for AFE, B-411 Submittal Procedures

JLSS 16-0014 01 34 00-1

SECTION 01 34 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SCOPE OF WORK

A. This Section includes administrative and procedural requirements for submitting Shop

Drawings, Product Data, Samples, and other miscellaneous submittals.

1.03 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

B. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Contracting Officer’s receipt of submittal.

1. Initial Review: Allow fourteen (14) calendar days for initial review of each submittal.

Allow additional time if processing must be delayed to permit coordination with subsequent submittals. Contracting Officer will advise Contractor when a submittal being processed must be delayed for coordination.

2. Allow fourteen (14) calendar days for processing each resubmittal.

3. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Use for Construction: Use only final submittals with mark indicating action taken by

Contracting Officer in connection with construction.

JLSS 16-0014 01 34 00-2

PART 2 PRODUCTS

2.01 SUBMITTALS

A. General: Prepare and submit Submittals required by individual Specification Sections.

1. Number of Copies: Submit four (4) copies of each submittal, unless otherwise indicated.

Contracting Officer will return two (2) copies. Mark up and retain one returned copy as a

Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Standard color charts.

e. Manufacturer's catalog cuts.

f. Wiring diagrams showing factory-installed wiring.

g. Printed performance curves.

h. Operational range diagrams.

i. Mill reports.

j. Standard product operating and maintenance manuals.

k. Compliance with recognized trade association standards.

l. Compliance with recognized testing agency standards.

m. Application of testing agency labels and seals.

n. Notation of coordination requirements.

C. Samples: Prepare physical units of materials or products, including the following:

1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

2. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from the same material to be used for the Work, cured and finished in manner specified, and physically identical with the product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

D. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

E. Safety Data Sheets (SDS): Submit information directly to Contracting Officer.

JLSS 16-0014 01 34 00-3

PART 3 EXECUTION

3.01 CONTRACTOR'S REVIEW

A. Review each submittal and check for compliance with the Contract Documents. Sign submittal under a cover letter before submitting to Contracting Officer.

B. Failure of the contractor to provide any required documents under the contract may result in withholding a retainage pursuant to the Payments Under Fixed-Price Construction Clause, FAR

52.232-5.

3.02 CONTRACTING OFFICER’S ACTION

A. General: Contracting Officer will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Contracting Officer will review each submittal, make marks to indicate corrections or modifications required, and return it. Contracting Officer will mark submittal appropriately to indicate action taken.

JLSS 16-0014 01 34 00-4

911th Airlift Wing, Renovate Facility for AFE, B-411 Quality Requirements

JLSS 16-0014 01 40 00 - 1

SECTION 01 40 00

QUALITY REQUIREMENTS

PART 1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SCOPE OF WORK

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the

Contract Document requirements.

1. Specific quality-control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's quality-control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Contractor to provide quality-control services required by Contracting

Officer are not limited by provisions of this Section.

C. See individual Specification Sections for specific test and inspection requirements.

D. This Section requires taking quality related actions during design, fabrication, and installation of products, materials, and systems. Completed work shall carry a minimum 365-day manufacturers and installers warranty from date of Substantial Completion, unless otherwise specified in other Specification Sections.

1.03 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and ensure that proposed construction complies with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that completed construction complies with requirements.

C. Mockups: Full-size, physical example assemblies to illustrate finishes and materials. Mockups are used to verify selections made under Sample submittals, to demonstrate appearance and, where indicated, qualities of materials and execution, and to review construction, coordination, testing, or operation; they are not Samples.

D. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

JLSS 16-0014 01 40 00 - 2

1.04 SUBMITTALS

A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

B. Schedule of Tests and Inspections: Prepare in tabular form and include the following:

1. Specification Section number and title.

2. Description of test and inspection.

3. Identification of applicable standards.

4. Identification of test and inspection methods.

5. Number of tests and inspections required.

6. Time schedule or time span for tests and inspections.

7. Entity responsible for performing tests and inspections.

8. Requirements for obtaining samples.

9. Unique characteristics of each quality-control service.

C. Reports: Prepare and submit certified written reports that include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Ambient conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with the

Contract Document requirements.

12. Name and signature of laboratory inspector.

JLSS 16-0014 01 40 00 - 3

13. Recommendations on retesting and reinspecting.

D. Permits, Licenses, and Certificates: For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.05 QUALITY ASSURANCE

A. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this

Project.

B. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

C. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance.

D. Testing Agency Qualifications: An agency with the experience and capability to conduct testing and inspecting indicated, as documented by ASTM E 548, and that specializes in types of tests and inspections to be performed.

E. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:

1. Build mockups in location and of size indicated or, if not indicated, as directed by

Contracting Officer.

2. Notify Contracting Officer (7) seven calendar days in advance of dates and times when mockups will be constructed.

3. Demonstrate the proposed range of aesthetic effects and workmanship.

4. Obtain Contracting Officer’s approval of mockups before starting work, fabrication, or construction.

5. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

6. Demolish and remove mockups when directed, unless otherwise indicated.

F. Preconstruction Testing: Testing agency shall perform, preconstruction testing for compliance with specified requirements for performance and test methods.

1. Contractor responsibilities include the following:

JLSS 16-0014 01 40 00 - 4

a. Provide test specimens and assemblies representative of proposed materials and construction. Provide sizes and configurations of assemblies to adequately demonstrate capability of product to comply with performance requirements.

b. Submit specimens in a timely manner with sufficient time for testing and analyzing results to prevent delaying the Work.

c. Fabricate and install test assemblies using installers who will perform the same tasks for Project.

d. When testing is complete, remove assemblies; do not reuse materials on Project.

2. Testing Agency Responsibilities: Submit a certified written report of each test, inspection, and similar quality-assurance service to Contracting Officer, with copy to Contractor.

Interpret tests and inspections and state in, each report whether tested and inspected work complies with or deviates from the Contract Documents.

3. TEST SECTIONS: Before proceeding with the work, the Contractor shall demonstrate the processes and materials to be used a minimum of 24 hours prior to proceeding with the work to allow for resolution of any questions or clarifications. Test sections shall include the following:

a. Joint Cleaning and Sealing. Include a minimum 50 ft length. All preparations and processes to be followed for the contract work must be demonstrated in the completion of the test section.

4. Positive Drainage: A horizontal surface included in this scope of work will be placed such that the surface will achieve positive drainage and water will, in accordance with existing drainage patterns, both freely flow onto the surface and will freely flow off and away from the surface to existing rain drainage systems. No water shall be allowed to “pond” or collect on that surface due to its profile, edging or joint filling treatments. Contractor shall completely remove and replace any work which does not conform to positive drainage requirements.

1.06 QUALITY CONTROL

A. Contractor Responsibilities: Unless otherwise indicated, provide quality-control services specified and required by Contracting Officer.

1. Engage a qualified testing agency to perform these quality-control services.

2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.

3. Where quality-control services are indicated as Contractor’s responsibility, submit a certified written report, in duplicate, of each quality-control service.

4. Testing and inspecting requested by Contractor and not required by the Contract

Documents are Contractor’s responsibility.

5. Submit additional copies of each written report directly to Contracting Officer, when they so direct.

JLSS 16-0014 01 40 00 - 5

B. Special Tests and Inspections: Contractor will engage a testing agency to conduct special tests and inspections required by Contracting Officer.

1. Testing agency will notify Contracting Officer promptly of irregularities and deficiencies observed in the Work during performance of its services.

2. Testing agency will submit a certified written report of each test, inspection, and similar quality-control service to Contracting Officer.

3. Testing agency will submit a final report of special tests and inspections at Substantial

Completion, which includes a list of unresolved deficiencies.

4. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

5. Testing agency will retest and reinspect corrected work.

C. Retesting and Reinspecting: Regardless of whether original tests or inspections were

Contractor’s responsibility, provide quality-control services, including retesting and reinspecting, for construction that revised or replaced Work that failed to comply with requirements established by the Contract Documents.

D. Testing Agency Responsibilities: Cooperate with Contracting Officer and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Contracting Officer and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

3. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

4. Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the Work.

5. Do not perform any duties of Contractor.

E. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field-curing of test samples.

JLSS 16-0014 01 40 00 - 6

5. Delete first subparagraph below if not required or common practice in Project vicinity.

6. Delivery of samples to testing agencies.

7. Preliminary design mix proposed for use for material mixes that require control by testing agency.

8. Security and protection for samples and for testing and inspecting equipment at Project site.

F. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.01 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Comply with the Contract Document requirements for Section 01 "Cutting and Patching."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

911th Airlift Wing, Renovate Facility for AFE, B-411 Environmental Protection

JLSS 16-0014 01 41 00-1

SECTION 01 41 00

ENVIRONMENTAL PROTECTION

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SCOPE OF WORK

B. The Contractor shall comply with all federal, state and local environmental rules and regulations, including all Air Force and 911th Airlift Wing (AW) programs and policies. Failure to comply shall result in the Contractor reimbursing the 911th AW for any fines, fees, or additional costs incurred by the 911th AW as a result of Contractor non-compliance.

C. The Contractor shall participate in the base Hazardous Materials (HAZMAT) program whereby all

HAZMAT shall be approved by the Government prior to use and all HAZMAT use tracked.

D. The Contractor shall adhere to the Air Force requirement to use licensed pesticide applicators as per

Para. E4.1.5.2.3 of DODI 4150.7: “Contractor employees performing pest management work on a

DoD installation shall be certified prior to the beginning of the contract under a State plan accepted in the State in which the work is performed.” All pesticides must be approved by the base Pest

Manager prior to bringing material on base or applying. This includes pesticides that can be purchased over the counter by consumers. Pesticides include any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest including but not limited to insecticides, herbicides, fungicides, and various other substances to control pests. Any pesticide usage and reporting must be in accordance with the Pittsburgh IAP ARS Integrated Pest Management Plan.

1.03 SUBMITTALS

A. The following shall be submitted in accordance with Section 01 34 00 SUBMITTALS.

1. Environmental Protection Program:

a. Within 10 calendar days after Notice to Proceed and prior to commencement of the work at the site, the Contractor shall submit in writing his detailed proposal for implementing requirements for environmental controls specified herein.

B. Preconstruction Survey:

1. Prior to start of any onsite construction activities, the Contractor and the Contracting Officer shall make a joint condition survey, after which the Contractor shall prepare a brief report indicating on a layout plan the condition of the areas immediately adjacent to the site of the work and adjacent to his assigned storage area and access routes(s) as applicable.

2. Both the Contracting Officer and Contractor will sign this report upon mutual agreement as to its accuracy and completeness.

JLSS 16-0014 01 41 00-2

C. Waste Disposal Scheme:

1. The Contractor shall submit a description of his scheme for disposing of waste materials resulting from the work under this contract.

2. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to the condition of the adjacent undisturbed…