FA6675-18-R-0004 – BUILDING 1628 RENOVATION
Request for Information (RFI) Response
RFI #3
Question: Does BCE have preferred Fire Protection System Contractors?
Response: BCE does not have any preferred Fire Protection System Contractors.
RFI #4
Question: Can the new duplex receptacles in room 114 be wired from an existing circuit or is a new dedicated circuit required?
Response: The receptacle can be run off of an existing receptacle circuit providing it does not overload the circuit per the NEC.
RFI #5 Pending Response
RFI #6
Question: Can the hose bib and drain to be installed be surface mounted or does it have to be in wall?
Response: The hose bib and drain shall be mounted in the wall.
RFI #7
Question: Will the existing drop ceilings that are currently in place need to be replaced?
Response: Existing ceilings will not need to be replaced unless damaged during construction. If damage occurs, contractor will repair/replace damaged ceilings.
RFI #8
Question: Please provide specifications for both the Air Compressor and Refrigerated Dryer.
Response: Existing Air Compressor and existing Air Dryer "installation only" is required for this project. See Statement of Work Revision 2.
RFI #9
Question: Can existing conduits be reused where practical for fire alarm wiring?
Response: Existing FA conduit may be used in its current location only. It shall not be removed and used in other locations.
Question: Does new or existing conduit need to be painted?
Response: Painting the conduit is not required.