SOW for Project 15-0026 Renovate Building 510 Attachment 4 to SABER Solicitation FA665617R0001

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition For Base Engineering Requirements(SABER), newest first.
File Type Posted
SABER_Building_Wages_Attachment_2(revision1).docx DOCX document
SABERamendment3.docx DOCX document
SABER_HeavyHighway_Wages_Attachment3(revision1).docx DOCX document
SABER_QandAcontinued.doc DOC document
SABER_QandA.doc DOC document
SABERSiteVisitAttendees.pdf PDF
SABER2017_Agenda.docx DOCX document
Amendment2Saber2017.docx DOCX document
Amendment1Saber2017.docx DOCX document
Project_ZQEL_15-0026_proposed_layout.pdf PDF
SABER_Basic_SOW_Attachment_1.doc DOC document
Site_Visit_Registration_FormAttachment7.xls XLS spreadsheet
SABER_Building_Wages_Attachment_2.docx DOCX document
CoEfficient_Pricing_Proposal_Spreadsheet_Attachment_5.docx DOCX document
SolicitationSaber2017.docx DOCX document
Question_Submission_Form_Attachment_6.doc DOC document
SABER_HeavyHighway_Wages_Attachment3.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PROJECT ZQEL 15-0026

Repair of Building 510 21 August 2017

910 SPTG/CE

Youngstown Air Reserve Station

3976 King Graves Road

Vienna OH 44473-5937

1.0. Location of Work:

The site of the work is at the Youngstown Air Reserve Station, 3976 King Graves Road, Vienna Ohio (Trumbull County), and Building 510.

2.0 Summary of Work: The Contractor shall furnish and install/perform all material, equipment, components, parts, tools, labor, transportation, hauling, disposal/recycling, cleaning, inspection, testing, commissioning, training, reporting, etc., necessary to perform this project as described in the contract-delivery order, including this Statement of Work and any/all applicable federal, state and local law, regulation, standards, and codes. Unless otherwise stated, any/all work items includes requirement for contractor to remove and properly dispose of/recycle off base, and to furnish and install/incorporate any/all new materials/equipment/components needed to properly complete the work item; any Government furnished property and/or reinstallation of existing materials/equipment/components shall be as stated/specified herein. Contractor shall submit materials/methods for approval prior to ordering and/or incorporation into the work; as a minimum, submittals shall include product literature, MSDS, standard color, texture and style samples/swatches/boards, and place of origin/manufacture. Demolished materials, waste/debris is property of the contractor, unless otherwise stated herein; contractor is responsible for proper disposal/recycling of such materials off base; such material shall be promptly removed from the installation and shall not be stored/stockpiled unless submitted and approved for such. Contractor is responsible for verification of all details, measurements, etc. prior to ordering materials and execution of work. The work includes, but is not limited to, the following principle elements:

3.0 PROJECT: Remove and replace existing 4’ X 5’ windows with thermally insulated double pane windows. Trim out windows inside and outside. Install finish on new trim compatible with color of wall covering and exterior finish. Construct walls for new offices and file room. Repair floor in hallway near conference room. Relocate furniture and file cabinets.

3.1. Contractor shall, finish added 2” X 4” metal stud, with 5/8th drywall on both side of wall between room 113 and 115 with 1 coat primer, 2 coats semi-gloss paint. Install vinyl base on new wall, both side. Contractor shall submit samples to the CO for selection.

3.2. Contractor shall remove section of wall in hallway to make a door way to enter into new room 114.

3.3. Contractor shall adjust lighting in room 115 and 114 after adding new dividing wall. No new lights required.

3.4. Contractor shall add light switch to room 114 with motion sensor style switch. Add 2 each electrical duplex 20 amp outlets on new dividing wall between rooms 114 and 115 on both sides of new wall totaling 4 each electrical duplex 20 amp outlet on new wall. Add two electrical duplex 20 amp outlet on existing wall of room 113 on room 114 side of wall. Totaling two each new electrical duplex 20 amp outlets.

3.5. Contractor shall install in rooms 114,115, and 122 a minimum one (1) dual port network jack on each wall. In multiple occupancy offices (training rooms, conference rooms etc.) there will be one (1) dual port network jack placed every ten (10) feet around the perimeter of the room based off the EIA/TIA nation installation standards for cabling and infrastructure and also prevents the need to rewire or come back in later if the use or configuration of the room changes, or in the event that furniture does not allow for the exact design as it was intended.

3.6. Contractor shall modify acoustical ceiling tile and track in rooms 114, and 115, and modify tile around existing smoke and additional detectors, big voice system, sprinkler system and any other required protrusion (s) in ceiling.

3.7. Contractor shall install additional detectors, Big Voice, HVAC and sprinklers in room 114 and adjust the same in room 115 due to the addition of the new room dividing wall.

3.8. Contractor shall remove and relocate all furniture in rooms 114 and 115 that and relocate furniture back to correct location after wall installation and painting.

3.9. Contractor shall remove and replace existing 3’ X 5’ windows with thermally insulated double pane windows. New windows shall have removable screens for each new window. Replace existing glazing using a minimum of 6-mm ( ¼ “) nominal laminated glass for inboard pane of all insulated windows. The 6-mm (1/4”) laminated glass consists of two nominal 3-mm (1/8”) glass panes bonded together with a minimum of a 0.75-mm (0.030-inch) polyvinyl-butyral (PVB) interlayer. In accordance with ASTM C 1048 and S.A.B.E.R. specification 08800-2 B.3 outboard glazing of insulated windows shall be 6-mm (1/4”) tempered glazing. All window tints shall be in outboard glazing. New glass shall match the existing glass in color/tint/size.

3.10. Contractor shall install new locks on new windows.

3.11. Contractor shall remove and replace existing blinds with new vinyl blinds. Contractor shall supply samples to Contracting Officer for selection.

3.12. Contractor shall repair floor in hallway near conference room by removing raised concrete beneath carpet. Carpet shall be redone in the area of the raised floor once raised concrete has been removed.

3.13. Contractor shall repair ceramic tile in doorway of men’s restroom near conference room.

Tile shall be reset after floor beneath tile is repaired and threshold replaced.

3.14. Contractor shall add 2” X 4” metal stud, with 5/8th drywall on both side wall

3.15. Contractor shall install 2” X 4” X 7’metal stud wall, with 5/8th drywall on both sides in room 122 in accordance with layout CIVIL ENGINEERING PROPOSED LAYOUT DATED: 15 may 2015.

3.16. Contractor shall remove all wall paper in hallway 107 and kitchen area 103.

3.17. Contractor shall patch, skim coat, 1 coat primer, 2 coats semi-gloss paint hallway 107 and kitchen area 103 after wall paper removal. Contractor shall supply Contracting Officer with samples of paint for selection.

3.18. Contractor shall relocate furniture and file cabinets as needed to work in designated areas and to relocate file cabinets to new location in building 510.

3.19. Contractor shall purchase the 2018 update to the RS Means estimating program with the associated software and hardcopy books for Youngstown Air Force Reserve Base as follows:

3 - 2016 RS Means Assemblies Electronic Cost Data

6 - 2016 RS Means Facilities Electronic Cost Data

1 - 2016 Assemblies Cost Hardback Book

1 - 2016 Facilities Cost Hardback Book"

4.0 Attachments

4.1. Drawing: Title: CIVIL ENGINEERING PROPOSED LAYOUT DATED: 15 may 2015

5.0 Green Procurement

Green Procurement items include, but not limited to: Paint Contractor shall comply with the Green Purchasing requirements of the contract. Several web links for the Contractors review, research and use, include, but not limited to:

5.1. Comprehensive Procurement Guidelines, EPA

http://www.epa.gov/cpg EPA's CPG Supplier Database is a searchable database of vendors who sell or distribute CPG-designated products with recycled content. This powerful tool allows users to search for vendors of a specific CPG product, product category, or type of material. In addition, users can search directly for a specific vendor by typing all or part of the vendor’s name in a search field. Database link: http://cpg.epa.tms.icfi.com/user/cpg_search.cfm

5.2. Environmentally Preferable Products, EPA

http://www.epa.gov/opptintr/epp http://www.epa.gov/epp/pubs/buying_green_online.pdf

5.3. Energy Star®, EPA

http://www.energystar.gov/products

5.4. Non-Ozone Depleting Substances, EPA

http://www.epa.gov/ozone/snap/lists/index.html

5.5. Energy Efficient Products and Minimal Standby Power Devices, DOE http://www.eere.energy.gov/features/dept_energy.html

5.6. Biobased Products Program, USDA

http://www.biobased.oce.usda.gov

5.7. “Biobased SuperCenter”http://www.biobased.org/association

FA6656-17-R-0001

Attachment 4

File details come from the government source that posted it. Updated .