Amendment1Saber2017.docx

DOCX document 29 KB Posted

Attached to
Simplified Acquisition For Base Engineering Requirements(SABER) Federal contract opportunity
Solicitation number
FA6656-17-R-0001Revised
Issued by
Department of the Air Force Reserve Command

About this file

Amendment 1 to Saber Solicitation FA665617R0001

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition For Base Engineering Requirements(SABER), newest first.
File Type Posted
SABERamendment3.docx DOCX document
SABER_HeavyHighway_Wages_Attachment3(revision1).docx DOCX document
SABER_Building_Wages_Attachment_2(revision1).docx DOCX document
SABER_QandAcontinued.doc DOC document
SABER_QandA.doc DOC document
SABERSiteVisitAttendees.pdf PDF
SABER2017_Agenda.docx DOCX document
Amendment2Saber2017.docx DOCX document
Project_ZQEL_15-0026_proposed_layout.pdf PDF
Question_Submission_Form_Attachment_6.doc DOC document
SABER_HeavyHighway_Wages_Attachment3.docx DOCX document
SOW_Project_15-0026_Renovate_Building_510_Attachment_4.doc DOC document
CoEfficient_Pricing_Proposal_Spreadsheet_Attachment_5.docx DOCX document
SolicitationSaber2017.docx DOCX document
SABER_Basic_SOW_Attachment_1.doc DOC document
Site_Visit_Registration_FormAttachment7.xls XLS spreadsheet
SABER_Building_Wages_Attachment_2.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA665617R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 03-Nov-2017 01:00 PM to 08-Nov-2017 01:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS:

Attachment 1: BASIC Statement of Work (SOW) for Simplified Acquisition of Base Engineering Requirements (SABER) dated 29 August 2016

Attachment 2: Construction Type: Building Wage Determination (See Section I, Contract Clause 52.222-6.) General Decision OH170122 Dated 09/08/2017, with modifications through Modification dated 09/08/2017

Attachment 3: Construction Type: Heavy and Highway Wage Determination (See Section I, Contract Clause 52.222-6.) General Decision OH170002 Dated 09/08/2017, with modifications through Modification 22 dated 09/08/2017

Attachment 4: SOW Task Order Project ZQEL 15-0026 Renovate Building 510 Drawing:

Project ZQEL 15-0026 SOW Civil Engineering Proposed Layout

Attachment 5: Coefficient Pricing Proposal Spreadsheet

Attachment 6: Questions Form

Attachment 7: Site Visit Registration

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .