SABER_QandA.doc

DOC document 42 KB Posted

Attached to
Simplified Acquisition For Base Engineering Requirements(SABER) Federal contract opportunity
Solicitation number
FA6656-17-R-0001Revised
Issued by
Department of the Air Force Reserve Command

About this file

Questions and Answers as of 25 October 2017

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition For Base Engineering Requirements(SABER), newest first.
File Type Posted
SABER_Building_Wages_Attachment_2(revision1).docx DOCX document
SABERamendment3.docx DOCX document
SABER_HeavyHighway_Wages_Attachment3(revision1).docx DOCX document
SABER_QandAcontinued.doc DOC document
SABERSiteVisitAttendees.pdf PDF
SABER2017_Agenda.docx DOCX document
Amendment2Saber2017.docx DOCX document
Amendment1Saber2017.docx DOCX document
Project_ZQEL_15-0026_proposed_layout.pdf PDF
CoEfficient_Pricing_Proposal_Spreadsheet_Attachment_5.docx DOCX document
SolicitationSaber2017.docx DOCX document
SABER_Basic_SOW_Attachment_1.doc DOC document
Site_Visit_Registration_FormAttachment7.xls XLS spreadsheet
SABER_Building_Wages_Attachment_2.docx DOCX document
Question_Submission_Form_Attachment_6.doc DOC document
SABER_HeavyHighway_Wages_Attachment3.docx DOCX document
SOW_Project_15-0026_Renovate_Building_510_Attachment_4.doc DOC document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER Solicitation FA665617R0001

Questions with Answers/Clarifications as of 25 October 2017

1. Will there be competition amongst the contract awardees for each task order on this contract.

Response: Once the contracts are awarded, the task orders will be competed between the two awardees.

2. What cost factors should be included in calculating a coefficient? (i.e. general conditions, profit, overhead, etc.)

Response: Coefficients are factors multiplied against the standard unit prices in the UPB to calculate delivery order prices. Coefficients should include (as cited in the contract) all contractor costs not included in the total of all the line item bare costs for a particular delivery order. Coefficients include but are not necessarily limited to: all site and home office overhead and profit, bonds, insurance, mobilization and demobilization, daily and final cleanup, payroll taxes, gross receipts tax, general conditions, general and administrative expenses, wage differences betweenR.S. MEANS and Davis Bacon labor rates, special clothing for workers, off site storage, proposal development and negotiation (including minimal design and submittals), site superintendence, quality control, routine security delays, and subcontractors overhead and profit.

3. Conflicting proposal due date.

Response: Proposal due date is November 8, 2017 (see Amendment 1)

4. Missing SOW drawing.

Response: See Amendment 1

5. Project SOW Section 3.0 states 4’x5’ windows, section 3.9 states 3’x5’ windows, which should we go with? The drawing shows both large double windows and small single windows. Are we to replace ALL windows in B510 or just a select few? The SOW never states.

Response: Disregard window sizes. All crank out windows are to be replaced in building 510.