Tab_F_Questions__3_-_2.pdf

PDF 165 KB Posted

Attached to
Base Operations and Support Services (BOS) at Youngstown ARS, OH Federal contract opportunity
Solicitation number
FA6656-15-R-0002
Issued by
Department of the Air Force Reserve Command

About this file

Tab F Questions 3 - 2

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations and Support Services (BOS) at Youngstown ARS, OH, newest first.
File Type Posted
CBA_30_Nov_16.PDF PDF
CBA_WD.htm HTM file
Summary_of_Changes_-_28_Nov_2016.docx DOCX document
PWS_SUMMARY_OF_CHANGES_-_21_Nov_2016.docx DOCX document
FA6656-15-R-0002-0015.docx DOCX document
Round_1_Tab_C_-_Youngstown_QAs_responses_21_Nov.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_5_21_Nov.xlsx XLSX spreadsheet
Youngstown_BOS_PWS_Revision_5_21_Nov_2016.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_4_16_Nov.xlsx XLSX spreadsheet
Youngstown_FA6656-15-R-0002-0011.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_2_7_Dec_15 _FA6656-15-R-0002.xlsx XLSX spreadsheet
FA6656-15-R-0002_0008.pdf PDF
Attach_1_-_Youngstown_BOS_PWS_13_Nov_2015.pdf PDF
FA6656-15-R-0002_0006.pdf PDF
Questions_from_Responses__4.pdf PDF
FA6656-15-R-0002_0005.pdf PDF
C-1_Grounds_Maintenance_Oct15Update.pdf PDF
Attach_11_-_Over_and_Above_Rates_Rev_2.docx DOCX document
FA6656-15-R-0002_0003.pdf PDF
Attach_1_-_Youngstown_BOS_PWS_Rev_1_29_Oct_2015.pdf PDF
Tab_D_QA__1_Response.pdf PDF
TAB_B_QUESTIONS_Responses.pdf PDF
RFP_Questions__2.pdf PDF
Attach_12_Pricing_Matrix_Rev_1.xlsx XLSX spreadsheet
TAB_C_QUESTIONS_Responses.pdf PDF
Questions_Tab_F_-_Responses.pdf PDF
RFP_Q A.pdf PDF
Atch_3_-_Pre-proposal_Conference_Agenda.pdf PDF
TAB_G_QUESTION.pdf PDF
TAB_B_QUESTIONS_Responses.pdf PDF
Atch_1_-_BOS_Site_Visit_Sign-in_Sheet_08_Oct_2015.pdf PDF
F-TE-7-A-1a_CATHODIC_PROTECTION_SYSTEMS_2_of_3.pdf PDF
F-TE-7-G_POL_SYSTEMS_(F-TE-7-G).pdf PDF
F-TE-7-E-3_Storm_Drainage_System.pdf PDF
F-TE-7-A-1_CATHODIC_PROTECTION_SYSTEMS_1_of_3.pdf PDF
F-TE-7-D-1_Street_Lighting.pdf PDF
F-TE-7-H_Gas_Lines.pdf PDF
F-TE-7-E-4_Industrial_Wastewater_System_Manholes.pdf PDF
F-TE-7-D-2_Airfield_Lighting_-_LZ_and_Ramp.pdf PDF
F-TE-7-C-2c_Grounds_Maintenance_Ravenna.pdf PDF
F-TE-7-E-1_Water_Lines_and_Hydrants.pdf PDF
F-TE-7-C-5_Airfield_Marking.pdf PDF
F-TE-7-E-2_Sanitary_Sewer_System.pdf PDF
Attach_13_-_Past_Performance_Transmittal_Template.docx DOCX document
Attach_8_-_Statement_of_Equivalent_Rates.pdf PDF
Attach_4_-_WD_OH150002_Mod_18.txt TXT text file
Attach_6_-_WD_OH150122_Mod_7.txt TXT text file
Attach_1_-_Youngstown_BOS_PWS.pdf PDF
Attach_16_-_Consent_Letter.docx DOCX document
FA6656-15-R-0002_Final.pdf PDF
Show all 50

Base Operations and Support Services (BOS) at Youngstown ARS, OH has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab F – Questions #3

1. Question: Reference PWS F-TE-2g, HVAC Filter Location and Quantities: Building

128 shows 5 – 24 x 24 x 12 and 11 - 24 x 20 x 12 metal type filters. Please answer the following questions:

a. Are these filters metal-cased pleated filters?

Answer: Yes they are metal-cased pleated filters.

b. Do they have a header or not?

Answer: Yes they have a header.

c. While all of the metal type filters we have found have a U.L. Class 2 rating, none of those that we have found utilize a MERV rating; the rating system in place is typically, 65%, 85% and 95%. Which level of efficiency is required?

Answer: 85%

d. Are they required to be replaced every 3 months just like a 1 or 2 inch filter?

Answer: No, replace these filters annually.

2. Question: Reference PWS F-TE-2g, HVAC Filter Location and Quantities: Building

126 shows 8 filters identified as “Lieberts”. While we are aware of what Liebert systems are,

a. What specific systems are these filters for?

Answer: Network Communication Center (NCC) Room

b. Do these filters also require a change every 3 months?

Answer: Yes

3. Question: Reference PWS F-TE-2g, HVAC Filter Location and Quantities: Building 503 shows pleated type filters with dimensions being “Model 401”. Please provide information that will allow an offeror to properly price this item.

Answer: Filter fits an Aprilaire model 2400

4. Question: Reference PWS F-TE-2e, Elevator Types: Would the government please provide the type of elevators the contract must maintain (i.e. hydraulic/traction/electric), along with the number of floors in each building, so that we can properly price the

Inspection and Preventative Maintenance requirements?

Answer:

Elevators (PWS Para F5.13)

Facility Manufacture Size Qty Floors Type

106 Otis 15 passenger/2500lbs 1 3 Hydraulic

128 ThyssenKrupp/Dover 16 passenger/2500lbs 1 2 Hydraulic

407 Schindler 2500lbs 1 3 Hydraulic

TOTAL 3

Added in the PWS.

5. Question: Reference PWS F5.18, Fire Protection Services: Reference the Frequency of the services requested is the government requiring the Annual Services and Monthly

Services or all services such as the 5-Year, 10-Year, 20-Year, and 50-Year frequency as noted in UFC3-601-02, para 2-2.3 Wet Pipe Sprinkler Systems ITM tasks?

Typically the Fire Protection Services are quoted based on the Annual and Monthly

Frequency with the 5 Year, 10 Year, and 20 Year Requirements quoted as an Extra when due for that requirement.

Answer: All maintenance required up to and including the 5 year inspection should be FFP as part of your bid. Requirements beyond 5 years will be done as a CM work order.

6. Question: Reference PWS F-TE-2h, Fire Pumps Wet and Dry Pipe Systems: There are four Fire Pumps listed to be serviced. Would the government please provide the

GPM of these pumps?

Answer: This information is not available.

7. Question: Reference PWS F-TE-2h, Fire Alarm Detection Systems: The list of Fire

Detection, Protection and Suppression Systems provided states there are 129 Fire

Alarm Detection Systems. Would the government please provide the number of devices on each system?

Answer: This data is listed in F-TE-2h.

8. Question: Reference PWS F-TE-2h, Risers on Suppression Systems: Would the government please provide the number of Risers on the Wet and Dry Suppression

Systems?

Answer: 70

9. Question: Reference PWS F6.2.1, Pest Management Services: Would the government please provide the building numbers and square footage of the facilities requiring pest management inspection and services, along with the frequency of the inspections?

Answer: The Pest Management Plan Identifies a frequency of monthly for surveillance/inspection to the CAC, Bldg 113.