ADDENDUM__2_FOR_QJKL_07_-_0008(20170413).pdf

PDF 65 KB Posted

Attached to
Repair Roof Bldg 805
Solicitation number
FA6633-17-Q0001
Issued by

About this file

addendum #2

View the file

Other files

File Type Posted
Amendment_0004.docx DOCX document
Addendum__4.doc DOC document
ADDENDUM_3_FOR_QJKL_07_-_0008(20170425).pdf PDF
Amendment__3.pdf PDF
Amendment_02.pdf PDF
QUESTIONS-RESPONSES_2.doc DOC document
QUESTIONS-RESPONSES.doc DOC document
Amendment_01.docx DOCX document
ADDENDUM_FOR_QJKL_07_-_0008.pdf PDF
FA6633-17-Q0001.docx DOCX document
Drawings.pdf PDF
Technical__Specifications_(1).pdf PDF
wage_determination.doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM FOR

QJKL 07 – 0008

4/14/2017

Replace Roof, Building 805

1. Technical Drawing sheet A2 – Caged ladder concrete slab requirement note:

Change to: Place a 36” (W) x 4” (D) x 10’ (L) unreinforced concrete slab.

The new slab must fit between the existing building wall and sidewalk with the felt installed.”

2. As a general note: The current roof insulation is 4.5” thick, with one ¾” thick fire-rated board between the steel deck and insulation, another 3/4 “ fire-rated board between the insulation and the membrane. Since the new high density board is ½” thick maximum, use two layers of 2.5” Poly-isocyanurate board with two layers of ½” thick fire-rated perlite board.

3. Place one layer ½” thick of perlite board to the decking and another layer of 1/2/” thick perlite board between the polyisocyanurate board and membrane.

4. The roofing system required shall be fully-adhered (glued down) to the existing steel decking.

5. Add: Apply ½” slope tapered insulation to crickets for positive drainage.

6. Section 07 60 Part 3 Execution: Use aluminum instead of copper for new coping metal.

7. Use 3/8” laminated plywood and attach it to the wall. The plywood will provide good adherence for the membrane flashing covering the exterior wall when applied with bonding adhesive.

8. Drawing sheets A6.1 and A7, note leader: Replace steel (STL.) to aluminum (Al).

1136527572C Typewritten Text