01_-_QJKL_09-0041_-_Drawings.pdf
PDF 9 MB Posted
- Attached to
- Construct Liquid Oxygen Storage, Bldg 818 Federal contract opportunity
- Solicitation number
- FA6633-15-B-0007
About this file
Drawings - Construct Liquid Oxygen Storage Bldg 818
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions-Responses_2.pdf | ||
| Site_Visit_Minutes_and_Attendees_12May15.pdf | ||
| Questions-Responses_1.pdf | ||
| 20150327_MN36_WD.pdf | ||
| SF_24_Bid_Bond_Form.pdf | ||
| FA6633-15-B-0007_Construct_Liquid_Oxygen_Storage_Bldg_818.pdf | ||
| 02_-_QJKL_09-0041_-_Specifications.pdf | ||
| Financial_Responsibility_Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK
BLDG 818
PLAN NORTH
BASE CONTRACTING
BLDG 729
BASE CIVIL ENGINEERING
BLDG 744
MAIN GATE
CONSTRUCTION HAUL ROUTE
1. THE CONTRACTOR MUST COORDINATE WITH THE ASSIGNED GOVERNMENT
ESCORT BEFORE ENTERING OR LEAVING THE CONTROLLED AREA THROUGH
ACCESS GATE BY BUILDING 820. ALL CONTRACTOR RESOURCES (VEHICLES,
EQUIPMENT, ETC.) MUST USE A DIRECT ROUTE BETWEEN THE ACCESS GATE
AND THE FREE ZONE ENTRANCE AND ARE NOT ALLOWED IN OTHER ADJACENT
CONTROLLED/RESTRICTED AREAS (UNLESS SPECIAL ARRANGEMENTS ARE PRE-
COORDINATED AND APPROVED IN ADVANCE.)
2. AT THE BEGINNING OF EACH WORK DAY, THE CONTRACTOR MUST NOTIFY THE
ASSIGNED GOVERNMENT ESCORT BEFORE OPENING THE ENTRANCE TO THE
FREE ZONE AREA. LIKEWISE, AT THE END OF THE WORK DAY, THE CONTRACTOR
MUST AGAIN NOTIFY THE GOVERNMENT ESCORT BEFORE CLOSING THE
ENTRANCE TO THE FREE ZONE AREA.
3. CONTRACTOR SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS FOR
PROVIDING THE FREE ZONE BARRICADES:
• BARRICADES SHALL BE "BICYCLE-RACK" TYPE
• BARRICADES SHALL BE SECURED WITH SAND BAGS TO ENSURE NO
MOVEMENT DURING HIGH WINDS
• PLASTIC ORANGE MESH FENCING SHALL BE ATTACHED TO THE BARRICADES
• REFLECTIVE SIGNS SHALL BE ATTACHED TO THE BARRICADES EVER 50 FEET
• ORANGE FLASHING LIGHTS SHALL ALSO BE ATTACHED TO THE BARRICADES;
EVERY 50 FEET POSITIONED BETWEEN THE REFLECTIVE SIGNS
• IF THE BARRICADES ARE MOVED, TURNED OVER, ETC. BY HIGH WINDS; THE
CONTRACTOR SHALL RESPOND IMMEDIATELY TO RESTORE THE FREE ZONE
BARRICADES IN THEIR ORIGINAL POSITION
4. THIS CROSS HATCHED AREA IS DESIGNED AS OBJECT FREE AREA. IN THIS
AREA, THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING
REQUIREMENTS:
• AT THE END OF EACH WORK DAY, ALL VEHICLES, EQUIPMENT, ETC. SHALL BE
RELOCATED OUTSIDE OF THE OBJECT FREE AREA.
• WHEN THE ADJACENT COMMERCIAL RUNWAY (04-22) IS BEING UTILIZED, NO
VEHICLES, EQUIPMENT OR PERSONNEL WILL BE ALLOWED IN THE OBJECT
FREE AREA.
FREE ZONE GENERAL NOTES:
801 802
FREE
ZONE
E N
T E
R
CONTRACTING OFFICE: CYNTHIA MURRY
PHONE: 612-713-1427
EMAIL: cynthia.murry@us.af.mil
ADDRESS: 934 CONF/LGC
760 MILITARY HIGHWAY, BLDG 729
MINNEAPOLIS-ST PAUL ARS, MIN 55450-2100
OWNER
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
934TH AIRLIFT WING
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
A s i n d ic a te d
F E
B R
U A
R Y
N
E B
B
M F
J
C
JH
Q J K
L
-0
G-001
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
C O
V E
R S
H E
E T
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
MINNEAPOLIS-SAINT PAUL AIR RESERVE STATION
CONSTRUCT OXYGEN STORAGE - BUILDING 818
FEBRUARY 2, 2015
760 MILITARY HIGHWAY
MINNEAPOLIS, MN 55450-2100
CONTRACT NUMBER: FA6643-10-D-0002
TASK ORDER NUMBER: 6N09
PROJECT NUMBER: QJKL 09-0041
F A
-1
-D
-0
SCALE: NOT TO SCALE
AREA LOCATION MAP
SCALE: NOT TO SCALE
BASE LOCATION MAP
# OF
TOTAL SHEET NO. SHEET TITLE
GENERAL
1 G-001 COVER SHEET
2 G-002 LIFE SAFETY PLAN
CIVIL
3 VF101 EXISTING CONDITIONS SURVEY
4 CD101 SITE DEMOLITION PLAN
5 CI101 CIVIL IMPROVEMENTS PLAN
6 C-501 CIVIL DETAILS
STRUCTURAL
7 S-001 STRUCTURAL GENERAL NOTES
8 S-101 STRUCTURAL FOUNDATION PLAN
9 S-301 STRUCTURAL SECTIONS & DETAILS
ARCHITECTURAL
10 A-001 ARCHITECTURAL GENERAL NOTES & LEGENDS
11 AD101 ARCHITECTURAL DEMOLITION FIRST FLOOR PLAN
12 A-101 ARCHITECTURAL FLOOR PLANS
13 A-102 ARCHITECTURAL REFLECTED CEILING PLAN AND ROOF PLAN
14 A-201 ARCHITECTURAL EXTERIOR ELEVATIONS
15 A-301 ARCHITECTURAL BUILDING SECTION & DETAILS
16 A-501 ARCHITECTURAL DETAILS
17 A-601 ARCHITECTURAL FINISH SCHEDULE AND DETAILS
FIRE PROTECTION
18 FA101 NEW WORK FIRE ALARM PLAN, NOTES AND LEGENDS
MECHANICAL
19 M-001 GENERAL NOTES AND LEGENDS
20 M-101 FIRST FLOOR MECHANICAL NEW WORK PLAN
21 M-501 MECHANICAL DETAILS
22 M-601 MECHANICAL SCHEDULES AND CONTROLS SEQUENCE
ELECTRICAL
23 E-001 ELECTRICAL GENERAL NOTES AND LEGENDS
24 ES101 SITE ELECTRICAL NEW WORK PLAN
25 ES102 SITE ELECTRICAL NEW WORK PLAN AND DETAILS
26 ED101 SITE ELECTRICAL DEMOLITION PLAN
27 ED401 ENLARGED DEMOLITION PLAN
28 E-101 ELECTRICAL NEW WORK POWER AND LIGHTING PLANS
29 E-501 LIGHTING SCHEDULES & DETAILS
30 E-601 ONE-LINE DIAGRAMS AND PANEL SCHEDULE
Grand total: 30
INDEX OF DRAWINGS
SCALE: NOT TO SCALE
FREE ZONE AREA BASE MAP
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
NO YES
NO YES
NO YES
NO YES
NO YES
BASIC BUILDING CODE INFORMATION
CONSTRUCTION CLASSIFICATION
TYPE: (IBC 602)
DOES BUILDING HAVE ACCESSORY
OCCUPANCY (IES)?:
(IBC 508.2)
WHAT PERCENT OF STORY IS
ACCESSORY OCCUPANCY?:
DOES BUILDING REQUIRE INCIDENTAL USE
AREA SEPARATION?:
(IBC 509)
MIXED OCCUPANCIES?: (IBC 508)
OCCUPANCY GROUP:
(NFPA 6.1)
NON SEPARATED?: (IBC 508.3)
SEPARATED?: (IBC 508.4)
IIB UNPROTECTED, NOT SPRINKLERED,
EXTERIOR WALLS OF NON-COMBUSTIBLE MATERIALS
STORAGE (S1) 600 SF
0 SF 0%
BUILDING CODE ANALYSIS
IBC 2012 / NFPA 101
BLDG 818
934TH AIRLIFT WING
BUILDING AREA
AREA LIMIT BY TABLE 503 OF IBC: (AREA LIMITATION
PER STORY)
AREA AS DESIGNED PER STORY: (AREA PER
STORY)
TOTAL DESIGNED AREA OF BUILDING:
17,500 SF
600 SF
600 SF
BUILDING HEIGHT
AS DESIGNED
WITHOUT ANY
ALLOWABLE INCREASE
(PER IBC TABLE 503)
AS ALLOWED BY IBC
ALLOWABLE
HEIGHT INCREASE
(PER IBC 504.2)
TOTAL HEIGHT
INCLUDING ANY
ALLOWABLE INCREASE
IN FEET IN STORIES IN FEET IN STORIES
15'-8" 1 55'-0" 2
N/A N/A N/A N/A
15'-8" 1 55'-0" 2
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
GENERAL FIRE PROTECTION REQUIREMENTS
SEPARATIONS
PER IBC SECTION 718.2FIREBLOCKING REQUIRED?:
PER IBC SECTION 717DRAFTSTOPPING REQUIRED?:
PER IBC SECTION 909SMOKE CONTROL SYSTEM
REQUIRED?:
PER IBC SECTION 709SMOKE BARRIERS REQUIRED?:
PER IBC SECTION 710SMOKE PARTITION REQUIRED?:
PER IBC SECTION 708FIRE PARTITION REQUIRED?:
PER IBC SECTION 707FIRE BARRIER REQUIRED?:
ALARM & DETECTION
PER UFC 3-600-01FIRE ALARM SYSTEM REQUIRED?:
PER IFC 908EMERGENCY ALARM SYSTEM
REQUIRED?:
SUPPRESSION
PER IFC SECTION 905STANDPIPES REQUIRED?:
PER UFC 3-600-01SPRINKLERS REQUIRED?:
SPRINKLERS PROVIDED?:
PER IBC 906PORTABLE EXTINGUISHERS
REQUIRED?:
PER IFC 904OTHER SUPPRESSION
SYSTEMS REQUIRED?:
PER IFC 910SMOKE & HEAT VENTS
REQUIRED?:
FIRE ALARM SYSTEM PROVIDED?:
FIRE RESISTANCE RATING OF BLDG ELEMENTS
STRUCTURAL FRAME
(PER IBC TABLE 601)
BEARING WALLS
RATING AS
REQUIRED
(IN HOURS)
BUILDING ELEMENT RATING AS
DESIGNED
(IN HOURS)
TESTING AGENCY
& DESIGN NO.
(UL, FM, ETC)
(PER IBC TABLE 601)
EXTERIOR
INTERIOR
NONBEARING WALLS & PARTITIONS
(PER IBC TABLE 601 & 602)
EXTERIOR
INTERIOR
FLOOR CONSTRUCTION INCLUDING
SUPPORTING BEAMS & JOISTS
(PER IBC TABLE 601)
ROOF CONSTRUCTION INCLUDING
SUPPORTING BEAMS & JOISTS
(PER IBC TABLE 601)
FIRE WALLS
(PER IBC TABLE 706.4)
FIRE BARRIERS
(PER IBC TABLE 707)
SHAFT ENCLOSURES
(PER IBC TABLE 713)
FIRE PARTITIONS
(PER IBC SECTION 708)
OPENING & PROTECTIVE LISTING BY
CATEGORY (FIRE SHUTTERS, DOORS,
ETC. (PER IBC SECTION 716)
HORIZONTAL SEPARATION
(PER IBC 508.4)
INCIDENTAL OCCUPANCIES
(PER IBC TABLE 509)
OCCUPANCY SEPARATION WALLS
(PER IBC TABLE 508.4)
EXIT STAIR
(PER NFPA 101 7.1.3.2)
HORIZONTAL EXIT
(PER IBC SECTION 1025
EXIT ACCESS CORRIDOR WALLS
(PER IBC TABLE 1018.1)
SHAFT WALLS INCLUDING ELEVATOR
AND MECHANICAL SHAFTS
(PER IBC SECTION 713)
0 HR 0 HR
0 HR 0 HR
0 HR 0 HR
30 MIN 30 MIN
0 HR 0 HR
0 HR 0 HR
0 HR 0 HR
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
MEANS OF EGRESS
EGRESS WIDTH
(PER NFPA 101, TABLE
7.3.3.1)
CORRIDOR WIDTH
(PER NFPA 101,
38.2.3.2)
CORRIDOR FIRE-
RESISTANCE RATING
(PER IBC TABLE 1018.1)
REQUIREDCODE ITEM PROVIDED NOTES
STAIR WIDTH
(PER NFPA 101, TABLE
7.3.3.1)
COMMON PATH OF
EGRESS TRAVEL
(PER NFPA 101, TABLE
A.7.6)
EXIT ACCESS TRAVEL
DISTANCE
(PER NFPA 101, TABLE
A.7.6)
DEAD ENDS
(PER NFPA 101,
TABLE A.7.6)
MINIMUM NUMBER OF
EXITS FOR OCCUPANT
LOAD
(PER NFPA 101, 7.4.1.2 &
38.2.4)
VERTICAL EXIT
ENCLOSURES
(PER NFPA 101 8.6.5)
GUARDS & HANDRAILS
(PER NFPA 101 7.2.2.4)
S = 36" 36"
N/A N/A
NFPA 42.2.4.1
N/A N/A
N/A N/A
S = 50'-0" < 50'-0"
S = 200'-0" 42'-0"
S = 50'-0" N/A N/A
1 1
N/A N/A
N/A N/A
EGRESS TRAVEL DISTANCE
LIFE SAFETY LEGEND
FURNISH AND INSTALL 2A: 20-BC DRY
CHEMICAL FIRE EXTINGUISHER AND CABINET
600 SF
STORAGE
EGRESS PATH A: 42'-0"3
+/- 14'-4"
15'-0" +/-
30 MIN RATED WALL
30 MIN RATED OVERHEAD DOOR WITH FUSIBLE LINK
30 MIN RATED WALL
30 MIN RATED DOOR
WITH PANIC HARDWARE
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
A s i n d ic a te d
F E
B R
U A
R Y
N
E B
B
M S
F J
C
JH
U S
A C
E F ile N a m e
Q J K
L
-0
G-002
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
L
IF
E S
A F
E T
Y P
L A
N
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
04 8268 02 4 8134
SCALE: 1/4"=1'-0"
GRAPHIC SCALE
PLAN NORTH
OCCUPANCY AREA
MAXIMUM AREA ALLOWED
PER OCCUPANT
CALCULATED OCCUPANCY
LOAD
FIRST FLOOR
STORAGE 600 SF 500 2
Grand total 600 SF 2
BUILDING DESIGN OCCUPANT LOAD (PER NFPA TABLE 7.3.1.2)
ROUTE DISTANCES
MARK LENGTH
EGRESS TRAVEL DISTANCE
A 42'-0"
SCALE: 1/4" = 1'-0"B4
LIFE SAFETY PLAN
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P a a a a h
WALL WIND ZONES
GABLE ROOF WIND ZONES (7º<Θ<45º)
3 3
3 3
2 2
2 2
2 211 a a a a a a
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
THE STRUCTURE IS DESIGNED AS A STABLE UNIT AFTER ALL COMPONENT PARTS ARE IN
PLACE. THEREFORE, THE CONTRACTOR/ERECTOR SHALL PROVIDE ALL NECESSARY
SHORING AND BRACING AS REQUIRED TO ENSURE STABILITY DURING ERECTION.
WHEN A DETAIL IS SHOWN ON THE STRUCTURAL DRAWINGS FOR ONE CONDITION, IT
SHALL APPLY TO ALL SIMILAR OR LIKE CONDITIONS, UNLESS NOTED OR SHOWN
OTHERWISE ON THE DRAWINGS.
DESIGN CRITERIA:
A: FLOOR LIVE LOAD:
B: ROOF LIVE LOAD:
C: GROUND SNOW LOAD, Pg:
a. FROST PENETRATION:
b. SLOPE-ROOF SNOW LOAD, Ps:
c. ROOF SLOPE FACTOR, Cs:
d. SNOW EXPOSURE FACTOR, Ce:
e. SNOW IMPORTANCE FACTOR, Is:
f. THERMAL FACTOR, Ct:
D: WIND LOADS
a. ULTIMATE WIND SPEED, Vult:
b. NOMINAL WIND SPEED, Vasd:
c. RISK CATEGORY:
d. WIND EXPOSURE:
e. INTERNAL PRESSURE COEFFICIENT:
f. PRESSURE COEFFICIENT ZONE WIDTH, a:
g. COMPONENT AND CLADDING WIND PRESSURE:
ROOF:
WALL:
E: SEISMIC LOADS
a. RISK CATEGORY:
b. SEISMIC IMPORTANCE FACTOR, Ie:
c. MAPPED SPECTRAL RESPONSE,
d. SITE CLASS:
e. DESIGN SPECTRAL RESPONSE,
f. SEISMIC DESIGN CATEGORY:
g. BASIC SEISMIC FORCE RESISTING SYSTEM:
ORDINARY STEEL MOMENT FRAMES
h. RESPONSE MODIFICATION COEFFICIENT, R = 3.5
i. SEISMIC RESPONSE COEFFICIENT, Cs: PER PEMB MANUFACTURER
j. DESIGN BASE SHEAR: PER PEMB MANUFACTURER
k. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE
THE STRUCTURE IS DESIGNED IN ACCORDANCE WITH IBC 2012, ASCE 7-10,
ASCE 32-01, UFC 3-130-04, UFC 3-301-01, AND UFC 4-010-01.
CONCRETE DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH ACI 318-11;
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE.
CONCRETE STRENGTH SHALL BE 4,500 PSI AT 28 DAYS.
REINFORCING STEEL SHALL BE ASTM A615, GRADE 60.
WELDED WIRE FABRIC SHALL BE ASTM A1064.
DESIGN, FABRICATE, AND ERECT STRUCTURAL STEEL IN ACCORDANCE WITH
AISC STEEL CONSTRUCTION MANUAL 14TH EDITION (AISC 325-10).
STRUCTURAL STEEL SHALL BE AS FOLLOWS:
a. W-SHAPES
b. PLATES, ANGLES, CHANNELS, MISC. STEEL
c. HSS
3/4" DIAMETER ASTM A325N BOLTS SHALL BE USED IN ALL STRUCTURAL STEEL BOLTED
CONNECTIONS UNLESS NOTED OTHERWISE. TIGHTEN BOLTS TO TENSION REQUIRED BY
AISC.
ANCHOR RODS SHALL BE ASTM F1554 Gr. 36, THREADED ON EACH END, WITH HEAVY HEX
NUT AND WASHER AT EACH END UNLESS OTHERWISE NOTED. MINIMUM ANCHOR ROD
LENGTH AND DIAMETER SHALL BE SPECIFIED ON SHEET S-301.
ALL WELDED CONSTRUCTION SHALL BE IN ACCORDANCE WITH AWS D1.1 AND AISC.
CONTRACTOR SHALL FULLY COORDINATE ALL ARCHITECTURAL AND STRUCTURAL
DRAWINGS (INCLUDING DIMENSIONS AND ELEVATIONS) AND SHALL FULLY RESOLVE ANY
CONFLICTS PRIOR TO COMMENCING WORK.
FABRICATION DRAWINGS SHALL NOT BE REPRODUCTION OF STRUCTURAL CONTRACT
DRAWINGS.
MISCELLANEOUS STRUCTURAL ITEMS, CONDITIONS OR PIECES OF STEEL MAY BE
SHOWN ON ARCHITECTURAL DRAWINGS.
CONTRACTOR SHALL CONSULT GOVERNMENT FOR DIRECTION SHOULD UNCHARTED OR
INCORRECTLY CHARTED PIPING OR OTHER UTILITIES BE ENCOUNTERED DURING SITE
CLEARING, GRADING AND EXCAVATION.
125 PSF
20 PSF
50 PSF
125 INCHES
35 PSF
0.9 1.0 1.0 1.1
115 MPH
89 MPH
II
C ±0.18
3 FT
ZONE 1: 17 PSF -29 PSF
ZONE 2: 17 PSF -49 PSF
ZONE 3: 17 PSF -73 PSF
ZONE 4: 29 PSF -32 PSF
ZONE 5: 27 PSF -49 PSF
II
1.00 Ss = 0.05 S1 = 0.03 D Sds = 0.053 Sd1 = 0.048 A
ASTM A992
ASTM A36
ASTM A500, Gr. B
PRE-ENGINEERED METAL BUILDING SYSTEM:
1.
2.
3.
4.
5.
6.
7.
THE BUILDING SHALL BE PRE-ENGINEERED BUILDING AS SPECIFIED IN SPECIFICATIONS
SECTION 13 34 19 METAL BUILDING SYSTEMS. THE BUILDING SHALL BE MANUFACTURER'S
STANDARD PREFABRICATED METAL STRUCTURE OF THE APPROXIMATE INSIDE AREA
SHOWN. RIGID FRAMES SHALL BE SPACED AT CENTER TO CENTER AS NOTED AND
OVERALL DIMENSIONS SHALL BE MAINTAINED. CONSTRUCTION DETAILS MAY VARY TO SUIT
MANUFACTURER'S STANDARD DESIGN.
THE BUILDING SHALL BE DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF THE
"SEISMIC DESIGN MANUAL (2ND EDITION)" WHICH INCLUDES "SEISMIC PROVISIONS FOR
STRUCTURAL STEEL BUILDINGS" (AISC 341-10) AND FABRICATED ACCORDING TO AISC &
AISI. THE DIMENSIONAL TOLERANCES OUTLINED IN THE AWS CODE UNDER WORKMANSHIP
AND THE TOLERANCES APPLICABLE TO ROLL FORM STEEL UNDER THE AISC "STANDARD
MILL PRACTICE" SECTION SHALL BE REQUIRED IN THE FABRICATION OF THE STEEL
BUILDING FRAMES.
A COMPLETE DESIGN ANALYSIS SHOWING ALL CALCULATIONS FOR THE RIGID FRAMES,
PURLINS, ANCHOR BOLT LAYOUT/DETAILS, & OTHER EMBEDDED ITEMS SHALL BE
SUBMITTED FOR APPROVAL WITH THE SHOP DRAWINGS. SHOP DRAWINGS SHALL INCLUDE
DETAILS OF ALL MAIN MEMBERS, FOUNDATION REACTIONS, TYPICAL CONNECTIONS
(SHOWING BOLT HOLES & WELDS) & ERECTION DRAWINGS.
THE BUILDING SHALL BE DESIGNED TO SUPPORT ALL MECHANICAL EQUIPMENT
INCLUDING HEATERS, SPRINKLERS, EXHAUST SYSTEMS AND ALL OTHER SUCH DEVICES
(COORDINATE WITH OTHER DISCIPLINES). ADDITIONAL GIRTS OR PURLINS SHALL BE
PLACED IN CONVENIENT LOCATIONS FOR ATTACHMENT OF ALL MECHANICAL EQUIPMENT.
ANY ATTACHMENT TO METAL DECK IS PROHIBITED.
CROSS BRACING AND/OR PORTAL FRAMES SHALL BE USED TO TAKE LATERAL LOADS TO
THE EXTENT PRACTICAL.
THE FOUNDATION DESIGN IS BASED UPON ESTIMATED REACTIONS OF SIMILAR BUILDING
DESIGNS. CONTRACTOR SHALL PROVIDE PRE-ENGINEERED METAL BUILDING REACTIONS
SIGNED AND SEALED BY A LICENSED ENGINEER TO THE ROICC AND RECEIVE APPROVAL
PRIOR TO START OF CONSTRUCTION.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL
DIMENSIONS. COORDINATE/VERIFY PIER SIZES ON SHEET S-101 WITH BASE PLATE SIZES
AND LOCATE ANCHOR RODS PER THE PEMB SHOP DRAWINGS PRIOR TO POURING
CONCRETE.
FOUNDATION NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
STRUCTURAL FOUNDATION DESIGN IS BASED UPON AN ALLOWABLE SOIL
BEARING CAPACITY OF 3,000 PSF PER THE ADJACENT BUILDING'S
GEOTECHNICAL REPORT FOR BUILDING 870 FUEL CELL ADDITION MINNEAPOLIS
SAINT PAUL AIR RESERVE STATION, MINNESOTA, BY TERRACON CONSULTANTS,
INC. (PROJECT NUMBER 41115019), DATED JULY 12, 2011.
LATERAL SOIL PRESSURE BASED ON SOIL DENSITY OF 120 PCF WITH AN ANGLE
OF INTERNAL REPOSE OF 30 DEGREES.
ALL FOUNDATIONS ARE TO BEAR ON UNDISTURBED IN-SITU SOIL OR ON TESTED
STRUCTURAL BACKFILL. FILL SHALL BE PLACED IN UNIFORM LIFTS OF NO MORE
THAN 8 INCHES THICK AND COMPACTED TO 95% MODIFIED PROCTOR VALUE
FOR BACKFILL IN ACCORDANCE WITH ASTM D-1557 (THIS INCLUDES THE LAYER
OF CLEAN WASHED SAND OR STONE FOR SLABS ON GRADE). THE MAXIMUM
PARTICLE SIZE FOR FILL PLACEMENT SHALL NOT EXCEED 2/3 OF THE LIFT
THICKNESS.
MAINTAIN POSITIVE SURFACE DRAINAGE TO PREVENT THE ACCUMULATION OF
WATER IN EXCAVATED AREAS.
MATERIAL TO BE USED AS FILL SHALL BE TESTED BY AN APPROVED TESTING
LABORATORY TO DETERMINE SUITABILITY PRIOR TO BEING PLACED.
REMOVE ALL ORGANIC AND DELETERIOUS MATERIAL.
SURFACE AREAS AT GRADE AND AREAS TO RECEIVE FILL SOILS SHALL BE
DETERMINED WITHIN ±2 PERCENTAGE POINTS OF THE OPTIMUM MOISTURE
CONTENT DETERMINED FROM THE STANDARD PROCTOR TEST.
IMMEDIATELY PRIOR TO CONSTRUCTION, SUB GRADE SOILS SHALL BE PROOF
ROLLED WITH A FULLY LOADED TANDEM-AXLE DUMP TRUCK OR SIMILAR
EQUIPMENT TO DETECT ANY UNSTABLE AREAS. THE PROOF ROLLING
EQUIPMENT SHALL MAKE A MINIMUM OF FOUR PASSES OVER EACH SECTION,
WITH THE LAST TWO PASSES PERPENDICULAR TO THE FIRST TWO. ANY AREAS
WHICH PUMP OR RUT SHALL BE UNDERCUT OR SCARIFIED AND DENSIFIED IN
PLACE AND PROOF ROLLED AGAIN CONTRACTOR SHALL NOTIFY ROICC PRIOR
TO COMMENCEMENT OF PROOF ROLLING OPERATIONS.
FILL PLACEMENT SHALL NOT BEGIN UNTIL PROOF ROLLING OPERATIONS ARE
SUCCESSFUL.
PER SECTION 4.2 AND C4.2 OF ASCE 32-01, UNDISTURBED GRANULAR SOILS OR
FILL MATERIAL WITH LESS THAN 5% OF MASS (BY DRY WEIGHT) PASS A #200
MESH SIEVE IN ACCORDANCE WITH ASTM D422 SHALL BE CONSIDERED NON-
FROST SUSCEPTIBLE SOIL.
COARSE AGGREGATE SIEVE ANALYSIS SHALL BE IN ACCORDANCE WITH ASTM
C136.
CONCRETE:
WELDED WIRE FABRIC WILL BE PLACED AT MID DEPTH OF SLAB, UNLESS
OTHERWISE NOTED.
PROPORTION AND DESIGN CONCRETE MIXES TO RESULT IN CONCRETE SLUMP
AT POINT OF PLACEMENT NOT LESS THAN 3" AND NOT MORE THAN 5".
ADDITION OF WATER TO READY-MIX IN THE FIELD SHALL NOT BE ALLOWED.
DEPOSIT CONCRETE IN A CONTINUOUS OPERATION UNTIL THE PLACING OF
CONCRETE IS COMPLETE. IF POUR IS TO BE DISCONTINUOUS, CONTRACTOR
SHALL USE CONSTRUCTION JOINTS.
SEE SECTION 7.7 OF ACI 318 FOR MINIMUM REINFORCED PROTECTION
REQUIREMENTS.
TYPICAL REINFORCEMENT SPLICES SHALL BE AS FOLLOWS:
#4 BARS - 22" LAP
#5 BARS - 28" LAP
#6 BARS - 33" LAP
#7 BARS - 48" LAP
#8 BARS - 55" LAP
12.1
12.2
12.3
12.4
12.5
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
F E
B R
U A
R Y
N
J L
B D
M
C
JH
Q J K
L
-0
S-001
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
C
JH
S T
R U
C T
U R
A L G
E N
E R
A L N
O T
E S
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
C J
C J
C J
C J
CJ CJCJ CJ
CJ CJCJ CJ
CJ CJCJ CJ
CJCJCJCJ
B1
S-301
A
B
C
1 2
6" Ø STEEL PIPE
BOLLARD (TYP. OF 8)
SEE B1/S-301
6" CONC. SLAB ON GRADE
W/6x6-W2-9xW2-9 WWF
TOP OF SLAB EL. VARIES
6" CONC. SLAB ON GRADE
W/ 6x6-W2.9xW2.9 WWF
TOP OF SLAB EL. 0'-0" @
O.H. DOORS. HIGH POINT @
COLUMN LINE B @ 1/8"/FT
TO DRAIN @ O.H. DOORS
6" CONC. SLAB ON GRADE
W/ 6x6-W2.9xW2.9 WWF
TOP OF SLAB EL. VARIES
A3
S-301
A1
S-301
B2
S-301
16"x16" CONC. PIER
W/ 8-#6 VERT. & #4
STIRRUPS @ 12" O.C.
(TYP. OF 6)
6' - 0 1/2"
5' - 0" 8' - 0" 7' - 0"
20' - 0"
5' - 0" 8' - 0"
ALL STEEL COLUMN, BASE PLATES &
ANCHOR BOLT SIZES BY PRE-ENGINEERED
METAL BUILDING SUPPLIER (TYP.)
/2
/4
/4
5' - 0" 7' - 0"
8" CONC. FOUNDATION WALL
(TYP. AT PERIMETER OF
BUILDING)
1/2" EXPANSION MATERIAL
BETWEEN CONC. SLAB AND
FOUNDATION WALL (TYP.)
SLOPE
S L O
P E
S L O
P E
S L O
P E
CONTROL JOINT (SEE D2/S-301)
1. BUILDING FINISHED FLOOR ELEVATION 0'-0" INDICATED
ON THE STRUCTURAL DRAWINGS CORRESPONDS TO
ELEVATION FFE 833.50' @ OVERHEAD DOORS AS
INDICATED ON THE CIVIL DRAWING CI101. FIELD
SURVEY WAS COMPLETED IN AUGUST 2014 BY BASE
INSTALLATION PERSONNEL. BEARING SYSTEM IS
BASED ON THE HENNEPIN COUNTY COORDINATE
SYSTEM, NAD83(HARN) 1996 ADJUSTMENT.
2. SEE SHEET S-001 FOR STRUCTURAL GENERAL NOTES.
3. SEE SHEET S-301 FOR ADDITIONAL DETAILS.
GENERAL NOTES:
LEGEND:
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
A s i n d ic a te d
F E
B R
U A
R Y
N
J L
B D
M
C
JH
Q J K
L
-0
S-101
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
C
JH
S T
R U
C T
U R
A L F
O U
N D
A T
IO
N
P L A
N
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
SCALE: 3/8" = 1'-0"A1
STRUCTURAL FOUNDATION PLAN
FOOTING SCHEDULE
SIZE (LxWxD) FOOTING STEEL
TOP OF
FOOTING REMARKS
1 CONT. x 2'-0" x 12" 3-#4 CONT. & #3 TRANS. @ 36" O.C. -4'-0"
2 4'-0" x 4'-0" x 12" 5-#5 EACH WAY -4'-0"
X
PLAN NORTH
SCALE: 3/8"=1'-0"
24 4
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
HEAVY HEX
NUT & WASHER
HEAVY HEX
NUT & WASHER
BASE PLATE BY PRE-
ENGINEERED METAL
BUILDING SUPPLIER
ANCHOR ROD, DIA BY
PRE-ENGINEERED METAL
BUILDING SUPPLIER
BOTTOM FOOTING
REINFORCEMENT (TYP.
@ ALL ANCHOR RODS)
T.O. CONC. FOOTING
P R
O J.
T
H D
2" DOMED CONC.
6" STEEL PIPE BOLLARD
(SCHEDULE 40) FILLED
WITH CONCRETE. PAINT
SAFETY YELLOW.
SLOPE FOR DRAINAGE
CONCRETE SLAB
POUR CONCRETE
MONOLITHICALLY WITH
FOOTING AS NECESSARY
2' - 0"
1/2" EXPANSION
MATERIAL WHERE
BOLLARD
FOUNDATION ABUTS
CONCRETE
BUILDING SLAB
1/8" t
SAWCUT & FILL
WITH SEALANT
REINFORCEMENT
F.F 0' - 0"
T.O. FOOTING
-4' - 0"
1/2" / 12"
8"
1/2" EXPANSION JOINT
PRE-ENGINEERED METAL
BUILDING BEYOND
ROLLUP DOOR
6" SLAB ON GRADE.
SEE PLAN.
6" CONC. SLAB ON GRADE
W/6x6-W2.9xW2.9 WWF
THICKENED SLAB EDGE
@ DOOR W/ 3-#4 CONT.
2" INSULATION
6" WELL-GRADED SAND
LAYER (TYP. @ INTERIOR)
COMPACTED SUBGRADE
95% ASTM D-1557
COMPACTED SUBGRADE
95% ASTM D-1557
ASPHALT
10 MIL VAPOR RETARDER
CONCRETE FOUNDATION WALL
W/ #4 @ 12" O.C. VERT. & # 4 @
10" O.C. HORZ.
8"x8" TURNDOWN
SLAB W/ 1-#4 CONT.
F.F 0' - 0"
T.O. FOOTING
-4' - 0"
CLR.
2"
4' - 0"
6" CONC. SLAB ON GRADE
W/6x6-W2.9xW2.9 WWF
6" WELL-GRADED SAND
LAYER (TYP. @ INTERIOR)
COMPACTED SUBGRADE
95% ASTM D-1557
COMPACTED SUBGRADE
95% ASTM D-1557
CONCRETE FOOTING.
SEE PLAN.
16"x16" CONCRETE PIER.
SEE PLAN.
STEEL COLUMN. BASE PLATE AND
ANCHOR ROD SIZE BY PRE-
ENGINEERED METAL BUILDING
SUPPLIER
1/2" EXPANSION JOINT
10 MIL VAPOR RETARDER
PROVIDE 2 STIRRUPS
IN TOP 5" OF PIER
2" INSULATION
F.F 0' - 0"
T.O. FOOTING
-4' - 0"
2' - 0"
8"
PRE-ENGINEERED METAL
BUILDING BEYOND
6" CONC. SLAB ON GRADE
W/6x6-W2.9xW2.9 WWF
2" INSULATION
6" WELL-GRADED SAND
LAYER (TYP. @ INTERIOR)
COMPACTED SUBGRADE
95% ASTM D-1557
COMPACTED SUBGRADE
95% ASTM D-1557
CONCRETE STRIP FOOTING.
SEE PLAN.
CONCRETE FOUNDATION
WALL W/ #4 @ 12" O.C. VERT. &
# 4 @ 10" O.C. HORZ.
CLEAN & ROUGH IN SURFACE
OR PROVIDE BONDING AGENT
BETWEEN TWO POURS (TYP.)
10 MIL VAPOR RETARDER
1/2" EXPANSION JOINT
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
A s i n d ic a te d
F E
B R
U A
R Y
N
J L
B D
M
C
JH
Q J K
L
-0
S-301
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
C
JH
S T
R U
C T
U R
A L S
E C
T
IO
N S
D
E T
A
IL
S
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
SCALE: 1" = 1'-0"D1
ANCHOR ROD DETAIL
SCALE: 3/4" = 1'-0"
S-101
B1
BOLLARD DETAIL
1/2 1 21
SCALE: 1"=1'-0"
GRAPHIC SCALES
SCALE: 3/4"=1'-0"
12 2
SCALE: 1" = 1'-0"D2
CONTROL JOINT DETAIL
SCALE: 3/4" = 1'-0"A1
SECTION
SCALE: 3/4" = 1'-0"B2
SECTION
SCALE: 3/4" = 1'-0"A3
SECTION
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
1. ALL EXISTING CONDITIONS AND DIMENSIONS SPECIFIED PER ORIGINAL DESIGN
DRAWINGS AND NON-DESTRUCTIVE SITE INVESTIGATIONS. CONTRACTOR SHALL
VERIFY ALL EXISTING CONDITIONS PRIOR TO START OF
DEMOLITION/CONSTRUCTION (TYP.) AND NOTIFY GOVERNMENT PROMPTLY IF ANY
DISCREPANCIES EXIST.
2. REMOVE ALL EXISTING WORK/MATERIAL, AS DESIGNATED, IN THEIR ENTIRETY
DOWN TO ORIGINAL SUBSTRATES IN INDICATED AREAS TO PERMIT COMPLETION
OF ALL REPAIRS AND REPLACEMENTS.
GENERAL DEMOLITION NOTES:
1. THE DRAWINGS INDICATE THE GENERAL EXTENT OF THE WORK. THE DRAWINGS
ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE
FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE
CONTRACT DOCUMENTS, ON THE BASIS OF THE GENERAL PERFORMANCE
CRITERIA AND GENERAL EXTENT OF WORK INDICATED, DESCRIBED OR REQUIRED.
2. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE
CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED TO EXCLUDE OTHER ITEMS
NECESSARY OR IMPLIED THEREFROM.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF
THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE
CONDITION.
4. ALL WORK SHALL CONFORM TO APPLICABLE INDUSTRY AND MANUFACTURER'S
PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS
WELL AS, ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY
CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE
BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION PRIOR TO PROCEEDING
WITH THE WORK.
5. THE CONTRACTOR SHALL PROTECT EXISTING, IN-PLACE, AND NEW WORK.
6. ALL WORK NOTED "N.I.C." OR "G.F.G.I." IS NOT MEANT TO BE PART OF THE
CONSTRUCTION SCOPE OF WORK AGREEMENT.
7. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE COLLECTION,
SEPARATION, RECYCLE, REMOVAL AND LEGAL DISPOSAL OF MATERIALS AND
RUBBISH.
8. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SHALL VERIFY ALL NEW
AND EXISTING CONDITIONS, SHOWN ON THESE DRAWINGS, AT THE SITE. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING OF ANY
DIFFERING CONDITIONS BEFORE COMMENCEMENT OF WORK. COMMENCEMENT OF
WORK SHALL CONSTITUTE ACCEPTANCE OF ALL NEW OR EXISTING CONDITIONS.
9. DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN, LARGE SCALE DETAILS GOVERN
OVER SMALL SCALE DETAILS. THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING OF ANY DIFFERING CONDITIONS BEFORE
COMMENCEMENT OF WORK.
10.DIMENSIONS NOTED AS 'HOLD' SHALL NOT VARY BY MORE THAN 1/8" FROM SIDE TO
SIDE OR FROM FRONT TO BACK, FINISHED SURFACE TO FINISHED SURFACE.
11.NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, AND ALTERATION
OPERATIONS SHALL BE APPLIED.
12.WALL AND/OR CEILING ASSEMBLIES THAT ARE IDENTIFIED WITH A FIRE RESISTIVE
RATING SHALL BE CONSTRUCTED AS DETAILED OR REFERENCED BY UL OR
OTHER REFERENCE.
13.DIMENSIONS SHOWN ARE TO FINISH FACE OF WALL UNLESS SPECIFICALLY NOTED
OTHERWISE.
14.PROVIDE EXPANSION AND CONTROL JOINTS IN ALL WORK AS PER PRODUCT
MANUFACTURER'S STANDARDS.
15.THE CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH ALL
APPLICABLE CODES, ORDINANCES AND REGULATORY AGENCIES AND SHALL
OBTAIN NECESSARY BUILDING AND FIRE PERMITS FROM ALL AUTHORITIES HAVING
JURISDICTION.
16.ALL INTERIOR FINISH MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF
ALL APPLICABLE CODES, ORDINANCES AND REGULATORY AGENCIES.
17.ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID
GALVANIC CORROSION.
18.NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS.
SHEETS ARE TO BE REVIEWED AND NOTES ON ANY ONE SHEET ARE TO BE
APPLIED TO RELATED DRAWINGS AND DETAILS.
19.A FINISH INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF
WALL IS TO BE FINISHED OR FIRE-RATED AS INDICATED.
20.WHEN NON-DIMENSIONED PARTITIONS APPEAR IN CONJUNCTION WITH DOOR
OPENINGS, THE DOOR WIDTH AND THE DOOR FRAME DETAILS DETERMINE THE
LOCATION OF ADJACENT WALLS AND FRAMES.
21.DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED. WHERE
SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED,
CONSULT THE CONTRACTING OFFICER BEFORE PROCEEDING WITH THE WORK.
22.THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL
FLOOR AND WALL SLEEVES, CONDUIT AND ALL MECHANICAL, ELECTRICAL,
PLUMBING, FIRE PROTECTION, STRUCTURAL AND ARCHITECTURAL ITEMS.
23.PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS
REQUIRED FOR MECHANICAL EQUIPMENT AND PLUMBING WORK. ALL ACCESS
PANEL LOCATIONS SHALL BE REVIEWED WITH THE CONTRACTING OFFICER PRIOR
TO PROCEEDING.
24.ALL PIPE DUCTS AND BUS DUCTS THAT PENETRATE FLOOR SLABS OR WALL
PARTITIONS SHALL BE INSTALLED IN A MANNER THAT WILL PRESERVE THE
MOISTURE RESISTIVENESS, FIRE RATING, AND STRUCTURAL INTEGRITY OF THE
BUILDING.
25.CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION
FOR PERSONS AND PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN SUCH A
MANNER TO AVOID ANY HAZARD TO PERSONS AND PROPERTY AS NECESSARY.
26.CONTRACTOR SHALL COORDINATE THE PHASING OF THE WORK TO BE
PERFORMED IN OR ABOUT EXISTING FACILITIES WITH CONTRACTING OFFICER,
PRIOR TO START OF SUCH WORK.
GENERAL NEW WORK NOTES:
EARTH
STRUCTURAL FILL
GRAVEL/STONE
CONCRETE/GROUT
CONCRETE
MASONRY UNITS
(CMU)
CMU IN SECTION
FACE BRICK
IN SECTION
CMU RUNNING
BOND ELEVATION
MODULAR BRICK
ELEVATION
EXPOSED FINISHED
WOOD TRIM IN SECTION
RIGID INSULATION
IN SECTION
BATT INSULATION
- THERMAL
SAND/E.I.F.S./
PLASTER/STUCCO
MATERIAL INDICATIONS:
STEEL IN SECTION
PLYWOOD IN SECTION
ELEVATIONS OF GLAZING
A1 View Name
SCALE: 1/8" = 1'-0"
DRAWING VIEW TITLE
DRAWING VIEW SCALE
DRAWING VIEW NUMBER
DRAWING TITLE INDICATOR
REVISION NUMBER
LIMIT OF REVISION AREA
REVISION CLOUD AND
NUMBER INDICATOR
DETAIL NUMBER
SHEET DETAIL IS LOCATED ON
LIMIT OF ENLARGED AREA
ENLARGED DETAIL/AREA INDICATOR
DIRECTION OF CUTTING PLANE
DETAIL NUMBER
SHEET DETAIL IS LOCATED ON
BUILDING SECTION INDICATOR
LINE OF CUTTING PLANE
DIRECTION OF CUTTING PLANE
DETAIL NUMBER
LINE OF CUTTING PLANE
WALL SECTION INDICATOR
SHEET DETAIL IS LOCATED ON
LIMIT OF CUTTING PLANE
DETAIL NUMBER
DIRECTION OF ELEVATION
EXTERIOR ELEVATION INDICATOR
SHEET DETAIL IS LOCATED ON
DETAIL NUMBER
DIRECTION OF ELEVATION
INTERIOR ELEVATION INDICATOR
SHEET DETAIL IS LOCATED ON
DETAIL NUMBER
SHEET DETAIL IS LOCATED ON
DETAIL CALLOUT INDICATOR
(MULTIPLE CALLOUTS)
A1
A-101
A2
A-102
A3
A-103
DRAWING SCALE INDICATOR164 8268
SCALE: 1/8"=1'-0"
GRAPHIC SCALE
NORTH ARROW
A101
A1 Ref
A101
A1
Ref
SYMBOLS:
PLAN NORTH
A101
A1
Ref
A101
A1
Ref
A1
A-101
LIMIT OF CUTTING PLANE
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
A s i n d ic a te d
F E
B R
U A
R Y
N
E B
B
M S
F J
C
JH
Q J K
L
-0
A-001
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
A R
C H
IT
E
C T
U R
A L G
E N
E R
A L
N O
T E
S
L E
G E
N D
S
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
ARCHITECTURAL ABBREVIATIONS
PSF POUNDS/SQUARE FOOT
PSI POUNDS/SQUARE INCH
P.M.J.F. PRE-MOLDED JOINT FILLER
PRE-FAB PREFABRICATED
Q
Q.T. QUARRY TILE
R
RAF RAISED ACCESS FLOOR
RECEP. RECEPTIONIST
REF. REFERENCE
REINF. REINFORCEMENT
REQ'D REQUIRED
REV. REVISIONS / REVISED
RH RIGHT HAND
RHR RIGHT HAND REVERSE
R.D. ROOF DRAIN
RM. ROOM
R.O. ROUGH OPENING
RB RUBBER BASE
S
SCHED. SCHEDULE
SECT. SECTION
S.G. SEMI-GLOSS PAINT
SSK SERVICE SINK
SHT. MET. SHEET METAL
SIM. SIMILAR
SCWD SOLID CORE WOOD
STC SOUND TRANSMISSION CLASS
SPEC. SPECIFICATION
SFRM SPRAYED FIRE-RESISTIVE
MATERIAL
SQ. SQUARE
ST. STAIN
S.S. STAINLESS STEEL
STD. STANDARD
STL. STEEL
STOR. STORAGE
STRUCT. STRUCTURAL
SUSP. SUSPENDED
T
T.B. TACKBOARD
TEL. TELEPHONE
TG TEMPERED GLASS
THK. THICK
T'HOLD THRESHOLD
TOIL. TOILET
TOC TOP OF CONRETE
TC TOP OF CURB
TOS TOP OF STEEL
TW TOP OF WALL
TU TOUCH UP
TYP. TYPICAL
U
UL UNDERWRITERS
LABORATORIES
UNFIN. UNFINISHED
U.N.O. UNLESS NOTED OTHERWISE
V
V.T.R. VENT THRU ROOF
VERT. VERTICAL
VEST. VESTIBULE
VCT VINYL COMPOSITION TILE
VCB VINYL COVE BASE
W
W.C. WATER CLOSET
W.R.G.B. WATER-RESISTANT GYP.
BOARD
W.S. WEATHERSTRIPPING
W.B. WHITE BOARD
W. WIDTH
WDW. WINDOW
W.R.O. WINDOW ROUGH OPENING
W.M.P. WIRE MESH PARTITION
W/ WITH
W/O WITHOUT
WD. WOOD
Y
YD. YARD
ARCHITECTURAL ABBREVIATIONS
FLOUR. FLUORESCENT
FTG. FOOTING
FDN. FOUNDATION
G
GA. GAGE OR GAUGE
GALV. GALVANIZED
G.L. GIRT LINE
GL. GLASS
G.P. GLOSS PAINT
GOVT. GOVERNMENT
G.F.G.I. GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
GYP. GYPSUM
GYP. BD.
(GWB)
GYPSUM BOARD
H
HDW. HARDWARE
H.V.A.C. HEATING VENTILATION & AIR
CONDITIONING
HGT. HEIGHT OR HIGH
H.P. HIGH POINT
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
HB HOSE BIBB
I
IN. INCH
I.D. INSIDE DIAMETER
INSUL. INSULATION
INT. INTERIOR
J
JT JOINT
JST. JOIST
K.P. KICK PLATE
L
LAM. LAMINATE
LDG LANDING
L.H. LEFT HAND
LHR LEFT HAND REVERSE
LT. LIGHT
LTG LIGHTING
LONG. LONGITUDINAL
LVR. LOUVER
LP. LOW POINT
M
MGR. MANAGER
MANUF. MANUFACTURER
MAS. MASONRY
MATL. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MET. METAL
M.W.P. METAL WALL PANEL
MIN. MINIMUM
MISC. MISCELLANEOUS
N
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
N.I.C. NOT IN CONTRACT
NTS NOT TO SCALE
NO. (#) NUMBER
O
OSHA OCCUPATIONAL SAFETY AND
HEALTH ACT
O.C. ON CENTER
O.W. OPEN WEB
OPNG. OPENING
OPP. OPPOSITE
O.H. OPPOSITE HAND
O.D. OUTSIDE DIAMETER
P
PT PAINT
PR. PAIR
PNL PANEL
PART. PARTITION
PLAS. PLASTER
PLAN. PLASTIC LAMINATE
PL PLATE
PLYWD PLYWOOD
LBS. POUNDS
ARCHITECTURAL ABBREVIATIONS
A
A.F.F. ABOVE FINISHED FLOOR
ACC. DR. ACCESS DOOR/PANEL
A.F. ACCESS FLOORING
ACCESS. ACCESSORIES
ACOUST. ACOUSTICAL
A.C. AIR CONDITIONING
ALUM. ALUMINUM
ADAAG AMERICAN WITH DISABILTITES
ACCESSIBILITY GUIDELINES
A.B. ANCHOR BOLT
& AND
ANG. ANGLE
ANOD. ANODIZED
APP. APPROVED
APPROX. APPROXIMATE
ARCH. ARCHITECTURAL
@ AT
AVG. AVERAGE
B
BM. BEAM
BLKG. BLOCKING
BD. BOARD
BTM. BOTTOM
B.H.M.I. BUILDER'S HARDWARE
MANUFACTURER'S
ASSOCIATION, INC.
BLDG. BUILDING
C
CLG. CEILING
CLG. HT. CEILING HEIGHT
CTR. CENTER
C. TO C. CENTER TO CENTER
CL. CENTERLINE
CH. CHANNEL
C.O. CLEANOUT
CLR. CLEAR
CLOS. CLOSET
COL. COLUMN
CO. COMPANY
CONC. CONCRETE
CMU CONCRETE MASONRY UNIT
CONF. CONFERENCE
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONTR. CONTRACTOR
C.J. CONTROL JOINT
CORR. CORRIDOR
C.Y. CUBIC YARD
D
DESC. DESCRIPTION
DET. DETAIL
DIA. DIAMETER
DIM. DIMENSION
DR. DOOR
DN. DOWN
D.S. DOWNSPOUT
DWG. DRAWING
E
EA. EACH
E.W.C. ELECTRIC WATER COOLER
ELEC. ELECTRICAL OR ELECTRIC
EL. ELEVATION
E.R.D. EMERGENCY ROOF DRAIN
ENGR. ENGINEER
E.P. EPOXY PAINT
EQ. EQUAL
EQUIP. EQUIPMENT
EXIST. EXISTING
E.J. (EXP. JT.) EXPANSION JOINT
EXP. EXPANSION/EXPOSED
EXP. TO
STRUCT.
EXPOSED TO STRUCTURE
EXT. EXTERIOR
F
F.O.G. FACE OF GIRT
FAC. FACTORY
FT. FEET
FV. FIELD VERIFY
FIN. FINISH
F.F. FINISHED FLOOR
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
FLR. FLOOR
F.D. FLOOR DRAIN
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
12'-4"
EXISTING CONCRETE
TO BE DEMOLISHED.
SEE CIVIL PLANS FOR
MORE INFORMATION.
EXISTING ASPHALT TO
BE DEMOLISHED. SEE
CIVIL PLANS FOR
MORE INFORMATION
EXISTING GRASS
TO REMAIN
EXISTING CONCRETE CURB
TO BE DEMOLISHED. SEE
CIVIL PLANS FOR MORE
INFORMATION.
EXISTING CONCRETE
PAD TO REMAIN
EXISTING CONCRETE
PAD TO REMAIN
LINE OF EXISTING
BUILDING 822
DA1DA1
DA2
DA2
DA2
DA2
EXISTING GRASS
TO REMAIN
EXISTING TO BE REMOVED
EXISTING TO REMAIN
EXISTING / DEMOLITION LEGEND
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
/4
F E
B R
U A
R Y
N
E B
B
M S
F J
C
JH
Q J K
L
-0
AD101
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
A R
C H
IT
E
C T
U R
A L D
E M
O L
IT
IO
N
F
IR
S T
F L
O O
R P
L A
N
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
SCALE: 1/4" = 1'-0"B1
DEMOLITION FLOOR PLAN
DEMOLITION KEYNOTES:
NO. DESCRIPTION
DA1 DEMOLISH EXISTING WOOD FRAMED STORAGE BUILDING AND
CONCRETE SLAB ON GRADE.
DA2 DEMOLISH EXISTING CONCRETE SLAB ON GRADE.
PLAN NORTH
04 8268 02 4 8134
SCALE: 1/4"=1'-0"
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
A-201 A1
A-201 A3
A-201 C1
A-201 C3
5'-0" 8'-0" 7'-0"
A1 A-301
+/- 15'-0" 20'-0"
8 BOT.
TRAILER
(N.I.C.)
8'-0" CLEAR
D R
IV
E
A
IS
L E
2 BOT.
CART
(N.I.C.)
4 BOT.
RACK
(N.I.C.)
PURGE
UNIT
(N.I.C.)
2'x7'
STOR
AREA
HIGH
PRES.
4'x'8'
(N.I.C.)
WORK
BENCH
3'x10'
(N.I.C.)
LINE OF EXISTING BLDG 822
A5 A-501
A4 A-301
NEW CONCRETE
SLAB. SEE CIVIL
PLANS FOR MORE
INFORMATION
A1
A1
A1
A1
A1
A1
A2
A2
A3
A3
A3
A3
A4
A4
A4
A4
A5
A5
A6
A6
A7
A8
A8
A8
A30
6'-0"
A
B
C
A10
A10
A11
523 SF
OXYGEN
STORAGE
A9
A30
EXISTING
CONCRETE SLAB
& MECH
EQUIPMENT
EXISTING
CONCRETE SLAB
AND MECH.
EQUIPMENT
EXISTING CONCRETE SLAB
A9
NEW ASPHALT.
SEE CIVIL PLANS
FOR MORE
INFORMATION
A26
A27
8'-0"
A30A30
1 2
AIR
COMP.
(N.I.C.)
NEW CURB. SEE
CIVIL PLANS FOR
MORE
INFORMATION.
S L O
P E
/8
S L O
P E
/8
GENERAL NOTES:
1. ALL EQUIPMENT LABELED WITH "N.I.C." IS NOT IN CONTRACT. THESE
ITEMS ARE GOVERNMENT FURNISHED.
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
A s i n d ic a te d
F E
B R
U A
R Y
N
E B
B
M S
F J
C
JH
fi le n a m e
Q J K
L
-0
A-101
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
A R
C H
IT
E
C T
U R
A L F
L O
O R
P L A
N S
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
SCALE: 3/8" = 1'-0"A1
FIRST FLOOR PLAN
PLAN NORTH
SCALE: 3/8"=1'-0"
24 4
GRAPHIC SCALE
NEW WORK KEYNOTES:
NO. DESCRIPTION
A1 METAL BUILDING FRAME
A2 8" INSET GIRTS
A3 EXTERIOR VERTICAL METAL WALL PANEL
A4 INTERIOR METAL LINER PANELS TO 8'-0" A.F.F.
A5 2'-0" X 6'-0" WIDE FIXED WINDOW AT 8'-0" A.F.F.
A6 6" CONCRETE FILLED BOLLARD, TYP OF 8
A7 LINE OF WINGTIP CLEARANCE, 116'-6" FROM CENTERLINE
A8 SPLASHBLOCK AT LOCATION OF DOWNSPOUT, TYP OF 3
A9 NEW 6" REINFORCED CONCRETE SLAB WITH 10 MIL VAPOR RETARDER
OVER 2" POLYISO RIGID INSULATION OVER 6" SAND LAYER
A10 8'-0" WIDE X 10'-0" TALL OVERHEAD COILING DOOR WITH AUTOMATIC
DOOR OPERATOR AND MANUAL CHAIN HOIST.
A11 3'-0" x 7'-0" INSULATED HOLLOW METAL PERSONNEL DOOR.
A26 ELECTRICAL PANEL
A27 COMMUNICATIONS RACK
A30 6" EXTERIOR CONCRETE SLAB
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
3" / 12" 3" / 12"
A5 A-501
A4 A-301
6" / 12"
A13
A15
A15
A
B
C
A16
A16
A16
A17
A13
A18
A18
1 2
A
B
C
A22
A23
A23
A23
A23
A23
A23
EXTEND DOOR
FRAMING UP FOR
CANOPY CONNECTION
A20
A20
A29
A28 A28
A28
A28 A28
A17
1 2
A5
A5
A21
A21
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
/8
F E
B R
U A
R Y
N
E B
B
M S
F J
C
JH
Q J K
L
-0
A-102
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
A R
C H
IT
E
C T
U R
A L R
E F
L E
C T
E D
C E
IL
IN
G P
L A
N A
N D
R O
O F
P L A
N
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
SCALE: 3/8" = 1'-0"A3
ROOF PLAN
SCALE: 3/8" = 1'-0"A1
REFLECTED CEILING PLAN
NEW WORK KEYNOTES:
NO. DESCRIPTION
A5 2'-0" X 6'-0" WIDE FIXED WINDOW AT 8'-0" A.F.F.
A13 2'-0" WIDE STANDING SEAM ROOF PANELS WITH 2" HIGH RIBS AND
THERMAL BREAK CLIPS.
A15 4x4 GUTTER
A16 4x4 OPEN FACED DOWNSPOUT, TYP OF 3
A17 ROOF CANOPY WITH STANDING SEAM ROOF PANELS TO MATCH THE
MAIN ROOF
A18 SNOW GUARDS MOUNTED TO STANDING SEAM ROOF
A20 MECHANICAL LOUVER
A21 MECHANICAL UNIT HEATER
A22 MECHANICAL DUCTWORK
A23 SUSPENDED LIGHT FIXTURE
A28 WALL PACK LIGHT, SEE ELECTRICAL
A29 COMPRESSED AIR PIPING
PLAN NORTH
SCALE: 3/8"=1'-0"
24 4
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
FIRST FLOOR
0"
T.O. STRUCTURE
12'-0"
A6
A10
A3
A15
A17
6"
12"
D3 A-501
A4 A-301
Sim
3"
12" 3"
12"
A28 A28
A15
A31
FIRST FLOOR
0"
T.O. STRUCTURE
12'-0"
A1 A-301
ABC
A6
A16
A15
A13
A5A5
A16
A6 4'-10" 6'-0" 8'-4" 6'-0" 4'-10"
A A A20
A28
FIRST FLOOR
0"
T.O. STRUCTURE
12'-0"
A8
A16
A15
A3
A6
A10
A17
A16
A15
6"
12"
D3 A-501
A4 A-301
Sim
3"
12" 3"
12"
A28 A28
1 2
FIRST FLOOR
0"
T.O. STRUCTURE
12'-0"
A1 A-301
A5 A-501
A B C
A6
A16
A3
A15
A6
A11
A17
A15
A13
A20
8'-0"
A28
A28 A28
A26
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
/4
F E
B R
U A
R Y
N
E B
B
M S
F J
C
JH
Q J K
L
-0
A-201
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
A R
C H
IT
E
C T
U R
A L E
X T
E R
IO
R
E L E
V A
T
IO
N S
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
SCALE: 1/4" = 1'-0"
A-101
C1
NORTH ELEVATION
SCALE: 1/4" = 1'-0"
A-101
C3
EAST ELEVATION
SCALE: 1/4" = 1'-0"
A-101
A1
SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
A-101
A3
WEST ELEVATION
NEW WORK KEYNOTES:
NO. DESCRIPTION
A3 EXTERIOR VERTICAL METAL WALL PANEL
A5 2'-0" X 6'-0" WIDE FIXED WINDOW AT 8'-0" A.F.F.
A6 6" CONCRETE FILLED BOLLARD, TYP OF 8
A8 SPLASHBLOCK AT LOCATION OF DOWNSPOUT, TYP OF 3
A10 8'-0" WIDE X 10'-0" TALL OVERHEAD COILING DOOR WITH AUTOMATIC
DOOR OPERATOR AND MANUAL CHAIN HOIST.
A11 3'-0" x 7'-0" INSULATED HOLLOW METAL PERSONNEL DOOR.
A13 2'-0" WIDE STANDING SEAM ROOF PANELS WITH 2" HIGH RIBS AND
THERMAL BREAK CLIPS.
A15 4x4 GUTTER
A16 4x4 OPEN FACED DOWNSPOUT, TYP OF 3
A17 ROOF CANOPY WITH STANDING SEAM ROOF PANELS TO MATCH THE
MAIN ROOF
A20 MECHANICAL LOUVER
A26 ELECTRICAL PANEL
A28 WALL PACK LIGHT, SEE ELECTRICAL
A31 NEW BUILDING SIGNAGE
04 8268 02 4 8134
SCALE: 1/4"=1'-0"
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
FIRST FLOOR
0"
T.O. STRUCTURE
12'-0"
A4 A-301
A5
A19
A13
A1
A19
A15
A3
A4
A6
A10
A4 A4
A9
A16
A2
A15
A17
3"
12" 3"
12"
6"
12"
A18A18
8'-0"
A-501 D1
A-501 D1
A-501 D5
A
A23
A25
A24
A25
SEE STRUCTURAL
DRAWINGS FOR
REINFORCEMENT
A-501 A5
Sim
A26
A21
A-501 C5
1 2
FIRST FLOOR
0"
T.O. STRUCTURE
12'-0"
A
A-501 D3
/2
A-501 H2
A-501 S2
A6
A10
A1
A4
A9
A19
A13
A10
A6
A25A25
SEE STRUCTURAL
DRAWINGS FOR
REINFORCEMENT
A24
A30
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
/2
F E
B R
U A
R Y
N
E B
B
M S
F J
C
JH
Q J K
L
-0
A-301
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
A R
C H
IT
E
C T
U R
A L B
U
IL
D
IN
G S
E C
T
IO
N
D E
T A
IL
S
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
SCALE: 1/2" = 1'-0"
A-101
A1
BUILDING SECTION
NEW WORK KEYNOTES:
NO. DESCRIPTION
A1 METAL BUILDING FRAME
A2 8" INSET GIRTS
A3 EXTERIOR VERTICAL METAL WALL PANEL
A4 INTERIOR METAL LINER PANELS TO 8'-0" A.F.F.
A5 2'-0" X 6'-0" WIDE FIXED WINDOW AT 8'-0" A.F.F.
A6 6" CONCRETE FILLED BOLLARD, TYP OF 8
A9 NEW 6" REINFORCED CONCRETE SLAB WITH 10 MIL VAPOR RETARDER
OVER 2" POLYISO RIGID INSULATION OVER 6" SAND LAYER
A10 8'-0" WIDE X 10'-0" TALL OVERHEAD COILING DOOR WITH AUTOMATIC
DOOR OPERATOR AND MANUAL CHAIN HOIST.
A13 2'-0" WIDE STANDING SEAM ROOF PANELS WITH 2" HIGH RIBS AND
THERMAL BREAK CLIPS.
A15 4x4 GUTTER
A16 4x4 OPEN FACED DOWNSPOUT, TYP OF 3
A17 ROOF CANOPY WITH STANDING SEAM ROOF PANELS TO MATCH THE
MAIN ROOF
A18 SNOW GUARDS MOUNTED TO STANDING SEAM ROOF
A19 R-19 VINYL FACED BATT INSULATION
A21 MECHANICAL UNIT HEATER
A23 SUSPENDED LIGHT FIXTURE
A24 2" POLYISO RIGID INSULATION AT FOUNDATION WALL
A25 CONTINUOUS 10 MIL VAPOR RETARDER UNDER CONCRETE FOUNDATION
AND CONCRETE SLAB
A26 ELECTRICAL PANEL
A30 6" EXTERIOR CONCRETE SLAB
SCALE: 1/2" = 1'-0"
A-101
A4
OVERHEAD DOOR SECTION
1 2 42
SCALE: 1/2"=1'-0"
GRAPHIC SCALE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
EXTERIOR METAL
BUILDING PANEL
METAL LINER PANEL
ALUMINUM HEAD FLASHING
@ EXTERIOR DOORS
SEALANT BOTH SIDES
HM DOOR FRAME
VINYL FACED BATT INSULATION
STEEL CHANNELS, BY METAL
BLDG. MANUFACTURER
FRAME TO STEEL
CONNECTION
J-TRIM
EXTERIOR METAL BUILDING PANEL
CLOSED SILL TRIM (TYP.)
INSULATED OVERHEAD
COILING DOOR
VINYL FACED BATT INSULATION
STEEL CHANNELS TOP AND BOTTOM
OF DOOR HOOD, BY METAL BLDG.
MANUFACTURER
/2
EXTERIOR METAL
BUILDING PANEL
SEALANT BOTH SIDES
HM DOOR FRAME
VINYL FACED BATT INSULATION
STRUCTURAL STEEL, BY METAL
BLDG. MANUFACTURER
FRAME TO STEEL
CONNECTION
J-TRIM
J-TRIM
METAL LINER PANEL
EXTERIOR METAL
BUILDING PANEL
LINER PANEL, UP TO
8'-0" AFF
J-TRIM (TYP.)
VINYL FACED BATT INSULATION
STRUCTURAL STEEL, BY METAL
BLDG. MANUFACTURER
OVERHEAD DOOR TRACK
WITH CONT. WEATHERSEALS
METAL JAMB TRIM
/8
(1
/2
M A
X
ALUMINUM EXIT THRESHOLD
SET IN A BED OF SEALANT
DOOR AND FRAME AS SCHEDULED
(REFER TO DOOR SCHEDULE & DETAILS)
WEATHER SEAL DOOR BOTTOM
/2
SLOPE
INSULATED OVERHEAD
COILING DOOR
BOTTOM SEAL
11 1/2"
SLOPE/NOTCH SLAB EDGE
COMPRESSIBLE FILLER AT
CONCRETE JOINT, TYP
EXTERIOR METAL WALL
PANEL
SEALANT BOTH SIDES
WINDOW HEAD
VINYL FACED BATT INSULATION
STEEL CHANNEL, BY METAL
BLDG. MANUFACTURER
CONTINUOUS FLASHING
AND DRIP EDGE
EXTERIOR METAL
BUILDING PANEL
SEALANT BOTH SIDES
WINDOW JAMB
VINYL FACED BATT INSULATION
STEEL CHANNELS, BY METAL
BLDG. MANUFACTURER
JAMB TRIM
EXTERIOR METAL
BUILDING PANEL
SILL FLASHING (HOLD SIDING DOWN
TO ALLOW FOR SLOPE IN FLASHING)
WINDOW SILL
VINYL FACED BATT INSULATION
STEEL CHANNEL, BY METAL
BLDG. MANUFACTURER
SEALANT BOTH SIDES
INTERIOR METAL LINER PANEL TO 8'-0" AFF
GUTTER
GUTTER CLIP
@ 3'-0" O.C.
V A
R
IE
S
ROOF FASTENERS (2) PER
CLIP. ENSURE ATTACHMENT
OF SCREW THROUGH EAVE
SUPPORT TRIM
TAPE MASTIC 3" LENGTH
ROOF PANEL WITH CLIPS
TO ALLOW FOR THERMAL
MOVEMENT
THERMAL BLOCK
EAVE SUPPORT TRIM
EAVE STRUT
STRUCTURAL FASTENERS
@ 1'-0" O.C.
PRE-INSTALLED
FASTENERS @ 1'-0" O.C.
WALL TRIM FASTENERS
@ 1'-0" O.C.
EAVE CLOSURE
FLASHING
BLIND RIVET @ 2'-0" O.C.
WALL PANEL
PURLIN
THERMAL BLOCK.
CONTINUOUS RUN
AT END WALL
STANDING SEAM PANEL
TAPE MASTIC, CONTINUOUS
ROOF TRIM FASTENERS
@ 1'-6" O.C.
STANDING SEAM PANEL CLIP
STRUCTURAL FASTENERS
(2) PER CLIP
RAKE FLASHING
WALL MAIN FASTENERS
@ 1'-0" O.C.
WALL PANEL
STRUCTURAL FASTENERS
(2) PER PURLIN
WALL TRIM FASTENERS
@ 1'-0" O.C.
RAKE SUPPORT FLASHING
1" MIN.
3" MIN.
6" MAX.
NOM.
5"
1' - 4" MIN.
1'-6" MAX.
RIDGE FLASHING
TAPE MASTIC
CONTINUOUS
STANDING SEAM
METAL CLOSURE
STANDING
SEAM PANEL
PURLIN
STANDING SEAM
PANEL CLIP
ROOF TRIM FASTENERS
(6) PER CLOSURE
ROOF TRIM FASTENERS @ 2'-0" O.C.
RIDGE SUPPORT FLASHING
TAPE MASTIC
CONTINUOUS
ROOF TRIM FASTENERS
(4) PER CLOSURE
3'-0"
6"
12"
8'-0"
METAL FRAME PRE-
MANUFACTURED CANOPY
WITH STANDING SEAM
ROOF PANELS TO MATCH
BUILDING ROOF COLOR.
EXTEND DOOR JAMB
FRAMING UP FOR
CANOPY CONNECTION
EXTERIOR METAL
PANEL WITH FLASHING
SLOPE GRADE AWAY
FROM BUILDING
CONTINUOUS VAPOR BARRIER
2" RIGID INSULATION
1/2" EXPANSION JOINT WITH
FILLER MATERIAL
SILL SEALER
INTERIOR METAL LINER PANEL
6" REINFORCED CONCRETE SLAB, SEE
STRUCTURAL FOR REINFORCEMENT
R-19 VINYL FACED BATT INSULATION
SHEET
IDENTIFICATION
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
T A
S K
O R
D E
R N
U M
B E
R
T
H A
IR
L
IF
T
W
IN
G
C K
D B
Y x
C
P R
O
JE
C T
N U
M B
E R
P
L O
T S
C A
L E
P L
O T
D A
T E
SHEET OF
I ro n H o rs e D r i ve
L a d s o n
S o u th
C a ro lin a
.8
.3 bb bb kk kk dd dd ff ff kk kk bb bb bb bb oo oo ff ff kk kk dd dd == == öö öö oo oo ee ee ff ff qq qq bb bb qq qq rr rr oo oo bb bb
C E
M S
P ro je c t N o
L
P ro je c t
M a n a g e r:
C H
R
IS
H
IN
S O
N
21 4 5
D
B
A
C O
N T
R A
C T
N U
M B
E R
/2
/2
A s i n d ic a te d
F E
B R
U A
R Y
N
E B
B
M S
F J
C
JH
Q J K
L
-0
A-501
M P
L S
-S T
P
A U
L A
IR
R
E S
E R
V E
S T
A T
IO
N
M
IL
IT
A R
Y H
IG
H
W A
Y M
IN
N
E A
P O
L
IS
M
N
-2
K R
C
A R
C H
IT
E
C T
U R
A L D
E T
A
IL
S
C O
N S
T R
U C
T O
X Y
G E
N S
T O
R A
G E
B
U
IL
D
IN
G
F A
-1
-D
-0
SCALE: 1 1/2" = 1'-0"
H1
HEAD DETAIL
SCALE: 1 1/2" = 1'-0"
H2
HEAD DETAIL
SCALE: 1 1/2" = 1'-0"
J1
JAMB DETAIL
SCALE: 1 1/2" = 1'-0"
J2
JAMB DETAIL
SCALE: 1 1/2" = 1'-0"
S1
SILL DETAIL
SCALE: 1 1/2" = 1'-0"
S2
SILL DETAIL
SCALE: 1 1/2" = 1'-0"
H3
HEAD DETAIL
SCALE: 1 1/2" = 1'-0"
J3
JAMB DETAIL
SCALE: 1 1/2" = 1'-0"
S3
SILL DETAIL
SCALE: 3" = 1'-0"
A-301
D1
GUTTER EAVE DETAIL
SCALE: 3" = 1'-0"
A-201
D3
RAKE DETAIL
SCALE: 1 1/2" = 1'-0"
A-301
D5
RIDGE DETAIL
SCALE: 1 1/2" = 1'-0"
A-101
A5
CANOPY DETAIL
SCALE: 1 1/2"=1'-0"
GRAPHIC SCALES
6"6"
SCALE: 3"=1'-0"
04 2
SCALE: 1 1/2" = 1'-0"
A-301
C5
SLAB EDGE DETAIL
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P
GENERAL FINISH NOTES
1. CONTRACTOR SHALL READ ALL NOTES BEFORE BEGINNING WORK.
2. FURNISH AND INSTALL MATERIALS IN COMPLIANCE WITH MANUFACTURER'S PRINTED SPECIFICATIONS AND
INSTALLATION INSTRUCTIONS.
3. ANY DISCONTINUED ITEMS SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT IMMEDIATELY.
CONTRACTOR TO NOTIFY GOVERNMENT OF ANY ITEMS REQUIRING FURTHER CLARIFICATION OF FINISH SELECTION.
4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING OF MATERIALS. DO NOT SCALE
ARCHITECTURAL DRAWINGS. REFER TO DIMENSIONED PLANS
5. CONTRACTOR SHALL PROVIDE TO OWNER ALL MANUFACTURER'S RECOMMENDED MAINTENANCE INSTRUCTIONS
ON ALL FINISH MATERIALS. CONTRACTOR TO PROVIDE GOVERNMENT WITH SHOP DRAWINGS FOR APPROVAL FOR
ALL NEW MATERIALS INSTALLED
6. INTERIOR CONSTRUCTION REQUIRING FINISH / COLOR SELECTION NOT NOTED WITHIN THE SCHEDULE SHALL BE SUBMITTED TO THE ARCHITECT IN WRITING, WITH SAMPLES OR FINISH / COLORS AVAILABLE, CLEARLY IDENTIFYING
ANY THAT MIGHT BE AT A PREMIUM ABOVE THE PRODUCT BID.
7. ALL PRODUCT SPECIFICATIONS ARE GIVEN TO DEFINE DESIGN, COLOR AND QUALITY. SUBSTITUTIONS REQUIRE THE PRIOR APPROVAL OF THE ARCHITECT. PROPOSED SUBSTITUTIONS SHALL ADHERE TO THE INTENT OF THE
QUALITY, DESIGN, COLOR AND PATTERN.
8. ALL FIRE HOSE CABINETS, FIRE EXTINGUISHER CABINETS AND ELECTRICAL PANELS SHALL BE PAINTED TO
MATCH THE ADJACENT WALL FINISHES UNLESS PRE-FINISHED.
9. ALL FINISHES ARE DESIGNATED USING "PLAN NORTH".
FLOOR FINISH NOTES
1. CONTRACTOR TO FOLLOW MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS ON ALL FLOORING
PRODUCTS AND USE THE ADHESIVES, EQUIPMENT / TOOLS REQUIRED / RECOMMENDED BY THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
WALL FINISH NOTES
1. MISCELLANEOUS GRILLS AND ACCESSORIES SHALL BE PAINTED TO MATCH ADJACENT WALL FINISHES
UNLESS THEY ARE PREFINISHED. CONTRACTOR TO VERIFY PAINT COLOR WITH GOVERNMENT.
2. ALL PAINT SHALL HAVE LESS THAN 150 G/l VOC.
DOORS & DOOR FRAMES
1. ALL METAL DOORS AND ALL DOOR FRAMES SHALL BE PAINTED PNT-1, BOTH SIDES OF DOOR. THE INTERIOR SIDE OF EXTERIOR METAL DOORS SHALL BE PAINTED PNT-1. SEE FINISH SCHEDULE.
HG
(HALF GLAZING)
OH
(OVERHEAD COILING DOOR)
1" INSULATED
GLAZING
INSULATED
SLATS
INSULATED
DOOR
CONT.
WEATHERSEALS
CHAIN
OPERATOR FRONT
MOUNTED DOOR
MOTOR
A B
6'-0"
A
1" INSULATED GLAZING
HDW-1 (EXTERIOR ENTRY DOOR)
QTY ITEM DESCRIPTION
HINGES 5 KNUCKLE FULL MORTISE, 32D FINISH3
LOCKSET ENTRY DOOR (F05)1
CLOSER -1
KICKPLATES
TOUCH BAR
WEATHER-STRIPPING
10"
1 SET -
DOOR SWEEP1
THRESHOLD
DOOR HARDWARE SCHEDULE
PANIC EXIT DEVICE1
1. ALL DOOR LITES AND SIDELITES SHALL BE TEMPERED OR LAMINATED GLASS.
(SAFETY GLASS COMPLYING W/ CPSC 16 CFR 1201).
2. SEE EXTERIOR COLOR SCHEDULE ON SHEET A-601 AND FINISH LIST ON SHEET
A-601 FOR DOOR AND FRAME FINISH COLORS.
3. PAINT NEW H.M. DOORS AND FRAMES: PNT-1
4. ALL NEW EXTERIOR DOORS SHALL BE INSULATED.
DOOR GENERAL NOTES:
HM HOLLOW METAL
ALUM ALUMINUM
STL GALVANIZED STEEL
DOOR MATERIAL…