FA568218R0009_0005.pdf
PDF 129 KB Posted
- Solicitation number
- FA568218R0009
About this file
Amendment 5
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum__1_Revised_ASHE_15-1017.pdf | ||
| ASHE_15-1017_Safety_Plan.pdf | ||
| FA568218R0009_0004.pdf | ||
| A-1_A-3_Drawings_REV2.pdf | ||
| C-1_C-2_C-4_C-5_Drawings_REV2.pdf | ||
| S-2_S-3_S-4_Drawings_REV2.pdf | ||
| Solicitation_Amendment__3_ASHE_15-1017.pdf | ||
| Addendum__1_ASHE_15-1017.pdf | ||
| E-3_E-4_Drawings_REV2.pdf | ||
| M-1_Drawing_REV2.pdf | ||
| Amendment__2.docx | DOCX document | |
| ASHE_15-1017_Addedum___1.pdf | ||
| FA568218R0009_Mod.pdf | ||
| FA568218R0009_27_Dec_17.pdf | ||
| Additional_Requirements,_Dec_2017.pdf | ||
| ASHE_15-1017_CCEB_2018.xls | XLS spreadsheet | |
| M_Drawings.pdf | ||
| S_Drawings.pdf | ||
| C_Drawings.pdf | ||
| A_Drawings.pdf | ||
| E_Drawings.pdf | ||
| ASHE_15-1017_TECHNICAL_SPECIFICATIONS_ENG.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1F3A27304A002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to correct addendum #1 incorporated to the solicitation Technical Specif ications by amendment 0003.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568218R0009
X 9B. DATED (SEE ITEM 11)
27-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Feb-2018
CODE
31 CONS LGC - FA5682
VIA PORDENONE 89/B, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
AVIANO (PN) 33081
FA5682 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA568218R0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 0002
The CLIN extended description has changed from:
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,
SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED
IN SECTION J HEREIN: TECHNICAL SPECIFICATION PROJECT ASHE 15-1017 CNS NEW EOD STORAGE
FACILITY DEMO SHEDS, AREA F, AVIANO AB, ITALY DATED JUNE 2016 AND ADDENDUM #1.
To:
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,
SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED
IN SECTION J HEREIN: TECHNICAL SPECIFICATION PROJECT ASHE 15-1017 CNS NEW EOD STORAGE
FACILITY DEMO SHEDS, AREA F, AVIANO AB, ITALY DATED JUNE 2016 AND ADDENDUM #1
REVISED.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
DOCS, EXHIBITS, ATTACHMENTS
The following documents are an integral part of this contract:
a. Attachment 1:
Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November 2005
b. Attachment 2:
Technical Specifications Project ASHE 15-1017 Cns New Eod Storage Facility Demo Sheds, Area F, Aviano AB, Italy dated Jun 2016 and ADDENDUM #1 REVISED dated Jan 2018.
- 116 written pages including cover page and ADDENDUM #1 REVISED dated Jan 2018.
c. Attachment 3:
Drawings
- 32 sheets as changed by ADDENDUM #1 REVISED dated Jan 2018.
d. Attachment 4:
Additional Requirements, dated Dec 2017
FA568218R0009
- 5 pages
e. Attachment 5:
Aviano AB Design Guide Revision including Annexes
- 317 pages
f. Attachment 6:
Safety Plan entitled “Piano di Sicurezza e Coordinamento” Project ASHE 15-1017 Cns New EOD Storage Facility
Demo Sheds, Area F, Aviano AB, Italy – marked Project ASHE 15-1017 and dated May 16
- 190 pages
(End of Summary of Changes)
File details come from the government source that posted it.