NEW CONS&DEMO.
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||
| ASHE 15-1017 CNS NEW EOD STORAGE FACILITY DEMO SHEDS | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||
| ASHE 15-1017 | FAC.939, AREA F, AVIANO AIR BASE, ITALY | ||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||
| A. | NEW CONSTRUCTION / Nuova Costruzione | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||
| Ia Architectural Work - Ia Lavori Architettonici | |||||||||||||
| NOT APPLICABLE Non Applicabile | |||||||||||||
| Total Architectural Work - Totale Lavori Architettonici | |||||||||||||
| Ib Structural Work - Ib Lavori Strutturali | |||||||||||||
| 1 | EXCAVATION FOR FOUNDATIONS | ||||||||||||
| Scavo per Fodazioni in c.a. | IT. No. Art. n. | 1 | m3 | ||||||||||
| Total Structural Work - Totale Lavori Strutturali | |||||||||||||
| Ic Civil Work - Ic Lavori Civili | |||||||||||||
| 2 | UNDERGROUND UTILITIES DEMOLITION | ||||||||||||
| Demolizione sottoservizi | IT. No. Art. n. | 1 | LS/AC | ||||||||||
| 3 | ASPHALT DEMOLITION | ||||||||||||
| Demolizione asfalto | IT. No. Art. n. | 2 | m2 | ||||||||||
| 4 | EXCAVATION FOR NEW SUB-BASE | ||||||||||||
| Scavo sbancamento | IT. No. Art. n. | 3 | m3 | ||||||||||
| Total Civil Work - Totale Lavori Civili | |||||||||||||
| Id Mechanical Work - Id Lavori Meccanici | |||||||||||||
| NOT APPLICABLE Non Applicabile | |||||||||||||
| Total Mechanical Work - Totale Lavori Meccanici | |||||||||||||
| Ie Electrical Work - Ie Lavori Elettrici | |||||||||||||
| Total Electrical Work - Totale Lavori Eletttrici | |||||||||||||
| TOTAL PART I - Totale Parte I | |||||||||||||
| PART IIa - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte IIa - Lavori Architettonici, Strutturali e Civili | |||||||||||||
| 5 | INDUSTRIAL CONCRETE FLOOR WITH EPOXY | ||||||||||||
| Pavimento industriale in cls con protezione in resina | IT. No. Art. n. | 1 | m2 | ||||||||||
| 6 | 8/10 mm THICK STEEL FLASHING | ||||||||||||
| Scossaline in lamiera di acciaio, spessore 8/10 mm | IT. No. Art. n. | 2 | m | ||||||||||
| 7 | 110 MM DIAMETER STEEL PIPE DOWNSPOUTS | ||||||||||||
| Pluviali in tubi di acciaio, diametro 110 mm | IT. No. Art. n. | 3 | m | ||||||||||
| 8 | 8/10 mm THICK STEEL GUTTERS | ||||||||||||
| Gronde in lamiera di acciaio, spessore 8/10 mm | IT. No. Art. n. | 4 | m | ||||||||||
| 9 | ROOF WATERPROOFING SYSTEM Sistema impermeabilizzazione tetto | IT. No. Art. n. | 5 | m2 | |||||||||
| 10 | EXTERNAL WALL INSULATION PACKAGE | ||||||||||||
| Cappotto per muri esterni | IT. No. Art. n. | 6 | m2 | ||||||||||
| 11 | CEMENT PLASTER FOR INTERNAL WALLS AND CEILING | ||||||||||||
| Intonaco per Muri interni e soffitto | IT. No. Art. n. | 7 | m2 | ||||||||||
| 12 | PAINTING OF INTERIOR WALLS | ||||||||||||
| Tinteggiatura di pareti interne | IT. No. Art. n. | 8 | m2 | ||||||||||
| 13 | PAINTING OF EXTERIOR WALLS | ||||||||||||
| Tinteggiatura di pareti esterne | IT. No. Art. n. | 9 | m2 | ||||||||||
| 14 | 1200X2150 mm METAL DOOR, SYMBOL "D1" | ||||||||||||
| Porta in metallo 1200x2150 mm, Sigla "D1" | IT. No. Art. n. | 10 | Ea./No. | ||||||||||
| 15 | 4500x3500 mm ROLL-UP DOOR, SYMBOL "D2" | ||||||||||||
| Portone sezionale 4500x3500 mm, Sigla "D2" | IT. No. Art. n. | 11 | Ea./No. | ||||||||||
| 16 | 4500x4500 mm ROLL-UP DOOR, SYMBOL "D3" | ||||||||||||
| Portone sezionale 4500x4500 mm, Sigla "D3" | IT. No. Art. n. | 12 | Ea./No. | ||||||||||
| 17 | 1200x2150 mm FIRE RATED DOOR, SYMBOL "D4" | ||||||||||||
| Porta REI 90 1200x2150 mm, Sigla "D4" | IT. No. Art. n. | 13 | Ea./No. | ||||||||||
| 18 | 2500x900 mm METAL WINDOWS, SYMBOL "W1" | ||||||||||||
| Finestre in metallo 2500x900 cm, Sigla "w1" | IT. No. Art. n. | 14 | Ea./No. | ||||||||||
| 19 | FIRE CABINET AND PORTABLE EXTINGUISHER | ||||||||||||
| Armadietto portaestintore ed estintore anticendio portatile | IT. No. Art. n. | 15 | Ea./No. | ||||||||||
| 20 | ROOF PERSONAL SAFETY HANCORS | ||||||||||||
| Ancoraggi di Sicurezza di copertura | IT. No. Art. n. | 16 | Ea./No. | ||||||||||
| 21 | RADOM MITIGATION SYSTEM | ||||||||||||
| Sistema Estrazione Radom | IT. No. Art. n. | 17 | LS/AC | ||||||||||
| 22 | ROOF LADDER | ||||||||||||
| Scala per accesso al tetto | IT. No. Art. n. | 18 | Ea./No. | ||||||||||
| 23 | METAL ROOF PARAPET | ||||||||||||
| Parapetto in ferro | IT. No. Art. n. | 19 | m | ||||||||||
| Total Architectural Work - Totale Lavori Architettonici | |||||||||||||
| IIb Structural Work - IIb Lavori Strutturali | |||||||||||||
| 24 | C16/20 LEAN CONCRETE SUBFOUNDATION | ||||||||||||
| Calcestruzzo C16/20 per sottofondazione | IT. No. Art. n. | 1 | m3 | ||||||||||
| 25 | C20/25 CONC.FOR FOUNDATION BOND BEAM | ||||||||||||
| Calcestruzzo C20/25 per cordolo di fondazione | IT. No. Art. n. | 2 | m3 | ||||||||||
| 26 | C25/30 CONCRETE FOR ELEVATION WALL | ||||||||||||
| Calcestruzzo C25/30 per muri in elevazione | IT. No. Art. n. | 3 | m3 | ||||||||||
| 27 | ALVEOLAR SLAB | ||||||||||||
| Solaio Alveolare | IT. No. Art. n. | 4 | m2 | ||||||||||
| 28 | C25/30 CONCRETE FOR SLAB | ||||||||||||
| Calcestruzzo C25/30 per soletta | IT. No. Art. n. | 5 | m2 | ||||||||||
| 29 | STEEL REBARS FOR RE-INFORCED CONCRETE | ||||||||||||
| Ferro d'armatura per c.a | IT. No. Art. n. | 6 | Kg | ||||||||||
| 30 | TESTING | ||||||||||||
| Collaudi | IT. No. Art. n. | 7 | LS/AC | ||||||||||
| Total Structural Work - Totale Lavori Strutturali | |||||||||||||
| IIc CivilWork - Lavori Civili | |||||||||||||
| 31 | STABILIZED GRANULAR SUB-BASE | ||||||||||||
| Inerte Stabilizzato per sottofondi | IT. No. Art. n. | 1 | m3 | ||||||||||
| 32 | EXTERNAL INDUSTRIAL CONCRETE FLOOR | ||||||||||||
| Pavimento industriale in c.a. per esterno | IT. No. Art. n. | 2 | m2 | ||||||||||
| 33 | 40X40 CM CONCRETE PIT | ||||||||||||
| Pozzetto in calcestruzzo 40x40 cm | IT. No. Art. n. | 3a | Ea./No. | ||||||||||
| 34 | PREFABRICATED CONCRETE ROAD CURBS | ||||||||||||
| Cigli stradali prefabbricati in calcestruzzo | IT. No. Art. n. | 4 | m | ||||||||||
| 35 | 3 CM THICK BITUMINOUS WARING COURSE | ||||||||||||
| Conglomerato bituminoso per strato di usura, spessore 3 cm | IT. No. Art. n. | 5 | m2 | ||||||||||
| 36 | 8 CM THICK BITUMINOUS CONCRETE BASE COURSE | ||||||||||||
| Conglomerato bituminoso di base, spessore 8 cm | IT. No. Art. n. | 6 | m2 | ||||||||||
| Total CivilWork - Totale Lavori Civili | |||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||||||||||||
| 37 | HVAC SYSTEM ROOFTOP1 | ||||||||||||
| Unità monoblocco per la climatizzazione | IT. No. Art. n. | 1 | LS/AC | ||||||||||
| 38 | HVAC SYSTEM ROOFTOP2 | ||||||||||||
| Unità monoblocco per la climatizzazione | IT. No. Art. n. | 2 | LS/AC | ||||||||||
| 39 | REMOTE CONTROL PANEL | ||||||||||||
| Pannello di comando remoto | IT. No. Art. n. | 3 | LS/AC | ||||||||||
| 40 | RECTANGULAR DUCTS GALVANIZED | ||||||||||||
| Canali rettangolari in acciaio zincato | IT. No. Art. n. | 4 | LS/AC | ||||||||||
| 41 | BALANCING DAMPER | ||||||||||||
| Serranda taratura | IT. No. Art. n. | 5a | Ea./No. | ||||||||||
| 42 | BALANCING DAMPER | ||||||||||||
| Serranda taratura | IT. No. Art. n. | 5b | Ea./No. | ||||||||||
| 43 | RECTANGULAR SOUND ATTENUATORS | ||||||||||||
| Silenziatore rettangolare | IT. No. Art. n. | 6a | Ea./No. | ||||||||||
| 44 | RECTANGULAR SOUND ATTENUATORS | ||||||||||||
| Silenziatore rettangolare | IT. No. Art. n. | 6b | Ea./No. | ||||||||||
| 45 | RECTANGULAR SOUND ATTENUATORS | ||||||||||||
| Silenziatore rettangolare | IT. No. Art. n. | 6c | Ea./No. | ||||||||||
| 46 | RECTANGULAR SOUND ATTENUATORS | ||||||||||||
| Silenziatore rettangolare | IT. No. Art. n. | 6d | Ea./No. | ||||||||||
| 47 | SUPPLY DIFFUSER | ||||||||||||
| Diffusore mandata | IT. No. Art. n. | 7a | Ea./No. | ||||||||||
| 48 | SUPPLY DIFFUSER | ||||||||||||
| Diffusore mandata | IT. No. Art. n. | 7b | Ea./No. | ||||||||||
| 49 | RETURN LOUVER | ||||||||||||
| Griglia ripresa | IT. No. Art. n. | 8a | Ea./No. | ||||||||||
| 50 | RETURN LOUVER | ||||||||||||
| Griglia ripresa | IT. No. Art. n. | 8b | Ea./No. | ||||||||||
| 51 | TESTING AND BALANCING HVAC SYSTEMS | ||||||||||||
| Taratura e collaudo impianti HVAC | IT. No. Art. n. | 9 | LS/AC | ||||||||||
| Total Mechanical Work - Totale Lavori Meccanici | |||||||||||||
| PART IV- ELECTRICAL WORK / Parte IV - Lavori Elettrici | |||||||||||||
| 52 | FURNISHING AND INSTALLATION NEW MAIN BREAKER 4x100A IN THE EXISTING BUILDING 947 (SUBSTATION 27-947) | ||||||||||||
| Fornitura e installazione di Installazine nuovo int. 4x100A all'interno dell'edificio esistente 947 (CABINA ELETTRICA 27-947) | IT. No. Art. n. | 1 | LS/AC | ||||||||||
| 53 | FURNISHING AND INSTALLATION "MDP" ELECTRICAL PANEL | ||||||||||||
| Fornitura e installazione di Quadro elettrico "MDP" | IT. No. Art. n. | 2 | LS/AC | ||||||||||
| 54 | FURNISHING AND INSTALLATION OF CONVERTER 400Vac-120vAC-60HZ-6KVA | ||||||||||||
| Fornitura e installazione convertitore 400Vac-120vAC-60HZ-6KVA | IT. No. Art. n. | 3 | LS/AC | ||||||||||
| 55 | FURNISHING AND INSTALLATION MAIN PANEL FEEDER LINE FG7OR-5G35mmq | ||||||||||||
| Fornitura e installazione di Linea di alimentazione generale FG7OR-5G35mmq | IT. No. Art. n. | 4a | m | ||||||||||
| 56 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 2x1,5mmq | ||||||||||||
| Fornitura e installazione di Cavo elettrico FG7OM1 2x1,5mmq | IT. No. Art. n. | 4b | m | ||||||||||
| 57 | FURNISHING AND INSTALLATIONELECTRICAL CABLE FG7OM1 3G1,5mmq | ||||||||||||
| Fornitura e installazione di Cavo elettrico FG7OM1 3G1,5mmq | IT. No. Art. n. | 4c | m | ||||||||||
| 58 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 3G2,5mmq | ||||||||||||
| Fornitura e installazione di Cavo elettrico FG7OM1 3G2,5mmq | IT. No. Art. n. | 4d | m | ||||||||||
| 59 | ELECTRICAL CABLE FG7OM1 3G4mmq | ||||||||||||
| Fornitura e installazione di Cavo elettrico FG7OM1 3G4mmq | IT. No. Art. n. | 4e | m | ||||||||||
| 60 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 5G2,5mmq | ||||||||||||
| Fornitura e installazione di Cavo elettrico FG7OM1 5G2,5mmq | IT. No. Art. n. | 4f | m | ||||||||||
| 61 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 5G4mmq | ||||||||||||
| Fornitura e installazione di Cavo elettrico FG7OM1 5G4mmq | IT. No. Art. n. | 4g | m | ||||||||||
| 62 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 5G6mmq | ||||||||||||
| Fornitura e installazione di Cavo elettrico FG7OM1 5G6mmq | IT. No. Art. n. | 4h | m | ||||||||||
| 63 | SUPPLY AND INSTALLATION AT SIGHT, OR DIGGING WITHIN WELLS, CONDUITS OF HIGH-DENSITY POLYETHYLENE "HDPE DIAM. 125 | ||||||||||||
| Fornitura e posa in opera a vista, entro cavedi o scavo, di cavidotti in polietilene alta densità "PEHD DIAM. 125 | IT. No. Art. n. | 5a | m | ||||||||||
| 64 | SUPPLY AND INSTALLATION AT SIGHT, OR DIGGING WITHIN WELLS, CONDUITS OF HIGH-DENSITY POLYETHYLENE "HDPE DIAM. 90 | ||||||||||||
| Fornitura e posa in opera a vista, entro cavedi o scavo, di cavidotti in polietilene alta densità "PEHD DIAM. 90 | IT. No. Art. n. | 5b | m | ||||||||||
| 65 | FURNISHING AND INSTALLATION PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 50X50X50X5cm. (compaction of soil at the pit’s bottom) | ||||||||||||
| Fornitura e installazione di Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 50x50x50x5cm (prevedere la compattazione del fondo del pozzetto). | IT. No. Art. n. | 6 | EA/NO | ||||||||||
| 66 | FURNISHING AND INSTALLATION NEWTRAY CABLE 100x75mm | ||||||||||||
| Fornitura e posa in opera di nuovo canale metallico 150x75mm | IT. No. Art. n. | 7a | EA/NO | ||||||||||
| 67 | FURNISHING AND INSTALLATION NEWTRAY CABLE 200x75mm | ||||||||||||
| Fornitura e posa in opera di nuovo canale metallico 200x75mm | IT. No. Art. n. | 7b | EA/NO | ||||||||||
| 68 | FURNISH AND INSTALL OF PVC PIPE - 20 DIAMETER | ||||||||||||
| Fornitura e posa in opera di tubo in PVC - diametro 20 mm | IT. No. Art. n. | 8a | m | ||||||||||
| 69 | FURNISH AND INSTALL OF PVC PIPE - 25 DIAMETER | ||||||||||||
| Fornitura e posa in opera di tubo in PVC - diametro 25 mm | IT. No. Art. n. | 8b | m | ||||||||||
| 70 | FURNISH AND INSTALL OF PVC PIPE - 32 DIAMETER | ||||||||||||
| Fornitura e posa in opera di tubo in PVC - diametro 32 mm | IT. No. Art. n. | 8c | m | ||||||||||
| 71 | FURNISH AND INSTALL OF PVC PIPE - 40 DIAMETER | ||||||||||||
| Fornitura e posa in opera di tubo in PVC - diametro 40 mm | IT. No. Art. n. | 8d | m | ||||||||||
| 72 | FURNISHING AND INSTALLATION OF WALL FLUSHED POWER POINT FOR GENERAL USE. | ||||||||||||
| Fornitura e posa in opera di punto di alimentazione generale | IT. No. Art. n. | 9 | EA/NO | ||||||||||
| 73 | FURNISHING AND INSTALLATION POWER OUTLET WITH SWITCH | ||||||||||||
| Fornitura e posa in opera di Punto presa con interruttore | IT. No. Art. n. | 10 | EA/NO | ||||||||||
| 74 | FURNISHING AND INSTALLATION UNEL RECEPTACLE 230VAC 10/16 AMPS 2P+G, WITH AUTOMATIC CIRCUIT BREAKER 3KA-16A-230V | ||||||||||||
| Fornitura e posa in opera di Punto presa UNEL 230VAC 10/16 AMPS 2P+G, CON INT. AUTOMATICO 3KA-16A-230V | IT. No. Art. n. | 11a | EA/NO | ||||||||||
| 75 | FURNISHING AND INSTALLATION 2P+G-230V CEE TYPE INTERLOCKED OUTLET WITH FUSE, PLUG PROVIDED. | ||||||||||||
| Fornitura e posa in opera di presa interbloccatastagna tipo CEE (2P+T-230V) con fusibile completa di spina. | IT. No. Art. n. | 11b | EA/NO | ||||||||||
| 76 | FURNISHING AND INSTALLATION 3P+G-400V CEE TYPE INTERLOCKED OUTLET WITH FUSE, PLUG PROVIDED. | ||||||||||||
| Fornitura e posa in opera di presa interbloccatastagna tipo CEE (3P+T-400V) con fusibile completa di spina. | IT. No. Art. n. | 11c | EA/NO | ||||||||||
| 77 | FURNISHING AND INSTALLATION US RECEPTACLES COMPLEX WITH 2x10A CB (120V), WITH AUTOMATIC CIRCUIT BREAKER 3KA-10A-230V | ||||||||||||
| Fornitura e posa in opera di presa USA con interruttore automatico 3kA, 10A, 120V 2P+T. | IT. No. Art. n. | 11d | EA/NO | ||||||||||
| 78 | FURNISHING AND INSTALLATION EMERGENCY BUTTON | ||||||||||||
| Fornitura e posa in opera di pulsante di emergenza | IT. No. Art. n. | 12 | EA/NO | ||||||||||
| 79 | FURNISHING AND INSTALLATION WALL FLUSHED LIGHT BUTTON OR SWITCH | ||||||||||||
| Fornitura e installazione di Interruttore o pulsante sottotraccia | IT. No. Art. n. | 13a | EA/NO | ||||||||||
| 80 | FURNISHING AND INSTALLATION LIGHT POINT ADDED | ||||||||||||
| Fornitura e installazione di Punto luce aggiunto | IT. No. Art. n. | 13b | EA/NO | ||||||||||
| 81 | FURNISHING AND INSTALLATION PHOTOCELL SWITCH | ||||||||||||
| Fornitura e installazione di sensore crepuscolare | IT. No. Art. n. | 13c | EA/NO | ||||||||||
| 82 | LED LIGHTING FIXTURE 3F LINDA LED 2X30W CONC L1570 TYPE | ||||||||||||
| Plafoniera per lampade a LED tipo 3F filippi Linda LED 2X30W CONC L1570 | IT. No. Art. n. | 14a | EA/NO | ||||||||||
| 83 | LED LIGHTING FIXTURE 3F LINDA LED 2X30W/865 EP L1570 TYPE - WITH EMERGENCY KIT - 2H | ||||||||||||
| Plafoniera per lampade a LED tipo 3F LINDA 2X30W/865 EP L1570 - completa di kit di emergenza - autonomia 2h | IT. No. Art. n. | 14b | EA/NO | ||||||||||
| 84 | LED LIGHTING FIXTURE 3F LINDA LED 1X24W EP L1270 TYPE - WITH EMERGENCY KIT - 2H - and exit/emergency pittogram | ||||||||||||
| Plafoniera per lampade a LED tipo 3F LINDA 1X24W EP L1570 - completa di kit di emergenza - autonomia 2h e pittogramma (sempre accesa) | IT. No. Art. n. | 14c | EA/NO | ||||||||||
| 85 | EXTERNAL FLOOD LIGHT, LED TYPE - 37W - IP65 | ||||||||||||
| Proiettore asimmetrico industriale da esterno a led-37W-IP65 | IT. No. Art. n. | 14d | EA/NO | ||||||||||
| 86 | FURNISHING AND INSTALLATION F.O. NEW 12 STRANDS FIBER OPTICAL SINGLE MODE CABLE FROM BUILDING 10293 TO NEW BUILDING 9391 GEOTEXTILE INNURDUCT TYPE | ||||||||||||
| Fornitura e installazione di F.O. Nuova fibra ottica single mode da 12 fibre dall'edificio esistente 10293 al nuovo edificio EOD (9391) marca geotextile innurduct | IT. No. Art. n. | 15a | m | ||||||||||
| 87 | FURNISHING AND INSTALLATION SC CONNECTOR FOR F.O. NEW 12 STRANDS FIBER OPTICAL SINGLE MODE. | ||||||||||||
| Fornitura e installazione di connettore per fibra ottica - connettore per attestare fibra a 12single mode | IT. No. Art. n. | 15b | LS/AC | ||||||||||
| 88 | FURNISHING AND INSTALLATION NEW DATA COMM AND DATA CENTER FOR BUILDING 10293 AND NEW BUILDING 9391 | ||||||||||||
| Fornitura e installazione di Nuove opere per l'impianto dati dell'edificio 10293 e del nuovo edificio 9391 | IT. No. Art. n. | 15c | LS/AC | ||||||||||
| 89 | FURNISHING AND INSTALLATION NEW DATA RACK | ||||||||||||
| Fornitura ed installazione nuovo rack dati | IT. No. Art. n. | 16 | LS/AC | ||||||||||
| 90 | FURNISHING AND INSTALLATION 2 COMMUNICATION OUTLET GROUP RJ45 cat6 | ||||||||||||
| Fornitura e installazione di Gruppo 2 prese per telecomunicazioni RJ45 cat.6 | IT. No. Art. n. | 17 | EA/NO | ||||||||||
| 91 | FURNISHING AND INSTALLATION CAT.6 UTP, UNSHIELDED | ||||||||||||
| Fornitura e installazione di cavo UTP cat.6, non schermato | IT. No. Art. n. | 18 | m | ||||||||||
| 92 | FURNISH AND INSTALL OPTICAL FIRE SMOKE DETECTOR, ADRESSABLE TYPE. | ||||||||||||
| Fornitura e posa in opera di rivelatore di fumo indirizzabile | IT. No. Art. n. | 19a | EA/NO | ||||||||||
| 93 | FURNISH AND INSTALL FIRE MANUAL PULL STATION, ADRESSABLE TYPE. | ||||||||||||
| Fornitura e posa in opera pulsante manuale di allarme incendio | IT. No. Art. n. | 19b | EA/NO | ||||||||||
| 94 | FURNISH AND INSTALL OPTIC / ACOUSTIC FIRE ALARM DEVICE. | ||||||||||||
| Fornitura e posa in opera di dispositivo di allarme incendio ottico / sonoro. | IT. No. Art. n. | 19c | EA/NO | ||||||||||
| 95 | FURNISH AND INSTALL ADRESSABLE FIRE ALARM CONTROL PANEL. EQUIPPED WITH 2X12V / 7AH BATTERIES AND ACCESSORIES. | ||||||||||||
| Fornitura e posa in opera di centrale allarme incendio. Equipaggaita con batterie 2x12V / 7Ah ed accessori. | IT. No. Art. n. | 19d | LS/AC | ||||||||||
| 96 | SUPPLY AND INSTALLATION OF DIALER SPIN. | ||||||||||||
| Fornitura e posa in opera di combinatore telefonico filare | IT. No. Art. n. | 19e | LS/AC | ||||||||||
| 97 | SUPPLY AND INSTALLATION OF CENTRAL MONACO | ||||||||||||
| Fornitura e posa in opera di centrale Monaco | IT. No. Art. n. | 19f | LS/AC | ||||||||||
| 98 | FURNISH AND INSTALL IN/OUT MODULE, TO CONTROL RELAIS AND ACQUIRE STATUS, | ||||||||||||
| Fornitura e posa in opera di moduli ingresso/uscita, per il controllo e l'acquisizione degli stati esterni | IT. No. Art. n. | 19g | EA/NO | ||||||||||
| 99 | FIRE ALARM SYSTEM HEAT DETECTOR. CEILING MOUNTED SMOKE. | ||||||||||||
| Fornitura e posa in opera di rivelatore di calore. Installato a soffitto | IT. No. Art. n. | 19h | EA/NO | ||||||||||
| 100 | FURNISH AND INSTALL DUCT STATION FOR ADDRESSABLE DETECTORS | ||||||||||||
| Fornitura e posa in opera di camera di analisi per rivelatori di fumo. | IT. No. Art. n. | 19i | EA/NO | ||||||||||
| 99 | FURNISH AND INSTALL CABLE FTG10(O)M1 TYPE - SECTION 2X1,5 SQ.MM. | ||||||||||||
| Fornitura e posa in opera di cavo FTG10(O)M1 - sezione 2x1,5 mmq. | IT. No. Art. n. | 20a | m | ||||||||||
| 100 | FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM DETECTORS, PULL STATIONS, ETC. - SECTION 2X1 SQ.MM. | ||||||||||||
| Fornitura e posa in opera di cavo loop per allarme incendio - sezione 2x1 mmq. | IT. No. Art. n. | 20b | m | ||||||||||
| 101 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE PAINTED RED - 25 DIAMETER | ||||||||||||
| Fornitura e posa in opera di tubo in acciaio zincato verniciato rosso - diametro 25 mm | IT. No. Art. n. | 20c | m | ||||||||||
| 102 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE PAINTED RED - 40 DIAMETER | ||||||||||||
| Fornitura e posa in opera di tubo in acciaio zincato verniciato rosso - diametro 40 mm | IT. No. Art. n. | 20d | m | ||||||||||
| 103 | FURNISH AND INSTALL NEW GROUNDING SYSTEM- 95 mmq BARE COPPER STRAND | ||||||||||||
| Fornitura e poso in opera di Nuovo impianto di terra - Corda nuda di rame 95 mmq | IT. No. Art. n. | 21a | m | ||||||||||
| 104 | FURNISH AND INSTALL GROUND INSPECTION PIT: NEW ELECTRICAL MANHOLE 400x400mm HEAVY DUTY CAST IRON WITH COPPER CLAD STEEL GROUND | ||||||||||||
| Fornitura e poso in opera di Pozzetto impianto di terra: nuova cameretta linea elettrica dimensioni 400x400mm con chiusino in ghisa completo di dispersore in acciaio ramato | IT. No. Art. n. | 21b | EA/NO | ||||||||||
| 105 | FURNISH AND INSTALL MAIN GROUND BAR | ||||||||||||
| Fornitura e poso in opera di Barra di terra pricnipale | IT. No. Art. n. | 21c | LS/AC | ||||||||||
| 106 | FURNISH AND INSTALL TEST CLAMP | ||||||||||||
| Fornitura e poso in opera di Sezionatore di misura | IT. No. Art. n. | 21d | EA/NO | ||||||||||
| 107 | FURNISH AND INSTALL LPS DOWN CONDUCTOR ASSEMBLY | ||||||||||||
| Fornitura e poso in opera di Calata di collegamento dall'impianto LPS in copertura fino al dispersore. | IT. No. Art. n. | 22a | EA/NO | ||||||||||
| 108 | FURNISH AND INSTALL 30x3,5mm STEEL STRIP ROOF CONDUCTOR | ||||||||||||
| Bandella di acciaio zincato 30X3,5mm | IT. No. Art. n. | 22b | m | ||||||||||
| 109 | FURNISH AND INSTALL PICKING-UP ROD H=2.5m | ||||||||||||
| Fornitura e posa in opera di asta di captazione h=2,5m | IT. No. Art. n. | 22c | EA/NO | ||||||||||
| 110 | TEST AND CERTIFICATION OF THE NEW FIRE ALARM SYSTEM. | ||||||||||||
| Collaudo e certificazione del nuovo impianto allarme incendio. | IT. No. Art. n. | 20e | LS/AC | ||||||||||
| 111 | EXECUTION OF THE AS BUILT DRAWINGS AND SCHEDULES | ||||||||||||
| Redazione ed emissione di disegni e schemi di As Built finali | IT. No. Art. n. | 23 | LS/AC | ||||||||||
| TOTAL PART IV / Totale Parte IV | |||||||||||||
| D. | DEMOLITION / Demolizioni | ||||||||||||
| 57 | B.9391 AND 5 SHEDs DEMOLITION | ||||||||||||
| Demolizione Edifico 9391 e 5 prefabbricati | IT. No. Art. n. | 1 | Ls/Ac | ||||||||||
| TOTAL PART D / Totale Parte D | |||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||||||||
| PART III - MECHANICAL WORK | |||||||||||||
| PART IV - ELECTRICAL WORK | |||||||||||||
| PART D - DEMOLITION / Demolizioni | |||||||||||||
| TOTAL PRICE / Costo Totale |
&RSheet &P of &N
Summary
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| ASHE 15-1017 CNS NEW EOD STORAGE FACILITY DEMO SHEDS | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 15-1017 | FAC.939, AREA F, AVIANO AIR BASE, ITALY | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| A. | NEW CONSTRUCTION / Nuova Costruzione | |||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| PART III - MECHANICAL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| PART IV - ELECTRICAL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| SUB TOTAL A. | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| D. | DEMOLITION/ Demolizioni | |||||||||||
| DEMOLITIONS | € 0.00 | € 0.00 | € 0.00 | |||||||||
| SUB TOTAL D. | € 0.00 | € 0.00 | € 0.00 | |||||||||
| TOTAL PRICE / Costo Totale | ||||||||||||
| 900X2150 mm METAL DOOR, STC50, SYMBOL "D5" | ||||||||||||
| Porta in ferro 900x2150 mm, STC50, Sigla "D5" | 2 |
&RSheet &P of &N
Grand Total
| ASHE 15-1017 CNS NEW EOD STORAGE FACILITY DEMO SHEDS | ||||||||
| INSTRUCTIONS FOR COMPLETING GCEB | ||||||||
| A. NEW CNSTR | D. DEMO | TOTAL A+D (€) | TOTAL A+D ($) | |||||
| TOTAL MATERIAL COSTS | € | € | € | $ | ||||
| TOTAL LABOR COSTS | € | € | € | $ | ||||
| TOTAL OTHER DIRECT COSTS | € | € | € | $ | ||||
| TOTAL DIRECT COSTS | € | € | € | $ | ||||
| OVERHEAD | % | € | € | € | $ | |||
| SUBTOTAL | € | € | € | $ | ||||
| PROFIT | % | € | € | € | $ | |||
| TOTAL PRICE | € | € | € | $ | ||||
| DATE | FIRM NAME | |||||||
| TITLE | BY | |||||||
| INSTRUCTIONS TO OFFERORS |
&RSheet &P of &N
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.