CONSTRUCTION COST ESTIMATE BREAKDOWN

View the file

Other files

File Type Posted
Addendum__1_Revised_ASHE_15-1017.pdf PDF
FA568218R0009_0005.pdf PDF
ASHE_15-1017_Safety_Plan.pdf PDF
FA568218R0009_0004.pdf PDF
A-1_A-3_Drawings_REV2.pdf PDF
C-1_C-2_C-4_C-5_Drawings_REV2.pdf PDF
S-2_S-3_S-4_Drawings_REV2.pdf PDF
Solicitation_Amendment__3_ASHE_15-1017.pdf PDF
Addendum__1_ASHE_15-1017.pdf PDF
E-3_E-4_Drawings_REV2.pdf PDF
M-1_Drawing_REV2.pdf PDF
Amendment__2.docx DOCX document
ASHE_15-1017_Addedum___1.pdf PDF
FA568218R0009_Mod.pdf PDF
FA568218R0009_27_Dec_17.pdf PDF
Additional_Requirements,_Dec_2017.pdf PDF
M_Drawings.pdf PDF
S_Drawings.pdf PDF
C_Drawings.pdf PDF
A_Drawings.pdf PDF
E_Drawings.pdf PDF
ASHE_15-1017_TECHNICAL_SPECIFICATIONS_ENG.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW CONS&DEMO.

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ASHE 15-1017 CNS NEW EOD STORAGE FACILITY DEMO SHEDS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 15-1017FAC.939, AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.NEW CONSTRUCTION / Nuova Costruzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Work - Ia Lavori Architettonici
NOT APPLICABLE Non Applicabile
Total Architectural Work - Totale Lavori Architettonici
Ib Structural Work - Ib Lavori Strutturali
1EXCAVATION FOR FOUNDATIONS
Scavo per Fodazioni in c.a.IT. No. Art. n.1m3
Total Structural Work - Totale Lavori Strutturali
Ic Civil Work - Ic Lavori Civili
2UNDERGROUND UTILITIES DEMOLITION
Demolizione sottoserviziIT. No. Art. n.1LS/AC
3ASPHALT DEMOLITION
Demolizione asfaltoIT. No. Art. n.2m2
4EXCAVATION FOR NEW SUB-BASE
Scavo sbancamentoIT. No. Art. n.3m3
Total Civil Work - Totale Lavori Civili
Id Mechanical Work - Id Lavori Meccanici
NOT APPLICABLE Non Applicabile
Total Mechanical Work - Totale Lavori Meccanici
Ie Electrical Work - Ie Lavori Elettrici
Total Electrical Work - Totale Lavori Eletttrici
TOTAL PART I - Totale Parte I
PART IIa - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte IIa - Lavori Architettonici, Strutturali e Civili
5INDUSTRIAL CONCRETE FLOOR WITH EPOXY
Pavimento industriale in cls con protezione in resinaIT. No. Art. n.1m2
68/10 mm THICK STEEL FLASHING
Scossaline in lamiera di acciaio, spessore 8/10 mmIT. No. Art. n.2m
7110 MM DIAMETER STEEL PIPE DOWNSPOUTS
Pluviali in tubi di acciaio, diametro 110 mmIT. No. Art. n.3m
88/10 mm THICK STEEL GUTTERS
Gronde in lamiera di acciaio, spessore 8/10 mmIT. No. Art. n.4m
9ROOF WATERPROOFING SYSTEM Sistema impermeabilizzazione tettoIT. No. Art. n.5m2
10EXTERNAL WALL INSULATION PACKAGE
Cappotto per muri esterniIT. No. Art. n.6m2
11CEMENT PLASTER FOR INTERNAL WALLS AND CEILING
Intonaco per Muri interni e soffittoIT. No. Art. n.7m2
12PAINTING OF INTERIOR WALLS
Tinteggiatura di pareti interneIT. No. Art. n.8m2
13PAINTING OF EXTERIOR WALLS
Tinteggiatura di pareti esterneIT. No. Art. n.9m2
141200X2150 mm METAL DOOR, SYMBOL "D1"
Porta in metallo 1200x2150 mm, Sigla "D1"IT. No. Art. n.10Ea./No.
154500x3500 mm ROLL-UP DOOR, SYMBOL "D2"
Portone sezionale 4500x3500 mm, Sigla "D2"IT. No. Art. n.11Ea./No.
164500x4500 mm ROLL-UP DOOR, SYMBOL "D3"
Portone sezionale 4500x4500 mm, Sigla "D3"IT. No. Art. n.12Ea./No.
171200x2150 mm FIRE RATED DOOR, SYMBOL "D4"
Porta REI 90 1200x2150 mm, Sigla "D4"IT. No. Art. n.13Ea./No.
182500x900 mm METAL WINDOWS, SYMBOL "W1"
Finestre in metallo 2500x900 cm, Sigla "w1"IT. No. Art. n.14Ea./No.
19FIRE CABINET AND PORTABLE EXTINGUISHER
Armadietto portaestintore ed estintore anticendio portatileIT. No. Art. n.15Ea./No.
20ROOF PERSONAL SAFETY HANCORS
Ancoraggi di Sicurezza di coperturaIT. No. Art. n.16Ea./No.
21RADOM MITIGATION SYSTEM
Sistema Estrazione RadomIT. No. Art. n.17LS/AC
22ROOF LADDER
Scala per accesso al tettoIT. No. Art. n.18Ea./No.
23METAL ROOF PARAPET
Parapetto in ferroIT. No. Art. n.19m
Total Architectural Work - Totale Lavori Architettonici
IIb Structural Work - IIb Lavori Strutturali
24C16/20 LEAN CONCRETE SUBFOUNDATION
Calcestruzzo C16/20 per sottofondazioneIT. No. Art. n.1m3
25C20/25 CONC.FOR FOUNDATION BOND BEAM
Calcestruzzo C20/25 per cordolo di fondazioneIT. No. Art. n.2m3
26C25/30 CONCRETE FOR ELEVATION WALL
Calcestruzzo C25/30 per muri in elevazioneIT. No. Art. n.3m3
27ALVEOLAR SLAB
Solaio AlveolareIT. No. Art. n.4m2
28C25/30 CONCRETE FOR SLAB
Calcestruzzo C25/30 per solettaIT. No. Art. n.5m2
29STEEL REBARS FOR RE-INFORCED CONCRETE
Ferro d'armatura per c.aIT. No. Art. n.6Kg
30TESTING
CollaudiIT. No. Art. n.7LS/AC
Total Structural Work - Totale Lavori Strutturali
IIc CivilWork - Lavori Civili
31STABILIZED GRANULAR SUB-BASE
Inerte Stabilizzato per sottofondiIT. No. Art. n.1m3
32EXTERNAL INDUSTRIAL CONCRETE FLOOR
Pavimento industriale in c.a. per esternoIT. No. Art. n.2m2
3340X40 CM CONCRETE PIT
Pozzetto in calcestruzzo 40x40 cmIT. No. Art. n.3aEa./No.
34PREFABRICATED CONCRETE ROAD CURBS
Cigli stradali prefabbricati in calcestruzzoIT. No. Art. n.4m
353 CM THICK BITUMINOUS WARING COURSE
Conglomerato bituminoso per strato di usura, spessore 3 cmIT. No. Art. n.5m2
368 CM THICK BITUMINOUS CONCRETE BASE COURSE
Conglomerato bituminoso di base, spessore 8 cmIT. No. Art. n.6m2
Total CivilWork - Totale Lavori Civili
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
37HVAC SYSTEM ROOFTOP1
Unità monoblocco per la climatizzazioneIT. No. Art. n.1LS/AC
38HVAC SYSTEM ROOFTOP2
Unità monoblocco per la climatizzazioneIT. No. Art. n.2LS/AC
39REMOTE CONTROL PANEL
Pannello di comando remotoIT. No. Art. n.3LS/AC
40RECTANGULAR DUCTS GALVANIZED
Canali rettangolari in acciaio zincatoIT. No. Art. n.4LS/AC
41BALANCING DAMPER
Serranda taraturaIT. No. Art. n.5aEa./No.
42BALANCING DAMPER
Serranda taraturaIT. No. Art. n.5bEa./No.
43RECTANGULAR SOUND ATTENUATORS
Silenziatore rettangolareIT. No. Art. n.6aEa./No.
44RECTANGULAR SOUND ATTENUATORS
Silenziatore rettangolareIT. No. Art. n.6bEa./No.
45RECTANGULAR SOUND ATTENUATORS
Silenziatore rettangolareIT. No. Art. n.6cEa./No.
46RECTANGULAR SOUND ATTENUATORS
Silenziatore rettangolareIT. No. Art. n.6dEa./No.
47SUPPLY DIFFUSER
Diffusore mandataIT. No. Art. n.7aEa./No.
48SUPPLY DIFFUSER
Diffusore mandataIT. No. Art. n.7bEa./No.
49RETURN LOUVER
Griglia ripresaIT. No. Art. n.8aEa./No.
50RETURN LOUVER
Griglia ripresaIT. No. Art. n.8bEa./No.
51TESTING AND BALANCING HVAC SYSTEMS
Taratura e collaudo impianti HVACIT. No. Art. n.9LS/AC
Total Mechanical Work - Totale Lavori Meccanici
PART IV- ELECTRICAL WORK / Parte IV - Lavori Elettrici
52FURNISHING AND INSTALLATION NEW MAIN BREAKER 4x100A IN THE EXISTING BUILDING 947 (SUBSTATION 27-947)
Fornitura e installazione di Installazine nuovo int. 4x100A all'interno dell'edificio esistente 947 (CABINA ELETTRICA 27-947)IT. No. Art. n.1LS/AC
53FURNISHING AND INSTALLATION "MDP" ELECTRICAL PANEL
Fornitura e installazione di Quadro elettrico "MDP"IT. No. Art. n.2LS/AC
54FURNISHING AND INSTALLATION OF CONVERTER 400Vac-120vAC-60HZ-6KVA
Fornitura e installazione convertitore 400Vac-120vAC-60HZ-6KVAIT. No. Art. n.3LS/AC
55FURNISHING AND INSTALLATION MAIN PANEL FEEDER LINE FG7OR-5G35mmq
Fornitura e installazione di Linea di alimentazione generale FG7OR-5G35mmqIT. No. Art. n.4am
56FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 2x1,5mmq
Fornitura e installazione di Cavo elettrico FG7OM1 2x1,5mmqIT. No. Art. n.4bm
57FURNISHING AND INSTALLATIONELECTRICAL CABLE FG7OM1 3G1,5mmq
Fornitura e installazione di Cavo elettrico FG7OM1 3G1,5mmqIT. No. Art. n.4cm
58FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 3G2,5mmq
Fornitura e installazione di Cavo elettrico FG7OM1 3G2,5mmqIT. No. Art. n.4dm
59ELECTRICAL CABLE FG7OM1 3G4mmq
Fornitura e installazione di Cavo elettrico FG7OM1 3G4mmqIT. No. Art. n.4em
60FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 5G2,5mmq
Fornitura e installazione di Cavo elettrico FG7OM1 5G2,5mmqIT. No. Art. n.4fm
61FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 5G4mmq
Fornitura e installazione di Cavo elettrico FG7OM1 5G4mmqIT. No. Art. n.4gm
62FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OM1 5G6mmq
Fornitura e installazione di Cavo elettrico FG7OM1 5G6mmqIT. No. Art. n.4hm
63SUPPLY AND INSTALLATION AT SIGHT, OR DIGGING WITHIN WELLS, CONDUITS OF HIGH-DENSITY POLYETHYLENE "HDPE DIAM. 125
Fornitura e posa in opera a vista, entro cavedi o scavo, di cavidotti in polietilene alta densità "PEHD DIAM. 125IT. No. Art. n.5am
64SUPPLY AND INSTALLATION AT SIGHT, OR DIGGING WITHIN WELLS, CONDUITS OF HIGH-DENSITY POLYETHYLENE "HDPE DIAM. 90
Fornitura e posa in opera a vista, entro cavedi o scavo, di cavidotti in polietilene alta densità "PEHD DIAM. 90IT. No. Art. n.5bm
65FURNISHING AND INSTALLATION PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 50X50X50X5cm. (compaction of soil at the pit’s bottom)
Fornitura e installazione di Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 50x50x50x5cm (prevedere la compattazione del fondo del pozzetto).IT. No. Art. n.6EA/NO
66FURNISHING AND INSTALLATION NEWTRAY CABLE 100x75mm
Fornitura e posa in opera di nuovo canale metallico 150x75mmIT. No. Art. n.7aEA/NO
67FURNISHING AND INSTALLATION NEWTRAY CABLE 200x75mm
Fornitura e posa in opera di nuovo canale metallico 200x75mmIT. No. Art. n.7bEA/NO
68FURNISH AND INSTALL OF PVC PIPE - 20 DIAMETER
Fornitura e posa in opera di tubo in PVC - diametro 20 mmIT. No. Art. n.8am
69FURNISH AND INSTALL OF PVC PIPE - 25 DIAMETER
Fornitura e posa in opera di tubo in PVC - diametro 25 mmIT. No. Art. n.8bm
70FURNISH AND INSTALL OF PVC PIPE - 32 DIAMETER
Fornitura e posa in opera di tubo in PVC - diametro 32 mmIT. No. Art. n.8cm
71FURNISH AND INSTALL OF PVC PIPE - 40 DIAMETER
Fornitura e posa in opera di tubo in PVC - diametro 40 mmIT. No. Art. n.8dm
72FURNISHING AND INSTALLATION OF WALL FLUSHED POWER POINT FOR GENERAL USE.
Fornitura e posa in opera di punto di alimentazione generaleIT. No. Art. n.9EA/NO
73FURNISHING AND INSTALLATION POWER OUTLET WITH SWITCH
Fornitura e posa in opera di Punto presa con interruttoreIT. No. Art. n.10EA/NO
74FURNISHING AND INSTALLATION UNEL RECEPTACLE 230VAC 10/16 AMPS 2P+G, WITH AUTOMATIC CIRCUIT BREAKER 3KA-16A-230V
Fornitura e posa in opera di Punto presa UNEL 230VAC 10/16 AMPS 2P+G, CON INT. AUTOMATICO 3KA-16A-230VIT. No. Art. n.11aEA/NO
75FURNISHING AND INSTALLATION 2P+G-230V CEE TYPE INTERLOCKED OUTLET WITH FUSE, PLUG PROVIDED.
Fornitura e posa in opera di presa interbloccatastagna tipo CEE (2P+T-230V) con fusibile completa di spina.IT. No. Art. n.11bEA/NO
76FURNISHING AND INSTALLATION 3P+G-400V CEE TYPE INTERLOCKED OUTLET WITH FUSE, PLUG PROVIDED.
Fornitura e posa in opera di presa interbloccatastagna tipo CEE (3P+T-400V) con fusibile completa di spina.IT. No. Art. n.11cEA/NO
77FURNISHING AND INSTALLATION US RECEPTACLES COMPLEX WITH 2x10A CB (120V), WITH AUTOMATIC CIRCUIT BREAKER 3KA-10A-230V
Fornitura e posa in opera di presa USA con interruttore automatico 3kA, 10A, 120V 2P+T.IT. No. Art. n.11dEA/NO
78FURNISHING AND INSTALLATION EMERGENCY BUTTON
Fornitura e posa in opera di pulsante di emergenzaIT. No. Art. n.12EA/NO
79FURNISHING AND INSTALLATION WALL FLUSHED LIGHT BUTTON OR SWITCH
Fornitura e installazione di Interruttore o pulsante sottotracciaIT. No. Art. n.13aEA/NO
80FURNISHING AND INSTALLATION LIGHT POINT ADDED
Fornitura e installazione di Punto luce aggiuntoIT. No. Art. n.13bEA/NO
81FURNISHING AND INSTALLATION PHOTOCELL SWITCH
Fornitura e installazione di sensore crepuscolareIT. No. Art. n.13cEA/NO
82LED LIGHTING FIXTURE 3F LINDA LED 2X30W CONC L1570 TYPE
Plafoniera per lampade a LED tipo 3F filippi Linda LED 2X30W CONC L1570IT. No. Art. n.14aEA/NO
83LED LIGHTING FIXTURE 3F LINDA LED 2X30W/865 EP L1570 TYPE - WITH EMERGENCY KIT - 2H
Plafoniera per lampade a LED tipo 3F LINDA 2X30W/865 EP L1570 - completa di kit di emergenza - autonomia 2hIT. No. Art. n.14bEA/NO
84LED LIGHTING FIXTURE 3F LINDA LED 1X24W EP L1270 TYPE - WITH EMERGENCY KIT - 2H - and exit/emergency pittogram
Plafoniera per lampade a LED tipo 3F LINDA 1X24W EP L1570 - completa di kit di emergenza - autonomia 2h e pittogramma (sempre accesa)IT. No. Art. n.14cEA/NO
85EXTERNAL FLOOD LIGHT, LED TYPE - 37W - IP65
Proiettore asimmetrico industriale da esterno a led-37W-IP65IT. No. Art. n.14dEA/NO
86FURNISHING AND INSTALLATION F.O. NEW 12 STRANDS FIBER OPTICAL SINGLE MODE CABLE FROM BUILDING 10293 TO NEW BUILDING 9391 GEOTEXTILE INNURDUCT TYPE
Fornitura e installazione di F.O. Nuova fibra ottica single mode da 12 fibre dall'edificio esistente 10293 al nuovo edificio EOD (9391) marca geotextile innurductIT. No. Art. n.15am
87FURNISHING AND INSTALLATION SC CONNECTOR FOR F.O. NEW 12 STRANDS FIBER OPTICAL SINGLE MODE.
Fornitura e installazione di connettore per fibra ottica - connettore per attestare fibra a 12single modeIT. No. Art. n.15bLS/AC
88FURNISHING AND INSTALLATION NEW DATA COMM AND DATA CENTER FOR BUILDING 10293 AND NEW BUILDING 9391
Fornitura e installazione di Nuove opere per l'impianto dati dell'edificio 10293 e del nuovo edificio 9391IT. No. Art. n.15cLS/AC
89FURNISHING AND INSTALLATION NEW DATA RACK
Fornitura ed installazione nuovo rack datiIT. No. Art. n.16LS/AC
90FURNISHING AND INSTALLATION 2 COMMUNICATION OUTLET GROUP RJ45 cat6
Fornitura e installazione di Gruppo 2 prese per telecomunicazioni RJ45 cat.6IT. No. Art. n.17EA/NO
91FURNISHING AND INSTALLATION CAT.6 UTP, UNSHIELDED
Fornitura e installazione di cavo UTP cat.6, non schermatoIT. No. Art. n.18m
92FURNISH AND INSTALL OPTICAL FIRE SMOKE DETECTOR, ADRESSABLE TYPE.
Fornitura e posa in opera di rivelatore di fumo indirizzabileIT. No. Art. n.19aEA/NO
93FURNISH AND INSTALL FIRE MANUAL PULL STATION, ADRESSABLE TYPE.
Fornitura e posa in opera pulsante manuale di allarme incendioIT. No. Art. n.19bEA/NO
94FURNISH AND INSTALL OPTIC / ACOUSTIC FIRE ALARM DEVICE.
Fornitura e posa in opera di dispositivo di allarme incendio ottico / sonoro.IT. No. Art. n.19cEA/NO
95FURNISH AND INSTALL ADRESSABLE FIRE ALARM CONTROL PANEL. EQUIPPED WITH 2X12V / 7AH BATTERIES AND ACCESSORIES.
Fornitura e posa in opera di centrale allarme incendio. Equipaggaita con batterie 2x12V / 7Ah ed accessori.IT. No. Art. n.19dLS/AC
96SUPPLY AND INSTALLATION OF DIALER SPIN.
Fornitura e posa in opera di combinatore telefonico filareIT. No. Art. n.19eLS/AC
97SUPPLY AND INSTALLATION OF CENTRAL MONACO
Fornitura e posa in opera di centrale MonacoIT. No. Art. n.19fLS/AC
98FURNISH AND INSTALL IN/OUT MODULE, TO CONTROL RELAIS AND ACQUIRE STATUS,
Fornitura e posa in opera di moduli ingresso/uscita, per il controllo e l'acquisizione degli stati esterniIT. No. Art. n.19gEA/NO
99FIRE ALARM SYSTEM HEAT DETECTOR. CEILING MOUNTED SMOKE.
Fornitura e posa in opera di rivelatore di calore. Installato a soffittoIT. No. Art. n.19hEA/NO
100FURNISH AND INSTALL DUCT STATION FOR ADDRESSABLE DETECTORS
Fornitura e posa in opera di camera di analisi per rivelatori di fumo.IT. No. Art. n.19iEA/NO
99FURNISH AND INSTALL CABLE FTG10(O)M1 TYPE - SECTION 2X1,5 SQ.MM.
Fornitura e posa in opera di cavo FTG10(O)M1 - sezione 2x1,5 mmq.IT. No. Art. n.20am
100FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM DETECTORS, PULL STATIONS, ETC. - SECTION 2X1 SQ.MM.
Fornitura e posa in opera di cavo loop per allarme incendio - sezione 2x1 mmq.IT. No. Art. n.20bm
101FURNISH AND INSTALL OF GALVANIZED STEEL PIPE PAINTED RED - 25 DIAMETER
Fornitura e posa in opera di tubo in acciaio zincato verniciato rosso - diametro 25 mmIT. No. Art. n.20cm
102FURNISH AND INSTALL OF GALVANIZED STEEL PIPE PAINTED RED - 40 DIAMETER
Fornitura e posa in opera di tubo in acciaio zincato verniciato rosso - diametro 40 mmIT. No. Art. n.20dm
103FURNISH AND INSTALL NEW GROUNDING SYSTEM- 95 mmq BARE COPPER STRAND
Fornitura e poso in opera di Nuovo impianto di terra - Corda nuda di rame 95 mmqIT. No. Art. n.21am
104FURNISH AND INSTALL GROUND INSPECTION PIT: NEW ELECTRICAL MANHOLE 400x400mm HEAVY DUTY CAST IRON WITH COPPER CLAD STEEL GROUND
Fornitura e poso in opera di Pozzetto impianto di terra: nuova cameretta linea elettrica dimensioni 400x400mm con chiusino in ghisa completo di dispersore in acciaio ramatoIT. No. Art. n.21bEA/NO
105FURNISH AND INSTALL MAIN GROUND BAR
Fornitura e poso in opera di Barra di terra pricnipaleIT. No. Art. n.21cLS/AC
106FURNISH AND INSTALL TEST CLAMP
Fornitura e poso in opera di Sezionatore di misuraIT. No. Art. n.21dEA/NO
107FURNISH AND INSTALL LPS DOWN CONDUCTOR ASSEMBLY
Fornitura e poso in opera di Calata di collegamento dall'impianto LPS in copertura fino al dispersore.IT. No. Art. n.22aEA/NO
108FURNISH AND INSTALL 30x3,5mm STEEL STRIP ROOF CONDUCTOR
Bandella di acciaio zincato 30X3,5mmIT. No. Art. n.22bm
109FURNISH AND INSTALL PICKING-UP ROD H=2.5m
Fornitura e posa in opera di asta di captazione h=2,5mIT. No. Art. n.22cEA/NO
110TEST AND CERTIFICATION OF THE NEW FIRE ALARM SYSTEM.
Collaudo e certificazione del nuovo impianto allarme incendio.IT. No. Art. n.20eLS/AC
111EXECUTION OF THE AS BUILT DRAWINGS AND SCHEDULES
Redazione ed emissione di disegni e schemi di As Built finaliIT. No. Art. n.23LS/AC
TOTAL PART IV / Totale Parte IV
D.DEMOLITION / Demolizioni
57B.9391 AND 5 SHEDs DEMOLITION
Demolizione Edifico 9391 e 5 prefabbricatiIT. No. Art. n.1Ls/Ac
TOTAL PART D / Totale Parte D
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
PART D - DEMOLITION / Demolizioni
TOTAL PRICE / Costo Totale

&RSheet &P of &N

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ASHE 15-1017 CNS NEW EOD STORAGE FACILITY DEMO SHEDS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 15-1017FAC.939, AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.NEW CONSTRUCTION / Nuova Costruzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ 0.00€ 0.00€ 0.00€ 0.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK€ 0.00€ 0.00€ 0.00€ 0.00
PART III - MECHANICAL WORK€ 0.00€ 0.00€ 0.00€ 0.00
PART IV - ELECTRICAL WORK€ 0.00€ 0.00€ 0.00€ 0.00
SUB TOTAL A.€ 0.00€ 0.00€ 0.00€ 0.00
D.DEMOLITION/ Demolizioni
DEMOLITIONS€ 0.00€ 0.00€ 0.00
SUB TOTAL D.€ 0.00€ 0.00€ 0.00
TOTAL PRICE / Costo Totale
900X2150 mm METAL DOOR, STC50, SYMBOL "D5"
Porta in ferro 900x2150 mm, STC50, Sigla "D5"2

&RSheet &P of &N

Grand Total

ASHE 15-1017 CNS NEW EOD STORAGE FACILITY DEMO SHEDS
INSTRUCTIONS FOR COMPLETING GCEB
A. NEW CNSTRD. DEMOTOTAL A+D (€)TOTAL A+D ($)
TOTAL MATERIAL COSTS€€€$
TOTAL LABOR COSTS€€€$
TOTAL OTHER DIRECT COSTS€€€$
TOTAL DIRECT COSTS€€€$
OVERHEAD%€€€$
SUBTOTAL€€€$
PROFIT%€€€$
TOTAL PRICE€€€$
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS

&RSheet &P of &N

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein.