Schedule of Material Submittals
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
English
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 08-1006 | PROJECT TITLE | |||
| ADD APPROACH LIGHT SYS, RWY 20 | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | |||||||||||||
| 1 | Construction Schedule | 1 | NTP+5 | ||||||||||
| 2 | Work Plan | 1 | NTP+5 | ||||||||||
| SECTION 01 11 01 | |||||||||||||
| 3 | Warranty letter | 1 | Prior to Final Inspection (FI) | ||||||||||
| 4 | Progress Schedule | 1 | NTP+10 | ||||||||||
| 5 | Mobility Plan | 1 | NTP+15 | ||||||||||
| 6 | Project sign | 1 | NTP+15 | ||||||||||
| 7 | Quality Control Plan | 1 | NTP+15 | ||||||||||
| 8 | Environmental protection plan | 1 | NTP+15 | ||||||||||
| 9 | Waste & construction debris management certificate | 1 | Prior to FI | ||||||||||
| 10 | As-Built drawings | 1 | Prior to FI | ||||||||||
| 11 | Spatial Data | 1 | Prior to FI, after as-builts approval | ||||||||||
| 12 | Key Personnel | 1 | NTP+15 | ||||||||||
| 13 | Personel listing | 1 | NTP+15 | ||||||||||
| 14 | Health and safety program | 1 | NTP+15 | ||||||||||
| 15 | O&M Manuals | 1 | Prior to FI | ||||||||||
| SECTION 03 30 00 | |||||||||||||
| 16 | Quality control plan | 1 | Prior to installation | ||||||||||
| 17 | Quality control personnel | 1 | 1 | Prior to installation | |||||||||
| 18 | Reinforcement Steel | 1 | 1 | 1 | Prior to installation | ||||||||
| 19 | Reinforcement Steel | 1 | daily | ||||||||||
| 20 | Concrete mix design | 1 | 1 | Prior to installation | |||||||||
| 21 | Concrete mix design | 1 | daily | ||||||||||
| 22 | Compressive strenght | 1 | Prior to installation | ||||||||||
| 23 | Compressive strenght test | 1 | daily | ||||||||||
| SECTION 04 20 00 | |||||||||||||
| 24 | bricks | 1 | 1 | 1 | Prior to installation | ||||||||
| 25 | mortar and sand | 1 | 1 | 1 | Prior to installation | ||||||||
| SECTION 05 12 00 | |||||||||||||
| 26 | Erection drawings | 1 | 1 | Prior to installation | |||||||||
| 27 | Fabrication drawings | 1 | 1 | Prior to installation | |||||||||
| SECTION 10 14 53 | |||||||||||||
| 28 | Traffic Signs | 1 | 1 | Prior to installation | |||||||||
| SECTION 26 56 20.00 10 | |||||||||||||
| 29 | Lighting and visual navigation aids | 1 | |||||||||||
| 30 | Handhole and wire cable tray | 1 | |||||||||||
| 31 | Handhole covers | 1 | |||||||||||
| 32 | Cable connectors ans splices | 1 | 1 | ||||||||||
| 33 | Each lighting fixture | 1 | |||||||||||
| 34 | Electrical tape | 1 | |||||||||||
| 35 | Conduit and fittings | 1 | |||||||||||
| 36 | Airfield lighting cable | 1 | |||||||||||
| 37 | Control cable | 1 | |||||||||||
| 38 | Airfield approach lights (elevated) | 1 | |||||||||||
| 39 | Sequence flashing lights (elevated) | 1 | |||||||||||
| 40 | Counterpoise wire | 1 | |||||||||||
| 41 | Ground rods | 1 | |||||||||||
| 42 | Transformers | 1 | |||||||||||
| 43 | Sealant | 1 | |||||||||||
| 44 | Pre-cast handholes | 1 | 1 | ||||||||||
| 45 | Handholes covers | 1 | 1 | ||||||||||
| 46 | Buried warning and identification tape | 1 | |||||||||||
| 47 | Cable tags | 1 | |||||||||||
| 48 | Field quality control | 1 | Upon task |
completion
| 49 | Visual inspection | 1 | Upon task completion |
| 50 | Final operating tests | 1 | After task and preliminary |
tests completion
| 51 | AGL Photometric test | 1 | Upon task completion | ||||||||||
| 52 | Qualifications | 1 | |||||||||||
| 53 | Construction outage plan | 1 | |||||||||||
| 54 | AGL System Installation Compliance Certificate | 1 | |||||||||||
| 55 | Training | 1 | 4 weeks before training | ||||||||||
| 56 | Operations and maintenance procedures | 1 | |||||||||||
| 57 | Posted instructions | 1 | |||||||||||
| 58 | Wiring drawings | 1 | Prior to 'as-built' | ||||||||||
| SECTION 31 00 00 | |||||||||||||
| 57 | Selected Soils material | 1 | Before use | ||||||||||
| 58 | Selected Soils execution | 6 | Daily | ||||||||||
| SECTION 31 05 19 | |||||||||||||
| 59 | Geotextile material | 1 | 1 | 1 | 1 | Prior to installation | |||||||
| SECTION 32 11 24 | |||||||||||||
| 60 | Crushed Aggregate Base Course material | 1 | 1 | Before use | |||||||||
| 61 | Crushed Aggregate Base Course execution | 7 | Daily | ||||||||||
| SECTION 32 11 34 | |||||||||||||
| 62 | Cement-Stabilized Soil material | 1 | 4 | Before use | |||||||||
| 63 | Cement-Stabilized Soil execution | 7 | Daily | ||||||||||
| SECTION 32 12 13 | |||||||||||||
| 64 | Prime Coat material | 1 | 2 | Before use | |||||||||
| 65 | Prime Coat execution | 3 | Daily | ||||||||||
| SECTION 32 12 16 | |||||||||||||
| 66 | HMA material | 1 | 1 | Before use | |||||||||
| 67 | HMA execution | 3 | Daily | ||||||||||
| SECTION 32 17 23 | |||||||||||||
| 68 | Road marking materials | 1 | Before use | ||||||||||
| 69 | Road marking equipment | 1 | 1 | Before use | |||||||||
| 70 | Road marking execution | 2 | Daily | ||||||||||
| SECTION 32 31 13 | |||||||||||||
| 71 | Fence asembly | 1 | Prior to installation | ||||||||||
| 72 | Location | 1 | Prior to installation | ||||||||||
| 73 | Gate assembly | 1 | Prior to installation | ||||||||||
| 74 | Gate hardware | 1 | Prior to installation | ||||||||||
| 75 | Erection drawings | 1 | Prior to installation | ||||||||||
| 76 | Fence asembly | 1 | 1 | 1 | Prior to installation | ||||||||
| 77 | Gate assembly | 1 | 1 | 1 | Prior to installation | ||||||||
| 78 | Gate harware | 1 | 1 | 1 | Prior to installation | ||||||||
| 79 | Zinc coating | 1 | 1 | 1 | Prior to installation | ||||||||
| 80 | Fabrics | 1 | 1 | 1 | Prior to installation | ||||||||
| 81 | Post | 1 | 1 | 1 | Prior to installation | ||||||||
| 82 | Braces | 1 | 1 | 1 | Prior to installation | ||||||||
| 83 | Line post | 1 | 1 | 1 | Prior to installation | ||||||||
| 84 | Sleeves | 1 | 1 | 1 | Prior to installation | ||||||||
| 85 | Top rails | 1 | 1 | 1 | Prior to installation | ||||||||
| 86 | Tension wire | 1 | 1 | 1 | Prior to installation | ||||||||
| 87 | Wire tires | 1 | 1 | 1 | Prior to installation | ||||||||
| SECTION 32 93 00 | |||||||||||||
| 88 | Peat | 1 | Prior to installation | ||||||||||
| 89 | Gypsum | 1 | Prior to installation | ||||||||||
| 90 | Ground Stakes | 1 | Prior to installation | ||||||||||
| 91 | Fertilizer | 1 | 1 | Prior to installation | |||||||||
| 92 | Staking material | 1 | Prior to installation | ||||||||||
| 93 | Metal anchors | 1 | Prior to installation | ||||||||||
| 94 | Antidesiccants | 1 | Prior to installation | ||||||||||
| 95 | Topsoil | 1 | Prior to installation | ||||||||||
| 96 | Soil | 1 | 1 | Prior to installation | |||||||||
| 97 | Plants | 1 | 1 | 1 | Prior to installation | ||||||||
| SECTION 33 40 00 | |||||||||||||
| 98 | Pipe for Culvert and Storm Drains | 1 | 1 | 1 | 1 | 1 | Prior to installation | ||||||
| 99 | Elastomeric Seals | 1 | 1 | 1 | Prior to installation | ||||||||
| 100 | Geotextile Filters | 1 | 1 | 1 | 1 | Before placement | |||||||
| 101 | Riprap | 1 | 1 | Before placement | |||||||||
| 102 | Post-Installation Inspection Report | 1 | 5 | After installation |
Page &P
Spanish
| PROGRAMA DE PRESENTACIÓN DE LOS ENTREGABLES | NÚMERO DE PROYECTO | |||
| QUUG 08-1006 | TÍTULO DE PROYECTO | |||
| AMPLIAR SISTEMA DE LUCES DE APROXIMACIÓN DE PISTA 20 | SOLICITACIÓN / CONTRATO Nº |
| (A completar por el Ingeniero de Proyecto) | (A completar por el Administrador del Contrato) | ||||||||||||||
| NÚMERO DE COPIAS REQUERIDAS | |||||||||||||||
| NÚMERO DE LÍNEA | PRODUCTO O DESCRIPCIÓN DEL PRODUCTO, REFERENCIA DEL CONTRATO, TIPO DE ENTREGA | CERTIFICADO DE CONFORMIDAD | PLANOS DE DISEÑO | MUESTRAS | SECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATALOGO | MANUAL DE INSTRUCCIONES | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TECNICOS | INFORMES DE ENSAYOS | INFORMES DEL TERRENO | FECHA PREVISTA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECIBIDA EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
FECHA PARA INGENIERÍA CIVIL
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA DE DEVOLUCION
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE ENTREGABLES
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN AL CONTRATISTA NUEVA ENTREGA DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
RECHAZADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | |||||||||||||
| 1 | Calendario de obra | 1 | NTP+5 | ||||||||||
| 2 | Plan de trabajo | 1 | NTP+5 | ||||||||||
| SECCIÓN 01 11 01 | |||||||||||||
| 3 | Carta de garantía | 1 | Antes de la Inspección Final (IF) | ||||||||||
| 4 | Calendarío de progreso | 1 | NTP+10 | ||||||||||
| 5 | Plan de movilidad | 1 | NTP+15 | ||||||||||
| 6 | Firma del proyecto | 1 | NTP+15 | ||||||||||
| 7 | Plan de control de la calidad | 1 | NTP+15 | ||||||||||
| 8 | Plan de proteccióm mediambiental | 1 | NTP+15 | ||||||||||
| 9 | Certificado de gestión de escombros y residuos en construcción | 1 | Antes de la Inspección Final (IF) | ||||||||||
| 10 | Planos de obra | 1 | Antes de la Inspección Final (IF) | ||||||||||
| 11 | Datos de lugar | 1 | Antes de la IF, después de la aprovación documento final de obra | ||||||||||
| 12 | Personal Clave | 1 | NTP+15 | ||||||||||
| 13 | Enumeración del personal | 1 | NTP+15 | ||||||||||
| 14 | Programa de seguridad y salud | 1 | NTP+15 | ||||||||||
| 15 | Manuales de operación y mantenimiento | 1 | Antes de la Inspección Final (IF) | ||||||||||
| SECCIÓN 03 30 00 | |||||||||||||
| 16 | Plan de control de la calidad | 1 | Antes de la instalación | ||||||||||
| 17 | Personal de control de la calidad | 1 | 1 | Antes de la instalación | |||||||||
| 18 | Acero de refuerzo | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 19 | Acero para armado | 1 | Diariamente | ||||||||||
| 20 | Diseño de la mezcla de hormigón | 1 | 1 | Antes de la instalación | |||||||||
| 21 | Diseño de la mezcla de hormigón | 1 | Diariamente | ||||||||||
| 22 | Fuerza de compresión | 1 | Antes de la instalación | ||||||||||
| 23 | Resistencia a la compresión | 1 | Diariamente | ||||||||||
| SECTION 04 20 00 | |||||||||||||
| 24 | Ladrillos | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 25 | morteros, y arenas | 1 | 1 | 1 | Antes de la instalación | ||||||||
| SECCIÓN 05 12 00 | |||||||||||||
| 26 | Planos de montaje | 1 | 1 | Antes de la instalación | |||||||||
| 27 | Planos de fabricación | 1 | 1 | Antes de la instalación | |||||||||
| SECCIÓN 10 14 53 | |||||||||||||
| 28 | Señales de tráfico | 1 | 1 | Antes de la instalación | |||||||||
| SECCIÓN 26 56 20.00 10 | |||||||||||||
| 27 | Ayudas visuales para navegación e iluminación | 1 | |||||||||||
| 28 | Arqueta y banco de tubos | 1 | |||||||||||
| 29 | Tapas de arquetas | 1 | |||||||||||
| 30 | Empalmes y conectores de cables | 1 | 1 | ||||||||||
| 31 | Características de las luces | 1 | |||||||||||
| 32 | Tapa electrica | 1 | |||||||||||
| 33 | Conductos y dispositivos | 1 | |||||||||||
| 34 | Cable para campo de vuelo | 1 | |||||||||||
| 35 | Cable de control | 1 | |||||||||||
| 36 | Luces de aproximación (Elevadas) | 1 | |||||||||||
| 37 | Luces de destello (elevadas) | 1 | |||||||||||
| 38 | Cable de contrapesado | 1 | |||||||||||
| 39 | Tomas de tierra | 1 | |||||||||||
| 40 | Transformadores | 1 | |||||||||||
| 41 | Sellante | 1 | |||||||||||
| 42 | Arquetas prefabricadas | 1 | 1 | ||||||||||
| 43 | Tapas de arquetas | 1 | 1 | ||||||||||
| 44 | Cinta de señalización | 1 | |||||||||||
| 45 | Etiquetado de cable | 1 | |||||||||||
| 46 | Control de calidad | 1 | Al completar la tarea | ||||||||||
| 47 | Inspección visual | 1 | Al completar la tarea | ||||||||||
| 48 | Pruebas de operatividad finales | 1 | Después de completar la tarea y los test preliminares | ||||||||||
| 49 | Prueba fotométrica de las ayudas visuales | 1 | Al completar la tarea | ||||||||||
| 50 | Calificaciones | 1 | |||||||||||
| 51 | Plan de interrupción de obra | 1 | |||||||||||
| 52 | Certificado de cumplimiento de la instalación del sistema de ayudas | 1 | |||||||||||
| 53 | Formación | 1 | 4 semanas antes de la prueba | ||||||||||
| 54 | Procedimientos de mantenimiento y operación | 1 | |||||||||||
| 55 | Instrucciones publicadas | 1 | |||||||||||
| 56 | Planos de cableado | 1 | Antes de aprovación documento final de obra | ||||||||||
| SECCIÓN 31 00 00 | |||||||||||||
| 57 | Material de suelo seleccionado | 1 | Antes de usar | ||||||||||
| 58 | Ejecución de suelo seleccionado | 6 | Diariamente | ||||||||||
| SECCIÓN 31 05 19 | |||||||||||||
| 59 | Material geotextil | 1 | 1 | 1 | 1 | Antes de la instalación | |||||||
| SECCIÓN 32 11 24 | |||||||||||||
| 60 | Zahorra artificial en capa base | 1 | 1 | Antes de usar | |||||||||
| 61 | Ejecución de zahorra artificial en capa base | 7 | Diariamente | ||||||||||
| SECCIÓN 32 11 34 | |||||||||||||
| 62 | Suelo estabilizado con cemento | 1 | 4 | Antes de usar | |||||||||
| 63 | Ejecución de suelo estabilizado con cemento | 7 | Diariamente | ||||||||||
| SECCIÓN 32 12 13 | |||||||||||||
| 64 | Emulsión bituminosa para riego de adherencia | 1 | 2 | Antes de usar | |||||||||
| 65 | Ejecución de emulsión bituminosa para riego de adherencia | 3 | Diariamente | ||||||||||
| SECCIÓN 32 12 16 | |||||||||||||
| 66 | Material HMA | 1 | 1 | Antes de usar | |||||||||
| 67 | Ejecución de HMA | 3 | Diariamente | ||||||||||
| SECCIÓN 32 17 23 | |||||||||||||
| 68 | Material de señalización vial | 1 | Antes de usar | ||||||||||
| 69 | Equipamiento de señalización vial | 1 | 1 | Antes de usar | |||||||||
| 70 | Ejecución de señalización vial | 2 | Diariamente | ||||||||||
| SECCIÓN 32 31 13 | |||||||||||||
| 71 | Montaje del vallado | 1 | Antes de la instalación | ||||||||||
| 72 | Localización | 1 | Antes de la instalación | ||||||||||
| 73 | Montaje de puerta | 1 | Antes de la instalación | ||||||||||
| 74 | Herraje de puerta | 1 | Antes de la instalación | ||||||||||
| 75 | Planos de montaje | 1 | Antes de la instalación | ||||||||||
| 76 | Montaje del vallado | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 77 | Montaje de puerta | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 78 | Herraje de puerta | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 79 | Recubrimiento de zinc | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 80 | Estructura | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 81 | Postes | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 82 | Abrazaderas | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 83 | Postes de hilera | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 84 | Fundas protectoras | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 85 | Railes superiores | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 86 | Cable de tensión | 1 | 1 | 1 | Antes de la instalación | ||||||||
| 87 | Cables tirantes | 1 | 1 | 1 | Antes de la instalación | ||||||||
| SECCIÓN 32 93 00 | |||||||||||||
| 88 | Turba | 1 | Antes de la instalación | ||||||||||
| 89 | Yeso | 1 | Antes de la instalación | ||||||||||
| 90 | Estacas | 1 | Antes de la instalación | ||||||||||
| 91 | Fertilizante | 1 | 1 | Antes de la instalación | |||||||||
| 92 | Material de atado | 1 | Antes de la instalación | ||||||||||
| 93 | Anclajes metálicos | 1 | Antes de la instalación | ||||||||||
| 94 | Antidesecantes | 1 | Antes de la instalación | ||||||||||
| 95 | Tierra vegetal | 1 | Antes de la instalación | ||||||||||
| 96 | Terreno | 1 | 1 | Antes de la instalación | |||||||||
| 97 | Plantas | 1 | 1 | 1 | Antes de la instalación |
| SECCIÓN 33 40 00 | ||||||||
| 98 | Tuberías para desagües pluviales | 1 | 1 | 1 | 1 | 1 | Antes de la instalación | |
| 99 | Sellados elastoméricos | 1 | 1 | 1 | Antes de la instalación | |||
| 100 | Filtros geotextiles | 1 | 1 | 1 | 1 | Antes de la colocación | ||
| 101 | Riprap | 1 | 1 | Antes de la colocación | ||||
| 102 | Informe de inspección posterior a la instalación | 1 | 5 | Después de la instalación |
Page &P
File details come from the government source that posted it.