Schedule of Material Submittals
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5575-17-B-0003-0001.pdf | ||
| Questions_and_Answers.pdf | ||
| 15-1009_Specs_Spanish.pdf | ||
| FA5575-17-B-0003.pdf | ||
| 15-1009_Drawings_Part1.pdf | ||
| 15-1009_Specs_English.pdf | ||
| 15-1009_Drawings_Part2.pdf | ||
| 15-1009_Ktor_Construction_Cost_Estimate_Breakdown.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 15-1009 | PROJECT TITLE |
RPR AIRFIELD APPROACH & ID LIGHTING, RUNWAY 20
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | ||||||||||
| 1 | Construction Schedule | 1 | NTP+5 | |||||||
| 2 | Work Plan | 1 | NTP+5 | |||||||
| SECTION 01 11 01 | ||||||||||
| 3 | Warranty letter | 1 | Prior to Final Inspection (FI) | |||||||
| 4 | Progress Schedule | 1 | NTP+10 | |||||||
| 5 | Mobility Plan | 1 | NTP+15 | |||||||
| 6 | Project sign | 1 | NTP+15 | |||||||
| 7 | Quality Control Plan | 1 | NTP+15 | |||||||
| 8 | Environmental protection plan | 1 | NTP+15 | |||||||
| 9 | Waste & construction debris management certificate | 1 | Prior to FI | |||||||
| 10 | As-Built drawings | 1 | Prior to FI | |||||||
| 11 | Spatial Data | 1 | Prior to FI, after as-builts approval | |||||||
| 12 | Key Personnel | 1 | NTP+15 | |||||||
| 13 | Personel listing | 1 | NTP+15 | |||||||
| 14 | Health and safety program | 1 | NTP+15 | |||||||
| 15 | O&M Manuals | 1 | Prior to FI | |||||||
| SECTION 03 30 00.00 20 | ||||||||||
| 12 | Inspection certificate of the concrete batch plant | 1 | ||||||||
| 13 | Concrete control test program | 1 | ||||||||
| 14 | Results of the concrete control tests | 1 | ||||||||
| SECTION 26 20 00 | ||||||||||
| 16 | RMC Conduit and fittings, 1 x type | 1 | ||||||||
| 17 | FMC Conduit and fittings, 1 x type | 1 | ||||||||
| 18 | Junction and pull boxes | 1 | ||||||||
| 19 | Wires and cables | 1 | ||||||||
| 20 | Circuit breakers | 1 | ||||||||
| 21 | Panelboards | 1 | ||||||||
| 22 | Surge Protective Device | 1 | ||||||||
| 23 | Transformer | 1 | ||||||||
| 24 | Enclosed Fuse Cut-out and Fuse Links | 1 | ||||||||
| 25 | Labels | 1 | ||||||||
| 26 | Panelboards | 1 | ||||||||
| 27 | One-line Diagram | 1 | ||||||||
| 28 | Unit Substation Drawings | 1 | ||||||||
| 29 | Devices subject to manual operation | 1 | Facility Acceptance -5 | |||||||
| 30 | 1000-Volt wiring test | 1 | Facility Acceptance -5 | |||||||
| 31 | Panelboards | 1 | ||||||||
| 32 | Transformer Losses Report | 1 | ||||||||
| 33 | Single line diagram of the "as-built" | 1 | ||||||||
| 34 | Schematic diagram | 1 | ||||||||
| 35 | Active electrical equipment O&M Manuals | 1 | ||||||||
| SECTION 26 56 20.00 10 | ||||||||||
| 36 | Lighting and visual navigation aids | 1 | ||||||||
| 37 | Handhole and wire cable tray | 1 | ||||||||
| 38 | Handhole covers | 1 | ||||||||
| 39 | Cable connectors ans splices | 1 | 1 | |||||||
| 40 | Each lighting fixture | 1 | ||||||||
| 41 | Airfield lights bases (deep and shallow) | 1 | ||||||||
| 42 | Electrical tape | 1 | ||||||||
| 43 | Conduit and fittings | 1 | ||||||||
| 44 | Airfield lighting cable | 1 | ||||||||
| 45 | Cable for pavement slot installation | 1 | ||||||||
| 46 | Control cable | 1 | ||||||||
| 47 | Airfield approach lights (inset and elevated) | 1 | ||||||||
| 48 | Sequence flashing lights (inset and elevated) | 1 | ||||||||
| 49 | Runway edge lights red prisms | 1 | ||||||||
| 50 | Light bases | 1 | ||||||||
| 51 | Counterpoise wire | 1 | ||||||||
| 52 | Ground rods | 1 | ||||||||
| 53 | Transformers | 1 | ||||||||
| 54 | Sealant | 1 | ||||||||
| 55 | Pre-cast handholes | 1 | 1 | |||||||
| 56 | Handholes covers | 1 | 1 | |||||||
| 57 | Buried warning and identification tape | 1 | ||||||||
| 58 | Cable tags | 1 | ||||||||
| 59 | Field quality control | 1 | Upon task |
completion 60 Visual inspection 1 Upon task completion
| 61 | Final operating tests | 1 | After task and preliminary tests completion | |||
| 62 | Qualifications | 1 | ||||
| 63 | Construction outage plan | 1 | ||||
| 64 | Training | 1 | 4 weeks before training | |||
| 65 | Operations and maintenance procedures | 1 | ||||
| 66 | Posted instructions | 1 | ||||
| 67 | Wiring drawings | 1 | Prior to 'as-built' |
| SECTION 31 23 00.00 20 | ||||||
| 68 | Material proposed as backfill, soil & topsoil | 4 | ||||
| 69 | Backfill material | 4 | Upon test execution | |||
| 70 | Compaction | 4 | Upon test execution | |||
| SECTION 32 07 06 | ||||||
| 71 | Paint | 1 | 1 | 1 | ||
| 72 | Glass spheres | 1 | 1 |