15-1009_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
RPR Airfield Approach & ID Lighting, Runway 20 QUUG 15-1009
Solicitation number
FA5575-17-B-0003
Issued by

About this file

Schedule of Material Submittals

View the file

Other files

File Type Posted
FA5575-17-B-0003-0001.pdf PDF
Questions_and_Answers.pdf PDF
15-1009_Specs_Spanish.pdf PDF
FA5575-17-B-0003.pdf PDF
15-1009_Drawings_Part1.pdf PDF
15-1009_Specs_English.pdf PDF
15-1009_Drawings_Part2.pdf PDF
15-1009_Ktor_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 15-1009PROJECT TITLE

RPR AIRFIELD APPROACH & ID LIGHTING, RUNWAY 20

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule1NTP+5
2Work Plan1NTP+5
SECTION 01 11 01
3Warranty letter1Prior to Final Inspection (FI)
4Progress Schedule1NTP+10
5Mobility Plan1NTP+15
6Project sign1NTP+15
7Quality Control Plan1NTP+15
8Environmental protection plan1NTP+15
9Waste & construction debris management certificate1Prior to FI
10As-Built drawings1Prior to FI
11Spatial Data1Prior to FI, after as-builts approval
12Key Personnel1NTP+15
13Personel listing1NTP+15
14Health and safety program1NTP+15
15O&M Manuals1Prior to FI
SECTION 03 30 00.00 20
12Inspection certificate of the concrete batch plant1
13Concrete control test program1
14Results of the concrete control tests1
SECTION 26 20 00
16RMC Conduit and fittings, 1 x type1
17FMC Conduit and fittings, 1 x type1
18Junction and pull boxes1
19Wires and cables1
20Circuit breakers1
21Panelboards1
22Surge Protective Device1
23Transformer1
24Enclosed Fuse Cut-out and Fuse Links1
25Labels1
26Panelboards1
27One-line Diagram1
28Unit Substation Drawings1
29Devices subject to manual operation1Facility Acceptance -5
301000-Volt wiring test1Facility Acceptance -5
31Panelboards1
32Transformer Losses Report1
33Single line diagram of the "as-built"1
34Schematic diagram1
35Active electrical equipment O&M Manuals1
SECTION 26 56 20.00 10
36Lighting and visual navigation aids1
37Handhole and wire cable tray1
38Handhole covers1
39Cable connectors ans splices11
40Each lighting fixture1
41Airfield lights bases (deep and shallow)1
42Electrical tape1
43Conduit and fittings1
44Airfield lighting cable1
45Cable for pavement slot installation1
46Control cable1
47Airfield approach lights (inset and elevated)1
48Sequence flashing lights (inset and elevated)1
49Runway edge lights red prisms1
50Light bases1
51Counterpoise wire1
52Ground rods1
53Transformers1
54Sealant1
55Pre-cast handholes11
56Handholes covers11
57Buried warning and identification tape1
58Cable tags1
59Field quality control1Upon task

completion 60 Visual inspection 1 Upon task completion

61Final operating tests1After task and preliminary tests completion
62Qualifications1
63Construction outage plan1
64Training14 weeks before training
65Operations and maintenance procedures1
66Posted instructions1
67Wiring drawings1Prior to 'as-built'
SECTION 31 23 00.00 20
68Material proposed as backfill, soil & topsoil4
69Backfill material4Upon test execution
70Compaction4Upon test execution
SECTION 32 07 06
71Paint111
72Glass spheres11