Contractor Construction Cost Estimate
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5575-17-B-0003-0001.pdf | ||
| Questions_and_Answers.pdf | ||
| 15-1009_Specs_Spanish.pdf | ||
| FA5575-17-B-0003.pdf | ||
| 15-1009_Drawings_Part1.pdf | ||
| 15-1009_Specs_English.pdf | ||
| 15-1009_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| 15-1009_Drawings_Part2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RENOVATE AIRFIELD APPROACH & ID LIGHTING, RWY 20 | 0.00 € | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 15-1009 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| WORKS IN AIRFIELD OPERATIONAL AREA | ||||||||||
| TRABAJOS EN ÁREA OPERATIVA DEL AERÓDROMO | ||||||||||
| 1 | Existing wiring in conduits demolition | |||||||||
| Demolición cableado existente en canalizaciones | Lm | |||||||||
| 2 | Approach cable FAA L-824C AWG #6 | |||||||||
| Cable de aproximación FAA L-824C AWG #6 | Lm | |||||||||
| 3 | Sequence Flashing Lights cable NYY -O 5x10mm2 RE | |||||||||
| Cable de luces de destellos NYY -O 5x10mm2 RE | Lm | |||||||||
| 4 | Señalización temp de umbral desplazado y coord. talleres | |||||||||
| Temp displaced threshold markings & shop coordination | Sm | |||||||||
| WORKS IN AIRFIELD OP. AREA TOTAL | ||||||||||
| TOTAL TRABAJOS ÁREA OP. DE AERÓDROMO |
| WORKS IN APPROACH AREA | ||
| TRABAJOS EN ÁREA DE APROXIMACIÓN | ||
| 5 | Existing direct buried wiring demolition | |
| Demolición cableado existente directamente enterrado | Lm | |
| 6 | Existing below pavement wiring demolition | |
| Demolición cableado existente bajo pavimento | Lm | |
| 7 | Approach cable FAA L-824C AWG #6 | |
| Cable de aproximación FAA L-824C AWG #6 | Lm | |
| 8 | Runway edge cable FAA L-824C AWG #8 | |
| Cable de borde de pista FAA L-824C AWG #8 | Lm | |
| 9 | Type A duct bank | |
| Canalización tipo A | Lm | |
| 10 | Type B duct bank, including overrun repairs | |
| Canalización tipo B, incluso reparación zona de parada | Lm | |
| 11 | 35 mm2 Counterpoise Wire | |
| Cable de Contrapesado 35 mm2 | Lm | |
| 12 | Manholes | |
| Arquetas | Ea | |
| 13 | FAA L-823 type I, Class B Connector | |
| Conector FAA L-823 tipo I, clase B | Ea | |
| 14 | Sequence Flashing Lights cable NYY -O 5x2.5mm2 RE | |
| Cable de luces de destellos NYY -O 5x2.5mm2 RE | Lm | |
| 15 | LED elevated approach fixture, high intensity, +5% spares | |
| Luces aprox. elevadas LED, alta intensidad, +5% extra | Ea | |
| 16 | LED inset approach fixture, high intensity, +1ea spare | |
| Luces aprox. empotradas LED, alta intensidad, +1ud extra | Ea | |
| 17 | Elevated Seq, Flash/Threshold Id. LED fixtures, +1ea spare | |
| Luces de destellos/id. umbral elevadas LED, +1ud extra | Ea | |
| 18 | Inset Seq, Flash/Threshold Id. LED fixtures, +1ea spare | |
| Luces de destellos/id. umbral empotradas LED, +1ud extra | Ea | |
| 19 | Flashing system control cabinet | |
| Unidad de control de luces de destellos | Ea | |
| 20 | Isolating transformer 100W/60Hz, +5% spares | |
| Transformador de aislamiento 100W/60Hz, +5% extra | Ea | |
| 21 | Frangible poles, incl couplings, concrete bases, etc. +5% spares | |
| Postes frangibles, incl acoplamientos, bases hormigón, etc.+5% extra | Ea | |
| 22 | Road crossing (directional boring) | |
| Cruce de carretera (topo) | Lm | |
| 23 | Red prisms for inset runway lights supply | |
| Suministro prismas rojos para luces empotradas de pista | Ea | |
| 24 | Approach lights aiming calibrating tool | |
| Equipo de calibración inclinación luces aproximacioón | Ea | |
| WORKS IN APPROACH AREA TOTAL | ||
| TOTAL TRABAJOS EN ÁREA DE APROXIMACIÓN |
| WORKS IN LIGHTING VAULT | ||
| TRABAJOS EN SUBESTACIÓN DE BALIZAJE | ||
| 25 | 10 KVA transformer incl. wires, cutouts and acc. | |
| Transformador 10 KVA, incl cableado, secc. y acc | Ea | |
| 26 | DP400V Panelboard | |
| Panel eléctrico DP400V | Ea | |
| WORKS IN LIGHITNG VAULT TOTAL | ||
| TOTAL TRABAJOSEN SUBESTACIÓN DE BALIZAJE |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| Works in Airfield Operational Area |
| Trabajos Área Operativa de Aerórdromo |
| Works in Approach Area |
| Trabajos en Área de Aproximación |
| Works in Lighting Vault |
| Trabajos en Subestación de Balizaje |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00
SUBTOTAL 0.00
PROFIT 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications