Contractor Construction Cost Estimate

View the file

Other files

File Type Posted
FA5575-17-B-0003-0001.pdf PDF
Questions_and_Answers.pdf PDF
15-1009_Specs_Spanish.pdf PDF
FA5575-17-B-0003.pdf PDF
15-1009_Drawings_Part1.pdf PDF
15-1009_Specs_English.pdf PDF
15-1009_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
15-1009_Drawings_Part2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RENOVATE AIRFIELD APPROACH & ID LIGHTING, RWY 200.00 €
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 15-1009MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
WORKS IN AIRFIELD OPERATIONAL AREA
TRABAJOS EN ÁREA OPERATIVA DEL AERÓDROMO
1Existing wiring in conduits demolition
Demolición cableado existente en canalizacionesLm
2Approach cable FAA L-824C AWG #6
Cable de aproximación FAA L-824C AWG #6Lm
3Sequence Flashing Lights cable NYY -O 5x10mm2 RE
Cable de luces de destellos NYY -O 5x10mm2 RELm
4Señalización temp de umbral desplazado y coord. talleres
Temp displaced threshold markings & shop coordinationSm
WORKS IN AIRFIELD OP. AREA TOTAL
TOTAL TRABAJOS ÁREA OP. DE AERÓDROMO
WORKS IN APPROACH AREA
TRABAJOS EN ÁREA DE APROXIMACIÓN
5Existing direct buried wiring demolition
Demolición cableado existente directamente enterradoLm
6Existing below pavement wiring demolition
Demolición cableado existente bajo pavimentoLm
7Approach cable FAA L-824C AWG #6
Cable de aproximación FAA L-824C AWG #6Lm
8Runway edge cable FAA L-824C AWG #8
Cable de borde de pista FAA L-824C AWG #8Lm
9Type A duct bank
Canalización tipo ALm
10Type B duct bank, including overrun repairs
Canalización tipo B, incluso reparación zona de paradaLm
1135 mm2 Counterpoise Wire
Cable de Contrapesado 35 mm2Lm
12Manholes
ArquetasEa
13FAA L-823 type I, Class B Connector
Conector FAA L-823 tipo I, clase BEa
14Sequence Flashing Lights cable NYY -O 5x2.5mm2 RE
Cable de luces de destellos NYY -O 5x2.5mm2 RELm
15LED elevated approach fixture, high intensity, +5% spares
Luces aprox. elevadas LED, alta intensidad, +5% extraEa
16LED inset approach fixture, high intensity, +1ea spare
Luces aprox. empotradas LED, alta intensidad, +1ud extraEa
17Elevated Seq, Flash/Threshold Id. LED fixtures, +1ea spare
Luces de destellos/id. umbral elevadas LED, +1ud extraEa
18Inset Seq, Flash/Threshold Id. LED fixtures, +1ea spare
Luces de destellos/id. umbral empotradas LED, +1ud extraEa
19Flashing system control cabinet
Unidad de control de luces de destellosEa
20Isolating transformer 100W/60Hz, +5% spares
Transformador de aislamiento 100W/60Hz, +5% extraEa
21Frangible poles, incl couplings, concrete bases, etc. +5% spares
Postes frangibles, incl acoplamientos, bases hormigón, etc.+5% extraEa
22Road crossing (directional boring)
Cruce de carretera (topo)Lm
23Red prisms for inset runway lights supply
Suministro prismas rojos para luces empotradas de pistaEa
24Approach lights aiming calibrating tool
Equipo de calibración inclinación luces aproximacioónEa
WORKS IN APPROACH AREA TOTAL
TOTAL TRABAJOS EN ÁREA DE APROXIMACIÓN
WORKS IN LIGHTING VAULT
TRABAJOS EN SUBESTACIÓN DE BALIZAJE
2510 KVA transformer incl. wires, cutouts and acc.
Transformador 10 KVA, incl cableado, secc. y accEa
26DP400V Panelboard
Panel eléctrico DP400VEa
WORKS IN LIGHITNG VAULT TOTAL
TOTAL TRABAJOSEN SUBESTACIÓN DE BALIZAJE
WORK SUMMARY
RESUMEN TRABAJOS
Works in Airfield Operational Area
Trabajos Área Operativa de Aerórdromo
Works in Approach Area
Trabajos en Área de Aproximación
Works in Lighting Vault
Trabajos en Subestación de Balizaje
GRAND TOTAL
GRAN TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD 0.00

SUBTOTAL 0.00

PROFIT 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

TITLE: BY:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N