AF 3052 Contractor.xls
XLS spreadsheet 34 KB Posted
- Attached to
- Groove North Touchdown Zone Federal contract opportunity
- Solicitation number
- FA5575-11-R-0006
About this file
Cost Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Running Grooving Q A.docx | DOCX document | |
| PPI Questionnaire.docx | DOCX document | |
| PPI Reference List.docx | DOCX document | |
| FA5575-11-R-0006 Groove North Touchdown Zone.doc | DOC document | |
| 10-1029 Drawings.pdf | ||
| 10-1029 Schedule of Material Submittals.xlsx | XLSX spreadsheet | |
| 10-1029 Specs English.pdf | ||
| 10-1029 Specs Spanish.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Groove North Touchdown Zone
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| GROOVE NORTH TOUCHDOWN ZONE/RANURAR ZONA DE TOMA DE CONTACTO NORTE | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1029 | MORON AIR BASE, SPAIN | |||||||||
| LINE NO. | UNIT OF MEAS. | MATERIAL COST | LABOR COSTS | OTHER DIRECT COSTS | LINE TOTAL | |||||
| ITEM | QUANTI. | UNIT | TOTAL | MH/MD | AV. RAT | TOTAL | ||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Ranurado | |||||||||
| Grooving | m2 | |||||||||
| TOTAL | ||||||||||
| TOTAL | ||||||||||
| TOTAL MATERIAL COSTS | ||||||||||
| TOTAL LABOR COSTS | ||||||||||
| TOTAL OTHER DIRECT COSTS | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Regular"AF Form 3052 (Computer Generated)&C&"Times New Roman,Bold"FOR OFFICIAL USE ONLY&R&"Times New Roman,Regular"Page &P of &N
Work Interruption
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| GROOVE NORTH TOUCHDOWN ZONE/RANURAR ZONA DE TOMA DE CONTACTO NORTE | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1029 | MORON AIR BASE, SPAIN | |||||||||
| LINE NO. | UNIT OF MEAS. | MATERIAL COST | LABOR COSTS | OTHER DIRECT COSTS | LINE TOTAL | |||||
| ITEM | QUANTI. | UNIT | TOTAL | MH/MD | AV. RAT | TOTAL | ||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Interrupciones de trabajo por tráfico aéreo | |||||||||
| Work interruptions due to aircraft traffic | h | |||||||||
| TOTAL | ||||||||||
| TOTAL | ||||||||||
| TOTAL MATERIAL COSTS | ||||||||||
| TOTAL LABOR COSTS | ||||||||||
| TOTAL OTHER DIRECT COSTS | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Regular"AF Form 3052 (Computer Generated)&C&"Times New Roman,Bold"FOR OFFICIAL USE ONLY&R&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .