10-1029 Schedule of Material Submittals.xlsx

XLSX spreadsheet 43 KB Posted

Attached to
Groove North Touchdown Zone Federal contract opportunity
Solicitation number
FA5575-11-R-0006
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Groove North Touchdown Zone, newest first.
File Type Posted
Running Grooving Q A.docx DOCX document
PPI Questionnaire.docx DOCX document
PPI Reference List.docx DOCX document
FA5575-11-R-0006 Groove North Touchdown Zone.doc DOC document
AF 3052 Contractor.xls XLS spreadsheet
10-1029 Drawings.pdf PDF
10-1029 Specs English.pdf PDF
10-1029 Specs Spanish.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 10-1029PROJECT TITLE
GROOVE NORTH TOUCHDOWN ZONESOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01011
1Construction Schedule4NTP+5
2Work Plan4NTP+5
3Certificates4NTP+5
SECTION 01011
4Progress Schedule4NTP+5
5Mobility Plan4NTP+5
6Quality Control Plan4NTP+5
7Waste & construction debris management4Final Inspection
8As-Built drawings4FI+15
9Spatial DataFI+15
10Personel listing4NTP+5
11Safety Program4NTP+5
12Warranty letter4FI+30
SECTION 02960
13Equipment4NTP+10
14Procedures4NTP+10
SECTION 02961
15Concrete mix design4NTP+10
16Laboratory test results4At test

completion 17 Aggregates 4 At test completion

18Cement444NTP+10
19Concrete slumps4At test

completion 20 Concrete air content 4 At test completion 21 Concrete strenght (cylinder) 4 At test completion

22Admixtures44NTP+10
23Absorbent curing material44NTP+10
24Liquid membrane-forming compound44NTP+10
25Sheet curin material44NTP+10
26Joint filler44NTP+10
27Joint sealant44NTP+10

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 10-1029TÍTULO DE PROYECTO:
RANURAR ZONA DE TOMA DE CONTACTO NORTESOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01000
1Plan de construcción4NTP+5
2Plan de obra4NTP+5
3Certificados4NTP+5
SECCIÓN 01011
4Programa de avance de obras4NTP+5
5Plan de movilización4NTP+5
6Plan de control de calidad4NTP+5
7Gestión de residuos y escombros4Inspección final
8Planos As-Builts4IF+15
9Datos espaciales4IF+15
10Listado de personal4NTP+5
11Plan de seguridad4NTP+5
12Carta de garantía4IF+30
SECCIÓN 02960
13Equipo4NTP+10
14Procedimientos4NTP+10
SECCIÓN 02961
15Fórmula de trabajo del hormigón4NTP+10
16Informes de ensayo de laboratorio4Al término

ensayo 17 Áridos 4 Al término ensayo

18Cemento444NTP+10
19Asiento de hormigón4Al término

ensayo 20 Contenido de aire en hormigón 4 Al término ensayo 21 Resistencia del hormigón (cilindro) 4 Al término ensayo

22Aditivos44NTP+10
23Material absorbente de curado44NTP+10
24Producto filmógeno de curado44NTP+10
25Lámina de curado44NTP+10
26Material de relleno de junta44NTP+10
27Sellante de junta44NTP+10
44NTP+10

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .