Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Running Grooving Q A.docx | DOCX document | |
| PPI Questionnaire.docx | DOCX document | |
| PPI Reference List.docx | DOCX document | |
| FA5575-11-R-0006 Groove North Touchdown Zone.doc | DOC document | |
| AF 3052 Contractor.xls | XLS spreadsheet | |
| 10-1029 Drawings.pdf | ||
| 10-1029 Specs English.pdf | ||
| 10-1029 Specs Spanish.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 10-1029 | PROJECT TITLE | |||
| GROOVE NORTH TOUCHDOWN ZONE | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01011 | |||||||
| 1 | Construction Schedule | 4 | NTP+5 | ||||
| 2 | Work Plan | 4 | NTP+5 | ||||
| 3 | Certificates | 4 | NTP+5 | ||||
| SECTION 01011 | |||||||
| 4 | Progress Schedule | 4 | NTP+5 | ||||
| 5 | Mobility Plan | 4 | NTP+5 | ||||
| 6 | Quality Control Plan | 4 | NTP+5 | ||||
| 7 | Waste & construction debris management | 4 | Final Inspection | ||||
| 8 | As-Built drawings | 4 | FI+15 | ||||
| 9 | Spatial Data | FI+15 | |||||
| 10 | Personel listing | 4 | NTP+5 | ||||
| 11 | Safety Program | 4 | NTP+5 | ||||
| 12 | Warranty letter | 4 | FI+30 | ||||
| SECTION 02960 | |||||||
| 13 | Equipment | 4 | NTP+10 | ||||
| 14 | Procedures | 4 | NTP+10 | ||||
| SECTION 02961 | |||||||
| 15 | Concrete mix design | 4 | NTP+10 | ||||
| 16 | Laboratory test results | 4 | At test |
completion 17 Aggregates 4 At test completion
| 18 | Cement | 4 | 4 | 4 | NTP+10 |
| 19 | Concrete slumps | 4 | At test |
completion 20 Concrete air content 4 At test completion 21 Concrete strenght (cylinder) 4 At test completion
| 22 | Admixtures | 4 | 4 | NTP+10 |
| 23 | Absorbent curing material | 4 | 4 | NTP+10 |
| 24 | Liquid membrane-forming compound | 4 | 4 | NTP+10 |
| 25 | Sheet curin material | 4 | 4 | NTP+10 |
| 26 | Joint filler | 4 | 4 | NTP+10 |
| 27 | Joint sealant | 4 | 4 | NTP+10 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 10-1029 | TÍTULO DE PROYECTO: | |||
| RANURAR ZONA DE TOMA DE CONTACTO NORTE | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01000 | |||||||
| 1 | Plan de construcción | 4 | NTP+5 | ||||
| 2 | Plan de obra | 4 | NTP+5 | ||||
| 3 | Certificados | 4 | NTP+5 | ||||
| SECCIÓN 01011 | |||||||
| 4 | Programa de avance de obras | 4 | NTP+5 | ||||
| 5 | Plan de movilización | 4 | NTP+5 | ||||
| 6 | Plan de control de calidad | 4 | NTP+5 | ||||
| 7 | Gestión de residuos y escombros | 4 | Inspección final | ||||
| 8 | Planos As-Builts | 4 | IF+15 | ||||
| 9 | Datos espaciales | 4 | IF+15 | ||||
| 10 | Listado de personal | 4 | NTP+5 | ||||
| 11 | Plan de seguridad | 4 | NTP+5 | ||||
| 12 | Carta de garantía | 4 | IF+30 | ||||
| SECCIÓN 02960 | |||||||
| 13 | Equipo | 4 | NTP+10 | ||||
| 14 | Procedimientos | 4 | NTP+10 | ||||
| SECCIÓN 02961 | |||||||
| 15 | Fórmula de trabajo del hormigón | 4 | NTP+10 | ||||
| 16 | Informes de ensayo de laboratorio | 4 | Al término |
ensayo 17 Áridos 4 Al término ensayo
| 18 | Cemento | 4 | 4 | 4 | NTP+10 |
| 19 | Asiento de hormigón | 4 | Al término |
ensayo 20 Contenido de aire en hormigón 4 Al término ensayo 21 Resistencia del hormigón (cilindro) 4 Al término ensayo
| 22 | Aditivos | 4 | 4 | NTP+10 |
| 23 | Material absorbente de curado | 4 | 4 | NTP+10 |
| 24 | Producto filmógeno de curado | 4 | 4 | NTP+10 |
| 25 | Lámina de curado | 4 | 4 | NTP+10 |
| 26 | Material de relleno de junta | 4 | 4 | NTP+10 |
| 27 | Sellante de junta | 4 | 4 | NTP+10 |
| 4 | 4 | NTP+10 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N