Corrosion Control Questions and Answers 7 June 21.docx
DOCX document 19 KB Posted
- Attached to
- Vehicle Corrosion Control Services, Kadena AB
- Solicitation number
- FA527021Q0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Corrosion PWS Updated 27 May 2021.doc | DOC document | |
| Combo Corrosion Control Amendment 3.docx | DOCX document | |
| Combo Corrosion Control Amendment 2.docx | DOCX document | |
| Corrosion Control Site Visit Questions.pdf | ||
| Combo Corrosion Control Amendment 1.pdf | ||
| Attachment 4 Past and Present Performance Questionnaire.docx | DOCX document | |
| Combo Corrosion Control Combo.docx | DOCX document | |
| Attachment 1 Corrosion PWS 21 Feb.pdf | ||
| Attachment 2 Question Form.docx | DOCX document | |
| Attachment 3 Past and Present Performance Data.docx | DOCX document | |
| Attachment 5 Site Visit Reservation Form.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.Who will perform the removal/installation of major assemblies when approved by the COR, Government or Contractor?
In the case that major assemblies required to be removed the Contractor will work with the COR to assess the best way forward. During the joint pre-inspection, the contractor will identify what major assemblies need removal. The Government may remove major assemblies when needed.
2. If the answer to #1 is for the Contractor to remove/install major assemblies, is the Contractor expected to supply specialized equipment and fluids for each vehicle type or will the Government provide use of available specialized equipment/fluids? Specialized tools, equipment, and fluids may be provided by the Government on a case by case basis.
3. Who is expected to order replacement assemblies when it is determined most cost effective to replace, Government or Contractor?
The Contractor will work with the COR when replacement parts are required. When deemed necessary to replace assemblies, the Government will provide the replacement.
4. How many vehicles does the Government estimate to be in a CAT V condition?
The Government does Not foresee any Category V assets at this point.
5. Is the 30-day turnaround expected for CAT V vehicles where assemblies require removal/replacement?
Turnaround time for Category V vehicles will be flexible.