Corrosion PWS Updated 27 May 2021.doc

DOC document 163 KB Posted

Attached to
Vehicle Corrosion Control Services, Kadena AB Federal contract opportunity
Solicitation number
FA527021Q0016
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to Vehicle Corrosion Control Services, Kadena AB, newest first.
File Type Posted
Corrosion Control Questions and Answers 7 June 21.docx DOCX document
Combo Corrosion Control Amendment 3.docx DOCX document
Combo Corrosion Control Amendment 2.docx DOCX document
Corrosion Control Site Visit Questions.pdf PDF
Combo Corrosion Control Amendment 1.pdf PDF
Attachment 4 Past and Present Performance Questionnaire.docx DOCX document
Attachment 2 Question Form.docx DOCX document
Attachment 5 Site Visit Reservation Form.docx DOCX document
Combo Corrosion Control Combo.docx DOCX document
Attachment 3 Past and Present Performance Data.docx DOCX document
Attachment 1 Corrosion PWS 21 Feb.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORKS STATEMENT (PWS)

VEHICLE CORROSION CONTROL REPAIRS, RUSTPROOFING, AND PAINTING

KADENA AIR BASE

OKINAWA, JAPAN

18 LRS/LGRV

Vehicle Management Flight

27 May 2021

PART 1 – GENERAL INFORMATION

1.1. GENERAL: This is a non-personnel services contract to provide vehicle corrosion control, rustproofing, and painting requirements. The objective of the program is to bridge the gap in backlog of vehicle corrosion while enhancing safety and extend equipment service life. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.2. Description of Services/Introduction: The contractor shall employ a labor force, with the appropriate skills and/or certifications to meet contract requirements. The contractor shall supply all required equipment, media and/or water blasting apparatus to remove paint coatings and corrosion. The contractor shall provide all personnel, supplies, facilities, transportation, tools, materials, supervision, and all other items and non-personal services necessary to perform vehicle corrosion control, rustproofing, and painting requirements as defined in this Performance Work Statement (PWS). Corrosion removal shall be conducted without hindering the structural integrity of the vehicles. The contractor shall restore equipment in accordance with technical data through metal repair such as welding and fabrication, rework of fiberglass, and plastic structures. The contractor shall appropriately store and dispose of all generated hazardous waste in accordance with Environmental Protraction Agency (EPA) and host country standards. The contractor shall be responsible for the safety and accountability of all its employees and provide all required personnel protective equipment.

1.3. Background: The 18 LRS Vehicle Management Flight requires corrosion repair rustproofing treatment of all underbody surfaces to include boxed-in internal structures, and repainting services for the vehicles listed in Part 5, Table 1. The end result needs to be a completely repainted and rustproofed vehicle with protective coating applied to underbody, and all boxed in internal structures.

1.4. Objectives: The contractor shall perform inspections, structural repairs, corrosion treatment, rustproof, and paint surfaces of vehicles. Assets are to be repaired to eliminate corrosion damage and extend life expectancy by rustproofing underbody components. The contractor shall conduct minor mechanical repairs, panel fabrication and hardware replacement (standard screws, bolt, and fasters) where needed. The contractor shall pick up equipment, and return completed product within 30 days; estimated 12-17 vehicles per month will be completed. It is anticipated that upon delivery of a completed asset, a return allocation of vehicles will be picked up for corrosion repair creating a rotational input of 10-15 items monthly.

1.5. Scope: The contractor’s labor force shall refurbish vehicles. To include the treatment of corrosion, repair of metal work, replacement of wood flooring, repair of fiberglass and plastics surfaces as required, including replacement of corroded hardware. It is not expected for the contractor to conduct full frame-up restoration, major assemblies (ie. Engine, transmission, drive axles) will not be taken apart or removed without prior coordination with the COR on a case-by-case basis. The work will be completed in accordance with the following included manuals:

· Air Force Instruction 24-302 Vehicle Management

· Technical Order 1-1-8 Application and Removal of Organic Coatings Aerospace and Non-Aerospace Equipment

· Technical Order 1-1-691 Cleaning and Corrosion Prevention and Control Aerospace and Non-Aerospace Equipment

1.6. Period of Performance: The period of performance shall be for one (1) Basic Ordering period of 12 months and one (1) additional 12-month ordering period. The Period of Performance reads as follows:

Basic Ordering Period: 1 Jun 2021 – 31 May 2022 (Projected) Ordering Period 1: 1 Jun 2022 – 28 May 2023 (Projected)

1.7. Quality Control: The contractor shall ensure quality service is maintained through the life of the contract and develop an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which it assures their work complies with the requirement of the contract. The contractor will provide the QCP plan to the Government no later than 30 days after contract award and provide any additional changes within 3 days of implementation.

1.8. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.9. Hours of Operation: The contractor will coordinate pickup and delivery times with the designated Government point of contact(s) (POCs). 18 LRS Vehicle Management hours of operation are 7:30 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. For afterhours support vehicle standby technician will be available on call when needed.

1.9.1. Recognized Holidays: The contractor will not be able to pick up or drop off any equipment on the following holidays:

New Year’s Day

Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.10. Place of Performance: The work to be performed under this contract will be performed at the contractor’s facility. The Government will provide an estimated 22,500 square feet plot of bare land on Kadena Air Base (KAB) for the contractor to set up mobile temporary operations if needed.

1.10.1. The contractor will be subject to the following limitation condition if chooses to utilized available space.

1.10.2. All areas must be maintained and secured at all times and sings with point of contact (POC) name and phone number must be posted on site.

1.10.3. Implement measures to prevent soil runoff from entering the base waterways while maintaining these areas and their surroundings in an orderly and safe manner.

1.10.4. Contractor will be responsible for all waste generated as results of operations.

1.11. Security Requirements: The contractor shall coordinate with the Government in order to obtain base access to designated vehicle pick-up/drop-off locations and workspace. The contractor shall comply with all applicable security requirements, abide by directions given by Military Police and/or other security personnel while adhering to installation traffic laws. The contractor will coordinate base access with the Government POC(s).

1.12. Physical Security: The contractor shall be responsible for safeguarding all government property in its possession.

1.13. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.14. Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform audits necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property: and provide site entry of Contractor personnel. A letter of designation will be issued to the COR, a copy of which will be provided to the Contractor, this letter will state COR responsibilities and limitations. The COR is not authorized to change any of the terms and conditions of the contract to include cost or price, estimates or changes in delivery dates.

Points of Contact: The follow personnel are the Government’s Point of Contact:

Contracting Officer: TSgt Ryan Keller Contract Specialist: 2d Lt Jessica Fernandez

1.15. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager will be the focal point of communication over contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

PART 2 - DEFINITIONS & ACRONYMS

2.1. DEFINITIONS AND ACRONYMS:

2.2. DEFINITIONS:

CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

QUALITY ASSURANCE. The contractor’s procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

WORK WEEK. Monday through Friday, unless specified otherwise.

2.3. ACRONYMS:

AFFARS - Air Force Federal Acquisition Regulation Supplement CCE - Contracting Center of Excellence CFR - Code of Federal Regulations CONUS - Continental United States (excludes Alaska and Hawaii) COR - Contracting Officer Representative COTS - Commercial-Off-the-Shelf DFARS - Defense Federal Acquisition Regulation Supplement DOD - Department of Defense FAR - Federal Acquisition Regulation CO - Contracting Officer OCI - Organizational Conflict of Interest OCONUS - Outside Continental United States (includes Alaska and Hawaii) PIPO - Phase In/Phase Out POC - Point of Contact PRS - Performance Requirements Summary PWS - Performance Work Statement QA - Quality Assurance QAP - Quality Assurance Program QASP - Quality Assurance Surveillance Plan QC - Quality Control QCP - Quality Control Program TE - Technical Exhibit

PART 3 - GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3.1. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.2. Government will provide all mil-spec information for primer and paint as specified in applicable technical publications.

3.3. Vehicle damage inspection will be conducted by the Government prior to pick-up and after drop-off for each piece of equipment. Contractor will be liable for any damaged occurred while vehicle was in their possession.

PART 4 - CONTRACTOR FURNISHED ITEMS AND SERVICES

4.1. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.2. General: The Contractor shall furnish all labor, supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.3. Materials: The Contractor shall acquire and utilize all materials required in accordance with Technical Order 36-1-191 with emphasis on chapter 2 and chapter 6. The latest version of this technical order will be supplied to the contractor in English as it is published.

4.4. PRIMER: Coating, Primer, Zinc-Rich, Rust-Inhibiting shall be used for superior corrosion protection.

4.5. TOPCOAT: Refueling vehicles shall be painted full gloss dark green, color number 14052 of FED-STD-595

4.6. Aircraft and support equipment towing vehicles shall be painted semi-gloss green, color number 24052 of FED-STD-595 and meet MIL-PRF-85285

4.7. All other vehicles and equipment types shall be painted utilizing the Original Equipment Manufacturers topcoat specification and color. The Vehicle Management Flight POC will determine topcoat color upon pickup and shall annotate the selection on the vehicle condition form.

4.8. Semi-Trailers: Top surfaces of unpainted wood floors will be rubbed down with raw linseed oil.

4.9. Equipment: The Contractor shall provide all equipment required to perform corrosion treatment, repair and refinish of vehicles.

PART 5 - SPECIFIC TASKS

5.1. SPECIFIC CONTRACTOR TASKS:

5.2. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform vehicle corrosion control, rustproofing, and painting requirements as defined in this Performance Work Statement (PWS) on the vehicle types listed in Table 1.

5.3. Corrosion levels will be categorized in 4 different severity zones as follows.

5.3.1. Corrosion Level I – Visible moderate corrosion thought the vehicle not affecting drivability or safe operation of the asset. Item requires minimal corrosion repair, main focus will be rustproofing treatment to extend vehicle life expectance.

5.3.2. Corrosion Level II – Mild degradation of metal starting to show as pitting or etching starting to cause weakening in material. Minimal metal fabrication work is needed in order to repair at this stage.

5.3.3. Corrosion Level III – Item requires attention to remove corrosion from metal. Significant corrosion requiring extensive sanding, moderate sheet metal work, and structure repairs.

5.3.4. Corrosion Level IV – Item requires extensive metalwork to abate the spread of corrosion. Severe corrosion requiring major panel, and structure repairs thought the majority of the vehicle.

5.3.5. Corrosion Level V – Severe corrosion covering the majority of the vehicle, corrosion has thinned the metal or pitted major load bearing structures to the point where is more cost effective to replace the assembly rather than repair it. Major assemblies (ie. Engine, power divider, drive axels, major frame assembly) require removal in order to conduct proper repairs.

Table 1

ITEM
DESCRIPTION
QTY
0001
R-11 Aircraft Refueler
23
0002
10K Standard Forklift
30
0003
10K All-Terrain Forklift
9
0004
10 Ton Tractor 6X4
8
0005
Tractor Tow Support Equipment (Bobtail)*
16
0006
6K Forklift
13
0007
MB-2 Aircraft Tow Tractor*
9
0008
60-74ft High Reach Truck
5
0009
Staircase Truck
4
0010
U-30 Aircraft Tow Tractor*
2
0011
Dump Truck
25
0012
40ft Trailer w/Conveyor kit
6
0013
1200 Gallon Fuel Truck
2
0014
Wheeled Excavator
10
0015
Scoop Loader 2.5 Cubic Yard
6
0016
Scoop Loader 4 Cubic Yard
15
0017
D7 Bulldozer
3
0018
Roller Vibrating Type 2
7
0019
Grader Size 5
2
0020
Trailer 38ft Flatbed
25
0021
Water Tank Trailer
28
0022
Compact Track Loader
30
0023
Drier Mixer Trailer
14
0024
R-12 Aircraft Refueler
13
0025
Hi-Reach Maintenance Platform
1
0026
4K Forklift
25
0027
MB-4 Aircraft Tow Tractor*
19
0028
30ft Van Trailer
7
0029
Trailer 22 Ton Tilt Deck
2

5.4. Acceptance of Equipment: Prior to receiving equipment, the contractor and the Vehicle Management representative will conduct a joint inspection to verify the corrosion level as identified by the government for each asset. The contractor shall record and inform government liaison about all damage during joint inspection on the vehicle condition form. The contractor and the Vehicle Management representative shall sign the vehicle condition form upon the contract accepting the equipment. The contractor is liable for the equipment, keys, and any installed accessories upon acceptance until the corrosion repair is complete and the Vehicle Management representative accepts delivery of the refinished equipment as indicated on the vehicle condition form.

5.5. Paint and rustproof preparation:

· Inspect and remove all corrosion.

· Conduct welding repairs and fabrication.

· Sand and scuff interior surfaces of access doors.

· Apply corrosion inhibiting primer to those areas where rust has been removed.

· Remove all markings, remove and reinstall all, lighting, reflective lenses, and placards such as, but not limited to; nomenclature, instructional, identification, and warning placards.

· Remove and or mask all components as necessary to minimize overspray.

5.6. Proper application of primer and topcoat:

· Apply rustproofing corrosion protection in accordance with Technical Data

· Primer and paint vehicles in accordance with Technical Data Note: Some vehicles will require special mil-spec polyurethane paint. When specified in equipment technical orders, this can be provided to the contractor by the government to include all SDS’s.

· All control panels behind access doors will be painted. All gauges will be masked to minimize paint overspray.

· Panel doors to an engine or electronic/electrical compartment will be painted as well as the panels.

· Overspray avoidance will be conducted by masking components such as; engine, electrical or electronic items, glass, and hydraulic rams.

· Non-skid coating will be applied where necessary.

· Ground points and copper points will NOT be painted.

· Undercarriage of all equipment will be painted and rustproof.

· Seal all seams where applicable.

5.7. Pickup and delivery of equipment to be painted.

· Contractor shall be responsible for provide pickup and delivery of all vehicles and equipment to Vehicle Management (Building 268) in Kadena AB.

5.8. Guarantee/Faulty Workmanship.

· Contractor will provide guarantee of work during which time any defects noted due to faulty workmanship will be corrected under warranty.

· Contractor will provide the transportation of equipment to remedy the problem, at no cost to the government.

5.9. Process Documentation.

· Contractor will document the repair process.

· Pictures of the vehicles during the repair process will be made available to the government within 3 days of vehicle repair. Pictures will capture vehicle Registration Number (license plate, and/or data plate) and major components affected by corrosion. Photographic repair process documentation will include corrosion and paint removal, rustproofing preparation, and paint application.

PART 6 - APPLICABLE PUBLICATIONS

6.1.1. The Contractor must abide by the most current edition of the following Technical Data;

6.1.2. Technical Order 36-1-191, Technical and Managerial Reference for Motor Vehicle Maintenance Change-1, 7 February 2019. (Special focus areas to Chapters 2, and 6)

6.1.3. Technical Order 1-1-8, Application and Removal of Organic Coatings, Aerospace and Non-Aerospace Equipment.

6.1.4. Technical Order 1-1-691, Cleaning and Corrosion Prevention and Control, Aerospace and Non-Aerospace Equipment.

6.1.5. Technical Order 35-1-3, Corrosion Prevention and Control, Cleaning, Painting, and Marking USAF Support Equipment (SE)

6.1.6. Technical Order 36-1-131/TB 43-0213, Corrosion Prevention and Control (CPC) For Tactical Vehicles

6.1.7. Air Force Instruction 24-302, Vehicle Management

6.1.8. For any questions regarding guidance of above technical data contractor will reach out to the government liaison or COR.

PART 7 - ATTACHMENT/TECHNICAL EXHIBIT LISTING

7.1. ATTACHMENT/TECHNICAL EXHIBIT LIST:

Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

Attachment 2/Technical Exhibit 2 – Deliverables Schedule

TECHNICAL EXHIBIT 1 PERFORMANCE REQUIREMENTS SUMMARY

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective
0BStandard
Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance

(The Service required—usually a shall statement)

PRS #1. The Contractor shall accept equipment IAW PWS para. 5.4.
Prior to receiving equipment, inspect it thoroughly for damage. Record and inform government liaison about all damage during joint inspection
90% equipment inspected
100%

Inspection

PRS #2. End result, completely repainted and rustproofed vehicle with protective coating applied to underbody, and all boxed in internal structures IAW PWS para. 1.3
Remove all corrosion, repaint and rustproof all surfaces to include boxed in internal structures.
95% equipment surface properly prepared and protected.
100%

Inspection

PRS #3. The Contractor shall properly apply primer and top coat IAW PWS para. 5.6.
Proper spec primer and top coat applied per applicable technical order
100% of equipment surface has primer and top coat properly applied.
100%

All control panels behind the access doors have primer and top coat applied per applicable technical order.

Inspection

Gauges free of primer and top coat overspray.

Engine, electrical and electronic items, glass, and hydraulic rams free of primer and top coat overspray.

Non-skid coating will be applied where necessary.

Ground points and copper points free of primer and top coat.

Undercarriage has primer and top coat applied.

All seams sealed

PRS #4. The contractor shall appropriately store and dispose of all generated hazardous waste in accordance with Environmental Protraction Agency (EPA) and host country standards IAW PWS 1.2.
Meet or exceed all environmental and host country standards in regards to hazardous waste storage, handling, and disposal.
100% Compliant
Quarterly and random Spot Inspections

TECHNICAL EXHIBIT 2 DELIVERABLES SCHEDULE

Deliverable
Frequency
# of Copies
Medium/Format
Submit To
Equipment Maintenance Documentation
Every equipment item serviced
(1 each) Electronic version emailed with 5 days of equipment delivery

(1 each) hardcopy at delivery

MS Word
18 LRS/LGRV

File details come from the government source that posted it. Updated .