Questions_&_Answers_21_Aug.pdf

PDF 141 KB Posted

Attached to
UPS Uninstall, procuremnet, and Installation Federal contract opportunity
Solicitation number
FA527019QA063
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to UPS Uninstall, procuremnet, and Installation, newest first.
File Type Posted
Questions_&_Answers_4_sep_2019.pdf PDF
Questions_&_Answers_29_Aug.pdf PDF
Attachmnet_1_Statement_of_Work_dated_27_Aug_2019.pdf PDF
Solicitation_Amendment_-_FA527019QA0630002.pdf PDF
SOW_dated_21_Aug_2019.pdf PDF
Solicitation_Amendment_-_FA527019QA0630001.pdf PDF
Questions_and_Answers_15_Aug.pdf PDF
Attachment_2__Question_Form.pdf PDF
Attachment_1_Statement_of_Work(_SOW)_dated_6_Aug.pdf PDF
Solicitation_-_FA527019QA063.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS &ANSWERS RFQ: FA527019QA063

QUESTIONS (Q) AND ANSWERS (A) 21 Aug. 2019 For

Solicitation Number: FA527019QA063 Uninterruptable Power Supply Procurement and Installation at Fort Buckner, Okinawa Japan

Q1. Could you provide approved as-built drawings confirmation of access point of each related equipment so that we can prepare the practical wiring diagram.

A1. 18 CONS will post amendment 0001 and as built drawing will be provided per request.

Q2. Install breakers might be upgraded but no indication in SOW?

A2. 18 Cons will post amendment 0001 and revise the SOW. Please refer to SOW para1 and para 3.

Q3. Replacement of the maintenance bypass is going to require power outages to the loads supported by the UPS to enable disconnection of the existing unit and connection of the new unit. Please advise maximum duration of each power outage to allow connection of the temporary source to support the loads.

A3. Current load on each UPS gives us 481min. (8hrs) of potential back up. I don't see Connecting to a temporary source would take more than 2hrs. at the same time we'll have to monitor the UPS just in case. Will require a 30 day notice to submit an outage request (dates and times) For approval