Q&A.pdf

PDF 193 KB Posted

Attached to
Flooring Projects for Bldgs 8517, 7153, 6136 and 16716
Solicitation number
FA5000-18-Q-0221
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
Bldg_16716_Diagram.pdf PDF
Bldg_8517_Diagram.pdf PDF
FA5000-18-Q-0221.pdf PDF
Bldg_6136_SOW.pdf PDF
Bldg_16716_SOW.pdf PDF
WDOL.pdf PDF
Bldg_8517_SOW.pdf PDF
Bldg_7153_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

PACIFIC AIR FORCES

673 CONS/PKA 18 September 2018

10480 Sijan Ave

JBER, AK 99506

Solicitation No: FA5000-18-Q-0221

Project: Flooring Projects (Bldgs 8517, 7153, 6136 and 16716)

Subject: Amendment for Questions and Answers

The purpose of this amendment is to clarify and answer the questions submitted by the contractors.

Q1: Bldg 8517 - typically in server rooms a Static Dissipative Rubber Tile or VCT tile is used due to the fact that servers are very sensitive to static discharges.

A1: Electrical Resistance: ESD S7.1/NFPA 99 Resistive/resistance characterization of material.

Electrical Resistance/Voltage Test ANSI/ESD S-20.20 compliant when using approved conductive foot-wear system.

Q2: Bldg 7153 - is there a basis of design for the carpet and rubber finish floor? Is the intention of this

ITB to install carpet in the areas where carpet is existing and rubber where rubber is existing?

A2: The replacement shall be tile where there's tile and carpet where's there's carpet as noted in Section 1.

Item 1.2

Q3: Bldg 16716 – is asbestos abatement needed?

A3: As far as asbestos abatement, sampling must be performed before work can begin to ensure the areas do not contain asbestos.

Q4: Bldg 16716 – is inlay needed before polishing/sealing the concrete?

A4: Yes, inlay will need to be inserted before finish is applied.

Q5: Bldg 16716 - is there a specific design for the flooring?

A5: The Government will choose the colors and pattern that will be polished onto the concrete. Logos will be placed, about 7’ x 7’, in 4 separate rooms (see logo below).

p

JERMAINE R. VILLAREAL, SrA, USAF

Contract Administrator