Q&A.pdf
PDF 193 KB Posted
- Solicitation number
- FA5000-18-Q-0221
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg_16716_Diagram.pdf | ||
| Bldg_8517_Diagram.pdf | ||
| FA5000-18-Q-0221.pdf | ||
| Bldg_6136_SOW.pdf | ||
| Bldg_16716_SOW.pdf | ||
| WDOL.pdf | ||
| Bldg_8517_SOW.pdf | ||
| Bldg_7153_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
PACIFIC AIR FORCES
673 CONS/PKA 18 September 2018
10480 Sijan Ave
JBER, AK 99506
Solicitation No: FA5000-18-Q-0221
Project: Flooring Projects (Bldgs 8517, 7153, 6136 and 16716)
Subject: Amendment for Questions and Answers
The purpose of this amendment is to clarify and answer the questions submitted by the contractors.
Q1: Bldg 8517 - typically in server rooms a Static Dissipative Rubber Tile or VCT tile is used due to the fact that servers are very sensitive to static discharges.
A1: Electrical Resistance: ESD S7.1/NFPA 99 Resistive/resistance characterization of material.
Electrical Resistance/Voltage Test ANSI/ESD S-20.20 compliant when using approved conductive foot-wear system.
Q2: Bldg 7153 - is there a basis of design for the carpet and rubber finish floor? Is the intention of this
ITB to install carpet in the areas where carpet is existing and rubber where rubber is existing?
A2: The replacement shall be tile where there's tile and carpet where's there's carpet as noted in Section 1.
Item 1.2
Q3: Bldg 16716 – is asbestos abatement needed?
A3: As far as asbestos abatement, sampling must be performed before work can begin to ensure the areas do not contain asbestos.
Q4: Bldg 16716 – is inlay needed before polishing/sealing the concrete?
A4: Yes, inlay will need to be inserted before finish is applied.
Q5: Bldg 16716 - is there a specific design for the flooring?
A5: The Government will choose the colors and pattern that will be polished onto the concrete. Logos will be placed, about 7’ x 7’, in 4 separate rooms (see logo below).
p
JERMAINE R. VILLAREAL, SrA, USAF
Contract Administrator