Bldg_16716_SOW.pdf
PDF 104 KB Posted
- Solicitation number
- FA5000-18-Q-0221
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A.pdf | ||
| Bldg_16716_Diagram.pdf | ||
| Bldg_8517_Diagram.pdf | ||
| FA5000-18-Q-0221.pdf | ||
| Bldg_6136_SOW.pdf | ||
| WDOL.pdf | ||
| Bldg_8517_SOW.pdf | ||
| Bldg_7153_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
673d Civil Engineer Squadron Joint Base Elmendorf‐Richardson, AK
20 July 2018
STATEMENT OF WORK
Building 16716
Work Order # 34057
SECTION 1: PROJECT INFORMATION
1.1 PROJECT LOCATION: Project 34057 shall be completed as a routine requirement at building 16716, on Joint Base Elmendorf‐Richardson, Alaska. Project hours are standard work hours.
1.2 UNIQUE REQUIREMENT: Notification of asbestos to workers. Upon completion of Demo work, 773 CES must perform a site visit to ensure demo work is fully completed.
Also, 773 CES must perform a site visit upon completion of the renovation to ensure all work is done in an acceptable manor.
1.3 PROJECT DESCRIPTION: Remove existing tile and carpeting (approximately 15,000 Sq ft), polish/seal concrete underneath.
SECTION 2: GENERAL REQUIREMENTS
2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government. Liquidated damages shall be assessed for work that is not finished within the scheduled performance period.
2.2 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the facility manager prior the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.
2.3 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.
2.4 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government.
2.5 HEALTH/SAFETY: The contractor shall be responsible for compliance with The regulations of the United Sates Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA) and Air Force Occupational and Environmental Safety, Fire Protection and Health Program (AFOSH) Publication. The contractor shall maintain a clean and debris free site at all times. The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.
SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS
3.1 General Requirements (Div 1)
3.1.1. Resurface flooring. Contractor shall control dust and access to work area at all times.
3.1.2. Provide and install carpet protection in adjacent space.
3.2 Existing Conditions (Div 2)
3.2.1. Demolish/remove existing Vinyl Tile and tile mastic.
3.2.2. Demolish/remove existing carpet and carpet mastic.
3.2.3. Demolish/remove existing cove base trim.
3.2.4. Contractor shall haul rubbish and debris from work area.
3.2.5. Contractor to supply carts and containers to prevent spillage of debris in or around facility.
3.2.6. Dispose of all demolition debris shall be in accordance with state and federal guidelines.
3.2.7. Provide and install dust control wall.
3.3 Finishes (Div 9)
3.3.1. Provide and install rubber cove base trim.
3.3.2. Polish concrete
3.3.3. Coat concrete with clear gloss sealer