PWS_Refuse_20170504.docx
DOCX document 120 KB Posted
- Attached to
- Integrated Base Solid Waste Services (Refuse) - JBER Federal contract opportunity
- Solicitation number
- FA5000-17-R-0006
About this file
PWS_20170504
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Conformed_RFP_FA5000-17-R-0006_with_Admt_02.docx | DOCX document | |
| FA5000-17-R-0006_Amendment_02.docx | DOCX document | |
| FA500017R00060001.pdf | ||
| Refuse_Site_Visit_Memorandum.pdf | ||
| Refuse_Pre-Proposal_Conference.ppt | PPT presentation | |
| Questions_&_Answers.pdf | ||
| JBER_MAP.pdf | ||
| Atch_4_-_Pricing_Worksheet.pdf | ||
| FA5000-17-R-0006_Solicitation.pdf | ||
| Base_Access_List.xlsx | XLSX spreadsheet | |
| Atch_1_-_PWS.pdf | ||
| Atch_3_-_SCA_2005-2017.pdf | ||
| Atch_5_-_PPQ_Refuse.pdf | ||
| Atch_2_-_Tech_Exhibit.xlsx | XLSX spreadsheet | |
| Draft_RFP_Summary.docx | DOCX document | |
| Draft_RFP.doc.pdf | ||
| PWS_Updated_8_Dec.pdf | ||
| Draft_RFP_Summary.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
INTEGRATED SOLID WASTE MANAGEMENT
AT
JOINT BASE ELMENDORF-RICHARDSON (JBER), ALASKA
4 May 2017
TABLE OF CONTENTS
| Description of Services | 4 |
| Collection Requirements | 4 |
| Recyclable Materials Processing | 6 |
| Disposal | 7 |
| Equipment Maintenance | 7 |
| Reports and Records | 8 |
| Service Summary | 8 |
| Quality Control | 9 |
| Quality Assurance | 9 |
| Performance Assessment | 9 |
| Periodic Progress Meeting | 9 |
| Government Furnished Property and Services | 10 |
| Government Equipment | 10 |
| Government Furnished Utilities | 11 |
| Security, Fire and Medical Services | 11 |
| Recycling Center/Material Recovery Facility | 11 |
| General Information | 11 |
| Mission | 11 |
| Hours of Operation | 11 |
| Holidays and Closures | 12 |
Performance of Services During Crisis Declared or Heightened Security
| Contractor Work Schedule | 12 | |
| Contract Personnel | 13 | |
| Contractor Manpower Reporting | 13 | |
| Security Requirements | 14 | |
| Safety Requirements and Reports | 17 | |
| Special Qualifications | 17 | |
| Contracting Officer and Contracting Officer Representative | 17 | |
| Multi-Functional Team | 17 | |
| Partnering Agreement | 17 | |
| Damages to Government Buildings, Equipment, or Vegetation | 17 | |
| Traffic Laws | 17 | |
| Weapons, Firearms, and Ammunition | 17 | |
| Cell Phone Usage | 17 | |
| Flight Line Driving | 18 | |
| Insurance | 18 | |
| Follow on Contract | 18 |
| 5.1 | Appendices | 17 |
| Appendix A, Estimated Workload Data | 18 | |
| Appendix B, Technical Exhibits 1 JBER Inventory and Schedule Frequencies | 19 | |
| Appendix C, Maps and/or Site Plans | 20 | |
| Appendix D, Special Events | 21 | |
| Appendix E, Required Reports/Forms | 22 |
Appendix F, GFE Phase Out Plan………
1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform integrated solid waste management at Joint Base Elmendorf-Richardson (JBER), Alaska. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations, international agreements, Status of Forces Agreements (SOFA) and appropriate Final Governing Standards (FGS) or, in their absence, the Overseas Environmental Baseline Guidance Document (OEBGD). Estimated workload factors are in Appendix A and collection areas are in Appendix B.
1.1. COLLECTION REQUIREMENTS.
1.1.1. Main Base
1.1.1.1. Municipal Solid Waste. The Contractor shall empty refuse containers based on historical data for the first 30 days of performance or at least weekly. The Contractor shall establish initial vehicle routes and collection schedules upon contract award. Details on size, routes, and frequencies shall be submitted to the Contracting Officer (CO) 5 calendar days prior to start of contract performance. The Contractor may propose adjustments to the schedule at any time but as a minimum the Contracting Officer’s designated Representative (COR / Quality Assurance Personnel) and contractor shall monitor fill capacities during the first 30 days of performance and during one other period to be agreed upon during the same performance period, in order to determine if adjustments to container size, routes, or frequencies should be made to provide the minimum number of pickups necessary to maintain a healthy, vector free environment and prevent waste container overflow. No changes are allowed to the schedule or haul route without CO or COR coordination. Historical frequency tables are located at Appendix B. When the Contractor completes service at a location there shall be no litter, waste, or recyclable material on the ground within a 10 foot radius of the container. To control wildlife access, Contractor shall ensure container openings are properly closed and secured. COR may request a change from standard dumpster to a bear resistant (BR) as circumstances warrant.
1.1.1.2. Food Waste. (Reserved)
1.1.1.3. Recycling. (Reserved)
1.1.2. Military Family Housing (MFH) (Non-Privatized) (Reserved)
1.1.2.1. Municipal Solid Waste. (Reserved)
1.1.2.2. Recycling. (Reserved)
1.1.2.3. Compostable Organics. (Reserved)
1.1.2.4. Bulk Item Pickup. (Reserved)
1.1.3. Over and Above Requirements. The following services shall be priced separately in accordance with the cost contained in blocks 19 through 24 on the SF 1449. The contractor shall be compensated IAW the price specified on the SF 1449 for that service. Services designated "IDIQ" shall be awarded as Indefinite Delivery/Indefinite Quantity items; the contractor shall be compensated IAW the unit price when these services are requested.
1.1.3.1. Unscheduled Pickup and Special Events. In addition to the scheduled solid waste collections, the CO or COR may request the contractor make unscheduled collections and disposals. For unscheduled events, the contractor shall respond within one business day of notification from the CO or COR. For special events, the contractor shall also provide (or re- position as directed) solid waste containers. These containers shall be placed in locations for a length of time designated by the CO or COR. The CO shall notify the contractor in writing at least 7 days in advance of the special event date. See Appendix A for workload data.
1.1.3.2. Construction and Demolition Debris (C&D) (IDIQ). (Reserved)
1.1.3.3. Public/Common Use MSW Receptacles. (Reserved)
1.1.3.4. Public/Common Use Recycling Receptacles. (Reserved)
1.1.3.5. Ash Collection. (Reserved)
1.1.3.6. Additional Pickups: In the event unusual conditions cause a container to require pickup before the scheduled time, the CO or COR may request in writing (email/Fax sufficient) pickup within 8 business hours and the contractor will be compensated at a unit rate based on the container size.
1.1.3.7. Container Relocations: The Government may request relocation of containers. The request will be made in writing and the container will be relocated within 24 hours. A container relocation is classified as anything over .25 miles. Anything less than .25 miles is considered standard business operations.
1.1.4. Inclement Weather Schedule. The contractor shall collect MSW during periods of inclement weather. In cases of severe weather, the CO or COR may authorize exceptions. When exceptions are granted all missed collections shall be performed within 24 hours after the severe weather has terminated, unless the CO authorizes additional time.
1.1.5. Route Parameters. The contractor shall propose routes to the base through the Post Road Gate to the CO for acceptance. Collection shall be made between the hours of 0630 through 1630 for all areas. Collection outside these hours shall require prior coordination of the CO or COR.
1.1.6. Points of Collection. Collection stations for MSW and recyclable materials are shown in Appendix B - Technical Exhibit 1. The contractor shall position bulk containers for customer ease in depositing MSW. The contractor shall also position containers to minimize interference with adjacent parking areas, sidewalks, roadways, overhead utilities, trees, storm drains, and other potential obstructions.
1.1.7. Cubic Yard Capacity. Proposed capacity of containers is indicated in Appendix B. The contractor is encouraged to identify changes to the capacity of containers and/or pickup frequency to improve the overall efficiency of MSW and recycling removal, and to submit these changes to the CO or COR. No changes shall be made until the proposed change is coordinated with the CO or COR.
1.1.8. Government-Approved Containers. Collection of MSW in all areas shall be from contractor-provided, CO or COR accepted containers. Containers shall meet the base architectural/appearance standards. All containers and equipment used during the performance of this contract, whether Government or contractor furnished, shall be uniform in color and consistent with the existing approved JBER color schemes. Refuse dumpsters/receptacles provided shall be sable brown. All containers shall be clearly marked to identify the contractor’s name, telephone numbers, and emergency telephone numbers. Contractor shall maintain all contractor and Government-furnished containers ensuring they remain free of unpleasant odors and pests. All containers must be in good working condition such that lids or doors open/close, easily accessible to customers, and minimize collection of rain water. All cleaning and painting of containers shall be performed off of JBER.
1.1.9. Maintaining Containers and Collection Area. The Contractor shall return all MSW and recycling containers to their original location after servicing, in an upright position with the lids securely in place (closed). The Contractor is responsible for cleaning up any spills, debris, etc., on the ground within 10 feet of the container when servicing a location. The contractor shall collect debris placed at collection stations; for example, tree branches, sacks, cartons, boxes, cans, tied bundles, or other containers. It is intended that the majority of debris will be placed in containers. The Contractor shall notify the COR of locations where debris is frequently placed outside of containers so the COR may notify facility managers and, if necessary, the Contractor can adjust the container size or pickup frequency with CO or COR approval. The contractor shall also notify the COR if it is discovered that a particular receptacle is being utilized for the wrong material.
1.1.10. Vehicle Weighing. All vehicles used to collect MSW, C&D, organics and recyclable commodities shall be weighed on state-certified public scales / weigh station, either on- or off- base. When use of off-base scales are the only option, a predetermined public state-certified scale/weight station will be identified for use. The COR may be present at the public scale for empty and loaded weighing with no notice to the Contractor. All weight discrepancies will be resolved prior to departing the scale site. The Contractor and COR (if present) shall sign all weight tickets. The Contractor shall submit a monthly report (para 1.5) that includes weight tickets that reflect the disposed tonnage, disposal date, vehicle type and landfill tipping fee cost. The Contractor shall be reimbursed for tipping fees according to submitted invoices.
1.2. RECYCLABLE MATERIALS PROCESSING. (Reserved)
1.2.1. Materials. (Reserved)
1.2.2. Pickup Points (Reserved)
1.2.3. Base Recycling Center / Material Recovery Facility. (Reserved)
1.2.3.1. Contractor Responsibilities. (Reserved)
1.2.4. Marketing. (Reserved)
1.2.5. Sales Receipts. (Reserved)
1.2.6. Composting. (Reserved)
1.2.6.1. Chipping / Debagging. (Reserved)
1.2.6.2. Material Placement. (Reserved)
1.2.6.3 Windrow Maintenance. (Reserved)
1.2.6.4. Disposition. (Reserved)
1.3. DISPOSAL.
1.3.1. Off-Base Disposal. The contractor shall transport and dispose of all municipal solid waste at a permitted off-base disposal site. A copy of the landfill(s) operating permit that material is transported to shall be provided to the CO. The contractor is responsible for disposal being in accordance with existing local, state, and federal regulations. The contractor shall be responsible for any permit or fees associated with the use of off-base disposal locations and invoice to CLIN 0018 for reimbursement.
1.3.1.1. The contractor shall use the Anchorage Regional Landfill (ARL) located at Eagle River as the primary disposal site. Contractor shall obtain COR written approval prior to utilizing other disposal sites. Contractor shall obtain weight tickets per each disposal and submit as tipping fee support documentation against CLIN 0018.
1.3.2. Disposal of Non-marketable Materials. (Reserved)
1.4. EQUIPMENT MAINTENANCE. Contractor or Government furnished containers shall match the architectural/appearance standards of the base. Additional re-painting must match the approved color scheme. The Contractor shall maintain all Contractor and Government provided containers so that they have a professional appearance and ensure they are free of unpleasant odors, dirt, debris, and pests. All containers must remain in good, workable condition, with no leaks. They must remain easily accessible to customers. The Contractor shall perform all cleaning, painting, and other maintenance tasks, to include vehicle and equipment, off-base. Minor repairs (lid replacement, adjustments/alignments/replacement of hinges, winches, latches, slider doors, and minor metal repairs) shall be performed on site or in-place as the mission and/or site conditions allow. Trucks and trailers used for hauling and collecting shall be free of odor, dirt, debris, and pests. Contractor vehicles and equipment shall not have any waste or equipment leaks such as oil or hydraulic fluid. Should any contractor vehicles or equipment have any leaks, the contractor is responsible for cleanup.
1.4.1. Contractor Vehicles. Any collision damage shall be repaired within thirty (30) calendar days of the occurrence. Contractor shall comply with base traffic regulations. Government facilities or provided parking space shall not be used for overnight parking of privately owned vehicles, trailers, snowmobiles, all-terrain vehicles or other conveyances. Contractor shall adhere to requirements of 673 Air Base Wing Instruction (ABWI) 32-2001, USAG-AK regulation 420-12, section 19.3 regarding vehicles storage within government facilities. All vehicles shall be in operable condition and meet all local, state, and federal safety requirements. Contractor vehicles shall have the company name prominently displayed on both sides of the vehicle and be maintained to present a neat, professional appearance. Contractor vehicles shall be used solely for the intended purpose of performing services in this PWS during normal hours of operation.
1.5. REPORTS AND RECORDS. The Contractor shall provide a monthly report, by the fifth working day of the month, detailing the previous months total contract costs incurred, cumulative weight tickets for total tonnage of solid waste collected (JBER-E MSW, JBER-R MSW, JBER-E roll offs, JBER-R roll offs, etc), tipping fees, weights diverted by recyclable commodity, cost to divert by recyclable commodity, and commodity sales proceeds reimbursed in sufficient detail to support Defense Environmental Programs Management requirements. ALL RECYCLABLE SALES RECEIPTS must accompany the report. Format for these monthly reports shall be coordinated with the CO or COR.
2. SERVICE SUMMARY. The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) and the Contractor’s Quality Control Plan (QCP) provide information on contract requirements, the expected level of Contractor performance, and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial 30 days of the contract, two additional errors on each Performance Objective shall be allowed in an effort to identify normal phase-in problems.
| Performance Objective |
| PWS para. |
| Performance Threshold |
| Collect Municipal Solid Waste in accordance with the established schedule. |
| 1.1 |
| No more than 2 Customer Complaints monthly. |
| Dispose of Municipal Solid Waste in accordance with the established governing directives. |
| 1.3 |
| 0 Deficiencies permitted. |
| Maintain equipment in good workable condition. Trucks and solid waste containers washed and free of odors. |
| 1.4 |
| No more than 2 Customer Complaints monthly. |
| Perform unscheduled collections required by the contracting officer in accordance with paragraph 1.1. |
| 1.1.3.1 |
| 0 Deficiencies permitted. (Delivery order shall not be accepted until all deficiencies are corrected.) |
| Produce/maintain reports and records |
| 1.5 |
| 0 Deficiencies permitted. |
2.1. QUALITY CONTROL. The contractor shall develop and maintain a quality program to ensure integrated solid waste management is performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non- recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Service Summary.
2.2. QUALITY ASSURANCE. The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this PWS. The contractor shall provide work schedules to the COR in accordance with paragraph 4.3 of this PWS. The COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The COR will use the Contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the Contractor. The Contractor shall respond to the CDR IAW instructions provided and return it to the CO within 10 calendar days of receipt.
2.3 PERFORMANCE ASSESSMENT
2.3.1. Periodic Validations. This method requires the COR to employ a “spot check” style of evaluation based on the Contractor’s schedule. Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
2.3.2. Unsatisfactory Performance. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service within 24 hours after notification by the COR. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one month period shall result in a warning or letter of concern from the CO. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive months during a contract period shall constitute an immediate Progress Meeting with the Multi-functional Team. All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance.
2.4. PERIODIC PROGRESS MEETINGS
2.4.1. Meetings. The CO, Functional Commander, COR, QRP Manager and/or Solid Waste Manager, other government personnel as appropriate, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, required contract modification(s), unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.
2.4.2. Meeting Minutes. The minutes of these meetings will be reduced to writing, signed by the CO, and any other signatures as deemed appropriate, distributed to the functional area and the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
3.1 Government Furnished Facility. Government will provide refuse center located at Bldg. 6258 Gibson Ave for an approximate 3,000 square feet. No alterations to the refuse center shall be made without the specific written permission from the Functional Commander and the CO as coordinated and approved via the Civil Engineer work order. In case of alterations necessary for compliance with OSHA, such permission shall not be reasonably withheld. Contractor shall return the office space to the government in the same condition as received, fair, wear and tear and approved modifications. This facility is for vehicle and equipment storage only. Contractor shall not perform vehicle maintenance in this facility.
3.2 Government Equipment.
3.2.1 This Government Property listed in paragraph 3.2.5 is furnished to the Contractor in an “as- is, where is” condition. The Government makes no warranty regarding the suitability for use of the Government property specified in this contract.
3.2.2 The Government bears no responsibility for repair or replacement of any lost Government property. If any or all of the Government property is lost or becomes no longer usable, the Contractor shall be responsible for replacement of the property at Contractor expense. The Contractor shall have title to all replacement property and shall continue to be responsible for contract performance.
3.2.3. Upon notification from the Contracting Officer or COR, the Contractor shall remove unserviceable and scrap property resulting from contract performance from the Government locations and move to DRMO or other designated location at Contractor expense.
3.2.4 Contractor shall replace the dumpster/roll-off with a similar model and cubic yard area which is lost, or damaged or otherwise unserviceable. COR may request a change from standard dumpster to a bear resistant (BR) as circumstances warrant.
3.2.5 Government property provided:
COMPONENT DESCRIPTION
QTY
DISPOSITION
| Roll Off 31-36 Cubic Yard |
| 42 |
| Used |
| Roll Off 20 Cubic Yard |
| 7 |
| Used |
| Bear Can 8 Cubic Yard |
| 73 |
| Used |
| Bear Can 6 Cubic Yard |
| 103 |
| Used |
| Standard Can 8 Cubic Yard |
| 232 |
| Used |
| Standard Can 6 Cubic Yard |
| 210 |
| Used |
3.2.6 Equipment Inventory. Contractor shall perform a physical joint annual inventory noting the condition of all Government/Contractor equipment 60 days prior to the start of each option year period. Refuse containers shall be clearly numbered and inventoried to reflect equipment current location and condition at all times.
3.2.7 Government Equipment Phase-In/Phase-Out. See Appendix F.
3.3 Government Furnished Utilities. Government will furnish utility service and perform facility maintenance and repairs. Utilities provided by government at Building 6258 will be electric, water, and heat.
3.3.1 Utility Conservation. Contractor shall adhere to all base level utility conservation practices or requirements. Contractor shall be responsible for operating under conditions that prevent waste of utilities.
3.4 Security, Fire, and Medical Services. Government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available on a cost reimbursement basis.
3.5 Recycling Center/Material Recovery Facility. (Reserved)
4. GENERAL INFORMATION.
4.1. MISSION. The overall Civil Engineer mission at JBER is to plan, maintain, operate, and protect the infrastructure, facilities, and environment for assigned Airmen, families, and civilian employees.
4.2. HOURS OF OPERATION. Perform integrated solid waste management services during normal duty hours and be available (by phone, pager, cell phone, text message or fax) during the Government Program Office’s hours (6:30 a.m. to 4:30 p.m., Monday through Friday) and for after-hours response to refuse problems or emergencies. This excludes federal holidays, unless otherwise required in the contract or approved by the CO. There may be situations that require the Contractor to work at times other than normal duty hours. When the Contractor’s work schedule conflicts with an Air Force mission requirement, advise the CO and reschedule the work to minimize disruption.
4.3. HOLIDAYS & CLOSURES
4.3.1. Recognized Federal Holidays. There may be federal holidays when the Contractor is not required to perform service, except in emergency situations or to support specific mission needs. The holidays are:
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
If a holiday falls on a Saturday, the preceding Friday will be observed. If a holiday falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day after the holiday observance.
4.3.2. Other Base Closures. Work scheduled but not accomplished because of base closure due to exercises or real-world events will be accomplished as soon as possible after base reopening.
4.4. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY
The services under this contract are not essential for performance during crisis. The CO will determine circumstances which constitute a crisis based on direction from Security Forces and base leadership.
4.5. CONTRACTOR WORK SCHEDULE
4.5.1. Schedule Submission and Approval. The Contractor shall submit a schedule for all services described in this PWS and Appendices to the CO for approval at the post-award conference. The schedule shall include routes, pickup points, times, and days that pickups will occur. The Contractor shall not deviate from the approved schedule without prior approval from the CO or COR. Permanent changes to the schedule must be submitted 10 days before implementation and receive CO approval before the Government will allow the proposed changes. The schedule must be submitted electronically using a file format compatible with Government software.
4.5.2. Schedule Changes. Occurrence based (non-permanent) schedule changes due to customer requests or base exercises shall be submitted to the COR and do not require CO approval.
4.6. CONTRACT PERSONNEL
4.6.1. Contract Manager. The contractor shall establish and maintain an office through which the contract manager or alternate(s) can be contacted during work hours. The contract manager or alternate shall be available during normal duty hours to meet on the installation within 1 hour with the government personnel designated by the CO/COR to discuss problem areas. The contractor shall provide the CO/COR telephone number(s) where validation results and complaints can be reported. The contractor shall also provide to the CO/COR the names and phone numbers of contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract. Contract Manager and alternate must be able to read, write, speak, and understand the English language. (Speaking skill is not required where the contractor employee is hearing impaired.)
4.6.2. Personnel. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.
4.6.3. Employee Restrictions. The government is authorized to restrict employment under the contract of any contractor employee or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
4.7. CONTRACTOR MANPOWER REPORTING. The Contractor shall report all contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for “U.S. Air Force” via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the electronic Contractor Manpower Reporting Application (eCMRA) help desk.
4.8. SECURITY REQUIREMENTS.
Contractor employees shall comply with JBER security requirements imposed by the Installation Commander at all times while on JBER premises. The Contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services at JBER. The Contractor is responsible for accountability of all such media, which shall be surrendered to the Security Forces Squadron Pass and Registration Section upon completion or termination of the contract or upon termination of an individual’s employment for the Contractor. The Contractor shall comply with all JBER policies regarding entry to the installation, rules of the road, contingency operations compliance, and photography prohibitions. Contractor employees are authorized entry to the installation for the purpose of work under this contract only, and are not authorized in other facilities or areas without prior government authorization. Due to safety/security requirements, Contractor personnel shall be required to fluently speak, comprehend, read, and write English.
4.8.1. Base Access. The Contractor must be aware that entry requirements are subject to change due to installation and world situations. All employees may be subject to a background check through the FBI for base access.
4.8.2. Main Base Access. Current security access restrictions at Boniface Gate require all contractor vehicles to enter through the Post Road Gate only. Contractor vehicles may be subject to search prior to gaining base entry. The Contractor should plan and allow for delays as a result of increased and ever- changing security procedures.
4.8.3. Security Manager. Upon contract award, the Contractor shall designate, in writing to the CO, a Security Manager who shall be the Contractor’s point of contact for all security matters. Within 5 working days of contract award, the Contractor’s Security Manager shall contact the Civil Engineer Squadron (CES) Security Manager for assistance on accomplishing Contractor personnel security requirements.
4.8.3.1. Security Training. Contractor personnel are required to attend security and OPSEC orientation under Homeland Security Presidential Directive (HSPD) Title 12. The Contractor shall schedule initial and annual refresher training (for all assigned contractor personnel) through the CES Security Manager. All contractor personnel shall be thoroughly briefed by the CES Security Manager on established security requirements and procedures as stipulated in Air Force Policy Directive (AFPD 31-1, Integrated Defense).
4.8.3.2. Security Authority. The Contractor shall brief all employees that they shall immediately leave any area upon notification by the CO, COR, constituted authority, Security Forces, or when directed as occasional operational requirements, real world activities, or emergencies dictate.
4.8.4 Restricted/Controlled Areas. Contractor performance within restricted/controlled areas shall require Contractor compliance with various levels of security and established personnel security entry control procedures. The Contractor shall ensure all contractor employees performing services in secured areas are processed for a controlled area, limited access, or visitor badge by the Entry Controller of the restricted/controlled area.
4.8.4.1 Access Coordination. The facility manager/user/occupant/requester will be responsible for providing access, escorts, or temporary visitor access badges for contractor personnel while performing ISWM duties. The Contractor shall be responsible for scheduling access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of the restricted/controlled area.
4.8.4.2 Escorts. At all times while in restricted/controlled areas, contractor employees shall be under direct surveillance of a person from that facility who is cleared to wear a controlled area badge and perform escort duties. Visitor badges shall be returned to the Entry Controller each time the employee completes the duties and leaves the area. This requirement is waived for contractor personnel who have unescorted access privileges and display a controlled area badge for the restricted/controlled areas.
4.8.5 Employee Background Checks. All Contractor employees who do not have a current security investigation acceptable to the Security Forces, and who require a National Agency Check (NAC) for the performance of their duties, shall complete an Electronic Personnel Security Questionnaire (EPSQ), SF 85P, Questionnaire for Public Trust Positions, in three copies (original and two photocopies); and an AF Form 2583, Request for Personnel Security Action. For all employees requiring local area network (LAN) access (if applicable), the Contractor shall submit the following information: full name, date and place of birth, social security account number, affirmation of United States citizenship, and any current security investigation data. Information shall be in writing, on company letterhead, and submitted to Security Forces through the CES Security Manager.
4.8.5.1 Pre-approval Coordination. The CES Security Manager is the source for the necessary forms and will provide instructions for receiving, preparing, and processing these forms. The Contractor shall coordinate with all required facilities to process all necessary paperwork. After forms have been properly completed, the CES Security Manager will make an appointment for contractor employee(s) to go to the Security Forces for submittal of paperwork and fingerprinting. Appointments will be scheduled within two weeks of request.
4.8.5.2 Badge Issuance. A minimum of 180 days is required to process contractor employee NACs. Additional time will be required if the NAC is unfavorable and may result in denial of entry to restricted/controlled areas or denial of base LAN access. The CES Security Manager will notify the Contractor of any NAC results. After completion of a favorable NAC, each eligible employee shall report to the CES Security Manager for processing of AF Form 2586, Unescorted Entry Authorization Certificate. The CES Security Manager will schedule appointments for issuance of badges.
4.8.5.3 Access Revocation. The JBER Installation Commander reserves the right to deny restricted area entry to any contractor employee whose NAC is unfavorable, and the right to terminate the entry of any employee upon disclosure of information indicating the individual’s continued entry to a secure area is not in the best interest of national security.
4.8.5.4 Badge Validity. Controlled area badges will be valid only for the actual period of employment or the term of the contract, whichever occurs first. Contractor employees must display the controlled area badge on their outer garment above waist level, and must, upon request, surrender the badge to any DoD member for identification verification. Violations or deviations from established security procedures by contractor employees may result in confiscation of controlled area badges and denial of future entry to restricted areas.
4.8.5.5 Contract Personnel Requirements. The Contractor shall not employ persons for work on this contract who are identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
4.8.6 Contractor Vehicles. Contractor vehicles must be maintained in a safe and operational condition at all times while on JBER.
4.8.7 For Official Use Only (FOUO). The contractor shall comply with DoD 5400-7-R, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
4.8.8 Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security or well-being of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.
4.8.9 Physical Security. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
4.8.10 Key Control. The contractor shall establish and implement methods of making sure all keys/combinations issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall immediately report to the COR or CO any occurrences of lost or duplicated keys. In the event keys other than master keys are lost or duplicated, the contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system, and the total cost will be deducted from the monthly payment due the contractor.
4.9 SAFETY REQUIREMENTS AND REPORTS. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence. Contractor shall provide protective footwear and gloves to all workers for use at all times during performance of services if required.
4.10. SPECIAL QUALIFICATIONS. (Reserved)
4.11. CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE.
The Contracting Officer will appoint a primary and alternate representative for management of the day to day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contract award.
4.12. MULTI-FUNCTIONAL TEAM. The Senior Leadership may require a multi-functional team be established between the government and the contractor to ensure joint cooperation and a sound customer focus of all parties involved in the execution of this contract.
4.13. PARTNERING AGREEMENT. The CO may require a partnering agreement, or multi-functional team, between the Government and Contractor to facilitate joint cooperation and a sound partnership of all parties involved in the execution of this contract. Partnering is the creation of a Government-Contractor relationship that promotes achievement of mutually beneficial goals. It involves an agreement in principal to share the risk involved in completing the project and to establish and promote a nurturing partnership environment. Representatives from each organization are encouraged to participate in developing a partnering agreement. The partnering agreement that results may be formal or informal. If formal, it should be reduced to writing and signed by the parties involved.
4.14. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT, OR VEGETATION. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
4.15. Traffic Laws. Contractor and its employees shall comply with base traffic regulations and may be subject to search prior to authorization to proceed through gate.
4.16. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on JBER.
4.17. Cell Phone Usage. Driving or being in physical control of a motor vehicle on post while operating a cellular phone or like device is prohibited unless the vehicle is safely parked or unless the driver of the vehicle is using a hands-free device. The wearing of any other portable headphones, earphones or other listening devices (except for hands-free cellular phones) while operating a motor vehicle is prohibited. Civilians, contractors, and visitors to the installation who fail to comply with this policy are subject to administrative action to include loss of driving privileges on post and removal and/or denial of re-entry to the installation.
4.18. Flight Line Driving. Contractor shall contact Air Field Management Office (AFM) at 552- 2444/2366/2107 at Building 11369 to schedule Airfield Driving Training. Contractor shall ensure any personnel operating vehicles on the flight line are properly trained and possess a current AF Form 483. Airfield driving training is an annual requirement and gate access codes are provided upon completion of training. Gate codes are controlled and may not be shared with individuals that have not accomplished training. If codes are given to personnel without the training it will result in security violation. Flight line driver training will be provided by the government at no additional expense
4.19. Insurance. Contractor shall obtain the necessary insurance as required by FAR 52.228-5, Part 28.3. The minimum amounts of insurance will be maintained IAW FAR 28.307-2.
4.20. Follow On Contract. The Contractor shall coordinate phase-out of current contract with follow on Contractor. Coordination includes transfer of ownership of equipment, allowing the incoming Contractor to interview current employees, provided that work interruption time is reasonable, and also provide the new Contractor opportunities for familiarization. The Contractor shall also identify a point of contact to facilitate phase-out with the follow on Contractor. The Contractor should expect these coordination actions no later than 6 months prior to end of period of performance. During the Phase-Out period, the outgoing Contractor shall perform all requirements in the PWS.
5. APPENDICES.
A. Estimated Workload Data B. Technical Exhibit 1, JBER Inventory and Schedule Frequencies C. Maps and/or Site Plans D. Special Events E. Required Reports/Forms F. GFE Phase In/Phase Out
APPENDIX A
ESTIMATED WORKLOAD DATA
TABLE A1
ITEM/ CLIN REF
NAME
ANNUAL ESTIMATED QUANTITY
| X001 |
| Municipal Solid Waste |
| 6100 |
| Tons |
| X008 |
| Unscheduled Pickups |
| 30 |
| Each |
| X008 |
| Special Event Container Placements |
| 23 |
| Each |
| X013 |
| Additional Pickups |
| 50 |
| Each |
| X014 |
| Container Relocations |
| 10 |
| Each |
| X017 |
| Container Maintenance |
| 1 |
| Lot |
| X018 |
| Landfill Tipping Fees |
| 6100 |
| Tons |
ONE WAY
| Distance To Disposal / Incinerator Site |
| 12 |
| Miles |
Distance To Recyclable Processing Center
Miles
APPENDIX B
JBER Inventory and Schedule Frequencies (TE-1 – see attached)
APPENDIX C - MAPS AND/OR SITE PLANS
The maps and work area layouts JBER will be available by CD upon written request to this office:
673d Contracting Squadron/LGCB 10480 Sijan Ave
JBER, AK 99506-2570
APPENDIX D – SPECIAL EVENTS
The following are estimated number of special events anticipated. Contractor shall be provided details on collection station pickup and container-cleaning frequency for special events as required.
EVENT
FREQUENCY
# / SIZE CONTAINER REQUIRED
TIMEFRAME
| Military Exercises |
| 16x per year; |
one week period 1-bear can or 1-20 or 31 cubic yard roll off
Various
| Air Show/Open House |
| Every other year |
| 6-31 cubic yard roll offs |
| July |
| Arctic Warrior Day |
| 3 days per year |
| 1-20 cubic yard roll off |
| Bazaar Sale/Hangar 5 |
| 2 days per year |
| 1-20 cubic yard roll off |
| November |
| Rodeo Show |
| 2 days per year |
| 4-bear cans |
| Fall |
| Car Show Festival |
| 2 days per year |
| 4-bear cans |
| Summer |
| Military Appreciation Picnic |
| 1 day per year |
| 2-bear cans |
| May |
| Spring Clean-Up |
| 5 days per year |
| 3-31 cubic yard rolls |
| May |
APPENDIX E – REQUIRED REPORTS/FORMS
| REQUIRED |
| DUE DATE |
| REFERENCE |
| Tracking, Reports and Filing Documentation |
| 5th working day of each month |
| para 1.5 |
Contractor’s Quality Control Program (QCP). Contractor is responsible for implementing and managing a QCP that identifies deficiencies and provides corrective actions throughout the life of the contract.
30 days upon contract award para 2 & 2.1
| Equipment Inventory |
| 60 day prior to Option Year |
| 3.2.6 |
| GFE Phase-In/Phase-Out Plan |
| April of Base Year |
| para 3.2.7/App F |
| Schedules |
| Pre-performance Conference |
| 4.5 |
| Safety Accident & Damage Report |
| When applicable |
| para 4.9 |
| Insurance |
| Award and annually |
| para 4.19 |
APPENDIX F – GFE PHASE-IN/PHASE-OUT
| Contract Year |
| GFE OUT |
| Contractor Provide |
Base year
Contractor shall provide in kind replacement for any receptacle that becomes unserviceable.
| Option Year 1 |
| 120 receptacles |
| Contractor shall provide at least 120 receptacles to replace the GFE identified for turn-in. |
| Option Year 2 |
| 120 receptacles |
| Contractor shall provide at least 120 receptacles to replace the GFE identified for turn-in. |
| Option Year 3 |
| 120 receptacles |
| Contractor shall provide at least 120 receptacles to replace the GFE identified for turn-in. |
| Option Year 4 |
| 120 receptacles |
| Contractor shall provide at least 120 receptacles to replace the GFE identified for turn-in. |
| Option Year 5 |
| 120 receptacles |
| Contractor shall provide at least 120 receptacles to replace the GFE identified for turn-in. |
| Option Year 6 |
| 0 (All GFE receptacles should be turned in by this time. All receptacles shall be Contractor provided.) |
| All receptacles needed in the performance of this contract shall be Contractor provided at this time. |
| Option Year 7 |
| 0 (All GFE receptacles should be turned in by this time. All receptacles shall be Contractor provided.) |
| All receptacles needed in the performance of this contract shall be Contractor provided at this time. |
(Note: The Contractor can provide more than the 120 receptacles per year therefore expediting the timeline. The table above outlines the minimum which needs to occur over the 5 year phase-out. Any deviations from the above plan shall be dis/approved by the CO.)
F.1. During the Base Year of this contract the Government will provide all existing GFE with the expectation that the Contractor shall provide an appropriate replacement receptacle should a Government receptacle become unserviceable. All Contractor provided receptacles shall match the receptacle they are replacing in size and type (i.e. bear resistant container, roll-off, etc.) unless otherwise approved by the CO or COR.
F.2. Contractor shall provide a plan outlining the phase-in/phase-out of GFE to the COR by April of the Base Year. Contractor’s plan shall communicate status of all orders/shipping/delivery information, logistics of the deployment, and other details ensuring continuance of operations.
F.3. Starting in Option Year 1 through Option Year 5, 120 receptacles will be identified for turn-in to Defense Logistics Agency during the joint inventory as outlined in para 3.2.6. As Contractor provided receptacles arrive, the COR will identify a laydown/staging area to be used in the changeover from GFE to Contractor provided equipment.
F.4. By start of Option Year 6, all receptacles used in the execution of this contract shall be Contractor provided and maintained to a suitable standard as outlined in the PWS (1.1.8, 1.1.9, 1.4).
File details come from the government source that posted it. Updated .